ML20235C730
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20212J9991999-10-0101 October 1999
[Table view]Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20112E8911996-05-24024 May 1996 FOIA Request to Inspect & Copy Original OL Issued by Aec/Nrc for Util & EPP Issued as App B to Plant OL SNRC-2192, Forwards Both Copies,Signed by Util President Cv Giacomazzo, of Amend 7 to Indemnity Agreement B-87.Util Returning Copies Because Effective Date Left Blank1995-05-15015 May 1995 Forwards Both Copies,Signed by Util President Cv Giacomazzo, of Amend 7 to Indemnity Agreement B-87.Util Returning Copies Because Effective Date Left Blank ML20082B9131995-03-13013 March 1995 Submits Corrected Page for Insertion Into Final Rept Re Confirmatory Survey of RB & Phase 4 Systems at Plant ML20081A9321995-03-0707 March 1995 Forwards Final Rept Orise 95/B-81, Confirmatory Survey of Reactor Bldg & Phase 4 Sys Shoreham Nuclear Power Station Brookhaven,Ny ML20081A6531995-03-0707 March 1995 Forwards Final Rept Orise 95/B-80, Confirmatory Survey of Radwaste Bldg,Suppression Pool,Phase 2 Phase 3 Sys,Shoreham Nuclear Power Station,Brookhaven,Ny ML20081B5801995-02-21021 February 1995 Forwards Final Rept Confirmatory Survey of Reactor Bldg & Phase 4 Sys Shoreham Nuclear Power Station Brookhaven,Ny ML20081A6841995-02-21021 February 1995 Forwards Final Rept Confirmatory Survey of Radwaste Bldg, Suppression Pool,Phase 2 & Phase 3 Sys,Shoreham Nuclear Power Station,Brookhaven,Ny ML20081A7111995-01-30030 January 1995 Forwards Rev 1 to Draft Rept Confirmatory Survey of Reactor Bldg & Phase 4 Sys,Shoreham Nuclear Power Station, Brookhaven,Ny ML20081A7001995-01-30030 January 1995 Forwards Rev 1 to Draft Rept Confirmatory Survey of Radwaste Bldg,Suppression Pool,Phase 2 & Phase 3 Sys, Shoreham Nuclear Power Station,Brookhaven,Ny SNRC-2188, Responds to NRC Request for Addl Info Re Certain Elevated Levels Found During Phase 4 Confirmatory Survey1995-01-20020 January 1995 Responds to NRC Request for Addl Info Re Certain Elevated Levels Found During Phase 4 Confirmatory Survey SNRC-2189, Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program,Annual Radiological Environ Operating Rept, Jan-June 19941995-01-20020 January 1995 Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program,Annual Radiological Environ Operating Rept, Jan-June 1994 SNRC-2187, Forwards Snps Annual Man-Rem Rept, Including Individuals for Whom Personnel Monitoring Provided During CY94,per 10CFR20.407(a) & (B).Rept Also Includes Individuals Identified in 10CFR20.202(a),who Require Monioring1995-01-11011 January 1995 Forwards Snps Annual Man-Rem Rept, Including Individuals for Whom Personnel Monitoring Provided During CY94,per 10CFR20.407(a) & (B).Rept Also Includes Individuals Identified in 10CFR20.202(a),who Require Monioring SNRC-2182, Forwards Final Annual Radioactive Effluent Release Rept for Cy 1994, Including Last Revised Copies of ODCM & Pcp.Rept Prepared for Closeout Purposes as Part of Completion of Plant Decommissioning1994-11-0101 November 1994 Forwards Final Annual Radioactive Effluent Release Rept for Cy 1994, Including Last Revised Copies of ODCM & Pcp.Rept Prepared for Closeout Purposes as Part of Completion of Plant Decommissioning ML20077L3331994-10-25025 October 1994 Forwards Revised Proposed Confirmatory Survey Plan for Reactor Bldg Shoreham Nuclear Power Station Brookhaven,Ny ML20077M8351994-10-20020 October 1994 Forwards Draft Rept, Confirmatory Survey of Radwaste Bldg, Suppression Pool & Phase 2 Systems,Shoreham Nuclear Power Station,Brookhaven,Ny ML20076K3881994-10-20020 October 1994 Forwards Proposed Confirmatory Survey Plan for Reactor Bldg, Shoreham Nuclear Power Station,Brookhaven,Ny,For Review & Comment SNRC-2184, Forwards Shoreham Decommissioning Project Termination Survey Final Rept Phase 4. Portions Withheld1994-10-12012 October 1994 Forwards Shoreham Decommissioning Project Termination Survey Final Rept Phase 4. Portions Withheld SNRC-2185, Summarizes Results from Revised Exposure Pathway Analysis Using Corrected Dcf for External Exposure for Cs-137.Rev 1 to Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl1994-10-0404 October 1994 Summarizes Results from Revised Exposure Pathway Analysis Using Corrected Dcf for External Exposure for Cs-137.Rev 1 to Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl ML20076F9251994-09-26026 September 1994 Forwards Final Rept Orise 94/I-80, Confirmatory Survey of Turbine Bldg,Site Grounds & Site Exteriors Shoreham Nuclear Power Station Brookhaven,Ny SNRC-2183, Forwards Amend 6 to Indemnity Agreement B-871994-09-23023 September 1994 Forwards Amend 6 to Indemnity Agreement B-87 SNRC-2181, Notifies of Equipment Changes to Shoreham Facility Which Have Occurred Subsequent to Rept on Phase I Final Survey Status,Provided in Util .Equipment Changes Described in Encl Table 11994-09-14014 September 1994 Notifies of Equipment Changes to Shoreham Facility Which Have Occurred Subsequent to Rept on Phase I Final Survey Status,Provided in Util .Equipment Changes Described in Encl Table 1 SNRC-2179, Proposes That Release Criterion for Soil Be Applied to Certain Other Bulk Matls Which Will Remain at Plant Upon Completion of Decommissioning.Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl1994-09-0101 September 1994 Proposes That Release Criterion for Soil Be Applied to Certain Other Bulk Matls Which Will Remain at Plant Upon Completion of Decommissioning.Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl SNRC-2180, Forwards 940829 Memo Entitled, Technical Evaluation of Dusting from Concrete Blocks, Addressing Issue Discussed in Insp Rept 50-332/94-021994-09-0101 September 1994 Forwards 940829 Memo Entitled, Technical Evaluation of Dusting from Concrete Blocks, Addressing Issue Discussed in Insp Rept 50-332/94-02 SNRC-2178, Forwards Proprietary Response to NRC Concerns Re Survey Instruments Used for Termination Survey.Extensive Discussion Provided in Interest of Rapidly Bringing Outstanding Concerns to Close.Response Withheld (Ref 10CFR2.790(a)(4))1994-08-17017 August 1994 Forwards Proprietary Response to NRC Concerns Re Survey Instruments Used for Termination Survey.Extensive Discussion Provided in Interest of Rapidly Bringing Outstanding Concerns to Close.Response Withheld (Ref 10CFR2.790(a)(4)) ML20072P1591994-08-17017 August 1994 Forwards Revised, Confirmatory Survey Plan for Radwaste Bldg & Suppression Pool for Plant SNRC-2177, Forwards Rev 3 to Shoreham Decommissioning Project Termination Survey Plan. Portions of Rept Withheld1994-08-0404 August 1994 Forwards Rev 3 to Shoreham Decommissioning Project Termination Survey Plan. Portions of Rept Withheld SNRC-2176, Informs of near-term Completion of Decommissioning of Shoreham Nuclear Power Station & Hereby Respectfully Requests Support in Achieving Timely Termination of Facility possession-only License NPF-821994-08-0404 August 1994 Informs of near-term Completion of Decommissioning of Shoreham Nuclear Power Station & Hereby Respectfully Requests Support in Achieving Timely Termination of Facility possession-only License NPF-82 ML20071L8741994-07-29029 July 1994 Forwards Confirmatory Survey Plan for Radwaste Building & Suppression Pool for Review & Comment SNRC-2175, Provides Notification of Survey Location Changes to Shoreham Facility Which Have Occurred Subsequent to Repts on Phases 1,2 & 3 Final Survey Status Provided in Refs 1,2 & 3 Respectively1994-07-18018 July 1994 Provides Notification of Survey Location Changes to Shoreham Facility Which Have Occurred Subsequent to Repts on Phases 1,2 & 3 Final Survey Status Provided in Refs 1,2 & 3 Respectively SNRC-2173, Forwards Termination Survey Final Rept Phase 3. Proprietary Pages to Rept Also Encl.Proprietary Pages Withheld (Ref 10CFR2.790)1994-06-14014 June 1994 Forwards Termination Survey Final Rept Phase 3. Proprietary Pages to Rept Also Encl.Proprietary Pages Withheld (Ref 10CFR2.790) SNRC-2172, Certifies That All SNM as Irradiated Fuel Permanently Removed from Site & That Decommissioning/Decontamination Work on Biological Shield Wall Complete,In Accordance W/Nrc Approving Amend 11 to Pol NPF-821994-06-0707 June 1994 Certifies That All SNM as Irradiated Fuel Permanently Removed from Site & That Decommissioning/Decontamination Work on Biological Shield Wall Complete,In Accordance W/Nrc Approving Amend 11 to Pol NPF-82 SNRC-2171, Submits Resolution of Items Identified by NRC Region I Project Inspector,Pertaining to Planned Final Draindown & Discharge of Spent Fuel Storage Pool,Following Complete Removal of Irradiated Fuel1994-06-0202 June 1994 Submits Resolution of Items Identified by NRC Region I Project Inspector,Pertaining to Planned Final Draindown & Discharge of Spent Fuel Storage Pool,Following Complete Removal of Irradiated Fuel SNRC-2170, Requests Approval of Proposed Change to Shoreham Decommissioning Plan for Addl Remedial Decontamination of Shoreham Spent Fuel Storage Pool Beyond That Originally Specified in Decommissioning Plan1994-05-20020 May 1994 Requests Approval of Proposed Change to Shoreham Decommissioning Plan for Addl Remedial Decontamination of Shoreham Spent Fuel Storage Pool Beyond That Originally Specified in Decommissioning Plan SNRC-2168, Notification to NRC of Transfer of Device Containing 30 Uci Cs-137 