ML20246B320

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 890503-0606.Violation Noted:Shift Test Engineer Failed to Issue Test Deficiency Rept to Document Valve Misalignment That Occurred During Testing
ML20246B320
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/30/1989
From: Warnick R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20246B307 List:
References
50-445-89-37, 50-446-89-37, NUDOCS 8907070281
Download: ML20246B320 (2)


Text

mg

\ -

._J. f '

za:

t APPENDIX A NOTICE OF VIOLATION TU: Electric Dockets: 50-445/89 445/89 1

' ComancherPeak; Steam' Electric Station Permits: CPPR-126 Unit 1, Glen Rose,-Texas CPPR-127-During an NRC in'spection conducted on May 3 through June!6, 1989, a

. violation.of'NRC requirements was identified. In accordance with the " General Statement of Policy and Procedure fer.NRC Enforcement Actions," 10 CFR Part'2, Appendix C (1988), the violation is listed below:

Criterion V of Appendix B to 10 CFR Part 50 states, in part, that activities affecting quality shall be' prescribed by documented procedures ofia. type appropriate to the circumstances, and'shall be accomplished in-accordanceLwith these procedures.

Paragraph 6.2.7;9.1of Procedure TDA-303, Revision 0, " Conduct of Testing,". states, " Testing shall be performed in accordance with-L ' approved test procedures and instructions."--Paragraph 6.1.6 of TDA-306,. Revision 0, " Control'of Deficiencies and Nonconformances,"

' states in part, "When an approved test. procedure / instruction is not complied with, a TDR shall be processed . . . . "

Contrary to these requirements on May 10, 1989, during the conduct of.the Remote Shutdown Capability and Loss of Control Room .

Habitability. tests, the Shift Test Engineer failed to issue a' test q deficiency report to document a valve misalignment that occurred during the testing. ,

This failure to document a deficiency is a Severity Level IV violation (Supplement 1) (445/8937-V-04). 1 Pursuant to the provisions of 10 CFR 2.201, TU Electric is hereby required to submit a written statement c explanation to the U. S.

Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC, 20555, with a copy to the Assistant Director for Inspection Programs, Comanche Peak Project Division, Office of <

Special Projects, within 30 days of the date of the letter transmitting this Notice. This reply should be clearly marked as a  :

" Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation if admitted, (2) the corrective steps that have been taken and the results achieved, (3).the' corrective steps that will be taken to avoid further C907070281 PDR 890630 I .

G ADOCK 05000445 i J PNU J

__ - .- ~

. , . ' .. .p 2

violations, andz.(4) the date when full compliance'will be achieved. ~

If.an' adequate reply is not received within the time specified in this Notice, an order!-may be issued to show cause why the license should not.be modified, suspended, or. revoked or,why such other action as may'be proper.should not be taken. Where good cause is shown, consideration will be!given to extending the~ response time.

FOR THE NUCLEAR REGULATORY COMMISSION R F/s) J

Dated at Comanche. Peak Site this 30th day of June- .1989 l

l l

- _ . _ _ _ - - . . . . - _ . _ . _ _ _ . - _ _ - _ _ . - __ _ _ _ _ _ _ _ _ _ _ _