Licensee 75-Day Letter Transmitting the Draft Written Exam and Operating Test Material (Folder 2)
ML20329A354
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/22/2020
From: Swift P
Exelon Generation Co
To: David Lew
Operations Branch I
Shared Package
ML19309E375 List:
References
CAC 000500
Download: ML20329A354 (4)


Text

TheAttachmentstothis letter contain NRCExamination Material which should be withheld from public disclosure for 2 years following theExamination per10CFR 2.390, 55.49,andNUREG-1021,Uponseparation, thiscover letter isdecontrolled.

g PaulM.Swift i -

3157915200Omee www exeloncorp com paul a exeloncorp swift com July22,2020 David Lew Chief Examiner,Region I U.S. NuclearRegulatoryCommission 2100Renaissance Boulevard Renaissance Park King ofPrussia,PA19406-2713 R.E.Ginna Nuclear PowerPlant Renewed FacilityOperating License No.DPR-18 NRCDocket No.50-244

Subject:

SubmittalofIntegrated Initial LicenseExamination Materials

Dear Mr.Lew:

Enclosed arethe examinationmaterials, which R.E. Ginna issubmitting insupport ofthe license initial examination scheduled forthe weekofOctober 05,2020, at Ginna Station.

ThissubmittalincludestheSenior Reactor Operator andReactor OperatorWritten Examinations,JobPerformance Measures, andIntegrated Plant Operation Scenario Guides. Pleaseforward attachments ALL to Joseph DeMarshall, Chief Examiner.

These examinationmaterialshave been developed inaccordance with NUREG-1021, "Operator LicensingExamination Standards forPower Reactors", Revision 11 Pleasenote thatreferencematerialsare attached to each i ndividualexamination question oritem.

Someminor modifications have been madetotheIntegrated Examination Outline with regards totheoperationalscenarios inorder toimprove balance andcontent. These changes improveexamination quality andareincompliance with NUREG-1021, "Operator Licensing ExaminationStandards forPower R eactors", Revision 11 Somemodifications oradjustments tothe examination material mayberequired dueto procedural changes.

Inaccordance with NUREG-1021, Revision 11,Section ES-201, "Initial Operator Licensing Examination Process",please ensure thatthese materialsare withheld from public disclosurefor2years aftertheexaminations are complete.

SRRS: this Retain 3D.100; document all untilregulatory associated actions withtheexamarecomplete, atwhich time maybediscarded.

it

TheAttachmentstothis contain letter NRCExamination Materialwhich should be withheid from publicdisclosure for 2 years following theExamination per10CFR 2.390, 55.49, andNUREG-1021,, Uponseparation, this coverletterisdecontrolled.

Should youhave anyquestions concerningthis please letter, George contact Wrobel, Manager SiteRegulatory Assurance, at(585)315-0552. Forquestions concerning examination materials, please contact ExamAuthor, Regulatory DavidEckert, at315-791-5523.

Respectfully, PaulSwift Site Vice President SRRS:

3D.100;Retainthis document until all actions regulatory the with associated examare atwhich complete, time maybediscarded.

it

TheAttachmentstothis letter contain NRCExamination Material which should be withheld from public disclosure for 2 years following theExamination per10CFR 2.390, 55.49, andNUREG-1021. Uponseparation, this cover letter isdecontrolled.

Enclosures:

  • Form ES-301-1, Administrative Topics Outlinefor RO
  • Form ES-301-1, Administrative Topics Outlinefor SRO a FormES-301-2, ControlRoom/In-PlantSystems Outline for RO
  • FormES-301-2, Control Room/In-Plant Systems Outline for SRO(I)
  • FormES-301-2, Control Room/In-Plant Systems Outline for SRO(U)
  • FormES-401-2, PWR Examination Outline (RO andSRO) (Provided byNRC) a FormES-401-3, Generic Knowledge andAbilities Outline (Tier 3)(Provided by NRC) a FormES-401-5, RO/SRO Composite Examination,with references attached
  • FormES-C-1, Control Room Systems andFacility Walk-Through JobPerformance Measures, with references attached a FormES-C-1, Administrative Topic Job Performance Measures, withreferences attached

= FormES-D-1, Scenario Outline, Scenario #1 a FormES-D-2, Integrated Plant Operation Scenario Guide, Scenario #1

  • FormES-D-1, Scenario Outline, Scenario#2
  • FormES-D-2, Integrated Plant Operation Scenario Guide, Scenario #2
  • FormES-D-1, Scenario Outline, Scenario #3 FormES-D-2, Integrated Plant Operation Scenario Guide, Scenario #3
  • FormES-D-1, Scenario Outline, Scenario #4
  • FormES-D-2, integrated Plant Operation Scenario Guide, Scenario #4
  • Form ES-D-1, Scenario Scenario Outline, #5
  • FormES-D-2, Integrated Plant Operation Scenario Guide, Scenario #5 a Completed Checklists:

e Form ES-201-3, Examination Security Agreements a Form ES-301-3, Operating Test Q ualityChecklist e Form ES-301-4, Simulator Scenario Quality Checklist

  • Form ES-301-6, Competencies Checklist a Form ES-401-4, Record ofRejected K/As (Provided byNRC) e FormES-401-6, Written Examination Quality Checklist cc: (withoutattachments unless indicated)

ChiefExaminer, Region 1 Mr.Joseph DeMarshall (with allattachments)

Branch Chief, Operator Licensing, Region 1 Mr.

Donald Jackson Ginna Station Project Manager, NRR Mr.

V.Sreenivas NRCSenior Resident Inspector -

Ginna Station -

Mr.Jason Schussler (E-mail)

SRRS:

3D.100;Retainthis document until regulatory all actions associated theexamare with complete,atwhichtimemaybediscarded.

it

TheAttachmentstothis lettercontain NRCExamination Materialwhich should be withheld from public disclosure for2 years followingtheExamination per10CFR 2.390, 55.49, andNUREG-1021. Uponseparation, thiscover letter isdecontrolled.

Bcc: (Electronic Copy, without attachments, unlessotherwisespecified)

Site Vice PresidentGinna-Station P.Swift Mr.

Manager, Site Regulatory Assurance -

GinnaStation-Mr.G.Wrobel Vice President -

Licensing andRegulatory (acting)

Affairs -

Mr.G.Kaegi Director, Licensing -

Mrs.S.Rafferty-Czincila ExelonDocument Control DeskLicensing (HardCopy)

Exelon Document ControlDesk Licensing HumanResources -

GinnaStation -

Mr.S.Moore Training Manager -

Ginna Station-Mr.S.Minya SRRS: Retain 3D.100; this document until all associated actions regulatory with examarecomplete, the time atwhich maybediscarded.

it