Letter Sequence Draft Other |
---|
|
Results
Other: ML20055D883, ML20055E009, ML20057E559, ML20057E560, ML20087G852, ML20087H514, ML20184A247, ML20184A248, ML20240A318, ML20240A322, ML20254A128, ML20254A272, ML20268A322, ML20268B437, ML20268C197, ML20274A136, ML20279A331, ML20297A306, ML20300A556, ML20301A632, ML20302A234, ML20302A235, ML20303A011, ML20303A016, ML20307A010, ML20307A019, ML20321A279, ML20322A350, ML20323A018, ML20325A031, ML20328A162, ML20329A432, ML20329A442, ML20350B716, ML20350B723, ML20350B739, ML20350B785, ML21012A270, ML21025A073, ML21025A143, ML21025A403, ML21025A405, ML21025A414, ML21040A471, ML21040A483, ML21043A207, ML21050A084, ML21050A119, ML21050A227, ML21056A220... further results
|
MONTHYEARML20055E0202019-04-22022 April 2019 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20260H1522019-10-14014 October 2019 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML20260H1512019-10-14014 October 2019 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) Project stage: Draft Other ML20260H1502019-10-14014 October 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML20055E0132019-10-15015 October 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML20055E0172019-10-28028 October 2019 Nile Mile Point Unit 2 - Draft Written Examination (Folder 2) Project stage: Draft Other ML20055E0152019-10-28028 October 2019 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML20055E0122019-10-28028 October 2019 NRC Comments on Draft Licensee-Developed Operating Test Project stage: Draft Other ML20055E0092020-01-15015 January 2020 Final Q/A Related Form - Form ES-401-6 (Folder 1) Project stage: Other ML20055D8832020-01-15015 January 2020 Final Qa/Related Forms (Folder 1) Project stage: Other ML20260H1542020-01-24024 January 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20260H1532020-01-24024 January 2020 Draft Written Examination (Folder 2) Project stage: Draft Other ML21025A4142020-02-0707 February 2020 Original Questions for Modified Questions Project stage: Other ML21025A1432020-02-0707 February 2020 ES-401-6 (Folder 1) Project stage: Other ML21025A0732020-02-0707 February 2020 Final QA Related Forms (Folder 1) Project stage: Other ML20279A3312020-02-0707 February 2020 Handouts to Applicants (Folder 3) Project stage: Other ML20274A1362020-02-0707 February 2020 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML20274A1052020-02-0707 February 2020 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML20274A0922020-02-0707 February 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML20274A0832020-02-0707 February 2020 Draft Written Examination (Folder 2) Project stage: Draft Other ML20274A0662020-02-0707 February 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20057E5602020-02-0707 February 2020 Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other ML20057E5592020-02-0707 February 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) Project stage: Other ML21056A3062020-02-10010 February 2020 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML21056A2852020-02-15015 February 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) Project stage: Other ML21056A2842020-02-15015 February 2020 Final Qa/Related Forms (Folder 1) Project stage: Other ML21056A3072020-03-12012 March 2020 Handouts to Applicants (Folder 3) Project stage: Other ML20087H5142020-03-27027 March 2020 Ja Fitzpatrick Final Written Exam Questions and Answer Key Project stage: Other ML20087G8522020-03-27027 March 2020 Ja Fitzpatrick - Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other ML20267A1582020-06-0303 June 2020 Draft Written Examination (Folder 2) Project stage: Draft Other ML20267A3922020-06-0909 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML21056A2232020-06-30030 June 2020 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML21056A2212020-06-30030 June 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) Project stage: Other ML21056A2202020-06-30030 June 2020 Final Qa/Related Forms (Folder 1) Project stage: Other ML20260H1672020-06-30030 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20260H1662020-06-30030 June 2020 Draft Written Examination (Folder 2), Test Answer Key Project stage: Draft Other ML20260H1652020-06-30030 June 2020 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML20260H1642020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) Project stage: Draft Other ML20260H1632020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML20184A2482020-06-30030 June 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) Project stage: Other ML20184A2472020-06-30030 June 2020 Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other ML20303A0122020-07-0202 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20329A3542020-07-22022 July 2020 Licensee 75-Day Letter Transmitting the Draft Written Exam and Operating Test Material (Folder 2) Project stage: Draft Other ML20329A2392020-07-22022 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20329A2232020-07-22022 July 2020 Draft Written Examination (Folder 2) Project stage: Draft Other ML20303A0142020-08-0707 August 2020 Draft Written Examination (Folder 2) Project stage: Draft Other ML20268B4372020-08-10010 August 2020 Handouts to Applicants (Folder 3) Project stage: Other ML22103A2232020-08-26026 August 2020 Revised Draft Written Examination and Operating Test Outlines (2022 Regional Audit Corrective Action) (Folder 2) Project stage: Draft Other 2020-03-12
[Table View] |
Similar Documents at Ginna |
---|
Category:Letter
MONTHYEARIR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of B Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23135A0412023-05-15015 May 2023 2022 Annual Radioactive Effluent Release Report and 2022 Annual Radiological Environmental Operating Report ML23121A0482023-05-0101 May 2023 R. E. Ginna Nuclear Power Plant Core Operating Limits Report Cycle 44, Revision 0 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000244/20230012023-04-26026 April 2023 LLC - Integrated Inspection Report 05000244/2023001 ML23100A0302023-04-10010 April 2023 2023 10 CFR 50.46 Annual Report ML23114A1152023-03-29029 March 2023 Electronic Reporting of Exposure Data for 2022 RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23075A0872023-03-15015 March 2023 R. E. Ginna Nuclear Power Plant - Project Manager Assignment ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000244/20220062023-03-0101 March 2023 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006) ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML23060A1622023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant, Supplemental Information - Proposed Alternatives Related to the Steam Generators RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 ML23005A1762023-02-23023 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 153 Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes ML23005A1222023-02-22022 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No 152 Adopt TSTF-315-Revise Technical Specification 3.1.8, Physics Tests Exceptions - Mode 2 RS-23-040, Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators2023-02-21021 February 2023 Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators ML22287A0692023-02-0808 February 2023 R. E. Ginna Station - Forward Fit Analysis (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23031A2992023-02-0707 February 2023 R. E. Ginna Nuclear Power Plant - Withdrawal of an Amendment Request ML23010A0112023-02-0101 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Inservice Testing of Refueling Water Storage Tank Outlet Value RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000244/20223012023-01-20020 January 2023 Initial Operator Licensing Examination Report 05000244/2022301 IR 05000244/20220122023-01-12012 January 2023 LLC - Design Basis Assurance Inspection (Teams) Inspection Report 05000244/2022012 ML22362A0382022-12-28028 December 2022 R. E. Ginna Nuclear Power Plant - Letter to Withdraw Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML22348A2062022-12-14014 December 2022 Re. Ginna Nuclear Power Plant - Annual Commitment Change Notification RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator2022-12-0707 December 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator 2024-02-05
[Table view] Category:License-Operator
MONTHYEARRS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23247A0092022-09-28028 September 2022 Final QA Related Forms RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20329A4322020-11-17017 November 2020 Final Qa/Related Forms (Folder 1) ML20329A4422020-09-17017 September 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20329A1812020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Operating Test Outlines (Folder 2) ML20329A1412020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20322A3502020-09-17017 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20321A2792020-09-17017 September 2020 Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML20328A1622020-09-17017 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20328A2792020-09-17017 September 2020 Handouts to Applicants (Folder 3) ML20328A2912020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20329A2002020-08-26026 August 