l l Prairie Island i Startup Physics Test Report Unit 2 Cycle 16

1.0 INTRODUCTION

l The Prairie Island Unit 2 reactor had 48 reload fuel assemblies manufactured by Westinghouse installed during the November 1993 refueling outage. The core design uses the VANTAGE + fuel assemblies enriched to 4.95 w/o U235. For peaking and ITC control this design uses 336 pins with 6 w/o gadolinium and 64 pins with 8 w/o gadolinium. The 8 w/o gadolinium pins are located in 8 demonstration assemblies.

j 2.0 STARTUP PHYSICS TESTING - INTRODUCTION:

l This report provides test results for the tests conducted during the startup of Prairie Island Nuclear Generating Plant, Unit 2. The procedures used in the startup test program were the most recent revision reviewed by the Plant operations Committee. The tests performed included the following:

(a) Zero Power Isothermal Temperature Coefficient (b) Control Banks' Worth (c) Critical Boron Concentration (d) Power Distribution Measurement j l

3.0 STARTUP PHYSICS TESTING - RESULTS:

Table 1 summarizes the following data for each test performed.

(a) Test

! (b) Procedure / Effective Revision (c) Parameter (d) Measured Value (e) Acceptance Criteria 4.0

SUMMARY

The data in Table 1 shows agreement with the acceptance criteria.

Page 1 of 4 9403070377 940222

! PDR ADOCK 05000306 l P PDR

TABLE 1 4

Startup Physics Testing Resulte Unit 2 Cycle 16 1.0 HZP ISOTHERMAL TEMPERATURE COEFFICIENT:

Procedure: D32 Revision: 5 (6/25/93)

Measured Value Accentance Criteria Test Condition ARO +1.86 pcm/*F <5 pcm/'F 2.0 CONTROL BANK 88 WORTH MEASUREMENTS:

(using the Rod Swap method)*

Procedure: D30 Revision: 23 (9/17/92)

Test Condition Mgasured Value Acceptance Criteria 4

Control Bank A 1125.1 pcm 1201 pcm 10% (1081-1321 pcm)

(reference)

Control Bank B 495.0 pcm 510 pcm i 15% (434-587 pcm)

Control Bank C 832.5 pcm 900 pcm i 15% (765-1035 pcm)

Control Bank D 603.5 pcm 684 pcm 15% (581-787 pcm)  ;

Shutdown Bank A 744.0 pcm 839 pcm 15% (713-965 pcm)  ;

Shutdown Bank B 762.5 pcm 847 pcm 15% (720-974 pcm) l Total Banks 4562.6 pcm 4981 pcm i 10% (4483-5479 pcm) 1 3.0 CRITICAL BORON CONCENTRATION: I Procedure: D34 Revision: 4 (6/29/93)

J i Test Condition Measured Value Acceptance Criteria l ARO 1816 ppm 1840 i 122 ppm Bank A IN, ORO 1684 ppm 1670 i 122 ppm

  • See report NSPNAD-88408-A, Rev 1, " Prairie Island Units 1 and 2 Rod Swap Methodology", September 1985.

Page 2 of 4

i TABLE 1 (Continued) 5.0 POWER DISTRIBUTION MEASUREME.E H Procedure: SP2116 Revision: 21 (12/6/93)

Plant Condition Parameter Value Acceptance Criteria 30% Power: '

MAX (RRI,-RRIp ) /RRI, pg 2 0.9 +8.1% 110%

pg < 0.9 +8.5% 115%

F" a X 1.03 X 1.05 2.72 <4.73 FAH X 1. 04 1.84 <2.12" QPTR 0.982 $1.02 and 20.98 100% Power:

MAX (RRI,-RRIp ) /RRI, pg 2 0.9 +4.6% 10%

pi < 0.9 +5.2% il5%

Fa " X 1. 03 X 1. 05 2.12 <2.21' FAH X 1.04 1.68 <1.75 QPTR 0.994 $1.02 and 20.98

  • The V(z) function is not applied since this is a non-equilibrium map.
    • Acceptance criteria is (2.40/P) x K(z).
  1. Acceptance criteria is 1.75 x ( 1 + 0. 3 (1-P) ) . 1 I

& Acceptance criteria is (2.40/P x V(z)] x K(z) .

1 Page 3 of 4 _

j l

l l

1

l I

I L

+

LEGEEQ:  !

i HZP . Hot Zero Power ,

ARO All Rods Out RRI, Reactich Rate Integral - Measured RRI p Reactish 1 ate Integral - Predicted pg Relative Assembly Power QPTR Quadrant Power Tilt Ratio ORO Other Rods Out l

i l

Page 4 of 4 j l