Letter Sequence Other |
|---|
|
Results
Other: ML18074A052, ML18074A053, ML18074A054, ML18074A055, ML18134A128, ML18134A137, ML18149A494, ML18323A272, ML18323A273, ML18323A274, ML19038A054, ML19038A101, ML19038A126, ML19045A271, ML19045A343, ML19045A424, ML19065A224, ML19065A230, ML19066A204, ML19066A214, ML19092A047, ML19217A267, ML19217A268, ML19217A269, ML19217A272, ML19217A273, ML19217A274, ML19298B558, ML19298B559, ML19302E287, ML19302F311, ML19302F437, ML19302F487, ML19330E279, ML19330E366, ML20020A001, ML20020A002, ML20022A259, ML20022A260, ML20022A261, ML20022A262, ML20055D883, ML20055E009, ML20057E559, ML20057E560, ML20087G852, ML20087H514, ML20184A247, ML20184A248, ML20240A318... further results
|
MONTHYEARML18135A3332017-12-11011 December 2017 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML18323A2722018-01-29029 January 2018 Final Operating Test (Parts a, B and C) (Folder 3) Project stage: Other ML18323A2742018-01-29029 January 2018 Post Exam Comments and Resolution, and Technical References Project stage: Other ML18323A2732018-01-31031 January 2018 Final Written Examination with Answer Key (401-5 Format)(Folder 3) Project stage: Other ML18134A1282018-03-0909 March 2018 Final Qa/Related Forms (Forms 1) Project stage: Other ML18074A0522018-03-0909 March 2018 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML18074A0552018-03-0909 March 2018 Final Operating Test (Section a, B, and C) (Folder 3) Project stage: Other ML18074A0532018-03-0909 March 2018 Final Written Examination with Answer Key (401-5 Format) (Folder 3) Project stage: Other ML18074A0542018-03-0909 March 2018 Handouts to Applicants (Folder 3) Project stage: Other ML18149A4942018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 RO (Folder 1) Project stage: Other ML18134A1372018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 SRO (Folder 1) Project stage: Other ML18135A2252018-03-20020 March 2018 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML19050A3742018-04-25025 April 2018 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML18135A3012018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) Project stage: Draft Other ML18135A2162018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML18135A2482018-05-21021 May 2018 Draft Written Examination (Folder 2) Project stage: Draft Other ML19217A2712019-02-0101 February 2019 TMI - Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML19038A1262019-02-0707 February 2019 Post Exam Comments and Technical References (Folder 1) Project stage: Other ML19038A0542019-02-0707 February 2019 Final Operating Test (Sections a, B, and C)(Folder 3) Project stage: Other ML19038A1012019-02-0707 February 2019 Final Written Examination with Answer Key (401-5 Format)(Folder 3) Project stage: Other ML19044A5862019-02-13013 February 2019 Draft Written Examination (Folder 2) Project stage: Draft Other ML19044A6062019-02-13013 February 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML19045A4162019-02-14014 February 2019 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML19045A4242019-02-14014 February 2019 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML19045A3432019-02-14014 February 2019 Final QA Related Forms (Folder 1) Project stage: Other ML19045A2712019-02-14014 February 2019 Handouts to Applicants (Folder 3) Project stage: Other ML19050A3652019-02-19019 February 2019 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML19065A2302019-03-0606 March 2019 Final Qa/Related Forms (Folder 1) Project stage: Other ML19065A2242019-03-0606 March 2019 Post Exam Comments Resolution References (Folder 1) Project stage: Other ML19065A0662019-03-0606 March 