|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20211K6241999-08-31031 August 1999 Proposed Tech Specs,Changing ISFSI License Conditions 6,7 & 8 & TS 3/4.1 by Permitting Inclusion of Bpras & Thimble Plug Devices in Sf Assemblies Stored in TN-40 Casks ML20206R0621999-05-13013 May 1999 Proposed Tech Specs,Removing Plant Organization Structure Requirement ML20205S3331999-04-20020 April 1999 Proposed Tech Specs Changing Implementation Date for Relocation from TS to UFSAR of Requirements in TS 3.1.E & Flooding Shutdown Requirements in TS 5.1 ML20205Q0351999-04-12012 April 1999 Proposed Tech Specs,Relocating Shutdown Margin Requirements from TS to COLR ML20204H3601999-03-19019 March 1999 Proposed Tech Specs Removing Dates of Two NRC SERs & Correcting Dates of One SER Listed in Section 2.C.4, Fire Protection ML20207F2901999-03-0101 March 1999 Proposed Revised Tech Specs Incorporating Combustion Engineering SG Welded Tube Sleeve TR Rev ML20203A2181999-02-0505 February 1999 Proposed Tech Specs,Changing TS 4.12, SG Tube Surveillance to Incorporate Changes to Abb C-E Sleeve Design Assumptions & Installation Techniques ML20196B9721998-11-25025 November 1998 Proposed Tech Specs,Allowing Limited Inoperability of Bast Level Channels & Transfer Logic Channels to Provide for Required Testing & Maint of Associated Components ML20155G6321998-11-0303 November 1998 Proposed Tech Specs B.3.1-7 & B.3.1-7a,rev 133A Re Reactor Coolant Sys ML20154S2101998-10-23023 October 1998 Proposed Tech Specs Clarifying Conditions That Constitute Operable Irpi Sys Channels ML20151U3651998-09-0404 September 1998 Proposed Tech Specs TS.3.1-5,TS.4.18-1 & B.4.18-1,clarifying SRs & LCOs for Operability for Reactor Coolant Vent Sys ML20237B5061998-08-12012 August 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std Tech Specs ML20236T6041998-07-20020 July 1998 Proposed Tech Specs Incorporating Elevated F* SG Tube Repair Criteria ML20249A7641998-06-11011 June 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20216G0371998-04-13013 April 1998 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20216D0591998-03-0606 March 1998 Proposed Tech Specs Updating Heatup & Cooldown Rate Curves, Incorporating Use of Pressure & Temp Limits Rept & Changing Pressurizer PORVs Operability Temp ML20217P0061998-03-0404 March 1998 Proposed Tech Specs Re Status of Relocated Requirements ML20217N9771998-03-0202 March 1998 Proposed Tech Specs 3.8.D Re Spent Fuel Pool Special Ventilation Sys ML20217P1431998-03-0202 March 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20202E5691998-02-10010 February 1998 Proposed Tech Specs 1-1 Re One Time Reduction of Mode 6 Reactor Coolant Sys Boron Concentration ML20198N8301998-01-15015 January 1998 Proposed Tech Specs Pages Allowing Use of Moveable Incore Detector Thimble Reduction for Unit 1,cycle 19 ML20198P0791998-01-0808 January 1998 Proposed Tech Specs Pages Re Suppl 5 to 951214 LAR on Conformance of Administrative Controls Section 6 to Guidance of STS ML20198B1471997-12-29029 December 1997 Proposed TS marked-up & Revised Pages,Incorporating Changes Associated w/951214 LAR ML20212F0471997-10-28028 October 1997 Proposed Tech Specs Pages Revising TS Section 4.12,allowing Use of voltage-based SG Tube Repair Criteria ML20217F4761997-10-0303 October 1997 Suppl Proposed Tss,Allowing Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20211H7581997-10-0101 October 1997 Proposed Tech Specs Re Physical Mods to Turbine Bldg Cooling Water Header Isolation Logic ML20217C5861997-09-26026 September 1997 Proposed Tech Specs Changes to TS 3.4.B to Change Minimum Conditions for AFW & Permit Startup Operations to Continue W/Inoperable Turbine Driven AFW Pump or Associated Sys Valves Due to Inability to Complete IST Requirements ML20216E4561997-09-0404 September 1997 Proposed Tech Specs,Supporting Conformance to TS Overtime Controls to NRC Guidance Issued 950409 ML20216D1141997-09-0202 September 1997 Proposed Tech Specs,Incorporating Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20217M6191997-08-15015 August 1997 Proposed Tech Specs Incorporating C-E SG Welded Sleeve TR, CEN-629-P,Rev 1 ML20149J0251997-06-30030 June 1997 Tech Spec Change Pages B.3.8-2 & B.3.8-5 to Amend Re Spent Fuel Pool Personnel Access Doors ML20141F5011997-05-15015 May 1997 Proposed Tech Specs 3.1.C, Reactor Coolant Sys Leakage & 4.12, SG Tube Surveillance ML20141A0871997-05-0707 