ML19341A993
From kanterella
Jump to navigation
Jump to search
ML19341A993 | |
Person / Time | |
---|---|
Site: | Prairie Island ![]() |
Issue date: | 10/22/1980 |
From: | Proft T TECHNIMET CORP. |
To: | |
Shared Package | |
ML19341A991 | List: |
References | |
CON-NRC-05-80-251, CON-NRC-5-80-251 78463, NUDOCS 8101290749 | |
Download: ML19341A993 (47) | |
Similar Documents at Prairie Island | |
---|---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211K6241999-08-31031 August 1999
[Table view]Proposed Tech Specs,Changing ISFSI License Conditions 6,7 & 8 & TS 3/4.1 by Permitting Inclusion of Bpras & Thimble Plug Devices in Sf Assemblies Stored in TN-40 Casks ML20206R0621999-05-13013 May 1999 Proposed Tech Specs,Removing Plant Organization Structure Requirement ML20205S3331999-04-20020 April 1999 Proposed Tech Specs Changing Implementation Date for Relocation from TS to UFSAR of Requirements in TS 3.1.E & Flooding Shutdown Requirements in TS 5.1 ML20205Q0351999-04-12012 April 1999 Proposed Tech Specs,Relocating Shutdown Margin Requirements from TS to COLR ML20204H3601999-03-19019 March 1999 Proposed Tech Specs Removing Dates of Two NRC SERs & Correcting Dates of One SER Listed in Section 2.C.4, Fire Protection ML20207F2901999-03-0101 March 1999 Proposed Revised Tech Specs Incorporating Combustion Engineering SG Welded Tube Sleeve TR Rev ML20203A2181999-02-0505 February 1999 Proposed Tech Specs,Changing TS 4.12, SG Tube Surveillance to Incorporate Changes to Abb C-E Sleeve Design Assumptions & Installation Techniques ML20196B9721998-11-25025 November 1998 Proposed Tech Specs,Allowing Limited Inoperability of Bast Level Channels & Transfer Logic Channels to Provide for Required Testing & Maint of Associated Components ML20155G6321998-11-0303 November 1998 Proposed Tech Specs B.3.1-7 & B.3.1-7a,rev 133A Re Reactor Coolant Sys ML20154S2101998-10-23023 October 1998 Proposed Tech Specs Clarifying Conditions That Constitute Operable Irpi Sys Channels ML20195F1391998-10-0808 October 1998 Non-proprietary Version of Rev 1 to NSPNAD-97002, Steam Line Break Methodology ML20151U3651998-09-0404 September 1998 Proposed Tech Specs TS.3.1-5,TS.4.18-1 & B.4.18-1,clarifying SRs & LCOs for Operability for Reactor Coolant Vent Sys ML20237B5061998-08-12012 August 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std Tech Specs ML20151Z9181998-08-0303 August 1998 Rev 0 to 5AWI 6.1.2, Design Outputs,Review & Verification ML20151Z9011998-08-0303 August 1998 Rev 2 to 5AWI 6.1.0, Design Change General ML20236T6041998-07-20020 July 1998 Proposed Tech Specs Incorporating Elevated F* SG Tube Repair Criteria ML20249A7641998-06-11011 June 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20216G0371998-04-13013 April 1998 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20248M1421998-04-0606 April 1998 Draft NRC Insp Manual Temporary Instruction 2515/XXX Fire Protection Functional Insp (Fpfi) ML20216D0591998-03-0606 March 1998 Proposed Tech Specs Updating Heatup & Cooldown Rate Curves, Incorporating Use of Pressure & Temp Limits Rept & Changing Pressurizer PORVs Operability Temp ML20217P0061998-03-0404 March 1998 Proposed Tech Specs Re Status of Relocated Requirements ML20217N9771998-03-0202 March 1998 Proposed Tech Specs 3.8.D Re Spent Fuel Pool Special Ventilation Sys ML20217P1431998-03-0202 March 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20202E5691998-02-10010 February 1998 Proposed Tech Specs 1-1 Re One Time Reduction of Mode 6 Reactor Coolant Sys Boron Concentration ML20198N8301998-01-15015 January 1998 Proposed Tech Specs Pages Allowing Use of Moveable Incore Detector Thimble Reduction for Unit 1,cycle 19 ML20198P0791998-01-0808 January 1998 Proposed Tech Specs Pages Re Suppl 5 to 951214 LAR on Conformance of Administrative Controls Section 6 to Guidance of STS ML20151Z9561998-01-0505 January 1998 Rev 0 to 5AWI 6.1.7, Design Change Work Orders ML20198B1471997-12-29029 December 1997 Proposed TS marked-up & Revised Pages,Incorporating Changes Associated w/951214 LAR ML20212F0471997-10-28028 October 1997 Proposed Tech Specs Pages Revising TS Section 4.12,allowing Use of voltage-based SG Tube Repair Criteria ML20151Z9441997-10-20020 October 1997 Rev 0 to 5AWI 6.1.6, Design Review & Approval ML20217F4761997-10-0303 October 1997 Suppl Proposed Tss,Allowing Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20211H7581997-10-0101 October 1997 Proposed Tech Specs Re Physical Mods to Turbine Bldg Cooling Water Header Isolation Logic ML20217C5861997-09-26026 September 1997 Proposed Tech Specs Changes to TS 3.4.B to Change Minimum Conditions for AFW & Permit Startup Operations to Continue W/Inoperable Turbine Driven AFW Pump or Associated Sys Valves Due to Inability to Complete