ML20329A354

From kanterella
Jump to navigation Jump to search

Licensee 75-Day Letter Transmitting the Draft Written Exam and Operating Test Material (Folder 2)
ML20329A354
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/22/2020
From: Swift P
Exelon Generation Co
To: David Lew
Operations Branch I
Shared Package
ML19309E375 List:
References
CAC 000500
Download: ML20329A354 (4)


Text

TheAttachmentstothis letter contain NRCExamination Material whichshould be withheld frompublic disclosure for2years following theExamination per10CFR 2.390, 55.49, andNUREG-1021,Uponseparation, this cover letter isdecontrolled.

g PaulM.Swift i

3157915200Omee wwwexeloncorp com paul swift aexeloncorp com July 22,2020 DavidLew Chief

Examiner, Region I

U.S.Nuclear Regulatory Commission 2100Renaissance Boulevard Renaissance Park KingofPrussia, PA19406-2713 R.E.GinnaNuclear PowerPlant RenewedFacility Operating License No.DPR-18 NRCDocket No.50-244

Subject:

Submittal ofIntegrated Initial LicenseExamination Materials

DearMr.Lew:

Enclosed aretheexamination materials, whichR.E.Ginna issubmitting insupport ofthe initial license examination scheduled fortheweekofOctober 05,2020, at Ginna Station.

Thissubmittal includes theSenior Reactor Operator andReactor OperatorWritten Examinations, JobPerformance

Measures, andIntegrated Plant Operation Scenario Guides.

Please forward ALLattachments toJoseph DeMarshall, Chief Examiner.

Theseexamination materials havebeendeveloped inaccordance with NUREG-1021, "Operator Licensing Examination Standards forPowerReactors",

Revision 11 Pleasenote that reference materials areattached toeachindividual examination question oritem.

Someminor modifications havebeenmadetotheIntegrated Examination Outline with regards totheoperational scenarios inorder toimprove balance andcontent.

These changes improve examination quality andareincompliance withNUREG-1021, "Operator Licensing Examination Standards forPowerReactors",

Revision 11 Somemodifications oradjustments totheexamination material mayberequired dueto procedural changes.

Inaccordance withNUREG-1021, Revision 11,Section ES-201, "Initial Operator Licensing Examination Process",

please ensure that these materials arewithheld frompublic disclosure for2years after theexaminations arecomplete.

SRRS:3D.100; Retain this document until all regulatory actions associated with theexamarecomplete, atwhichtimeitmaybediscarded.

TheAttachmentstothis letter contain NRCExamination Material whichshould be withheid frompublic disclosure for2yearsfollowing theExamination per10CFR 2.390, 55.49, andNUREG-1021,,Uponseparation, this cover letter isdecontrolled.

Should youhaveanyquestions concerning this

letter, please contact George
Wrobel, Manager SiteRegulatory Assurance, at(585) 315-0552.

Forquestions concerning examination materials, please contact Regulatory ExamAuthor, David

Eckert, at315-791-5523.

Respectfully, PaulSwift Site VicePresident SRRS:3D.100; Retain this document until allregulatory actions associated with theexamarecomplete, atwhich timeitmaybediscarded.

TheAttachmentstothisletter contain NRCExamination Material whichshould be withheld frompublic disclosure for2years following theExamination per10CFR 2.390, 55.49, andNUREG-1021.

Uponseparation, thiscoverletter isdecontrolled.

Enclosures:

Form ES-301-1, Administrative Topics Outline forRO Form ES-301-1, Administrative Topics Outline forSRO a

Form ES-301-2, ControlRoom/In-PlantSystems Outline forRO FormES-301-2, Control Room/In-Plant Systems Outline forSRO(I)

FormES-301-2, Control Room/In-Plant Systems Outline forSRO(U)

FormES-401-2, PWR Examination Outline (ROandSRO)(Provided byNRC) a FormES-401-3, Generic Knowledge andAbilities Outline (Tier 3)(Provided by NRC) a FormES-401-5, RO/SRO Composite Examination,withreferences attached FormES-C-1, Control Room Systems andFacility Walk-Through JobPerformance

Measures, with references attached a

FormES-C-1, Administrative Topic Job Performance

Measures, withreferences attached

=

FormES-D-1, Scenario

Outline, Scenario
  1. 1 a

FormES-D-2, Integrated Plant Operation Scenario

Guide, Scenario
  1. 1 FormES-D-1, Scenario
Outline, Scenario#2 FormES-D-2, Integrated Plant Operation Scenario Guide, Scenario
  1. 2 FormES-D-1, Scenario
Outline, Scenario
  1. 3 FormES-D-2, Integrated Plant Operation Scenario Guide, Scenario #3 FormES-D-1, Scenario
Outline, Scenario
  1. 4 FormES-D-2, integrated Plant Operation Scenario
Guide, Scenario
  1. 4 FormES-D-1, Scenario
Outline, Scenario
  1. 5 FormES-D-2, Integrated Plant Operation Scenario
Guide, Scenario
  1. 5 a

Completed Checklists:

e FormES-201-3, Examination Security Agreements a

FormES-301-3, Operating TestQuality Checklist e

FormES-301-4, Simulator Scenario Quality Checklist FormES-301-5, Transient andEventChecklist FormES-301-6, Competencies Checklist a

FormES-401-4, Record ofRejected K/As(Provided byNRC) e FormES-401-6, Written Examination Quality Checklist cc: (without attachments unless indicated)

Chief

Examiner, Region 1

- Mr.JosephDeMarshall (with allattachments)

Branch

Chief, Operator Licensing, Region 1

- Mr.Donald Jackson GinnaStation Project

Manager, NRR

- Mr.V.Sreenivas NRCSenior Resident Inspector

- GinnaStation

- Mr.JasonSchussler (E-mail)

SRRS:3D.100; Retain this document until allregulatory actions associated withtheexamarecomplete, atwhich timeitmaybediscarded.

TheAttachmentstothis letter contain NRCExamination Material whichshould be withheld frompublic disclosure for2years following theExamination per10CFR 2.390, 55.49, andNUREG-1021.

Uponseparation, this cover letter isdecontrolled.

Bcc:

(Electronic Copy, without attachments, unless otherwise specified)

Site VicePresident

- GinnaStation

- Mr.P.Swift

Manager, Site Regulatory Assurance

- Ginna Station

- Mr.G.Wrobel Vice President

- Licensing andRegulatory Affairs (acting)

- Mr.G.Kaegi

Director, Licensing

- Mrs.S.Rafferty-Czincila ExelonDocument Control DeskLicensing (Hard Copy)

Exelon Document ControlDeskLicensing HumanResources

- GinnaStation

- Mr.S.Moore Training Manager

- Ginna Station

- Mr.S.Minya SRRS:3D.100; Retain this document until all regulatory actions associated withtheexamarecomplete, atwhichtimeitmaybediscarded.