May 1997 Proposed Tech Specs Re Spent Fuel Pool Special Ventilation Sys ML20137T2081997-04-10010 April 1997 Proposed Tech Specs,Clarifying Amend Request Re Conformance of Administrative Controls Section 6 to Guidance of STS ML20135F7481997-03-0707 March 1997 Proposed Tech Specs Re Cooling Water Sys Emergency Intake Design Basis ML20135A9401997-02-21021 February 1997 Proposed Tech Specs,Allowing Use of Credit for Soluble Boron in Spent Fuel Pool Criticality Analyses ML20134L8901997-02-12012 February 1997 Proposed Tech Specs 3.3-3 Re Safety Injection Pump Low Temp Operations ML20134J6281997-02-0606 February 1997 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20134E9421997-01-29029 January 1997 Proposed Tech Specs Revising Prairie Island Design Bases Re Cooling Water Emergency Intake ML20135A8251996-11-27027 November 1996 Proposed Tech Specs Incorporating New SG Tube Sleeve Designs & Installation & Exam Techniques ML20135A5091996-11-25025 November 1996 Proposed Tech Specs Implementing Mods Proposed by Suppl to License Amend Request & Revising TS Pp in Final Form to Reflect Changes Proposed by Suppl ML20134H3771996-11-0606 November 1996 Proposed Tech Specs of Appendix a Re Cooling Water Sys ML20134E4551996-10-25025 October 1996 Proposed Tech Specs Changing TS 4.4.A, Containment Leakage Tests, Bases to TS Section B.4.4, Containment Sys Tests & Adding TS.6.5.J, Containment Leakage Rate Testing Program ML20129E2591996-09-24024 September 1996 Proposed Tech Specs,Changing TS 4.12 to Incorporate Revised Acceptance Criteria for SG Tubes W/Degradation in Tubesheet Region ML20117P4311996-09-11011 September 1996 Proposed Tech Specs,Revising Plant TS Governing Cw Sys ML20117B2381996-08-15015 August 1996 Proposed Tech Specs 3.3.B.2 Re Containment Cooling Sys & Bases to Conform to Supporting Analyses ML20115G8121996-07-15015 July 1996 Proposed Tech Specs Re Moveable Incore Detector Thimble Reduction ML20095J7951995-12-14014 December 1995 Proposed Tech Specs for Conformance of Administrative Controls Section 6 to Guidance of STS ML20094S2791995-11-28028 November 1995 Proposed Tech Specs Re Radiological Effluent TS Conformance ML20087F3571995-08-0909 August 1995 Proposed Tech Specs Table TS 3.15-1,Pages 1 & 2 & Bases Page B.3.15-1 Marked Up to Implement License Amend Request 1999-08-31
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211K6241999-08-31031 August 1999 Proposed Tech Specs,Changing ISFSI License Conditions 6,7 & 8 & TS 3/4.1 by Permitting Inclusion of Bpras & Thimble Plug Devices in Sf Assemblies Stored in TN-40 Casks ML20206R0621999-05-13013 May 1999 Proposed Tech Specs,Removing Plant Organization Structure Requirement ML20205S3331999-04-20020 April 1999 Proposed Tech Specs Changing Implementation Date for Relocation from TS to UFSAR of Requirements in TS 3.1.E & Flooding Shutdown Requirements in TS 5.1 ML20205Q0351999-04-12012 April 1999 Proposed Tech Specs,Relocating Shutdown Margin Requirements from TS to COLR ML20204H3601999-03-19019 March 1999 Proposed Tech Specs Removing Dates of Two NRC SERs & Correcting Dates of One SER Listed in Section 2.C.4, Fire Protection ML20207F2901999-03-0101 March 1999 Proposed Revised Tech Specs Incorporating Combustion Engineering SG Welded Tube Sleeve TR Rev ML20203A2181999-02-0505 February 1999 Proposed Tech Specs,Changing TS 4.12, SG Tube Surveillance to Incorporate Changes to Abb C-E Sleeve Design Assumptions & Installation Techniques ML20196B9721998-11-25025 November 1998 Proposed Tech Specs,Allowing Limited Inoperability of Bast Level Channels & Transfer Logic Channels to Provide for Required Testing & Maint of Associated Components ML20155G6321998-11-0303 November 1998 Proposed Tech Specs B.3.1-7 & B.3.1-7a,rev 133A Re Reactor Coolant Sys ML20154S2101998-10-23023 October 1998 Proposed Tech Specs Clarifying Conditions That Constitute Operable Irpi Sys Channels ML20195F1391998-10-0808 October 1998 Non-proprietary Version of Rev 1 to NSPNAD-97002, Steam Line Break Methodology ML20151U3651998-09-0404 September 1998 Proposed Tech Specs TS.3.1-5,TS.4.18-1 & B.4.18-1,clarifying SRs & LCOs for Operability for Reactor Coolant Vent Sys ML20237B5061998-08-12012 August 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std Tech Specs ML20151Z9181998-08-0303 August 1998 Rev 0 to 5AWI 6.1.2, Design Outputs,Review & Verification ML20151Z9011998-08-0303 August 1998 Rev 2 to 5AWI 