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML22103A2232020-08-26026 August 2020 Revised Draft Written Examination and Operating Test Outlines (2022 Regional Audit Corrective Action) (Folder 2) ML20329A2392020-07-22022 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20329A2232020-07-22022 July 2020 Draft Written Examination (Folder 2) ML20329A3542020-07-22022 July 2020 Licensee 75-Day Letter Transmitting the Draft Written Exam and Operating Test Material (Folder 2) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323D1722019-11-18018 November 2019 R. E. Ginna Nuclear Power Plant - Senior Reactor and Reactor Operator Initial License Examinations ML21041A2942019-10-0303 October 2019 Original Questions for Modified Written Exam Questions RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19045A3702019-02-12012 February 2019 March 2019 GFE Cover Letter Ri ML18353A6082018-12-18018 December 2018 Senior Reactor Operator Retake License Examinations ML18344A5852018-12-10010 December 2018 R. E. Ginna - Reactor Operator Retake License Examinations ML19119A1472018-10-30030 October 2018 Final Qa/Related Forms (Folder 1) ML19156A1482018-08-27027 August 2018 Final Qa/Related Form - ES-201-1 (Folder 1) ML18233A5092018-08-21021 August 2018 Operator Licensing Operating Test Approval RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17272A3242017-09-28028 September 2017 R. E. Ginna - Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17114A2862017-04-21021 April 2017 Miscellaneous Exam Material (Folder 1) ML17114A2172017-04-21021 April 2017 Final Qa/Related Forms (Folder 1) ML17114A3172017-04-21021 April 2017 Handouts to Applicants (Folder 3) ML17123A1722017-04-14014 April 2017 Post Exam Comments Resolution References (Folder 1) ML17114A3752017-03-0909 March 2017 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML17114A1562017-03-0909 March 2017 Final Qa/Related Forms - ES-401 (Folder 1) ML17114A3812017-03-0909 March 2017 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML17066A2272017-03-0707 March 2017 Initial Operator Licensing Operating Test Approval: R. E. Ginna Nuclear Power Plant ML17104A2162017-03-0707 March 2017 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML17104A2012017-03-0303 March 2017 Final Operating Test (Sections a, B, and C) (Folder 3) ML17114A4232017-01-19019 January 2017 Draft Written Exam (Folder 2) ML17114A4372017-01-19019 January 2017 Draft Operating Exam (Section a, Section B, Section C) (Folder 2) ML17114A3522017-01-19019 January 2017 Final Outlines (Folder 3) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17114A4112016-12-0909 December 2016 Draft - Outlines (Folder 2), (Facility Letter. Dtd ML16286A4132016-10-11011 October 2016 Senior Reactor and Reactor Operator Initial License Examinations - )R.E. Ginna Nuclear Power Plant) ML15156A5522015-01-21021 January 2015 Final Qa/Related Forms (Folder 1) ML15043A6812014-12-16016 December 2014 Final Operating Exam (Sections a, B, and C) (Folder 3) 2023-06-16
[Table view] Category:Part 55 Examination Related Material
MONTHYEARRS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23247A0092022-09-28028 September 2022 Final QA Related Forms RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20329A4322020-11-17017 November 2020 Final Qa/Related Forms (Folder 1) ML20329A4422020-09-17017 September 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20329A1812020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Operating Test Outlines (Folder 2) ML20329A1412020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20328A2792020-09-17017 September 2020 Handouts to Applicants (Folder 3) ML20321A2792020-09-17017 September 2020 Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML20322A3502020-09-17017 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20328A1622020-09-17017 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20328A2912020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML22103A2232020-08-26026 August 2020 Revised Draft Written Examination and Operating Test Outlines (2022 Regional Audit Corrective Action) (Folder 2) ML20329A2002020-08-26026 August 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20329A2392020-07-22022 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20329A2232020-07-22022 July 2020 Draft Written Examination (Folder 2) ML20329A3542020-07-22022 July 2020 Licensee 75-Day Letter Transmitting the Draft Written Exam and Operating Test Material (Folder 2) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323D1722019-11-18018 November 2019 R. E. Ginna Nuclear Power Plant - Senior Reactor and Reactor Operator Initial