Notice of Violation from Insp on 870803-07.Violation Noted:Failure to Implement Fire Protection Procedure TDP-307
ML20238A787
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/25/1987
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20238A783 List:
References
50-302-87-21, NUDOCS 8708310210
Download: ML20238A787 (1)


Text

- _ _ _ _ _.

ENCLOSURE 1 NOTICE OF VIOLATION Florida Power Corporation Docket No. 50-302 Crystal River License Nos. DPR-72 During the Nuclear Regulatory Commission (NRC) inspection conducted on August 3-7, 1987, a violation of NRC' requirements was identified. The violation involved the failure to comply with NRC fire protection requirements.

In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1986), the violation is listed below:

Technical Specification 6.8.1.f requires written procedures to be established, implemented and maintained on the fire protection program.

Training Department Procedure TDP-307, Section 6.4, requires that all fire brigade members must complete the fire brigade requalification training program in order to maintain qualification as a fire brigade member.

Contrary to the above, the fire brigade training procedure was not imple;nented in that, not all plant personnel assigned duty as fire brigade members had received '.he requalification training required by Procedure TDP-307.

This is a Severity Level V violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, Florida Power Corporation is hereby required to submit to this Office within 30 days of the date of the letter transmitting this Notice a written statement or explanation in reply including (1) admission or denial of the violation, (2) the reason for the violation if admitted, (3) the corrective steps which have been taken and the results achieved, (4) the corrective steps which will be taken to avoid further violations, and (5) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.

FOR THE NUCLEAR REGULATORY COMMISSION H rdt, Chief ngineer'ng Branch Divisio of Reactor Safety Dated $ Atlanta, Georgia thisgf9dayof/hd 1987 8708310210 870825 PDR ADOCK 05000302 G ppg