6.1.0, Design Change General ML20236T6041998-07-20020 July 1998 Proposed Tech Specs Incorporating Elevated F* SG Tube Repair Criteria ML20249A7641998-06-11011 June 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20216G0371998-04-13013 April 1998 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20248M1421998-04-0606 April 1998 Draft NRC Insp Manual Temporary Instruction 2515/XXX Fire Protection Functional Insp (Fpfi) ML20216D0591998-03-0606 March 1998 Proposed Tech Specs Updating Heatup & Cooldown Rate Curves, Incorporating Use of Pressure & Temp Limits Rept & Changing Pressurizer PORVs Operability Temp ML20217P0061998-03-0404 March 1998 Proposed Tech Specs Re Status of Relocated Requirements ML20217N9771998-03-0202 March 1998 Proposed Tech Specs 3.8.D Re Spent Fuel Pool Special Ventilation Sys ML20217P1431998-03-0202 March 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20202E5691998-02-10010 February 1998 Proposed Tech Specs 1-1 Re One Time Reduction of Mode 6 Reactor Coolant Sys Boron Concentration ML20198N8301998-01-15015 January 1998 Proposed Tech Specs Pages Allowing Use of Moveable Incore Detector Thimble Reduction for Unit 1,cycle 19 ML20198P0791998-01-0808 January 1998 Proposed Tech Specs Pages Re Suppl 5 to 951214 LAR on Conformance of Administrative Controls Section 6 to Guidance of STS ML20151Z9561998-01-0505 January 1998 Rev 0 to 5AWI 6.1.7, Design Change Work Orders ML20198B1471997-12-29029 December 1997 Proposed TS marked-up & Revised Pages,Incorporating Changes Associated w/951214 LAR ML20212F0471997-10-28028 October 1997 Proposed Tech Specs Pages Revising TS Section 4.12,allowing Use of voltage-based SG Tube Repair Criteria ML20151Z9441997-10-20020 October 1997 Rev 0 to 5AWI 6.1.6, Design Review & Approval ML20217F4761997-10-0303 October 1997 Suppl Proposed Tss,Allowing Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20211H7581997-10-0101 October 1997 Proposed Tech Specs Re Physical Mods to Turbine Bldg Cooling Water Header Isolation Logic ML20217C5861997-09-26026 September 1997 Proposed Tech Specs Changes to TS 3.4.B to Change Minimum Conditions for AFW & Permit Startup Operations to Continue W/Inoperable Turbine Driven AFW Pump or Associated Sys Valves Due to Inability to Complete IST Requirements ML20216E4561997-09-0404 September 1997 Proposed Tech Specs,Supporting Conformance to TS Overtime Controls to NRC Guidance Issued 950409 ML20216D1141997-09-0202 September 1997 Proposed Tech Specs,Incorporating Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20217M6191997-08-15015 August 1997 Proposed Tech Specs Incorporating C-E SG Welded Sleeve TR, CEN-629-P,Rev 1 ML20149J0251997-06-30030 June 1997 Tech Spec Change Pages B.3.8-2 & B.3.8-5 to Amend Re Spent Fuel Pool Personnel Access Doors ML20141F5011997-05-15015 May 1997 Proposed Tech Specs 3.1.C, Reactor Coolant Sys Leakage & 4.12, SG Tube Surveillance ML20141A0871997-05-0707 May 1997 Proposed Tech Specs Re Spent Fuel Pool Special Ventilation Sys ML20137T2081997-04-10010 April 1997 Proposed Tech Specs,Clarifying Amend Request Re Conformance of Administrative Controls Section 6 to Guidance of STS ML20137W3621997-03-17017 March 1997 Rev 2 to Test Procedure TR-228, Three Hour Fire Test of One and Three Hour Versawrap Raceway Fire Barrier Sys for Conduits & Cable Trays ML20135F7481997-03-0707 March 1997 Proposed Tech Specs Re Cooling Water Sys Emergency Intake Design Basis ML20135A9401997-02-21021 February 1997 Proposed Tech Specs,Allowing Use of Credit for Soluble Boron in Spent Fuel Pool Criticality Analyses ML20134L8901997-02-12012 February 1997 Proposed Tech Specs 3.3-3 Re Safety Injection Pump Low Temp Operations ML20134J6281997-02-0606 February 1997 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20134E9421997-01-29029 January 1997 Proposed Tech Specs Revising Prairie Island Design Bases Re Cooling Water Emergency Intake ML20136H0101997-01-29029 January 1997 Rev 12 to Abnormal Procedure AB-3, Earthquakes ML20135A8251996-11-27027 November 1996 Proposed Tech Specs Incorporating New SG Tube Sleeve Designs & Installation & Exam Techniques ML20135A5091996-11-25025 November 1996 Proposed Tech Specs Implementing Mods Proposed by Suppl to License Amend Request & Revising TS Pp in Final Form to Reflect Changes Proposed by Suppl ML20138G8751996-11-0808 November 1996 Rev 2 to TN-40 Cask Unloading Procedure 1999-08-31
[Table view] |
Text
.