Source.Device Transferred to JW Merkel,Terra Analytics,Inc1994-05-13013 May 1994 Notification to NRC of Transfer of Device Containing 30 Uci Cs-137 Source.Device Transferred to JW Merkel,Terra Analytics,Inc SNRC-2169, Advises of Listed Clarification to Util Re Resignation of Jc Brons from Position of Executive Vice President of Shoreham Decommissioning Project1994-05-11011 May 1994 Advises of Listed Clarification to Util Re Resignation of Jc Brons from Position of Executive Vice President of Shoreham Decommissioning Project ML20029E1731994-05-11011 May 1994 Informs That Based on Recent Discussions Between Officials, Licensee Decided to Retain Organizational Position at Least Until Fuel Removed from Site ML20029D1991994-04-29029 April 1994 Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program Annual Radiological Environ Operating Rept Jan-Dec 1993. ML20029D2571994-04-28028 April 1994 Advises That Jc Brons Resigned to Pursue Employment W/ Another Util Co,Effective 940429 ML20029C7111994-04-22022 April 1994 Submits Technical Info on Biological Shield Wall Blocks to Be Surveyed SNRC-2163, Provides Notification of Equipment Changes to Facility Which Have Occurred Subsequent to Report on Phase I Final Survey Status Provided in Util1994-04-21021 April 1994 Provides Notification of Equipment Changes to Facility Which Have Occurred Subsequent to Report on Phase I Final Survey Status Provided in Util ML20065M3701994-04-20020 April 1994 Responds to NRC Verbal Request for Info Re Estimated Cost for Decommissioning SNRC-2160, Forwards Financial Info Required by 10CFR50.71(b)1994-03-30030 March 1994 Forwards Financial Info Required by 10CFR50.71(b) SNRC-2161, Forwards 1994 Internal Cash Flow Projection for Shoreham Nuclear Power Station1994-03-30030 March 1994 Forwards 1994 Internal Cash Flow Projection for Shoreham Nuclear Power Station SNRC-2148, Forwards Info Supporting Licensee Proposed Amend,Submitted on 941104.Specifically,info Supports Estimates & Conclusions Re Small Quantity of Remaining Radioactive Matl & Low Radiological Significance of Potential Accident Releases1994-03-0808 March 1994 Forwards Info Supporting Licensee Proposed Amend,Submitted on 941104.Specifically,info Supports Estimates & Conclusions Re Small Quantity of Remaining Radioactive Matl & Low Radiological Significance of Potential Accident Releases 1999-10-01 Category:INTERNAL OR EXTERNAL MEMORANDUM MONTHYEARML20202D5011997-11-28028 November 1997
[Table view]Forwards Table Summarizing Contractor Costs,Staff Hours & FTEs Expended in Removing Sites from Site Decommissioning Mgt Plan & Fsv & Shoreham Nuclear Power Facilities,In Response to C Paperiello 970605 Memorandum NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20059J7931994-01-26026 January 1994 Responds to Request for Headquarters to Review Changes to Shoreham Nuclear Power Station Revised Security Plan for Long Term Defueled Condition,Fuel Storage in Spent Fuel Pool,Rev 2,dtd 930701 ML20056G8501993-08-25025 August 1993 Notification of Significant Licensee Meeting 93-113 W/Util on 930908 to Discuss Transfer of Fuel from Shoreham to Limerick ML20128H5441993-02-0303 February 1993 Notification of 930222 Meeting W/Util in Wading River Road, Ny to Discuss Schedule for Util Final Survey & NRC Confirmatory Survey of Shoreham Nuclear Power Station ML20062E9801990-11-15015 November 1990 Summary of 901107 Telcon W/Util,New York Power Authority & Stone & Webster Re Reactor Pressure Vessel Transportation ML20062C2841990-10-18018 October 1990 Forwards Requests for Hearing Filed by Shoreham-Wading River Central School District & Scientists & Engineers for Secure Energy,Inc Re Various NRC Licensing Actions Addressed on 901017.W/o Encl.W/Certificate of Svc.Served on 901018 ML20059P0831990-10-12012 October 1990 Notification of 901017 Meeting W/Nrc in Rockville,Md to Discuss Decommissioning of Facilities ML20059B9961990-07-19019 July 1990 Notification of Significant Licensee Meeting 90-92 W/Util on 900731 in King of Prussia,Pa to Discuss Facility Proposal for Mods to Operator Licenses & Requalification Program to Reflect Defueled Condition ML20055G5821990-07-19019 July 1990 Notification of 900802 Meeting W/Util in Rockville,Md to Resolve NRC Comments Re Util 900105 Defueled OL Tech Specs ML20055C3521990-02-26026 February 1990 Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20248B8451989-09-21021 September 1989 Submits Agenda for 890928 Meeting W/Util in Rockville,Md Re Current Plant Status,Response to NRC ,Plant Staffing Until Transfer of License,Plans for Transfer & Other Licensing Action Requests ML20248C8311989-09-20020 September 1989 Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action ML20247L8871989-09-13013 September 1989 Notification of 890928 Meeting W/Util in Rockville,Md Re Current Status of Facility ML20247H9261989-09-0909 September 1989 Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 ML20247D4191989-09-0606 September 1989 Notification of Cancellation of 890912 Meeting W/Util in Rockville,Md to Discuss Plant Current Status ML20246P6491989-09-0606 September 1989 Notification of 890912 Meeting W/Util in Rockville,Md to Brief NRC Mgt on Current Plant Status ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20245H6451989-08-0404 August 1989 Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR ML20248D1431989-07-27027 July 1989 Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants ML20247B7541989-07-19019 July 1989 Confirms That Licensee 880711,890221 & 0630 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss, Acceptable.Licensing Action for TACs 69886,69887,69893 & 69894 Considered Complete ML20247E6721989-07-17017 July 1989 Proposes Closeout of Plant Correspondence Control Ticket Re Environ Conservation Organization Request for Notification Whenever License Amend Requests Result in Impairment of Plant Operability.Intervenor Will Be Placed on Svc List ML20246K5991989-07-12012 July 1989 Notification of 890725 Meeting W/Util in Birmingham,Al to Discuss Status of Current Licensing Activities & Corporate Initiatives for Plants.Meeting Agenda Encl ML20246L6801989-07-10010 July 1989 Notification of Significant Licensee Meeting 89-101 W/Util on 890718 in King of Prussia,Pa to Discuss Util Engineering Reorganization ML20247A9561989-07-0606 July 1989 Notification of 890717 Meeting W/Lead Plant Utils in Rockville,Md to Discuss Implementation of Revised STS ML20245F9381989-06-20020 June 1989 Notification of Significant Licensee Meeting 89-085,Rev 4 W/ Util on 890630 in King of Prussia,Pa Re Sale of Facility to State of Ny ML20245E0281989-06-20020 June 1989 Notification of Significant Licensee Meeting 89-085,Rev 3 W/ Util on 890623 in Region I Ofc Re Sale of Plant to State. List of Attendees Included ML20245A7331989-06-14014 June 1989 Rev 1 to Notification of Significant Licensee Meeting 89-085 on 890620 W/Util in King of Prussia,Pa to Discuss short-term Plans & Licensee Compliance Upon Shareholder Approval of Sale of Facility to State of Ny ML20058K0691989-05-26026 May 1989 Responds to Region I Request for Verification of Closeout of Four Items Per Change Notice 88-04 of NRC Insp Manual.Items Include,Diesel Generator Fuel Oil,Bwr Recirculation Pump Trip & Sampling & Analyzing Diesel Generator Fuel Oil ML20244B1131989-05-25025 May 1989 Notification of Significant Licensee Meeting 89-085 W/Util on 890620 in King of Prussia,Pa to Discuss short-term Plans & License Compliance Upon Shareholder Approval of Sale of Plant to State of Ny ML20246H3771989-05-12012 May 1989 ALAB-913.* Advises That Time Provided within Which Commission May Act to Review Aslab Decision ALAB-913 Expired.Commission Declined Review.Decision Became Final on 890501.W/Certificate of Svc.Served on 890512 ML20246P9601989-05-10010 May 1989 Discusses 890413 Meeting W/Rosemount & Industry Re Malfunctions of Rosemount Transmitters.List of Attendess, Agenda,Nrc Info Notice 89-042 & Viewgraphs Encl ML20246N0371989-05-0909 May 1989 Responds to 881208 Memo Re Escort Policy at Facility.Util Agreed,On 890419,to Upgrade Visitor Escort Requirements in Ofc & Svcs Bldg Annex or Provide Addl Security Measures ML20246G3291989-05-0404 May 1989 Cancels 890509 Meeting W/Util in Rockville,Md to Discuss Portions of Security Plan ML20246C1821989-05-0404 May 1989 Notification of 890509 Meeting W/Util in Rockville,Md to Discuss Portions of Plant Security Plan ML20245E9781989-04-17017 April 1989 Forwards Regulatory History AC83-2 Re Licensee Action During Natl Security emergency,10CFR50 (54FR7178) ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20244E2681989-04-12012 April 1989 Summary of Operating Reactors Events Meeting 89-015 on 890412.Discussion of Events,List of Attendees & Three Significant Items Identified for Input Into NRC Performance Indicator Program & Summary of Reactor Scrams Also Encl ML20244A5461989-04-10010 April 1989 Notification of 890503 Meeting W/Util in Rockville,Md to Discuss Using Leak Before Break Methodology on Lines Connected to RCS ML20244A5571989-04-10010 April 1989 Notification of 890502 Meeting W/Util in Rockville,Md to Discuss Nonlinear Piping Analysis to Remove Snubbers & Pipe Supports ML20248D8731989-04-0505 April 1989 Discussion of Shoreham Full Power Ol.