ML20244B682

From kanterella
Jump to navigation Jump to search
Startup Physics Test Rept,Unit 2,Cycle 11
ML20244B682
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 06/07/1989
From:
NORTHERN STATES POWER CO.
To:
Shared Package
ML20244B523 List:
References
NUDOCS 8906130208
Download: ML20244B682 (4)


Text

_ _ _ . - - - _

PRAIRIE ISLAND STARTUP PHYSICS TEST REPORT UNIT 2 CYCLE 11

1.0 INTRODUCTION

The Prairie Island Unit 2 reactor had 40 reload fuel assemblies manufactured by Westinghouse installed in 1986 during the tenth refueling for that facility.

2.0 STARTUP PHYSICS TEST - INTRODUCTION This report provides test results for the tests conducted during'the startup of Prairie Island Nuclear Generating Plant, Unit 2. The procedures used in the startup test program were the most recent revision reviewed by the Plant Operations Committee. The tests performed include the-following:

(a) Zero Power Isothermal Temperature Coefficient (b) Control Banks' Rod Worth (c) Critical Boron Concentration (d) Power Distribution Measurement 3.0 STARTUP PHYSICS TEST - RESULTS Table 1 summarizes the following data for each test performed.

(a) Test (b) Procedure / Effective Revision (c) Parameter (d) Measured Value (e) Acceptance Criteria 4.0

SUMMARY

The data presented in Table 1 shows agreement with the acceptance criteria.

l l

8906130208 890607 PDR ADOCK 05000306 P PDC Page 1 of 4

1,m.

TABLE 1 UNIT 2 CYCLE 11 STARTUP TEST RESULTS 1.0 HZP Isothermal Temperature Coefficient Procedure: D32 Revision: 2 (2/19/S1)

Test Condition Measured f,9 Acceptance Criteria ARO -2.5 pcm/F <5 pcm/F 2.0 Control Banks' Worth Measurements using the Rod Swap method

  • Procedure: D30 Revision: 12 (4/1/86)

Test Condition Measured Worth Acceptance Criteria Control Bank A 1170 pcm 1220 pcm i 10% (1098-1342)

(reference)

Control Bank C 983 pcm 966 pcm i 15% (821-i111) ,

Control Bank B 605 pcm 580 pcm 15% ~ (493-667)

Control Back D 684 pcm 724 pcm i 15% (615-833)

Shutdown Bank A 718 pcm 765 pcm i 15% (650-880)

Shutdown Bank B 718 pcm 764 pcm i 15% (649-879)

Total Banks 4878 pcm 5019 pcm i 10% (4517-5521) 3.0 Critical Boron Concentration l

l Procedure: D34 l Revision: 2 (8/13/85) l Test Condition Measure Value Acceptance Criteria j All Rods Out 1482 ppm 1485 1 50 ppm Bank A In ORO 1348 ppm 1346 50 ppm

  • See report NSPNAD-8408-A, Rev. 1, " Prairie Island Units 1 and 2 l Rod Swap Methodology", September, 1985.

l l

Page 2 of 4

+

Y y

50

. Power Distribution Measurements Procedure: SP 1116 Revision: 13 (4/1/86)

- Plant Condition Parameter Value ' Acceptance Criteria 20% Power MAX (RRI -RRI )/RRI Pi >"0.9 P P 4.1% 10%'

Pi I 0.9 4.2% i 15%

N, F

0 Maximum 2.31 at z = 7.5 ft <4.60 4 Limiting 2.31 at z = 7.5 ft <4.60 Ng Fg 1.50 <1.98 QPTR 1.016 <1.02 100% Power MAX (RRI -RRI )/RRI Pi >"0.9 P P 5.4 1 10%

Pi 7 0.9 5.0 i 15%

N, F

Q Maximum 2.01 at z = 5.7 ft <2.30 Limiting 2.01 at z = 5.7 ft <2.30 Ng Fg 1.49 <1.60 QPTR 1.005 <1.02

  • Values include uncertainties of 1.05 and 1.03. The V(z) function is not applied.

Applied criteris is (2.30/P)xK(z).

    • Value includes uncertainty of 1.04.

Acceptance criteria is 1.60 [1 + 0.3(1-P)].

Page 3 of 4 1

"= ,

l ,

.p.'.

LEGEND .

HZP Hot Zero Power ARO All Rods Out RRI, Reaction Rate Integral - Measured RRI Reaction Rate Integral - Predicted p

Pi Relative Assembly Power QPTR . Quadrant Power Tilt Ratio

--iso Isothermal Temperature Coefficient pcm/ F ORO Other Rods Out Page 4 of 4

_ - _ _ - _ _ _ - _ _ _ - _ _ -