2019 Draft Written Examination (Folder 2) Project stage: Draft Other ML19065A0772019-03-0606 March 2019 Draft Operating Test (Section a, Section B, Section C)(Folder 2) Project stage: Draft Other ML19066A2142019-03-0707 March 2019 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML19066A2042019-03-0707 March 2019 Final QA Related Form - Form ES-401-6 (Folder 1) Project stage: Other ML19092A0472019-04-0202 April 2019 Handouts to Applicants (Folder 3) Project stage: Other ML20055E0202019-04-22022 April 2019 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML19217A2722019-07-0202 July 2019 TMI - Final Written Examination with Answer Key (401-5 Format) (Folder 3) Project stage: Other ML19217A2692019-07-15015 July 2019 TMI - Post Exam Comments and NRC Resolution (Folder 1) Project stage: Other ML19330E3662019-07-17017 July 2019 Final Qa/Related Form - Form ES-401-6 (Folder 1) Project stage: Other ML19302F6342019-07-23023 July 2019 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML19302F5982019-07-23023 July 2019 Draft Written Examination (Folder 2) Project stage: Draft Other ML19217A2732019-07-26026 July 2019 TMI - Handouts to Applicants (Folder 3) Project stage: Other ML19217A2742019-07-26026 July 2019 TMI - Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other ML19217A2672019-07-26026 July 2019 TMI - Final Qa/Related Forms (Folder 1) Project stage: Other ML19217A2682019-07-26026 July 2019 TMI - Final Qa/Related Form - Form ES-401-6 (Folder 1) Project stage: Other ML19298B5582019-08-26026 August 2019 Final Written Examination with Answer Key (401-5 Format) (Folder 3) Project stage: Other ML19298B5592019-08-26026 August 2019 Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other ML19302F4872019-09-13013 September 2019 Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other ML19302E2872019-09-13013 September 2019 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML19302F3112019-09-13013 September 2019 Final Written Examination with Answer Key (401-5 Format) (Folder 3) Project stage: Other ML19302F4372019-09-27027 September 2019 Handouts to Applicants (Folder 3) Project stage: Other 2019-02-07
[Table View] |
Text
ES-301 Transient and Event Checklist Form ES-301-5 Facility: LIMERICK Date of Exam: 11/26/2018 Operating Test No.: 001 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios (1) 3005E (2) 4058E (3) 6221E (4) 2016 S T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
SRO-U (1)
RX 0
1 1 0 NOR 0*
1 1 1 I/C 1,2,3 4,5,6 8,9 8
4 4 2 MAJ 7
1 2
2 1 TS 1,2 2
0 2 2 SRO-U (2)
RX 1
1 1
1 0 NOR 0*
1 1 1 I/C 2,3,4 5,7,8 6
4 4 2 MAJ 6
1 2
2 1 TS 2,4 2
0 2 2 SRO-I (1)
RX 3
1 1
1 0 NOR 0*
1 1 1 I/C 1,2,3 4,5,6 8,9 3,4,5, 7,8 5,6,8 16 4
4 2 MAJ 7
6 7
3 2
2 1 TS 1,2 2
0 2 2 SRO-I (2)
RX 1
3 2
1 1 0 NOR 1
1 1
1 1 I/C 1,2, 3,6 2,5 2,4,5 6,8,9 12 4
4 2 MAJ 7
6 7
3 2
2 1 TS 2,4 2
0 2 2
ES-301 Transient and Event Checklist Form ES-301-5 Instructions:
- 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4.
For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: LIMERICK Date of Exam: 11/26/2018 Operating Test No.: 001 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios (1) 3005E (2) 4058E (3) 6221E (4) 2016 S T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
SRO-I (3)
RX 1
1 1
1 0 NOR 0*
1 1 1 I/C 3,4,5 2,3,4 5,7,8 9
4 4 2 MAJ 7
6 2
2 2 1 TS 2,4 2
0 2 2 RO-(1)
RX 1
1 1
1 0 NOR 0*
1 1 1 I/C 1,2, 3,6, 8,9 2,5 8
4 4 2 MAJ 7
6 2
2 2 1 TS 0
0 2 2 RO-(2)
RX 0*
1 1 0 NOR 1
1 1
1 1 I/C 3,4,5 3,4,5, 7,8 2,4,9 11 4
4 2 MAJ 7
6 7
3 2
2 1 TS 0
0 2 2 Instructions:
- 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4.
For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.