* Advises of 890417 Public Meeting in Rockville,Md for Director of NRR to Discuss Findings on Whether Lilco Should Be Granted Full Power Ol.W/Certificate of Svc.Served on 890405 ML20247E6801989-03-28028 March 1989 Discusses 890327 Telcon W/E Lane Reporter for Newsday Re Consideration Given to Idea of Dry Cask Storage ML20247B7351989-03-24024 March 1989 Notification of 890503 Meeting W/B&W,Inel & Util in Rockville,Md to Discuss Licensing Submittals for Plants ML20246M4801989-03-22022 March 1989 Notification of 890328 Meeting W/Util in Central Islip,Ny to Discuss Emergency Planning Issues ML20236A0241989-03-0808 March 1989 Notification of 890309 & 10 Meetings W/Util in Rockville,Md to Discuss Final Resolution of Tech Spec Certification Issues ML20236A9721989-03-0707 March 1989 Forwards Feb 1989 Status Rept Re Current Review Milestones for Each Std Plant Project 1997-11-28 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20202D5011997-11-28028 November 1997
[Table view]Forwards Table Summarizing Contractor Costs,Staff Hours & FTEs Expended in Removing Sites from Site Decommissioning Mgt Plan & Fsv & Shoreham Nuclear Power Facilities,In Response to C Paperiello 970605 Memorandum NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20059J7931994-01-26026 January 1994 Responds to Request for Headquarters to Review Changes to Shoreham Nuclear Power Station Revised Security Plan for Long Term Defueled Condition,Fuel Storage in Spent Fuel Pool,Rev 2,dtd 930701 ML20056G8501993-08-25025 August 1993 Notification of Significant Licensee Meeting 93-113 W/Util on 930908 to Discuss Transfer of Fuel from Shoreham to Limerick ML20128H5441993-02-0303 February 1993 Notification of 930222 Meeting W/Util in Wading River Road, Ny to Discuss Schedule for Util Final Survey & NRC Confirmatory Survey of Shoreham Nuclear Power Station ML20062E9801990-11-15015 November 1990 Summary of 901107 Telcon W/Util,New York Power Authority & Stone & Webster Re Reactor Pressure Vessel Transportation ML20062C2841990-10-18018 October 1990 Forwards Requests for Hearing Filed by Shoreham-Wading River Central School District & Scientists & Engineers for Secure Energy,Inc Re Various NRC Licensing Actions Addressed on 901017.W/o Encl.W/Certificate of Svc.Served on 901018 ML20059P0831990-10-12012 October 1990 Notification of 901017 Meeting W/Nrc in Rockville,Md to Discuss Decommissioning of Facilities ML20059B9961990-07-19019 July 1990 Notification of Significant Licensee Meeting 90-92 W/Util on 900731 in King of Prussia,Pa to Discuss Facility Proposal for Mods to Operator Licenses & Requalification Program to Reflect Defueled Condition ML20055G5821990-07-19019 July 1990 Notification of 900802 Meeting W/Util in Rockville,Md to Resolve NRC Comments Re Util 900105 Defueled OL Tech Specs ML20055C3521990-02-26026 February 1990 Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20248B8451989-09-21021 September 1989 Submits Agenda for 890928 Meeting W/Util in Rockville,Md Re Current Plant Status,Response to NRC ,Plant Staffing Until Transfer of License,Plans for Transfer & Other Licensing Action Requests ML20248C8311989-09-20020 September 1989 Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action ML20247L8871989-09-13013 September 1989 Notification of 890928 Meeting W/Util in Rockville,Md Re Current Status of Facility ML20247H9261989-09-0909 September 1989 Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 ML20246P6491989-09-0606 September 1989 Notification of 890912 Meeting W/Util in Rockville,Md to Brief NRC Mgt on Current Plant Status ML20247D4191989-09-0606 September 1989 Notification of Cancellation of 890912 Meeting W/Util in Rockville,Md to Discuss Plant Current Status ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20245H6451989-08-0404 August 1989 Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR ML20248D1431989-07-27027 July 1989 Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants ML20247B7541989-07-19019 July 1989 Confirms That Licensee 880711,890221 & 0630 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss, Acceptable.Licensing Action for TACs 69886,69887,69893 & 69894 Considered Complete ML20247E6721989-07-17017 July 1989 Proposes Closeout of Plant Correspondence Control Ticket Re Environ Conservation Organization Request for Notification Whenever License Amend Requests Result in Impairment of Plant Operability.Intervenor Will Be Placed on Svc List ML20246K5991989-07-12012 July 1989 Notification of 890725 Meeting W/Util in Birmingham,Al to Discuss Status of Current Licensing Activities & Corporate Initiatives for Plants.Meeting Agenda Encl ML20246L6801989-07-10010 July 1989 Notification of Significant Licensee Meeting 89-101 W/Util on 890718 in King