ML20235D829
Similar Documents at Monticello, 05000000 | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M3801999-10-21021 October 1999
[Table view]Forwards Insp Rept 50-263/99-06 on 990813-0923.Four Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20217G0711999-10-13013 October 1999 Forwards Insp Rept 50-263/99-12 on 990913-17.No Violations Noted ML20216J2491999-09-30030 September 1999 Ack Receipt of 980804,990626 & 0720 Ltrs in Response to GL 98-01,suppl 1, Year 2000 Readiness of Computer Sys at Npps. Staff Review Has Concluded That All Requested Info Has Been Provided ML20212K9131999-09-30030 September 1999 Refers to 990920 Meeting Conducted at Monticello Nuclear Generating Station to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA ML20217B1421999-09-30030 September 1999 Informs That on 990902,NRC Staff Completed mid-cicle Plant Performance Review of Monticello Nuclear Generating Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Information & to Plan for Insp Activities ML20216G4341999-09-24024 September 1999 Forwards Exam Rept 50-263/99-301 on 990823-26.Violation Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy.Test Was Administered to Two Applicants. Both Applicants Passed All Sections of Exam ML20216J8091999-09-24024 September 1999 Informs That New Diaphragm Matl Has Corrected Sticking Problem Associated with Increased Control Rod Drive Scram Times.Augmented Testing of Valves at Monticello Has Been Discontinued ML20212G7171999-09-24024 September 1999 Submits Semiannual Status Update on Project Plans for USAR Review Project & Conversion to Its.Conversion Package Submittal Continues to Be Targeted for Aug of 2000 ML20212G9801999-09-23023 September 1999 Refers to Resolution of Unresolved Items Identified Re Security Alarm Station Operations at Both Monitcello & Prairie Island ML20212F0901999-09-21021 September 1999 Confirms Discussion Between M Hammer & Rd Lanksbury to Have Routine Mgt Meeting on 991005 in Lisle,Il.Purpose of Meeting to Discuss Improvement Initiatives in Areas of Operations & Equipment Reliability ML20217A5751999-09-0909 September 1999 Forwards Individual Exam Results for Licensee Applicants Who Took Aug 1999 Initial License Exam.Without Encls ML20212A9761999-09-0909 September 1999 Submits 1999 Annual Rept of Any Changes or Errors Identified in ECCS Analytical Models or Applications ML20211Q6981999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Monticello Operator License Applicants During Wks of 010604 & 11.Validation of Exam Will Occur at Station During Wk of 010514 ML20211K7971999-09-0101 September 1999 Informs That Util Reviewed Rvid as Requested in NRC .Recommended Corrections Are Listed ML20211L1981999-09-0101 September 1999 Forwards Insp Rept 50-263/99-05 on 990702-0812.No Violations Noted ML20211K2591999-08-27027 August 1999 Forwards NSP Co Fitness for Duty Program Performance Data for Six Month Period Ending 990630 ML20211F9961999-08-26026 August 1999 Forwards Effluent & Waste Disposal Semi-Annual Rept for 990101-990630, Revised Effluent & Waste Disposal Semi-Annual Rept for 980701-981231 & Revs to ODCM for Monitcello Nuclear Generating Plant ML20211C9501999-08-23023 August 1999 Forwards Rev 17 to Monticello Nuclear Generating Plant USAR, Updating Info in USAR to Reflect Implementation of Increase in Licensed Core Thermal Power from 1,670 Mwt to 1,775 Mwt.Rept of Changes,Tests & Experiments Not Included ML20210T9601999-08-12012 August 1999 Provides Rept on Status of Util RPV Feedwater Nozzle Insps Performed in Response to USI A-10 Re BWR Nozzle Cracking ML20210U1831999-08-12012 August 1999 Revises 980202 Commitment Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions ML20210Q0341999-08-0404 August 1999 Forwards SE Granting Licensee 980724 Relief Request 10 Re Third 10-year Interval ISI Program Plan,Entitled, Limited Exam ML20210H0861999-07-28028 July 1999 Forwards Insp Rept 50-263/99-04 on 990521-0701.No Violations Noted.Licensee Conduct at Monticello Facility Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Appropriate Radiological Controls ML18107A7051999-07-20020 July 1999 Provides Suppl Info Which Supersedes Info in 990625 Ltr in Response to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML20212H3191999-07-16016 