Exhibit B Prairie Island Nuclear Generating Plant License Amendment Request Dated February 10,1998 Proposed Changes Marked Up On Existing Technical Specification Pages Exhibit B consists of an existing Technical Specification page with the proposed changes highlighted on that page (shaded material to be added, strike-through material to be removed). The page affected by this License Amendment Request is listed below-Table TS.1-1 2
1
TABLE TS.1 1 Rr" 111 9/10/9^
TABLE TS.1-1 QEEEATIONAL MODES REACTOR
% RATED AVERAGE VESSEL llEAD REACTIVITY THERMAL COOLANT CLOSURE BOLTS
- t. Q
[ LODE TITLE CONDITION POWER,_ TEMPERAT_URE FULLY TENSIONED 1 POWER OPERATION Critical > 2% NA -YES 2 '110T STANDBY ** Critical 5 2% NA YES 3 il0T SHUTDOWN ** Suberitical NA h 350*F YES 4 INTERMEDIATE Suberitical NA < 350'F YES SHUTDOWN ** a 200*F 5 COLD SHUTDOWN Suberitical NA < 200*F YES 6 REFUELING .NA* NA NA NO Boron concentration of the reactor coolant system and the refueling cavity sufficient to ensure that the more restrictive of the following conditions is met:
- a. K.rc $ 0.95, or
-b. Boron concentration 2 2000 ppm?**.
- Prairie Island specific MODE title, not consistent with Standard Technical Specificat. ion MODE titles. MODE numbers are consistent with Standard Technical Specification MODE numbers.
'***Thsle s3 to rTeii61sh tTays teidib 6 r o nTc oiice ht rat tonlishalElisq?1900? ppm 1fo r'1
, d
- d199EAjMODE}.6j L operaeioniduring;thsiUnitij2kfor.ce' iputage;whicin; began}gniJanua t
4 l
n _ _ _ _ _ _ _ _ _ _
Exhibit C Prairie Island Nuclear Generating Plant
)
License Amendment Request Dated February 10,1998 )
Revised Technical Specification Pages Exhibit C consists of a revised page for the Prrarie Island Technical Specifications with the proposed changes incorporated, The revised page is listed below:
Table TS.1-1 P
TAB',E TS .1 -1 ,
p s .
TABLE TS.1-1 OPERATIONAL MODES REACTOR
% RATED 0.VEAACE VESSEL HEAD REACTIVITY THERMAL COOLANT CLOSURE BOLTS HQDE TITLE CONDITION POWER TEMPERATURE EpLLY TENSIONED 1 POWER OPERATION Critical > 2% NA YES 2 HOT STANDBY ** Critical 5 2% NA YES 3 HOT SHUTDOWN ** Suberitical NA h 350'F YES 4 INTERMEDIATE Suberitical NA < 350*F YES SHUTDOWN ** h 200*F 5 COLD SHUTDOWN .Suberitical NA < 200'F YES 6 REFUELINC NA* NA NA NO
+
Boron concentration of the reactor coolant system and the refueling cavity sufficient to ensure that the more restrictive of the following conditions is met:
- a. K e rr s 0.95, or
- b. Boron concentration 2 2000 ppm ***.
l
- Prairie Isiand specific MODE title, not consistent with Standard Technical Specification MODE titles. MODE numbers are consistent with Standard Technical Specification MODE numbers.
- The reactor coolant system boron concentration shall be 2 1900 ppm for MODE 6 operation during the Unit 2 forced outage which began on January 24, 1998.
I i
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _