ML20236G932 | 2 July 1998 | Notice of Violation from Insp on 980329-0509.Violation Noted:Four Examples Were Identified,Where Licensee Failed to Meet Requirement for Design of ECCS Switchover from Refueling Water Storage Tank to Containment Recirculation | |
ML20217F605 | 24 April 1998 | Notice of Violation from Insp on 980215-0328.Violations Noted:Corrective Actions Were Not Sufficient to Identify That Excessive Leakage in ECC Sys Check Valves During Unit 1 Cycle 6 Required Unit 1 Safety Injection Pumps Be Started | |
ML20248L883 | 19 March 1998 | Notice of Violation from Insp on 980104-0214.Violation Noted:Licensee Failed to Document Heat Related Degredation of Unit 2,Train B Solid State Safeguards Sequencer | |
ML20198R657 | 16 January 1998 | Notice of Violation from Insp on 970922-25.Violation Noted: on 961029,licensee Made Changes to Emergency Plan,W/O Commission Approval,That Decreased Effectiveness of Plan & Did Not Continue to Meet Planning Standard 50.47(b)(2) | |
IR 07100012/2011022 | 16 January 1998 | Notice of Violation from Insp on 971012-1122.Violation Noted:Procedure IPO-005B,rev 2,not Appropriate to Circumstances in That Procedure Did Not Require Pressure Be Maintained Below Rc System Pressure & Temp Limits | |
ML20198N207 | 14 January 1998 | Notice of Violation from Insp on 970608-0719 & Subsequent Inoffice Reviews Concluded on 971114.Violation Noted: Procedures OPT-102A & 102B Did Not Include Appropriate Quantitative Acceptance Criteria | |
ML20199H013 | 21 November 1997 | Notice of Violation from Insp on 970831-1011.Violation Noted:Thermometer IC1473,was Used During Performance of Procedure PPT-SX-7505A on 970807 | |
ML20211A069 | 19 September 1997 | Notice of Violation from Insp on 970720-0830.Violation Noted:On 970507,while Performing Procedure OPT-457B,licensed Operator Failed to Close Valve 2-8812A Per Step 8.8 | |
ML20198F727 | 12 September 1997 | Notice of Violation from Investigation Completed on 970606. Violation Noted:Jw Holybee,Employee of Contractor,Submitted Inaccurate Info to NRC | Fitness for Duty |
ML20198G182 | 12 September 1997 | Notice of Violation from Investigation on 970606.Violation Noted:Mn Shook Submitted Falsified Info to NRC Re Being Denied Access to Nuclear Power Plant as Result of fitness-for-duty Policy | Fitness for Duty |
ML20151L915 | 5 August 1997 | Notice of Violation from Insp on 970608-0719.Violations Noted:Licensee Failed to Establish Necessary Compensatory Actions Prior to Impairing Fire Protection Assembly by Removing Concrete Floor Plug | Fire Protection Program |
ML20149L327 | 25 July 1997 | Corrected Page 2 for Notice of Violation Issued on 970611 | Condition Adverse to Quality |
ML20148K276 | 11 June 1997 | Notice of Violation from Insp on 970421-0502.Violation Noted:Ler 445/96-002-00 Failed to Include Description of Numerous Previous Occasions Where Same Valve Failed to Stroke Closed within Timeframe Specified in TSs | Condition Adverse to Quality |
ML20148H442 | 6 June 1997 | Notice of Violation from Insp on 970428-0502.Violation Noted:Nrc Identified That No Instructions or Procedures Existed at Plant to Ensure That All Licensed Operators Have Available Appropriate Lenses | |
ML20148F876 | 3 June 1997 | Notice of Violation from Insp on 970317-21.Violation Noted:Failure to Perform Requalification on Listed Changes in Analog Cable Type & Length Essential Variable on Acts Sheet TBX-02-196 | |
ML20137W345 | 15 April 1997 | Notice of Violation from Insp on 970202-0315.Violation Noted:During Performance of Procedure MSM-CO-8802,Steps 8.6.1.3. & 8.6.1.12,maint Personnel Failed to Torque Train B motor-driven Auxiliary Feedwater Pump Discharge Valve | |
ML20136B898 | 7 March 1997 | Notice of Violation from Insp on 961222-970201.Violation Noted:Corrective Actions Taken to Prevent Repetition of 1993 Unit Two Grid Synchronization Event Not Effective | |
ML20136C002 | 5 March 1997 | Notice of Violation from Insp on 970210-14.Violation Noted: Licensee Had Not Corrected Weakness Involving Implementation of Site Evacuation Procedures That Was Identified During Emergency Preparedness Insp | |
ML20135B597 | 27 November 1996 | Notice of Violation from Insp on 960929-1109.Violation Noted:Procedure Change to Procedure MSM-G0-0204 Rev 4 Required That Valves Be Cycled to Remove Entrapped Air Activity That Could Affect Set Pressure | |
ML20129G198 | 23 October 1996 | Notice of Violation from Insp on 960818-0928.Violation Noted:Licensee Failure to Establish,Implement & Maintain Procedures Covering Activities Recommended in App A,Station Administrative Procedure, Clearance & Safety Tagging | Fire Watch |
ML20149F288 | 4 August 1994 | Notice of Violation from Insp on 940529-0709.Violation Noted:Failure to Remove Field Work Request Tags from safety- Related Equipment Following Voiding of Action Requests or Work Orders | |
ML20059C361 | 30 December 1993 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Noncompliance Noted:Licensee Did Not Assure That Plant Personnel Implemented SOP-506.Contract Personnel Changed Pressurization Source W/O Authorization | |
ML20128F699 | 4 February 1993 | Partially Withheld Notice of Violation from Insp on 930104-06 (Ref 10CFR73.21).Violation Noted:Failure to Search Packages Prior to Introduction to Protected Area | |
ML20127K489 | 20 January 1993 | Notice of Violation from Insp on 921022-1218.Violation noted:20 Licensee & Contractor Supervisors Had Not Received Initial Behavior Observation Training & 21 Licensee & Contractor Supervisors Had Not Received Annual Training | |
ML20126J317 | 31 December 1992 | Notice of Violation from Insp on 921011-1125.Violation Noted:Contract Personnel Observed to Operate Polar Crane in Vicinity of Reactor Vessel Head Contrary to Listed Procedural Requirements | |
ML20126J344 | 31 December 1992 | Notice of Violation from Insp on 921025-1205.Violation Noted:Corrective Measures Implemented in Response to Westinghouse Technical Bulletin NSD-TB-89-06,inadequate | |
ML20126F128 | 18 December 1992 | Notice of Violation from Insp on 921109-13.Violation Noted: Workers in Svc Insp Preparation Work in Reactor Containment Bldg Removed Insulation from Piping & Did Not Have Work Evaluated Through Analysis of Containment Surveys | |
ML20058K381 | 12 December 1990 | Notice of Violation from Insp on 901113-16.Violation Noted:Technical Evaluations & Surveillance of Engineering Activities Not Being Conducted by Engineering Assurance | |
ML20058A104 | 10 October 1990 | Notice of Violation on 900807-0918.Violation Noted:Logs of Steam Generator Feedwater Flow Not Maintained at 15-minute Intervals | |
ML20059K342 | 17 September 1990 | Notice of Violation from Insp on 900820-24.Violation Noted: Failure to Establish Procedure Prescribing Administrative Controls Necessary to Assure That ATWS Mitigation Actuation Circuitry Operational | |
ML20059D656 | 29 August 1990 | Notice of Violation from Insp on 900731-0807.Violation Noted:Water Formed from Condensed Main Steam,Backed Up to Upstream Side of Atmospheric Relief Valve & Caused Erratic Performance & Damage to Insulation & Lighting Fixtures | |
ML20058M248 | 3 August 1990 | Notice of Violation from Insp on 900606-0703.Violations Noted:Procedure OPT-467A Inadequate,Work Crew Opened Unit 2 Reactor Coolant Pump Seal Water Return Filter Instead of Correct Filter & Deficiency Not Promptly Identified | |
ML20055D423 | 29 June 1990 | Notice of Violation from Insp on 900503-0605.Violations Noted:Failure to Perform Isotopic Analysis for Iodine within Specified Time Interval & Inadequate Test Procedure Review Criteria | Power change |
ML20248A661 | 26 September 1989 | Notice of Violation from Insp on 890802-0905.Violation Noted:Qc Hold Point Bypassed Prior to Welding of Replacement Tray Fittings as Specified in Work Package T140EDA42-01 | |
ML20248A569 | 26 September 1989 | Notice of Violation from Insp on 890802-0905.Violation Noted:Mfg Defects Requiring Repairs Erroneously Identified as Nonextensive Installation Deficiencies Which Severely Limited Review for Generic Implications | |
ML20248B982 | 22 September 1989 | Notice of Violation from Insp on 890802-0905.Violation Noted:Conduits C14007913,13G01422,C1PAS11 & C13034061 Had Loose Fittings & Elbow for Conduit C13001413 & Junction Boxes JB1S-0169,JB1S-177G & JB1S-165G Had Looses Screws | |
ML20247Q057 | 20 September 1989 | Notice of Violation from Insp on 890802-0905,Violation Noted:Operator Stationed at Emergency Diesel Generator B Could Not Take Action Specified by Rev Due to Inadequate Procedure & Inadequate Training | |
ML20247B877 | 8 September 1989 | Notice of Violation from Insp on 890717-27.Violations Noted: Failure to Correct Deficiencies Identified in Fabrication of Containment Electrical Penetration Welds & Fuel Transfer Tube Penetration Welds | Nondestructive Examination |
ML20246H513 | 28 August 1989 | Notice of Violation from Insp on 890717-28.Violation Noted: Adequate Preservation,Safekeeping & Storage of Excessive Number of Completed Work Packages Awaiting Final Review for Excessive Period of Time Not Provided | |
ML20246B320 | 30 June 1989 | Notice of Violation from Insp on 890503-0606.Violation Noted:Shift Test Engineer Failed to Issue Test Deficiency Rept to Document Valve Misalignment That Occurred During Testing | |
ML20245E073 | 19 June 1989 | Notice of Violation from Insp on 890503-0606.Violation Noted:Neither Test Deficiency Rept Nor Test Procedure Change Processed to Document or Correct Deviation from Test Procedure Instruction | |
ML20245D980 | 19 June 1989 | Notice of Violation from Insp on 890503-0606.Violation Noted:Substituted Carbon Steel Grade 5 Bolts for Silicon Bronze Bolts in Auxiliary Feedwater Pump Motor W/O Documenting,Reviewing & Approving Change to Design | |
ML20247G603 | 18 May 1989 | Notice of Violation from Insp on 890405-0502.Violation Noted:Shift Test Engineer Failed to Obtain Shift Supervisor Permission to Perform Class 1E Inverter Test & Operator Failed to Perform Two Steps During Realignment of Pump | |
ML20247C269 | 16 May 1989 | Notice of Violation from Insp on 890405-0502.Violation Noted:Welds on North Face of Duct Segments Lacked Required Galvanizing & Raw Edges of Structural Components on Internal Portion of One Duct Segment Still Uncoated | |
ML20244C778 | 14 April 1989 | Notice of Violation from Insp on 890308-0404.Violation Noted:Qc Inspectors Not Equipped Nor Trained to Measure Listed Insp Attributes to Tolerance Required by post-const Hardware Validation Program | |
ML20247B070 | 24 March 1989 | Notice of Violation from Insp on 890208-0307.Violations Noted:Snubbers Installed W/Low Strength Bolting That Could Have Been Overstressed If Subjected to Max Allowable Design Load & Inadequate Review of Design Calculations Identified | |
ML20235U059 | 28 February 1989 | Notice of Violation from Discussions on 860128.Violation Noted:Applicant Failed to File Timely Request for Extension of CPPR-126,per 10CFR2.109 | |
ML20235U760 | 28 February 1989 | Notice of Violation from Insp on 890111-0207.Violation Noted:Unauthorized Work or Inadequate Insp by QC Resulted in Pipe Support Deviating from Design Documentation Requirements | |
ML20235P687 | 22 February 1989 | Notice of Violation from Insp on 890111-0207.Violation Noted:Wrong Procedure Followed Re Required Evaluation for Reportability of Each Deficiency Found in Design & Const of Plant.No Evidence of Such Evaluations Being Performed Found | |
ML20195F905 | 18 November 1988 | Notice of Violation from Insp on 881005-1101.Violation Noted:Inspector Indicated Adequate Thread Engagement, However,No Documentation Exists as Verification |