July 1999 Forwards Aug 1999 Monticello RO Exam Package,Including Revised Outlines.All Changes Are in Blue Font ML20209G5621999-07-14014 July 1999 Forwards Insp Rept 50-263/99-11 on 990621-24.No Violations Noted.Objective of Insp,To Determine Whether Monticello Nuclear Generating Station Emergency Plan Adequate & If Station Personnel Properly Implemented Emergency Plan ML20196J5351999-07-0202 July 1999 Discusses GL 92-01,Rev 1,Supp 1, Rv Integrity, Issued by NRC on 950515 & NSP Responses & 980917 for Monticello Npp.Informs That Staff Revised Info in Rvid & Released Info as Rvid Version 2 ML20196J9681999-07-0101 July 1999 Informs That in Sept 1998,Region III Received Rev 20 to Portions of Util Emergency Plan Under 10CFR50.54(q).Based on Determination That Changes Do Not Decrease Effectiveness of Licensee Emergency Plan,No NRC Approval Required ML20209B6151999-06-25025 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Y2K Readiness Disclosure Attached ML20196H2291999-06-24024 June 1999 Responds to Administrative Ltr 99-02,dtd 990603,requesting Licensee to Provide Estimate of Licensing Action Submittals Anticipated.Four New Submittals Per Year Are Anticipated ML20207D5851999-05-25025 May 1999 Submits Info Re Partial Fulfillment of License Conditions Placed on Amend 101,which Approved Use of Ten Exceptions for 24 Months Subject to Listed App C Conditions.Util Will Submit Second Rept to Obtain Approval for Continued Use ML20206S0911999-05-17017 May 1999 Forwards Response to NRC 990324 RAI Re Proposed Amend to pressure-temp Limits & Surveillance Capsule Withdrawal Schedule, .Supporting Calculations Also Encl ML20206N5601999-05-13013 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Cm Craig Will Be Section Chief for Monticello Npp.Organization Chart Encl ML20206G2181999-05-0505 May 1999 Discusses Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, Dtd 960110,for Plant ML20206G4901999-05-0404 May 1999 Forwards Staff Review of Licensee 960508 Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Sf,Over Fuel in Rc or Over Safety-Related Equipment, .Overall, Responses Acceptable.Tac M95610 Closed ML20206G7741999-05-0303 May 1999 Forwards Insp Rept 50-263/99-02 on 990223-0408.One Violation Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20206D1651999-04-27027 April 1999 Forwards Radiation Environ Monitoring Program for MNGP for Jan-Dec 1998, Per Plant TS 6.7.C.1.Ltr Contains No New NRC Commitments or Modifies Any Prior Commitments ML20205N0821999-04-12012 April 1999 Forwards SE of NSP Response to NRC GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Licensee Adequately Addressed Actions Requested in GL ML20205N5301999-04-0909 April 1999 Discusses Arrangements Made on 990406 for Administration of Licensing Exams at Monticello Nuclear Generating Station During Wk of 990823.Requests That Exam Outlines Be Submitted by 990128 & Supporting Ref Matls by 990719 ML20205N4811999-04-0909 April 1999 Forwards Licensing Requalification Insp Rept 50-263/99-10 on 990308-12.No Violations Noted.However,Inspectors Through Observation of Simulator Scenario Exams Noted Difficulties in Ability of SM to Simultaneously Implement Duties of SM ML20196K7831999-03-31031 March 1999 Forwards Decommissioning Funding Status Rept for Monticello & Prairie Island Nuclear Generating Plants,Per Requirements of 10CFR50.75(f)(1) ML20205H5731999-03-29029 March 1999 Submits Required 1998 Actual & 1999 Projected Cash Flow Statements for Monticello Nuclear Generating Plant & PINGP, Units 1 & 2.Encl Contains Proprietary Info.Proprietary Info Withheld,Per 10CFR2.790(b)(1) ML20205C4851999-03-26026 March 1999 Informs That on 990203,NRC Staff Completed PPR of Nuclear Plant.Staff Conducts Reviews for All Operating NPPs to Develop an Integrated Understanding of Safety Performance ML20205C6561999-03-26026 March 1999 Submits Semiannual Update on Project Plans for USAR Review Project & Conversion to ITS ML20205A5881999-03-24024 March 1999 Forwards Request for Addl Info Re Submittal Requesting Rev of pressure-temperature Limits & Surveillance Capsule Withdrawal Schedule ML20204H4711999-03-18018 March 1999 Forwards SER Concluding That Util Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Monticello & Adequately Addressed Actions Requested in GL 96-05 ML20207H5161999-03-11011 March 1999 Forwards Insp Rept 50-263/99-01 on 990112-0222.No Violations Noted ML20207F4091999-02-28028 February 1999 Forwards Fitness for Duty Program Performance Data for Six Month Period from 980701-981231,IAW 10CFR26.71 ML20207F6741999-02-24024 February 1999 Forwards Summary of Nuclear Property Insurance Maintained at Monticello & Prairie Island Nuclear Generating Plants ML20207F6901999-02-23023 February 1999 Forwards Effluent & Waste Disposal Semi-Annual Rept for 980701-981231, Off-Site Radiation Dose Assessment for 980101-981231 & Revised Effluent & Waste Disposal Semi- Annual Rept for 980101-980630, for Monticello ML20203F2541999-02-10010 February 1999 Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function 1999-09-09 Category:INCOMING CORRESPONDENCE MONTHYEARML20212G7171999-09-24024 September 1999
[Table view]Submits Semiannual Status Update on Project Plans for USAR Review Project & Conversion to Its.Conversion Package Submittal Continues to Be Targeted for Aug of 2000 ML20216J8091999-09-24024 September 1999 Informs That New Diaphragm Matl Has Corrected Sticking Problem Associated with Increased Control Rod Drive Scram Times.Augmented Testing of Valves at Monticello Has Been Discontinued ML20212A9761999-09-0909 September 1999 Submits 1999 Annual Rept of Any Changes or Errors Identified in ECCS Analytical Models or Applications ML20211K7971999-09-0101 September 1999 Informs That Util Reviewed Rvid as Requested in NRC .Recommended Corrections Are Listed ML20211K2591999-08-27027 August 1999 Forwards NSP Co Fitness for Duty Program Performance Data for Six Month Period Ending 990630 ML20211F9961999-08-26026 August 1999 Forwards Effluent & Waste Disposal Semi-Annual Rept for 990101-990630, Revised Effluent & Waste Disposal Semi-Annual Rept for 980701-981231 & Revs to ODCM for Monitcello Nuclear Generating Plant ML20211C9501999-08-23023 August 1999 Forwards Rev 17 to Monticello Nuclear Generating Plant USAR, Updating Info in USAR to Reflect Implementation of Increase in Licensed Core Thermal Power from 1,670 Mwt to 1,775 Mwt.Rept of Changes,Tests & Experiments Not Included ML20210T9601999-08-12012 August 1999 Provides Rept on Status of Util RPV Feedwater Nozzle Insps Performed in Response to USI A-10 Re BWR Nozzle Cracking ML20210U1831999-08-12012 August 1999 Revises 980202 Commitment Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions ML18107A7051999-07-20020 July 1999 Provides Suppl Info Which Supersedes Info in 990625 Ltr in Response to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML20212H3191999-07-16016 July 1999 Forwards Aug 1999 Monticello RO Exam Package,Including Revised Outlines.All Changes Are in Blue Font ML20209B6151999-06-25025 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Y2K Readiness Disclosure Attached ML20196H2291999-06-24024 June 1999 Responds to Administrative Ltr 99-02,dtd 990603,requesting Licensee to Provide Estimate of Licensing Action Submittals Anticipated.Four New Submittals Per Year Are Anticipated ML20207D5851999-05-25025 May 1999 Submits Info Re Partial Fulfillment of License Conditions Placed on Amend 101,which Approved Use of Ten Exceptions for 24 Months Subject to Listed App C Conditions.Util Will Submit Second Rept to Obtain Approval for Continued Use ML20206S0911999-05-17017 May 1999 Forwards Response to NRC 990324 RAI Re Proposed Amend to pressure-temp Limits & Surveillance Capsule Withdrawal Schedule, .Supporting Calculations Also Encl ML20206D1651999-04-27027 April 1999 Forwards Radiation Environ Monitoring Program for MNGP for Jan-Dec 1998, Per Plant TS 6.7.C.1.Ltr Contains No New NRC Commitments or Modifies Any Prior Commitments ML20196K7831999-03-31031 March 1999 Forwards Decommissioning Funding Status Rept for Monticello & Prairie Island Nuclear Generating Plants,Per Requirements of 10CFR50.75(f)(1) ML20205H5731999-03-29029 March 1999 Submits Required 1998 Actual & 1999 Projected Cash Flow Statements for Monticello Nuclear Generating Plant & PINGP, Units 1 & 2.Encl Contains Proprietary Info.Proprietary Info Withheld,Per 10CFR2.790(b)(1) ML20205C6561999-03-26026 March 1999 