Letter Sequence Draft Other |
|---|
|
Results
Other: ML18074A052, ML18074A053, ML18074A054, ML18074A055, ML18134A128, ML18134A137, ML18149A494, ML18323A272, ML18323A273, ML18323A274, ML19038A054, ML19038A101, ML19038A126, ML19045A271, ML19045A343, ML19045A424, ML19065A224, ML19065A230, ML19066A204, ML19066A214, ML19092A047, ML19217A267, ML19217A268, ML19217A269, ML19217A272, ML19217A273, ML19217A274, ML19298B558, ML19298B559, ML19302E287, ML19302F311, ML19302F437, ML19302F487, ML19330E279, ML19330E366, ML20020A001, ML20020A002, ML20022A259, ML20022A260, ML20022A261, ML20022A262, ML20055D883, ML20055E009, ML20057E559, ML20057E560, ML20087G852, ML20087H514, ML20184A247, ML20184A248, ML20240A318... further results
|
MONTHYEARML18135A3332017-12-11011 December 2017 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML18323A2722018-01-29029 January 2018 Final Operating Test (Parts a, B and C) (Folder 3) Project stage: Other ML18323A2742018-01-29029 January 2018 Post Exam Comments and Resolution, and Technical References Project stage: Other ML18323A2732018-01-31031 January 2018 Final Written Examination with Answer Key (401-5 Format)(Folder 3) Project stage: Other ML18134A1282018-03-0909 March 2018 Final Qa/Related Forms (Forms 1) Project stage: Other ML18074A0522018-03-0909 March 2018 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML18074A0552018-03-0909 March 2018 Final Operating Test (Section a, B, and C) (Folder 3) Project stage: Other ML18074A0532018-03-0909 March 2018 Final Written Examination with Answer Key (401-5 Format) (Folder 3) Project stage: Other ML18074A0542018-03-0909 March 2018 Handouts to Applicants (Folder 3) Project stage: Other ML18149A4942018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 RO (Folder 1) Project stage: Other ML18134A1372018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 SRO (Folder 1) Project stage: Other ML18135A2252018-03-20020 March 2018 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML19050A3742018-04-25025 April 2018 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML18135A3012018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) Project stage: Draft Other ML18135A2162018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML18135A2482018-05-21021 May 2018 Draft Written Examination (Folder 2) Project stage: Draft Other ML19217A2712019-02-0101 February 2019 TMI - Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML19038A1262019-02-0707 February 2019 Post Exam Comments and Technical References (Folder 1) Project stage: Other ML19038A0542019-02-0707 February 2019 Final Operating Test (Sections a, B, and C)(Folder 3) Project stage: Other ML19038A1012019-02-0707 February 2019 Final Written Examination with Answer Key (401-5 Format)(Folder 3) Project stage: Other ML19044A5862019-02-13013 February 2019 Draft Written Examination (Folder 2) Project stage: Draft Other ML19044A6062019-02-13013 February 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML19045A4162019-02-14014 February 2019 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML19045A4242019-02-14014 February 2019 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML19045A3432019-02-14014 February 2019 Final QA Related Forms (Folder 1) Project stage: Other ML19045A2712019-02-14014 February 2019 Handouts to Applicants (Folder 3) Project stage: Other ML19050A3652019-02-19019 February 2019 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML19065A2302019-03-0606 March 2019 Final Qa/Related Forms (Folder 1) Project stage: Other ML19065A2242019-03-0606 March 2019 Post Exam Comments Resolution References (Folder 1) Project stage: Other ML19065A0662019-03-0606 March 2019 Draft Written Examination (Folder 2) Project stage: Draft Other ML19065A0772019-03-0606 March 2019 Draft Operating Test (Section a, Section B, Section C)(Folder 2) Project stage: Draft Other ML19066A2142019-03-0707 March 2019 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML19066A2042019-03-0707 March 2019 Final QA Related Form - Form ES-401-6 (Folder 1) Project stage: Other ML19092A0472019-04-0202 April 2019 Handouts to Applicants (Folder 3) Project