IST Requirements ML20216E4561997-09-0404 September 1997 Proposed Tech Specs,Supporting Conformance to TS Overtime Controls to NRC Guidance Issued 950409 ML20216D1141997-09-0202 September 1997 Proposed Tech Specs,Incorporating Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20217M6191997-08-15015 August 1997 Proposed Tech Specs Incorporating C-E SG Welded Sleeve TR, CEN-629-P,Rev 1 ML20149J0251997-06-30030 June 1997 Tech Spec Change Pages B.3.8-2 & B.3.8-5 to Amend Re Spent Fuel Pool Personnel Access Doors ML20141F5011997-05-15015 May 1997 Proposed Tech Specs 3.1.C, Reactor Coolant Sys Leakage & 4.12, SG Tube Surveillance ML20141A0871997-05-0707 May 1997 Proposed Tech Specs Re Spent Fuel Pool Special Ventilation Sys ML20137T2081997-04-10010 April 1997 Proposed Tech Specs,Clarifying Amend Request Re Conformance of Administrative Controls Section 6 to Guidance of STS ML20137W3621997-03-17017 March 1997 Rev 2 to Test Procedure TR-228, Three Hour Fire Test of One and Three Hour Versawrap Raceway Fire Barrier Sys for Conduits & Cable Trays ML20135F7481997-03-0707 March 1997 Proposed Tech Specs Re Cooling Water Sys Emergency Intake Design Basis ML20135A9401997-02-21021 February 1997 Proposed Tech Specs,Allowing Use of Credit for Soluble Boron in Spent Fuel Pool Criticality Analyses ML20134L8901997-02-12012 February 1997 Proposed Tech Specs 3.3-3 Re Safety Injection Pump Low Temp Operations ML20134J6281997-02-0606 February 1997 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20134E9421997-01-29029 January 1997 Proposed Tech Specs Revising Prairie Island Design Bases Re Cooling Water Emergency Intake ML20136H0101997-01-29029 January 1997 Rev 12 to Abnormal Procedure AB-3, Earthquakes ML20135A8251996-11-27027 November 1996 Proposed Tech Specs Incorporating New SG Tube Sleeve Designs & Installation & Exam Techniques ML20135A5091996-11-25025 November 1996 Proposed Tech Specs Implementing Mods Proposed by Suppl to License Amend Request & Revising TS Pp in Final Form to Reflect Changes Proposed by Suppl ML20138G8751996-11-0808 November 1996 Rev 2 to TN-40 Cask Unloading Procedure 1999-08-31 Category:TEST REPORT MONTHYEARML20195F1391998-10-0808 October 1998
[Table view]Non-proprietary Version of Rev 1 to NSPNAD-97002, Steam Line Break Methodology ML20073D5011994-08-20020 August 1994 Reactor Containment Building Integrated Leak Rate Test, June 1994 ML20063L7261994-02-22022 February 1994 Startup Physics Test Rept Unit 2 Cycle 16 ML20199A0491994-01-0909 January 1994 Issue B to FTCR/94/0060, Test Rept for 1 Hour Fire Hose Stream Tests on Darmatt KM1 Fire Protection Sys for Electrical Circuits Sys to ASTM E119 NRC GL 86-10 Suppl 1 ML20044C3221993-01-31031 January 1993 Reactor Containment Bldg Integrated Leak Rate Test. ML20082T4801991-08-20020 August 1991 Reactor Containment Bldg Integrated Leak Rate Test,June 1991 ML20244B6821989-06-0707 June 1989 Startup Physics Test Rept,Unit 2,Cycle 11 ML20245G1381989-04-30030 April 1989 Unit 2 Reactor Containment Bldg Integrated Leak Rate Test ML20235V2971987-06-30030 June 1987 Probabilistic Evaluation of Reduction in Turbine Valve Test Frequency ML20137K3641986-01-20020 January 1986 Reactor Containment Bldg Integrated Leak Rate Test Rept, Oct 1985 ML20128N2701985-01-15015 January 1985 Generator Tube Repair Using Leak-Tight Sleeves, Final Rept ML20199A0031984-04-10010 April 1984 Rept on Fire Resistant Cables, for Rockbestos Co,New Haven,Ct ML20039D6051981-11-17017 November 1981 Inservice Inspection - Exam Summary Prairie Island Nuclear Generating Plant - Unit 1,810908-1014,Refueling Outage 6, Insp Period 3. ML20008F8161981-05-0707 May 1981 Startup Physics Test Rept,Unit 2,Cycle 6. ML20004E1391981-03-31031 March 1981 Reactor Containment Bldg Integrated Leak Rate Test,Mar 1981. ML20003B4881981-02-0404 February 1981 Auxiliary Feedwater Pump Endurance Test. ML20002E3861981-01-22022 January 1981 Startup Physics Test Rept Unit 1 Cycle 6. ML19347C7341980-10-31031 October 1980 Unit 1 Reactor Containment Bldg Integrated Leak Rate Test - Oct 1980 ML19341A9931980-10-22022 October 1980 Analysis of Failed Steam Generator Support Bolts from Northern States Power Co,Prairie Island Nuclear Generation Plant,Unit 1. Attachment a to Parameter,Inc Rept IE-121 Encl ML19338G6211980-06-30030 June 1980 Fire Qualification Test on Retrofit Penetration Seals. ML19309H6421980-03-11011 March 1980 Startup Physics Test Rept,Unit 2,Cycle 5 Startup. ML19247B0221979-08-0101 August 1979 Cycle 5 Startup Physics Test Rept. 1998-10-08 |
Text
O A AC H V E \~~
\O-l VEJ A \ O. ,- ~
NO. OF PAGES 3d l
C DUPLICATE: ALREADY ENTERED INTO SYSTEM UNDER ANO.
GIBLE: HARD COPY AT:
R O CF 0 OTHER 1
Retrieved from "https://kanterella.com/w/index.php?title=ML19341A993&oldid=2351458"