Submits Semiannual Update on Project Plans for USAR Review Project & Conversion to ITS ML20207F4091999-02-28028 February 1999 Forwards Fitness for Duty Program Performance Data for Six Month Period from 980701-981231,IAW 10CFR26.71 ML20207F6741999-02-24024 February 1999 Forwards Summary of Nuclear Property Insurance Maintained at Monticello & Prairie Island Nuclear Generating Plants ML20207F6901999-02-23023 February 1999 Forwards Effluent & Waste Disposal Semi-Annual Rept for 980701-981231, Off-Site Radiation Dose Assessment for 980101-981231 & Revised Effluent & Waste Disposal Semi- Annual Rept for 980101-980630, for Monticello ML20203A3081999-01-28028 January 1999 Forwards TS Page 60d,as Supplement 3 to 971125 LAR Re CST Low Level Hpci/Rcic Suction Transfer.Page Includes NRC Approved Amend 103 Changes for Use by NRC in Issuing SER ML20202F7821999-01-27027 January 1999 Forwards 1999 Four Year Simulator Certification Rept for MNGP Simulation Facility, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(vi).Ltr Contains No New Commitments or Modifies Any Prior Commitments ML20206S0331999-01-20020 January 1999 Submits Annual Rept of Safety & Relief Valves Failure & Challenges ML20206P1221998-12-31031 December 1998 Forwards LAR for License DPR-22,revising TS pressure-temp Curves Contained in Figures 3.6.1,3.6.2,3.6.3 & 3.6.4, Deleting Completed RPV Sample SRs & Requirement to Withdraw Specimen at Next Refueling Outage & Removing Redundant SR ML20198M3271998-12-28028 December 1998 Submits Change to Commitment for Submittal of ITS Application.Util Plans to Provide ITS Conversion Package Submittal to NRC in Dec of 2000 ML20198J7511998-12-22022 December 1998 Informs of Completion of Listed Commitment Made in Re Severe Accident Mgt. Severe Accident Mgt Guidelines Have Been Assessed,Plant Procedures Have Been Modified & Training of Affected Plant Staff Has Been Completed ML20198J4311998-12-21021 December 1998 Forwards Rev 2 to SIR-97-003, Review of Test Results of Two Surveillance Capsules & Recommendations for Matls Properties & Pressure-Temp Curves to Be Used for Monticello Rpv. Under Separate Cover,Licensee Is Providing LAR to Revise Curves ML20198J7711998-12-14014 December 1998 Documents 981214 Discussion with NRC Staff Re Deviation from Emergency Procedure Guidelines ML20195C8781998-11-11011 November 1998 Forwards Supplement to 971125 License Amend Request Re Condensate Storage Tank Low Level Suction Transfer Setpoints for HPCI Sys & Reactor Core Isolation Cooling Sys ML20195C9631998-11-11011 November 1998 Forwards 120-day Response to NRC GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment ML20195E2261998-11-10010 November 1998 Submits Suppl 1 to Util Response to NRC Request for Addl Info Re 981118 Request for Deviation from Emergency Procedure Guidelines ML20155H6591998-11-0404 November 1998 Forwards Response to 980910 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20155F9091998-10-27027 October 1998 Forwards Master Table of Contents to Rev 16 of Usar.Info Was Inadvertantly Omitted at Time of 981023 Submittal 05000263/LER-1998-005, Forwards LER 98-005-00,re HPCI Being Removed from Service to Repair Steam Leak in Drain Trap Bypass.Commitments Made by Util Are Listed1998-10-21021 October 1998 Forwards LER 98-005-00,re HPCI Being Removed from Service to Repair Steam Leak in Drain Trap Bypass.Commitments Made by Util Are Listed ML20154L9321998-10-12012 October 1998 Forwards Suppl 2 to LAR & Suppl 980319,which Proposed Changes to Ts,App a of Operating License DPR-22 for Mngp.Number of Addl Typos & One Title Change on Pages Associated with Amend Request Have Been Identified ML20154L8671998-10-0909 October 1998 Forwards Suppl 1 to LAR for License DPR-22, Replacing Exhibits B & C of Original Submittal to Reflect Item 2 & Subsequent Changes.Request for APRM Flow Converter Calibr Interval Extension,Withdrawn 05000263/LER-1998-004, Forwards LER 98-004-00 Re Manual Scram Inserted Following Pressure Transient Closes Air Ejector Suction Isolation Valves & Trips Offgas Recombiners.Ler Contains Listed Commitment1998-10-0909 October 1998 Forwards LER 98-004-00 Re Manual Scram Inserted Following Pressure Transient Closes Air Ejector Suction Isolation Valves & Trips Offgas Recombiners.Ler Contains Listed Commitment ML20154J6201998-10-0505 October 1998 Forwards Rev 49 to Monticello Security Plan.Encl Withheld, Per 10CFR73.21 ML20153F5351998-09-25025 September 1998 Submits Semiannual Status Update on Project Plans for USAR Review Project & Conversion to Improved TS ML20153F0051998-09-25025 September 1998 Forwards Suppl 1 to 971031 Application for Amend to License DPR-22,replacing Exhibit C Which Contains TS Pages Incorporating Proposed Changes Described in Original 971031 Request ML20153D1441998-09-17017 September 1998 Informs NRC That Listed Commitments 1 & 3 Were Completed by End of 1998 Refueling Outage.Commitments Involved Final Disposition of Remaining Outlier Components Re All Known Outstanding Work Associated with GL 87-02,Suppl 1,USI A-46 ML20153D8561998-09-17017 September 1998 Forwards Rev 17 to EPIP A.2-414, Large Vol Liquid Sample &/ or Dissolved Gas Sample Obtained at Post Accident Sampling Sys. Superseded Procedures Should Be Destroyed.Ltr Contains No New NRC Commitments,Nor Does It Modify Prior Commitments ML20153E0331998-09-17017 September 1998 Forwards Response to NRC 980629 RAI Re RPV Weld Chemistry Values Previously Submitted as Part of Plant Licensing Basis.Next Monticello RPV Sample Capsule Scheduled to Be Removed During 1999/2000 Refueling Outage ML20153E9011998-09-0909 September 1998 Forwards Rev 1 to MNGP Colr,Cycle 19, Incorporating Changes to power-flow Maps in Figures 6 & 7.Changes Made to Correct Errors in Stability Exclusion Region & Stability Buffer Region Shown on Rev 0 ML20151S7401998-08-28028 August 1998 Responds to NRC Re Violations Noted in Insp Rept 50-263/98-09.Corrective Actions:Procedure 4 AWI-04.04.03 Will Be Revised to Eliminate Term Urgent from Section 4.3.1.D ML20237E9741998-08-26026 August 1998 Forwards Rev 4 to EWI-09.04.01, Inservice Testing Program. Rev of Inservice Testing Program Reflects Valves Added as Result of Component Mods Recently Performed ML20238E8201998-08-26026 August 1998 Forwards Effluent & Waste Disposal Semi-Annual Rept for Jan-June 1998 & Revised Effluent & Waste Disposal Semi- Annual for Jul-Dec 1997. Ltr Contains No New NRC Commitments,Nor Does It Modify Any Prior Commitments ML20237E6821998-08-25025 August 1998 Forwards fitness-for-duty Program Performance Data for Six Months Period Ending 980630 1999-09-09 Category:PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC MONTHYEARML19325E9801989-11-0101 November 1989
[Table view]Requests That Author Name Be Placed on Distribution List Re Schedule of Hearing in Alchemie Case.W/Certificate of Svc. Served on 891101 ML20247F8061989-07-0505 July 1989 FOIA Request for Documentation Re Incidents of Drug &/Or Alcohol Abuse During Past Five Yrs Amoung Employees or Contractors ML20247E6951989-06-27027 June 1989 Advises That Newly Formed Environ Conservation Organization Intends to Oppose Any Util Actions That Might Impact Negatively on Future Operability of Facility ML20247H3631989-06-26026 June 1989 Advises of Formation of Resources Conservation Organization. New Group Intends to Oppose Any Util Actions That Might Impact Negatively on Future Facility Operability.Ad Rossin Will Serve as Organization Coordinator ML20245B3981989-05-0808 May 1989 Discusses Technical & Safety Concerns Re Flow & Pressure Drop Calculations for RWCU & Feedwater & Condensate Sample Panels at Plant ML20245B4081989-03-10010 March 1989 Requests Response to 881014 & 890119 & 23 Ltrs Re Technical & Safety Concerns at Plant ML20244B0011989-03-0808 March 1989 Lists Facts to Consider for Action to Fix or Close GE Reactors Once & for All ML20245B4091989-01-23023 January 1989 Refers to Re Corrosion Inhibitors in Closed Water Sys at Plant.Last Sentence on First Page of Ltr Should Be Changed to Read One Example Is Loss of Air Cooling to Shutdown Board Rooms at Sequoyah ML20245B4101989-01-19019 January 1989 Requests That Jg Partlow Pursue Completion of Engineering Assignment of ED Buggs at Plant Concerning Corrosion Inhibitors for Closed Water Sys.Draft Engineering Rept Recommending Corrosion Inhibitors for Closed Water Sys Encl ML20206D8951988-10-15015 October 1988 Expresses Opinion That Plants Should Remain Closed Until Converted to