License Examinations ML21041A2942019-10-0303 October 2019 Original Questions for Modified Written Exam Questions RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18353A6082018-12-18018 December 2018 Senior Reactor Operator Retake License Examinations ML18344A5852018-12-10010 December 2018 R. E. Ginna - Reactor Operator Retake License Examinations ML19119A1472018-10-30030 October 2018 Final Qa/Related Forms (Folder 1) ML19156A1482018-08-27027 August 2018 Final Qa/Related Form - ES-201-1 (Folder 1) ML18233A5092018-08-21021 August 2018 Operator Licensing Operating Test Approval RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17272A3242017-09-28028 September 2017 R. E. Ginna - Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17114A2862017-04-21021 April 2017 Miscellaneous Exam Material (Folder 1) ML17114A2172017-04-21021 April 2017 Final Qa/Related Forms (Folder 1) ML17114A3172017-04-21021 April 2017 Handouts to Applicants (Folder 3) ML17123A1722017-04-14014 April 2017 Post Exam Comments Resolution References (Folder 1) ML17114A3752017-03-0909 March 2017 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML17114A1562017-03-0909 March 2017 Final Qa/Related Forms - ES-401 (Folder 1) ML17114A3812017-03-0909 March 2017 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML17104A2162017-03-0707 March 2017 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML17066A2272017-03-0707 March 2017 Initial Operator Licensing Operating Test Approval: R. E. Ginna Nuclear Power Plant ML17104A2012017-03-0303 March 2017 Final Operating Test (Sections a, B, and C) (Folder 3) ML17114A4232017-01-19019 January 2017 Draft Written Exam (Folder 2) ML17114A4372017-01-19019 January 2017 Draft Operating Exam (Section a, Section B, Section C) (Folder 2) ML17114A3522017-01-19019 January 2017 Final Outlines (Folder 3) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17114A4112016-12-0909 December 2016 Draft - Outlines (Folder 2), (Facility Letter. Dtd ML16286A4132016-10-11011 October 2016 Senior Reactor and Reactor Operator Initial License Examinations - )R.E. Ginna Nuclear Power Plant) ML15156A5522015-01-21021 January 2015 Final Qa/Related Forms (Folder 1) ML15043A6792014-12-16016 December 2014 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML15043A6802014-12-16016 December 2014 Handouts to Applicants (Folder 3) 2023-06-16
[Table view] |
Text
TheAttachmentstothis letter contain NRCExamination Material which should be withheld from public disclosure for 2 years following theExamination per10CFR 2.390, 55.49,andNUREG-1021,Uponseparation, thiscover letter isdecontrolled.
g PaulM.Swift i -
3157915200Omee www exeloncorp com paul a exeloncorp swift com July22,2020 David Lew Chief Examiner,Region I U.S. NuclearRegulatoryCommission 2100Renaissance Boulevard Renaissance Park King ofPrussia,PA19406-2713 R.E.Ginna Nuclear PowerPlant Renewed FacilityOperating License No.DPR-18 NRCDocket No.50-244
Subject:
SubmittalofIntegrated Initial LicenseExamination Materials
Dear Mr.Lew:
Enclosed arethe examinationmaterials, which R.E. Ginna issubmitting insupport ofthe license initial examination scheduled forthe weekofOctober 05,2020, at Ginna Station.
ThissubmittalincludestheSenior Reactor Operator andReactor OperatorWritten Examinations,JobPerformance Measures, andIntegrated Plant Operation Scenario Guides. Pleaseforward attachments ALL to Joseph DeMarshall, Chief Examiner.
These examinationmaterialshave been developed inaccordance with NUREG-1021, "Operator LicensingExamination Standards forPower Reactors", Revision 11 Pleasenote thatreferencematerialsare attached to each i ndividualexamination question oritem.
Someminor modifications have been madetotheIntegrated Examination Outline with regards totheoperationalscenarios inorder toimprove balance andcontent. These changes improveexamination quality andareincompliance with NUREG-1021, "Operator Licensing ExaminationStandards forPower R eactors", Revision 11 Somemodifications oradjustments tothe examination material mayberequired dueto procedural changes.
Inaccordance with NUREG-1021, Revision 11,Section ES-201, "Initial Operator Licensing Examination Process",please ensure thatthese materialsare withheld from public disclosurefor2years aftertheexaminations are complete.
SRRS: this Retain 3D.100; document all untilregulatory associated actions withtheexamarecomplete, atwhich time maybediscarded.
it
TheAttachmentstothis contain letter NRCExamination Materialwhich should be withheid from publicdisclosure for 2 years following theExamination per10CFR 2.390, 55.49, andNUREG-1021,, Uponseparation, this coverletterisdecontrolled.