of Prussia,Pa to Discuss Util Engineering Reorganization ML20247A9561989-07-0606 July 1989 Notification of 890717 Meeting W/Lead Plant Utils in Rockville,Md to Discuss Implementation of Revised STS ML20245F9381989-06-20020 June 1989 Notification of Significant Licensee Meeting 89-085,Rev 4 W/ Util on 890630 in King of Prussia,Pa Re Sale of Facility to State of Ny ML20245E0281989-06-20020 June 1989 Notification of Significant Licensee Meeting 89-085,Rev 3 W/ Util on 890623 in Region I Ofc Re Sale of Plant to State. List of Attendees Included ML20246D8841989-06-19019 June 1989 Staff Requirements Memo Re 890601 Briefing on Operating Reactors & Fuel Facilities in Rockville,Md.Commission Expressed Disappointment in Long Term Operating Performance of Turkey Point Nuclear Power Plant ML20245A7331989-06-14014 June 1989 Rev 1 to Notification of Significant Licensee Meeting 89-085 on 890620 W/Util in King of Prussia,Pa to Discuss short-term Plans & Licensee Compliance Upon Shareholder Approval of Sale of Facility to State of Ny ML20058K0691989-05-26026 May 1989 Responds to Region I Request for Verification of Closeout of Four Items Per Change Notice 88-04 of NRC Insp Manual.Items Include,Diesel Generator Fuel Oil,Bwr Recirculation Pump Trip & Sampling & Analyzing Diesel Generator Fuel Oil ML20244B1131989-05-25025 May 1989 Notification of Significant Licensee Meeting 89-085 W/Util on 890620 in King of Prussia,Pa to Discuss short-term Plans & License Compliance Upon Shareholder Approval of Sale of Plant to State of Ny ML20246H3771989-05-12012 May 1989 ALAB-913.* Advises That Time Provided within Which Commission May Act to Review Aslab Decision ALAB-913 Expired.Commission Declined Review.Decision Became Final on 890501.W/Certificate of Svc.Served on 890512 ML20246P9601989-05-10010 May 1989 Discusses 890413 Meeting W/Rosemount & Industry Re Malfunctions of Rosemount Transmitters.List of Attendess, Agenda,Nrc Info Notice 89-042 & Viewgraphs Encl ML20246N0371989-05-0909 May 1989 Responds to 881208 Memo Re Escort Policy at Facility.Util Agreed,On 890419,to Upgrade Visitor Escort Requirements in Ofc & Svcs Bldg Annex or Provide Addl Security Measures ML20246C1821989-05-0404 May 1989 Notification of 890509 Meeting W/Util in Rockville,Md to Discuss Portions of Plant Security Plan ML20246G3291989-05-0404 May 1989 Cancels 890509 Meeting W/Util in Rockville,Md to Discuss Portions of Security Plan NUREG-1353, Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-13531989-05-0202 May 1989 Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-1353 ML20245D2381989-04-24024 April 1989 Staff Requirements Memo Re Discussion of Full Power License on 890417 in Rockville,Md.Presentors for Licensee Listed ML20245C8711989-04-21021 April 1989 Staff Requirements Memo on Commission 890420 Affirmation/ Discussion in Rockville,Md Re Full Power OL for Plant ML20245E9781989-04-17017 April 1989 Forwards Regulatory History AC83-2 Re Licensee Action During Natl Security emergency,10CFR50 (54FR7178) ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20244E2681989-04-12012 April 1989 Summary of Operating Reactors Events Meeting 89-015 on 890412.Discussion of Events,List of Attendees & Three Significant Items Identified for Input Into NRC Performance Indicator Program & Summary of Reactor Scrams Also Encl ML20244A5461989-04-10010 April 1989 Notification of 890503 Meeting W/Util in Rockville,Md to Discuss Using Leak Before Break Methodology on Lines Connected to RCS ML20244A5571989-04-10010 April 1989 Notification of 890502 Meeting W/Util in Rockville,Md to Discuss Nonlinear Piping Analysis to Remove Snubbers & Pipe Supports ML20248D8731989-04-0505 April 1989 Discussion of Shoreham Full Power Ol.* Advises of 890417 Public Meeting in Rockville,Md for Director of NRR to Discuss Findings on Whether Lilco Should Be Granted Full Power Ol.W/Certificate of Svc.Served on 890405 ML20247E6801989-03-28028 March 1989 Discusses 890327 Telcon W/E Lane Reporter for Newsday Re Consideration Given to Idea of Dry Cask Storage 1997-11-28 Category:NRC TO ACRS MONTHYEARML20205T6491988-11-0707 November 1988
[Table view]Ack Receipt of to Chairman Zech Re Alchemie Applications to Operate Facility for Separation of Stable Isotopes at Oak Ridge,Tn & Construct Similar Facility at Oliver Springs,Tn ML20154P3961988-09-27027 September 1988 Forwards Info in Preparation for ACRS Subcommittee on Safeguards & Security 881006 Meeting.Encls Withheld (Ref 10CFR2.790) ML20154N9681988-05-25025 May 1988 Recommends That ACRS Begin Review Schedules Upon Agreement That Viable Util Restart Plan Established & That ACRS Consider Subcommittee Site Visit & Meeting in Early Jul Followed by Full Committee Meeting in mid-Jul ML20154P0671988-04-28028 April 1988 Requests Close Coordination W/Edo to Ensure That Review of Shutdown Nuclear Power Plants Complete IR 05000528/19850121985-09-25025 September 1985 Forwards 850806 & 0730 Ltrs & Insp Rept 50-528/85-12 Per ACRS 811215 Request for Info Re Startup Experience on Unit 1 Prior to Loading on Unit 2.Unit 2 Fuel Load Scheduled for Nov.Initial Criticality Expected by Jan 1986 ML20197J6941985-05-0202 May 1985 Forwards Addl Info in Response to 850226 Request Re Emergency Evacuation Procedures During Seismic Events from Other Countries & Earthquake Emergency Planning Studies. W/O Encl ML20140E6851985-02-12012 February 1985 Discusses Followup Items of 841101-03 ACRS 295th Meetings, Per 841204 Memo.Seismic Design Margin Program Expected to Be Completed by FY86.Addl Sys Interaction Studies at Facility Would Not Result in Significant Improvement in Risk ML20054G5821982-06-15015 June 1982 Responds to 820512 Memo Re Control of Occupational Doses by Prevention of Transport & Buildup of Radioactive Crud,By Removal of Radionuclide Deposits & Minimization of Failure of Major Plant Components ML20140G9281982-04-0909 April 1982 Forwards,For Review,Seismic site-specific Spectra Info,Per Telcon & Request by D Okrent.Comments Will Determine Discussion Topics at ACRS Subcommittee on Midland 820520-21 Meetings ML20235C4011978-07-17017 July 1978 Informs That on 740821,agreement Reached to Assist Arcs in Early Identification of Potential Problem Areas & Potentially Difficult Novel Features for Each Application. Comparison of Principal Design Characteristics of NSSS Encl ML20137D8811978-06-14014 June 1978 Responds to ACRS 770117 & 0217 Recommendations for Review of Sys Design for Safe Shutdown & Shutdown Heat Removal to Assure Adequate Seismic Design Margins.Final Rept Will Be Developed Based on Current Available Info ML20137D6411978-03-0808 March 1978 Forwards Case Responding to Allen Re Seismicity in Region of Facilities ML20137D5761978-03-0101 March 1978 Forwards J Allen Ltr to L Reiter Re Seismicity in Site Region,Per Request ML20235C9441975-09-23023 September 1975 Assesses Plant Application for Ol,Per 740821 Agreement to Render Technical Assistance.No Const or Licensing Delays Anticipated Pending Resolution of Concern Re Dynamic Loads on Containment Resulting from LOCA & Relief Valve Action ML20235F6371975-01-30030 January 1975 Submits Comments on Technical Issues Addressed in Lj Koch to WR Stratton,Recommending That ACRS Reconsider Position on High Pressure Testing of Drywell Structure Described in ACRS on Allens Creek Station ML20155F0011974-01-12012 January 1974 Forwards Responses to Inquiries for Use by Subcommittee Prior to 740117-18 Meeting.Responses Will Form Basis for Further Discussions W/Staff ML20235E9251972-12-21021 December 1972 Forwards to Applicants Re Consequences of Postulated Pipe Failures Outside Containment Structure ML20235E9141972-12-0808 December 1972 Forwards Util Re Reporting Requirements of Tech Specs for Listed Plants & to Util Re QA Program for Listed Plants ML20235E6651972-11-16016 November 1972 Forwards to Util Requesting That Analyses Be Performed Re Changes in Shape of Scram Reactivity Curve & Requesting Addl Info Concerning Valve Failures ML20235E3451972-09-29029 September 1972 Forwards Util Providing Info Re Availability & Reliability of HPCI Sys for Dresden Units 2 & 3 & Quad Cities Units 1 & 2 ML20235D5771972-02-17017 February 1972 Forwards Div of Reactor Licensing & 720124 Discussion & Conclusions Re 20% Operation of Plant for ACRS Info ML20235C1481971-12-29029 December 1971 Transmits Div of Reactor Licensing ,Which Requests Addl Info on Design Features of Energy Absorbing Sys,As Info for ACRS ML20235E2911971-10-26026 October 1971 Forwards Div of Reactor Licensing 711018 Request for Rept on Large Number of Unusual Occurrences During Operation of Plant,For Info ML20235E1791971-10-26026 October 1971 Forwards Util 711005 Rept of 710905 & 09 Occurrences & 711018 Transmittal of Summary of HPCI Problems Experienced During Startup Testing at Monticello Plant ML20235D8641971-10-0404 October 1971 Forwards Util 710915,24 & 28 Ltrs Re Inoperable HPCI Sys on 710904,failure of ECCS Pump on 710915 & 710918 Occurrence Involving HPCI Sys,Respectively ML20235E5961971-08-20020 August 1971 Forwards Rept to ACRS Re Wh Zimmer Nuclear Power Station Unit 1 CP Review, for Review ML20235B7021971-06-21021 June 1971 Forwards Util 710526 & 0611 Ltrs Transmitting Amends 11 & 12,respectively to Application for License.Amends 11 & 12 Also Encl ML20235D5101971-06-11011 June 1971 Transmits Util Reporting Unusual