Alternative Fuel Source ML20245B4121988-10-14014 October 1988 Informs of Several Technical Concerns Expressed While at Util & Requests That Jg Partlow Pursue Resolution of Listed Concerns ML20206D9711988-09-0808 September 1988 Forwards Ltrs Exchanged Between NRC & Author in 1984 Re Problems in Commercial Nuclear Power Field & Change in Federal Regulations to Allow Senior Reactor Operator to Deviate from Tech Specs in Emergency ML20206D9451988-08-12012 August 1988 Annotated Ltr Expressing Appreciation for Reply to & Assurance in Response to Concerns Pertaining to Operation of Ref Plants ML20245D6611988-08-0808 August 1988 Submits Listed Comments in Response to Re Safety Practice to Schedule Nuclear Plant Operating & Maint Personnel for 16 H Shifts &/Or Excessive Overtime ML20206E0281988-07-0707 July 1988 Advises That Nuclear Industry Overlooked Most Important Lesson Resulting from TMI Accident,To Wit,That Station Operator/Mgt Official Stationed in Control Room Would Have Prevented Accident ML20150A7961988-06-30030 June 1988 Comments on Util 880616 Request to Suspend Antitrust License Condition.Economic Advantages for Util Owning Nuclear Power Plants Have Failed to Materialize ML20155B6651988-06-16016 June 1988 FOIA Request for plant-specific Documents Re Fire Protection Requirements,Insp repts,hardware-specific Deficiencies & NRC Communications W/Util ML20206E0361988-04-29029 April 1988 Opines That 10CFR50.54(x) & (Y) Superfluous & Dangerous.Nrc Should Instruct Operators Not to Depart from Tech Specs in Emergency.Author Resume Detailing Experience in Commercial Nuclear Power Field Encl ML20155A7431988-02-24024 February 1988 Discusses Safety Problems at Comm Ed Nuclear Power Plants Re Risking Fuel Meltdown by Turning Off Safety Sys as Directed by Util Policy in Emergency If Core Cooling Is Adequate. Vice President Instruction Encl ML20148G9001988-02-0101 February 1988 FOIA Request for Documents Re 10CFR50,App R Insps & Enforcements ML20206E0431988-01-29029 January 1988 Expresses Concern Re Two Hazardous Practices at Ref Plants, Including Risking Meltdown by Authorizing Operators to Turn Off Nuclear Plant Safety Sys During Emergency ML20149G1051987-12-18018 December 1987 Opposes NRC Reduction at TMI-2.Reducing Staff Prior to Completion of Core Removal Inappropriate & Misguided Move. Recent Shutdown of Oyster Creek for Incident Re Destruction of Data Decreases Util Standing W/Local Residents ML17303A6161987-09-30030 September 1987 Forwards Scenario Review for Rancho Seco Emergency Preparedness Exercise,871104. Incomplete Scenario Provided for Review.Plant data,in-plant Chemistry & Radiological Data & Controller Info to Support Fire Drill Missing Elements ML20235T7341987-09-0101 September 1987 Requests That EIS Documents Re Meltdown Prepared by Impartial Sources Be Made Available to Public.Observation of Plant Life Indicates Level of Contamination of General Environ Causing Widespread Severe Damage ML20238B7731987-08-0707 August 1987 FOIA Request for Records Explaining Status of Listed LERs Omitted from List,Previously Received from Nrc,Of LERs Filed by Commercial Nuclear Power Plant Licensees for Operating Year 1986 ML20238E0261987-07-15015 July 1987 Responds to Recipient 870528 Response to Bg Strout Re Maine Yankee & Pilgrim.Author Distressed by NRC Answers & Requests Addl Response to Listed Questions ML20235L7061987-07-0808 July 1987 Opposes Util Application for Amends to Licenses,Allowing New Ownership & Financing Arrangement.Nshc Should Not Be Made W/O Public Hearings on Serious Financial Qualifications Questions ML20235K0421987-07-0202 July 1987 FOIA Request for List of All Licensed Reactor Operators & Senior Reactor Operators for Facilities ML20235F7451987-06-30030 June 1987 FOIA Request for Documents Re Safeteam Programs Being Used at Listed Facilities ML20215L5051987-06-23023 June 1987 Provides Brief Updated Rept on Status of Comm Ed Proposal Before State of Il Commerce Commission to Restructure Ownership & Other Financial Arrangements Re Facilities.Urges NRC Not to Make Finding Prior to Hearing ML20215L4871987-06-23023 June 1987 Urges NRC Not to Approve Comm Ed Request for Amend of Any OL Re Braidwood 1 & 2 & Not to Determine No Significant Hazard Exists W/O First Holding Adjudicatory Hearings on Serious Financial Qualifications Issues ML20215D6371987-06-12012 June 1987 Forwards Reply to Responses from NRC & B&W Owners Group. NRC Response Evidences No Independent Review of B&W Claims. Commission Urged to Take Personal Jurisdiction of Petition to Ensure That Latest Commitment Not Frustrated ML20236H1481987-05-30030 May 1987 Discusses Varga Reply to 870428 Mailgram Re Proof That LOCA Could Not Occur in Reactor Core at Plants.Evidence in Files of Repeated AEC & NRC Repression & Ignorance of Legitimate ACRS Concerns Cited.Congressional Hearings Requested ML20215K8391987-04-22022 April 1987 Opposes Licensing of Facilities for All the Same Old Reasons ML20214E2281987-04-16016 April 1987 FOIA Request for PRAs for Listed Plants Be Placed in PDR ML20214L0951987-03-13013 March 1987 Comments on Proposed Rule 10CFR50 Re Mod of Safety Rules to Enable Facilities to Startup Operation.Opposes Rule Due to Result of NRC Abdicating Responsibility as Protector of Safety of Populations Exposed to Radiation During Accidents ML20236D9381987-03-0404 March 1987 Partially Withheld Ltr Discussing Nuclear Power Industry Problems as Encountered During 6 Yrs of Employment at Limerick.Shoreham, & Hope Creek.Demotions & Terminations for Reporting Safety Concerns Described ML20215K8531987-02-24024 February 1987 Advises That Nassau County Board of Cooperative Educational Svcs Has Not Entered Into Any Agreement W/Lilco to Have Salisbury Campus Used for Relocation Facility in Event of Radiological Emergency ML20207T2381987-02-18018 February 1987 FOIA Request for Rept on Odds of Large Radioactive Release at Us Commercial Nuclear Reactors,Including Surry,Peach Bottom,Sequoyah,Grand Gulf & Zion ML20236D1281987-02-15015 February 1987 Forwards Preliminary Investigation of Worker Allegations About Safety of Plant Conducted by Gap in 1986.Investigation Revealed Enough Info to Raise Serious Questions Re Const Quality.Petition Per 2.206 Forthcoming ML20211B6601987-01-0505 January 1987 FOIA Request for Documents Re Allegations,Investigations, Fines,Convictions & Other Dispositions of Cases in Which Operators of Listed Facilities Charged W/Violating Federal whistle-blowing Statutes ML20207Q0971986-12-29029 December 1986 FOIA Request for Documents Re Util Proposed Reduction of EPZ at Seabrook,Changes to Containment at GE Plants, Including Pilgrim & Vermont Yankee & Insp of Pilgrim 1 Since Shutdown in Apr ML20215K9121986-11-26026 November 1986 Requests Opinion of Fairness of Shoreham Proceeding ML20212D7651986-11-12012 November 1986 Expresses Safety Concerns Re Containment Pressure Boundary, Based on 850916 Sser ML20215K9561986-09-22022 September 1986 Supports Licensing of Facility Due to Close NRC Scrutiny of Const & Operation ML20213C7931986-09-12012 September 1986 FOIA Request for Documents Re Western Piping & Engineering Pipe Clamps Furnished to Perry 1 & 2 & Van Meter 820607, 0721,0818 & 840125 Complaints to NRC Re Design Deficiencies at River Bend ML20211C5631986-09-12012 September 1986 FOIA Request for Three Classes of Documents Re Use of Western Piping & Engineering Clamps at Perry Nuclear Power Plant & All Complaints/Correspondence Involving Deficiency Complaint at River Bend Plant ML20215L4061986-09-11011 September 1986 FOIA Request for All Ltrs,Depositions & Other Communications Re Facilities ML20215N9491986-09-11011 September 1986 FOIA Request for Ltrs,Depositions & Other Communications in Connection W/Nine Mile Point & Shoreham Nuclear Power Stations ML20215K2791986-09-0404 September 1986 FOIA Request for Six Categories of Documents Re 1982 Civil Penalty & Ofcs of Investigations & Inspector & Auditor Investigations of Listed Facilities 1989-07-05 Category:TELEGRAMS-CORRESPONDENCE MONTHYEARML19325E9001989-10-19019 October 1989
[Table view]Forwards Text of Info Communicated to All Util W/ Westinghouse NSSS Design on Pressurizer Safety Valve Set Pressure Deviation Info Request Response ML18031B1361987-01-16016 January 1987 Forwards Updates of TVA Activities for Wks of 870119 & 26 ML20213F3831985-07-15015 July 1985 Requests Suspension of Low Power Testing at Facility Until Investigation of Accident Causing Hot Shutdown of Plant & Review of Training of Personnel & Condition of Equipment Complete ML20213F3871985-07-11011 July 1985 Requests Immediate Halt of Low Power Testing at Facility Until Investigation of 850710 Accident in Which Valve Sys in Primary Containment Bldg Improperly Left Open Releasing Gas Into Atmosphere Complete ML20102A3531984-07-11011 July 1984 FOIA Request for W Butler 810407 Memo Re H2 Combustion, Evaluation of Glow Plug Igniter Concept for Use in Sequoyah Nuclear Plant, & M Berman 830524 Memo Re Mod of Nuclear Reactor Containment Atmosphere ML20127B8081984-06-0808 June 1984 Advises That Responses to Questions Re Safety Significance of Low Power or Normal Operation W/Tech Spec & Surveillance Procedure Errors Raised in Congressman Markey Inadequate ML20137H0261978-06-27027 June 1978 Announces Signing of Renegotiated Contracts W/Dow Chemical Co for Supply to Dow of Steam from Util Plant & Electricity from Util Electric Sys ML20137D6351978-01-0909 January 1978 Requests Delay in Issuance of Ols,Pending Resolution of Cluster of 46 micro-earthquakes Northwest of Lake Anna Dam. Site Seismic Design Questioned ML20086D4811977-06-20020 June 1977 Advises That Addl Conservatism Being Administratively Added to Tech Specs for Max Critical Power Ratio Limits,In Light of GE ML20085G9801973-09-0808 September 1973 Telecopy AO BFAO-739T:on 730908,fuse Blown in HPCI Inverter Power Supply.Reactor Pressure Immediately Reduced to 120 Psig ML20235D8291971-09-0707 September 1971 Requests Copies of 710422 Twx Re 710422-0505 Plant Operation W/Inoperative HPCI Sys & AEC 710429 Reply Sent to Util & G Merritt of State of Mn Pollution Control Agency ML20084V1151969-09-29029 September 1969 Submits Results of Investigation of RCPB Valves ML20101U6691968-07-0505 July 1968 Responds to Re Release of Two Remaining Stub Tubes for Repair.Unable to Determine How Meaningful Info Could Be Obtained from Surveillance Program to Expose Clad & Unclad Samples of Stub Tube Matl ML20084C1821968-06-25025 June 1968 Responds to NRC Re Release of Two Remaining Stub Tubes for Repair.Insufficient Technical Justification Exists to Phase Out Tube Sample Surveillance Program.Stub Tube Repair Operation Proceeding W/O Sample Surveillance Program ML20235A3051964-09-28028 September 1964 Lists Util Representatives Who Will Attend ACRS 641007 Meeting in Washington,Dc to Discuss Bodega,Per 640928 Telcon ML20234F1481964-05-12012 May 1964 Requests That Bodega Questions Be Sent by Collect Telegram, Per Telcon ML20234A7611964-05-0808 May 1964 Twx Requesting Response to & Stds for Control Rods ML20234E2051964-04-30030 April 1964 Informs That Listed Persons Will Be Brought to ACRS 640508 Meeting ML20234B9051963-07-25025 July 1963 Informs That If Meeting Desired for Util Bodega Bay Earthquake design,630801 & 02 Dates Preferred ML20235A6451963-06-12012 June 1963 Informs That Calls for Rd Not Received ML20234B9851963-06-12012 June 1963 Informs That Amends 3 to Suppl & Parts I & III Forms Will Be Mailed on 630613 ML20234B1551963-04-26026 April 1963 Advises That Proposal Submitted to GE on Scope Limited to Dynamic Analysis of GE Installations for Ground Motion Specified by Util Not Yet Accepted 1989-10-19 |
Text
. _ - _
j4a c>d f'T a
/' .
1
[; @ 'h b. 7 _)) j~ .
k< /
Y:Y.3liT2d hNili@l Mf2. l.U.$. / -
V,
' 'D+ ~
1 1971 SD ~/ I 4 58 i USAEC HGS GTWN I
TLX4091t (20)CTA0lS MA096 d.S. Ai ; e'. DDG i c )MM.
M L M603 DV NL PDB ARO ROCHESTER MINN 6
- PETEx A MORRIS (DLY DONT PHONE), DIRECTOR DIVISION OF REACTOR l
LICENSING i
4f0MIC ENERGY COMMISSION WASHDC i
\
PLi.A.c.E 1"URNISH A COPY OF NSPTWX 22 APRIL 1971 CONCERNING THE ;
CPERATION OF MONTICELLO WITH INOPERATIVE HPCI SYSTEM DURING i 22 APAIL TO 5 MAY 1971 SENT TO STEVE J GADLER 2120 CARTER AVE I ST PAUL NINN ALSO A COPY OF YOUR REPLYING LETTER 29 APRIL 1971 WnlCH 'NVITED NSP ATTENTION TO IMPORTANCE OPE'4ABLE HPCI SYSTEM FON THE PUBLIC HCALTH AND SAFETY SEND TO GRANT MERRITT EXECUTIVE DIRECTCH MINNESOTA POLLUTION CONTROL AGENCY THANK YOU STEVE J GADLER 2120 CA p ER AVE ST PAUL MINN NSPTWX 22 1971 22 5 1971 2120 29 1971 2120.
(0 v cb '%
330A EDT E
?? ~
0 p -
hx .A
/
- USAEC Has GTWN g
ESIEM LIN!QNINCOMMC 8709250370 870921 -
?
- ;i ? :J)c
. j; a ,
_ _ _ _ _ _ _ _ - - - _ - - - . - _ _