Application for Amends to Licenses DPR-29 & DPR-30,modifying Tech Specs Re Turbine Control Valve Fast Closure Scram
ML20235D972
Person / Time
Site: Quad Cities, 05000000
Issue date: 04/07/1972
From: Brian Lee
COMMONWEALTH EDISON CO.
To: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20235B311 List: ... further results
References
FOIA-87-111 NUDOCS 8709250429
Download: ML20235D972 (2)


Text

_ _ _ - - - - -

1 I

']

D

(

+r r

itelsdatofy File Cy.,

q Commonwealth Edison Company J

CNE F 1.t s T NATlONAL PLAZA * - C H I C A G O.

IL LI N Ol s j

u*.., s ir,

, -g ' ' "

Lj rott orcies sox 747

  • cnicaoo,attisois o.,o-April 7, 1972 j

s,%' k m-1

( wt V.'

gq 49,t; e N.TM+

i l'

Dr. Peter A. Morris, Director Division of Reactor Licensing j.

fg

j U.S. Atomic Energy Commission 53

$Jg 1

washington, D.C.

20545 f

s Subbet:

Proposed Change to Appendix A, DPR-2 g

DPR-30 filed under AEC DktsCso-257 and Su.;od Dear Dr. Norris Pursuant to Section 50.59 of 10 CFR 50 and paragraph 3.B 4

of Facility Licenses DPR-29 and DPR-30, Commonwealth Edison Company-and Iowa-IJ.linois Gas and Electric Company.hereby submit. a proposed l

change to Appendix A of DPR-29 and DPR-30 (Quad-Cities Units 1 and'

2).

The purpose of this change is to modify the technical j

specifications concerning the turbine control valve fast closure j

The page changes to the technical specifications are j

ecram.

attached.

The safety evaluation for the proposed change is given j

I below.

Presently the turbine control system oil pressure scram setpoint is set at 1100 psig.

In this change, it is proposed that l

the scram setpoint be set equal to or greater than 900.psig.

With

~

the 1100 scram setpoint, several spurious scrams have occurred in Dresden Units 2 and 3 due to the fact that the setpoint was too close to the normal operating pressure of 1250 psig.

Therefore, it is proposed that the scram be set at 900 psig which will allow

)

adequate margin, for pressure must drop to 600 psig before the f

turbine control valves begin to close.

Thus, there is a margin l

of 300 psig between the point at which the scram is initiated and at which the turbine control valves actually begin to close.

{

i q

dJ 2

ppo g 49pt;

_ _@4-

{

8'709250429 870921 PDR FOIA I

/,

NENZ87-111 PDR

t,

.' Commonwealth Edison Company l

Dr. Peter-A. Morris 2,-

April 7, 1972 This proposed change is identical.to Change 16 to DPR-19 and., Change 8 to DPR-25, Appendix A which you have previously approved.

This proposed change has been reviewed and approved by

- the Commonwealth Edison Company Nuclear. Review. Board.

In addition to three-signed originals, 19 copies of this change are also submitted.

Very truly yours, l

.)gh'h

\\,

(

Byron Lee, Jr.

Assistant to the President d