Occurrences on 710420,26 & 0502 ML20235D1591971-05-11011 May 1971 Transmits Util Re Occurrence Relating to off-gas Monitors & Util Reporting AO Relating to Safety/ Relief Valve Setting Exceeding 1,080 Psig ML20235C8321971-05-0101 May 1971 Forwards Util 710428 Twx Advising That HPCI Sys Became Inoperable on 710422 & Div of Reactor Licensing Advising That Plant Must Be Shut Down,For Info ML20235D9111971-04-22022 April 1971 Forwards Div of Reactor Licensing 710407 Request for Addl Info for Review of Design Repts 7 & 8 ML20235D8921971-03-11011 March 1971 Forwards Util Transmitting Design Rept 8, Small Steam Line Break, for Info ML20235D7571971-02-17017 February 1971 Forwards Util Summarizing Status of Items on Structural Design ML20235F1651970-12-0101 December 1970 Forwards Design Repts in Response to ACRS Concerns on Containment Analysis & Seismic & Structural Design ML20235B6561970-11-0505 November 1970 Forwards Preliminary Rept to ACRS, for Review.Rept Presents Preliminary Comments on Proposed Plant ML20235C6491970-09-0202 September 1970 Forwards AEC Re Util Request for Reduction of Design Pressure for Drywell & Torus of Containments ML20235C5651970-08-11011 August 1970 Forwards Util Transmitting Rept Containing Addl Info on Pressure Suppression Concept in Response to 700427 & 0528 Ltrs ML20235C5091970-06-0101 June 1970 Forwards AEC Requesting Addl Info Re Proposed Reduction in Design Pressure for Containment Drywell & Torus for Plant ML20235C4121970-05-27027 May 1970 Forwards Util Transmitting GE Rept Entitled, Addl Info Pressure Suppression Concept Test Data Rept, for Review.Util Requested That Rept Be Withheld from Public Disclosure ML20235C3691970-05-0404 May 1970 Forwards Listed Items,Including Util Transmitting Table for Insertion in Rept on Proposed Containment Design Pressure for Brunswick Steam Electric Plant & AEC 700427 Response to Util Request for Design Change in Containment ML20244E1411970-05-0202 May 1970 Forwards H Denton to RW Staehle Re Recommendations for Course of Action to Be Taken for Repair of Safe Ends on Reactor Vessels of Utils for Committee Use ML20235C2691970-04-30030 April 1970 Forwards Util Informing of Mgt Changes in Company ML20140G9011970-04-28028 April 1970 Forwards 10CFR30-36 & 150,for Info in Connection W/Review of Midland.W/O Encls ML20140G8351970-04-15015 April 1970 Submits Agenda for ACRS Subcommittee on Midland Plant 700424 Meeting in Chicago,Il to Discuss Radioactive Matl in Process Steam,Potential for Subsidence,Seismic Design Criteria, Emergency Plans & Flood Protection Level ML20140G8501970-02-12012 February 1970 Submits Agenda for ACRS Subcommittee on Midland Plant 700424 Meeting in Washington,Dc to Discuss Emergency Plans,Adequacy of ESF & Protection Sys,Containment Design,Silting of ECCS Reservoir & Steam Purity & Monitoring ML20235B8901969-12-0909 December 1969 Forwards Exhibit H of Util CP Application for Facility for Review ML20235B7541969-11-24024 November 1969 Forwards Div of Reactor Licensing 691124 Rept Concerning AEC Review of Util Facility for ACRS Review at Dec Meeting ML20235B7301969-11-20020 November 1969 Forwards 691119 Amend 9 to License Application for Review. W/O Encl ML20235B6491969-11-0404 November 1969 Forwards S&W Forwarding Proprietary SWND-2, Loctvs,Computer Code to Determine Pressure & Temp Response of Pressure Suppression Containments to LOCA & Util Requesting Rept Be Withheld for Review ML20235B7141969-10-0808 October 1969 Forwards AEC to Util Requesting Identification of Reactor Protection Sys & Instrumentation Sys That Initiate or Control ESFs Which Will & Will Not Be Designed to Meet IEEE-279 Requirements for Review 1988-09-27 |
Text
.
d 3 33
.c l
JUL 5 1968 Docket No. 50-322 .
Dr. Carroll W. Zabel Chairman, Advisory Committee on Reactor Safeguards U. S. Atomic Energy Consnission Washington, D. C. 20545
Dear Dr. Zabel:
Eighteen copies of a report prepared by the Division of Reactor. I Licensing are enclosed for the review of the Committee. The Report relates to the preliminary aspects of the application by the Long Island Lighting Company for a construction permit for its proposed Shoreham Nuclear Power Station, Unit 1.
Sincerely, )
Original Signed by Peter A. Morris Peter A. Morris, Director Division of Reactor Licensing
Enclosure:
ACRS Report (18)
Distribution:
RPB-4 Read.
Suppl. /
N. D. Mason K. R. Goller j
j R. S. Boyd 8709240555 870921 /
OfVtCE > ....
DRL DRL DRL DRL DRh4
. .. }. '
\ /
1 :cw Er d RSBoyd fchroeder PAMorris SURNAME > . . . . . . . . . .. . .
DATE > 87../.3../.. 68
. . 7/... 3/ 68 7/ ./68 . 7/ 3. . /68. . .
7/ ) /68 -
Fortu AEC=818 (Rev,9-53) u s sovtamurNT rommsorra me-o-ate 429