Should youhave anyquestions concerningthis please letter, George contact Wrobel, Manager SiteRegulatory Assurance, at(585)315-0552. Forquestions concerning examination materials, please contact ExamAuthor, Regulatory DavidEckert, at315-791-5523.
Respectfully, PaulSwift Site Vice President SRRS:
3D.100;Retainthis document until all actions regulatory the with associated examare atwhich complete, time maybediscarded.
it
TheAttachmentstothis letter contain NRCExamination Material which should be withheld from public disclosure for 2 years following theExamination per10CFR 2.390, 55.49, andNUREG-1021. Uponseparation, this cover letter isdecontrolled.
Enclosures:
- Form ES-301-1, Administrative Topics Outlinefor RO
- Form ES-301-1, Administrative Topics Outlinefor SRO a FormES-301-2, ControlRoom/In-PlantSystems Outline for RO
- FormES-301-2, Control Room/In-Plant Systems Outline for SRO(I)
- FormES-301-2, Control Room/In-Plant Systems Outline for SRO(U)
- FormES-401-2, PWR Examination Outline (RO andSRO) (Provided byNRC) a FormES-401-3, Generic Knowledge andAbilities Outline (Tier 3)(Provided by NRC) a FormES-401-5, RO/SRO Composite Examination,with references attached
- FormES-C-1, Control Room Systems andFacility Walk-Through JobPerformance Measures, with references attached a FormES-C-1, Administrative Topic Job Performance Measures, withreferences attached
= FormES-D-1, Scenario Outline, Scenario #1 a FormES-D-2, Integrated Plant Operation Scenario Guide, Scenario #1
- FormES-D-1, Scenario Outline, Scenario#2
- FormES-D-2, Integrated Plant Operation Scenario Guide, Scenario #2
- FormES-D-1, Scenario Outline, Scenario #3 FormES-D-2, Integrated Plant Operation Scenario Guide, Scenario #3
- FormES-D-1, Scenario Outline, Scenario #4
- FormES-D-2, integrated Plant Operation Scenario Guide, Scenario #4
- Form ES-D-1, Scenario Scenario Outline, #5
- FormES-D-2, Integrated Plant Operation Scenario Guide, Scenario #5 a Completed Checklists:
e Form ES-201-3, Examination Security Agreements a Form ES-301-3, Operating Test Q ualityChecklist e Form ES-301-4, Simulator Scenario Quality Checklist
- Form ES-301-6, Competencies Checklist a Form ES-401-4, Record ofRejected K/As (Provided byNRC) e FormES-401-6, Written Examination Quality Checklist cc: (withoutattachments unless indicated)
ChiefExaminer, Region 1 Mr.Joseph DeMarshall (with allattachments)
Branch Chief, Operator Licensing, Region 1 Mr.
Donald Jackson Ginna Station Project Manager, NRR Mr.
V.Sreenivas NRCSenior Resident Inspector -
Ginna Station -
Mr.Jason Schussler (E-mail)
SRRS:
3D.100;Retainthis document until regulatory all actions associated theexamare with complete,atwhichtimemaybediscarded.
it
TheAttachmentstothis lettercontain NRCExamination Materialwhich should be withheld from public disclosure for2 years followingtheExamination per10CFR 2.390, 55.49, andNUREG-1021. Uponseparation, thiscover letter isdecontrolled.
Bcc: (Electronic Copy, without attachments, unlessotherwisespecified)
Site Vice PresidentGinna-Station P.Swift Mr.
Manager, Site Regulatory Assurance -
GinnaStation-Mr.G.Wrobel Vice President -
Licensing andRegulatory (acting)
Affairs -
Mr.G.Kaegi Director, Licensing -
Mrs.S.Rafferty-Czincila ExelonDocument Control DeskLicensing (HardCopy)
Exelon Document ControlDesk Licensing HumanResources -
GinnaStation -
Mr.S.Moore Training Manager -
Ginna Station-Mr.S.Minya SRRS: Retain 3D.100; this document until all associated actions regulatory with examarecomplete, the time atwhich maybediscarded.
it