Ro:On 721107,differential Pressure Switch That Initiates Reactor bldg-to-torus Vacuum Breakers Found Failed.Cause of Failure Not Identified.Bellows Assembly of Switch Replaced
ML20235F193
Person / Time
Site: Monticello, 05000000
Issue date: 11/16/1972
From: Mayer L
NORTHERN STATES POWER CO.
To: Giambusso A
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20235B311 List: ... further results
References
FOIA-87-111 NUDOCS 8709280447
Download: ML20235F193 (1)


Text

.

/ DT5ti DEBEn &cear-sn n- 4o NORTHERN STATES POWER C0MPANY Minneapolis, Min esota 55401 November 16, 1972

,,6 0 Mr. A. Giambusso <f Deputy Director for Reactor Proja:ts /f Directorate of Licensing United States Atomic Energy Conrn:ssion ._

(S Wa shington, D. C. 20545 .

M-Dear Mr. Giambuseo 6 .s- .

LONTICELLO NUCLEAR GENERATING PLANT '? '-

Docket No. 50-263 License No. DPR-22  ;

Failure of Reactor Building to Torus Vacuun Breaker Differential Pressure Control Switch A condition occurred at the Monticello Nuclear Generating Plant recently which we are reporting to your office in accordance with Section 6.6.C.1 of Appendix A, Teche,ical Specifications, of Provisional Operating License DPR-22.

On November 7,1972, while performing a surveillance test, one of two differential pressure switches which initiate the reactor building-to-torus vacuum breakers was found failed in the untripped condition. The failure resulted in an inoperability of one of the two 2005 vacuun relief breakers. The redundant unit was tested inrned-lately and determined to be operable.

The cause of the failure has not been identified; however, it is known that the failure occurred in the bellows assernbly of the DP switch. The bellows assernbly of the switch was replaced, the DP switch was calibrated, and the systern was functionally tested. The failed bellows assembly has been returned to the manu-facturer for further analysis of the failure. Both differential pressure switches which serve to control the reactor building to suppression chamber vacutrn breakers have been placed on an accelerated eight week surveillance test schedule.

Yours very truly, 0- ,

L. O. Mayer P. .

Director Nuc, lear Support Services LOWmmm ec: BH Grier E

(

emwm im mumi a vaqty 8 e+:g (f 8709280447 PDR 870921 FOIA (