g l
Northem States Power Company I
414 Nicollet Mall Minneapolis, Minnesota 55401-1927 Telephone (612) 330 5500 l
June 7, 1989 l
l Director of Nuclear Reactor Regulation U S Nuclear Regulatory Commission, Region III Attn: Document Control Desk l
Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Startun Physics Test Report. Unit 2 Cycle 11
Reference:
- 1) Letter dated July 9,1986, D M Musolf (NSP) to J G Keppler (NRC), "Startup Physics Test Report, Unit 1 Cycle 11".
Beginning with Cycle 11, both Prairie Island units began operating with fuel manufactured by Westinghouse Electric Corporation.
Section 6.7.A.1 of the Prairie Island Technical Specifications requires that a Startup Report be submitted within 90 days following resumption of commercial operation with fuel installed that has a different design or has been manufactured by a different fuel supplier.
In accordance with'that requirement, Reference 1 was submitted following the
- startup of Unit 1 Cycle 11 in April of 1986. However, no Startup Report was submitted following the startup of Unit 2 Cycle 11 in November of 1986.
Due to an error in interpretation of the Technical Specification reporting requirements, it was believed that the Technical Specifications only required the submittal of a Startup Report for the first unit to resume commercial operation utilizing the new fuel type.
A recent NSP Quality Assurance Audit brought this interpretation of the Technical Specifications into question, and as a result, a Startup Report for Unit 2 Cycle 11 has been prepared and is attached for tha information of the NRC Staff. The tests performed during the Unit ? Cycle 11 startup were the same as those performed during the Unit 1 Cycle 11 startup described in Reference 1, and all acceptance criteria were met.
fDN I
l )
8906130152 890607 PDR ADOCK 05000306 P
PDC O
6:;
?o j:/'/, '
o L'
80' O**N Director of NRR
--June 7, 1989l Page 2..
We apologize for.any inconvenience the delay in submittal:of this Startup_
Report may have, caused..Please contact us if you have any questions related to.the'. attached Startup Report.
t Thomas M Parker Manager-Nuclear Support Services c: Regional Administrator-III NRR Project Manager, NRC Senior Resident Inspector, NRC MPCA
' Attn: J V Ferman G Charnoff Attachment l
l l