stage: Other ML20055E0202019-04-22022 April 2019 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML19217A2722019-07-0202 July 2019 TMI - Final Written Examination with Answer Key (401-5 Format) (Folder 3) Project stage: Other ML19217A2692019-07-15015 July 2019 TMI - Post Exam Comments and NRC Resolution (Folder 1) Project stage: Other ML19330E3662019-07-17017 July 2019 Final Qa/Related Form - Form ES-401-6 (Folder 1) Project stage: Other ML19302F6342019-07-23023 July 2019 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML19302F5982019-07-23023 July 2019 Draft Written Examination (Folder 2) Project stage: Draft Other ML19217A2732019-07-26026 July 2019 TMI - Handouts to Applicants (Folder 3) Project stage: Other ML19217A2742019-07-26026 July 2019 TMI - Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other ML19217A2672019-07-26026 July 2019 TMI - Final Qa/Related Forms (Folder 1) Project stage: Other ML19217A2682019-07-26026 July 2019 TMI - Final Qa/Related Form - Form ES-401-6 (Folder 1) Project stage: Other ML19298B5582019-08-26026 August 2019 Final Written Examination with Answer Key (401-5 Format) (Folder 3) Project stage: Other ML19298B5592019-08-26026 August 2019 Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other ML19302F4872019-09-13013 September 2019 Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other ML19302E2872019-09-13013 September 2019 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML19302F3112019-09-13013 September 2019 Final Written Examination with Answer Key (401-5 Format) (Folder 3) Project stage: Other ML19302F4372019-09-27027 September 2019 Handouts to Applicants (Folder 3) Project stage: Other 2019-02-07
[Table View] |
Similar Documents at Ginna |
|---|
|
Text
TheAttachmentstothis letter contain NRCExamination Material whichshould be withheld frompublic disclosure for2years following theExamination per10CFR 2.390, 55.49, andNUREG-1021,Uponseparation, this cover letter isdecontrolled.
g PaulM.Swift i
3157915200Omee wwwexeloncorp com paul swift aexeloncorp com July 22,2020 DavidLew Chief
- Examiner, Region I
U.S.Nuclear Regulatory Commission 2100Renaissance Boulevard Renaissance Park KingofPrussia, PA19406-2713 R.E.GinnaNuclear PowerPlant RenewedFacility Operating License No.DPR-18 NRCDocket No.50-244
Subject:
Submittal ofIntegrated Initial LicenseExamination Materials
DearMr.Lew:
Enclosed aretheexamination materials, whichR.E.Ginna issubmitting insupport ofthe initial license examination scheduled fortheweekofOctober 05,2020, at Ginna Station.
Thissubmittal includes theSenior Reactor Operator andReactor OperatorWritten Examinations, JobPerformance
- Measures, andIntegrated Plant Operation Scenario Guides.
Please forward ALLattachments toJoseph DeMarshall, Chief Examiner.
Theseexamination materials havebeendeveloped inaccordance with NUREG-1021, "Operator Licensing Examination Standards forPowerReactors",
Revision 11 Pleasenote that reference materials areattached toeachindividual examination question oritem.
Someminor modifications havebeenmadetotheIntegrated Examination Outline with regards totheoperational scenarios inorder toimprove balance andcontent.
These changes improve examination quality andareincompliance withNUREG-1021, "Operator Licensing Examination Standards forPowerReactors",
Revision 11 Somemodifications oradjustments totheexamination material mayberequired dueto procedural changes.
Inaccordance withNUREG-1021, Revision 11,Section ES-201, "Initial Operator Licensing Examination Process",
please ensure that these materials arewithheld frompublic disclosure for2years after theexaminations arecomplete.
SRRS:3D.100; Retain this document until all regulatory actions associated with theexamarecomplete, atwhichtimeitmaybediscarded.
TheAttachmentstothis letter contain NRCExamination Material whichshould be withheid frompublic disclosure for2yearsfollowing theExamination per10CFR 2.390, 55.49, andNUREG-1021,,Uponseparation, this cover letter isdecontrolled.
Should youhaveanyquestions concerning this
- letter, please contact George
- Wrobel, Manager SiteRegulatory Assurance, at(585) 315-0552.
Forquestions concerning examination materials, please contact Regulatory ExamAuthor, David
- Eckert, at315-791-5523.
Respectfully, PaulSwift Site VicePresident SRRS:3D.100; Retain this document until allregulatory actions associated with theexamarecomplete, atwhich timeitmaybediscarded.
TheAttachmentstothisletter contain NRCExamination Material whichshould be withheld frompublic disclosure for2years following theExamination per10CFR 2.390, 55.49, andNUREG-1021.
Uponseparation, thiscoverletter isdecontrolled.
Enclosures:
Form ES-301-1, Administrative Topics Outline forRO Form ES-301-1, Administrative Topics Outline forSRO a
Form ES-301-2, ControlRoom/In-PlantSystems Outline forRO FormES-301-2, Control Room/In-Plant Systems Outline forSRO(I)
FormES-301-2, Control Room/In-Plant Systems Outline forSRO(U)
FormES-401-2, PWR Examination Outline (ROandSRO)(Provided byNRC) a FormES-401-3, Generic Knowledge andAbilities Outline (Tier 3)(Provided by NRC) a FormES-401-5, RO/SRO Composite Examination,withreferences attached FormES-C-1, Control Room Systems andFacility Walk-Through JobPerformance
- Measures, with references attached a
FormES-C-1, Administrative Topic Job Performance
- Measures, withreferences attached
=
FormES-D-1, Scenario
- Outline, Scenario
- 1 a
FormES-D-2, Integrated Plant Operation Scenario
- Guide, Scenario
- 1 FormES-D-1, Scenario
- Outline, Scenario#2 FormES-D-2, Integrated Plant Operation Scenario Guide, Scenario
- 2 FormES-D-1, Scenario
- Outline, Scenario
- 3 FormES-D-2, Integrated Plant Operation Scenario Guide, Scenario #3 FormES-D-1, Scenario
- Outline, Scenario
- 4 FormES-D-2, integrated Plant Operation Scenario
- Guide, Scenario
- 4 FormES-D-1, Scenario
- Outline, Scenario
- 5 FormES-D-2, Integrated Plant Operation Scenario
- Guide, Scenario
- 5 a
Completed Checklists:
e FormES-201-3, Examination Security Agreements a
FormES-301-3, Operating TestQuality Checklist e
FormES-301-4, Simulator Scenario Quality Checklist FormES-301-5, Transient andEventChecklist FormES-301-6, Competencies Checklist a
FormES-401-4, Record ofRejected K/As(Provided byNRC) e FormES-401-6, Written Examination Quality Checklist cc: (without attachments unless indicated)
Chief
- Examiner, Region 1
- Mr.JosephDeMarshall (with allattachments)
Branch
- Chief, Operator Licensing, Region 1
- Mr.Donald Jackson GinnaStation Project
- Manager, NRR
- Mr.V.Sreenivas NRCSenior Resident Inspector
- GinnaStation
- Mr.JasonSchussler (E-mail)
SRRS:3D.100; Retain this document until allregulatory actions associated withtheexamarecomplete, atwhich timeitmaybediscarded.
TheAttachmentstothis letter contain NRCExamination Material whichshould be withheld frompublic disclosure for2years following theExamination per10CFR 2.390, 55.49, andNUREG-1021.
Uponseparation, this cover letter isdecontrolled.
Bcc:
(Electronic Copy, without attachments, unless otherwise specified)
Site VicePresident
- GinnaStation
- Mr.P.Swift
- Manager, Site Regulatory Assurance
- Ginna Station
- Mr.G.Wrobel Vice President
- Licensing andRegulatory Affairs (acting)
- Mr.G.Kaegi
- Director, Licensing
- Mrs.S.Rafferty-Czincila ExelonDocument Control DeskLicensing (Hard Copy)
Exelon Document ControlDeskLicensing HumanResources
- GinnaStation
- Mr.S.Moore Training Manager
- Ginna Station
- Mr.S.Minya SRRS:3D.100; Retain this document until all regulatory actions associated withtheexamarecomplete, atwhichtimeitmaybediscarded.