Trip Rept of Site Visit During Wk of 751006 Re NRC Concerns & General Overview by Util of Const Activities.Summary of Site Visit Schedule & Participating Personnel Encl
ML20235C151
Person / Time
Site: 05000000, Zimmer
Issue date: 10/21/1975
From: Jackson J
Office of Nuclear Reactor Regulation
To: Muller D
NRC
Shared Package
ML20235B311 List: ... further results
References
FOIA-87-111 NUDOCS 8709240368
Download: ML20235C151 (7)


Text

_ - - _ _ _ _ _ - - _ _

~ n.

m .M .

, 1 y . .

L t-

~

M8 UNITED STATES .

. NUCLEAR ' REGULATORY COMMI'sslON -

j.

W ASHINGTON. O. C. 205$5 l

CCI 211975 1

j Docket No.-50-358 <

') .

'I Daniel R.' Muller, Assistant Director for Environmental Projects 'D .

THRU: B. J. Youngblood. Chief. Environmental Projects Branch 3 TRIP REPORT OW SITE VISIT TO THE WM. H. ZIMMER NUCLEAR POWER STATION, UNIT 1,.MOSC0W, 0HIO-During the week of October'6,1975, NRC staff conducte'd a site visit at [s i, the Wm.- H. Zimmer Nuclear, Power Station, Unit 1. near ~ Moscow, Ohio. .NRC I staf f was represented by the Environmental Project Manager (EPN) and- i members of the Radiological Assessment (RAB), Cost Benefit Analysis (CBAB) and Environmental Specialist-(ESB) Branches. Aside from meeting with the applicant, the Cincinnati Gas and Electric Company (CG&E), and his con -

sultant, Sargent and Lundy-(S&L), NRC staff met with various local and state level officials. 3 A sumary of the site visit's. schedule and meeting participants is '.

  • i attached.

4k' d{

d Is'Y 'bN l On October 6,1975, D. Nash, CBAB.. met with representatives from the Cicmont County Planning Commission and the Richmond School District l Board of Education.

.)

I On October 7,1975 NRC staff met with CG&E and S&L staff at CG&E's

}

offices in Cincinnati, Ohio. The meeting consisted of NRC staff j concerns to the applicant, and a general overview by the CG&E staff of construction activities. Specific topics discussed included: }

. The possible future change in tax revenue distribution.

. Construction work force impacts due to commuting personnel.

. The clarification of radiological monitoring sites and transport '

media uses. .i

. The fomat for reporting the Environmental Technical Specificpt, ions, i

. The suspended solids concentration of the Ohio River, and possible }i turbidity increases due to the Zimmer Station. '

i .

s.uil09 4

N

~ ptsTmuuhuN or mo - ~*e i is UNUMlTEQ- g Qf

  • /c Y 8709240368 870923 PDR FOIA - -

PIENZ87-111 PDR __~WpMa_

^- - g

L .

  • t ., . .

I F

j. '.

Daniel R. fiuller

, [ OCT 2 I W5 P The depth and volume of the settling basin.  !

5 Theoperation.

and type and level of wastewater treatment during constru i

Section402dischargepermit(ftPOES).The -status r Comercial Kentucky. fish data collected by either the States of Ohio or During to NRC _ the meeting, CG&E issued an infonnal report nses contain review. concerns arising from the tendered Environmental Report (ER) i This report, like the docketed ER, duplicated many of the i responses which the applicant gave orally during the meeting.

During the afternoon session of the CG&E meeting, D. Nash met members in Cincinnati. of the Ohio-Kentucky-Indiana (0KI) Regional Plann 1 October town of lioscow, 8,1975, Ohio. was spent at the Zimmer site, and in the adjacen of its place the .site and transmission right-of-way was postponed 4 Clermont County NRC Library staff inspected the Local Public Document Room at the in Batavia. Ohio.  !

the site visit included the reactor vessel and buildinPoints of interest during

., radwaste buildings, the cooling tower, the pump house,g, the turbine and Creek.

Zimmer Unit 1 is presently 35% complete. and Little Indian i

' During the morning of October 9,1975. S. Bland and the ESB team participated sites, and the transmission in a fly-over of the Zimmer site, proposed monitori right-of-way. 1 Concurrent with the fly-over during October 9, J. D. Jackson ml the Clermont County Commissioners in Batavia, Ohio, and the Ohio Department of Transportation (DOT) in Lebanon, Ohio.

The Clermont County Commissioner meeting centered the power station, and environmental impacts including aesthetics around local sentim 4 traffic and noise. ,

i traffic impacts and mitigation measures duerce.to the constj

, ,g ,4R 3 -*E "

"~

3_ . '- - : ~

"C.i i-p:  ;

l .

Daniel R. Nuller OCT 2 1 1975 i I

l i

During the afternoon of October 9,1975, the NRC staff met with staff  ?

representing the Ohio Enviror. mental Protection Agency (EPA), the Ohio l l' Power Siting Commission, and the Ohio Department of Health at the Ohio t a

. EPA offices in Columbus, Ohio. The meeting consisted primarily of water  ;

.i quality questions by the NRC staff, and environmental statement comments '

by Ohio Power Siting Commission staff. Specifically, NRC discussion  :

included: '

The regional USEPA chlorine limit for. discharge wastes, and its relationship with the Zimmer Station.

. State level discharge permit status.  !

Ohio River water quality standards.

t .

Surface runoff monitoring programs' (NRC staff noted the.

observed high turbidity within Little Indian Creek, presumably the result of Zimer site runoff).

The discharge location and treatment level of sewage from the construction work force. .

Possible concern over asbestos' fibers within liquid and gaseous '

wastes. '

Ohio Power Siting Commission staff noted the following concerning the NRC environmental statement (0L stage)*

t Updated cost-benefit analysis. ,  !

Recalculated source term.

Modification of the 0.8 use factor.

Updated need for power section. I The CBAB staff member was requested to prepare a trip report summarizing the pertinent details of his individual discussions with local officials.

i

b. , l

..D. Jacks n, Project Manager l  ;

Environmental Projects Branch 3  !

Division of Reactor Licensing f

i

_ ____ __ _ __ -- - - -- - k.

i 1

W: w

'. b lC

.E -y .

j

i

, -]

SUMMARY

OF ZIMMER SITE VISIT SCHEDULE-

~

~AND PARTICIPATING PERSONNEL '

NRC-Team:- J.-D.. Jackson, EPH .

J.'S. Bland, RAB D. A.. Hash, CBAB' '

.T. D. Cain, Aquatic Biologist, ESB J. R. Kline,-Terrestrial-Ecologist, ESB A. Steen, Aquatic Ecologist, ESB J. C. Lehr, Environmental Engineer, ESB MONDAY, OCTOBER 6, 1975 Meeting between D. A. Nash, CBAB and local officials: Clermont County Planning Commission and the Richmond School District Board of Education *.

TUESD Y, OCTOBER 7, 1975 Applicant Meeting (10:00 AM to 4:00 PM)

Cincinnati Gas and Electric Company (CG&E):

J. D. Flynn, Manager, Licensing and Environmental Affairs J. R. Schott, Zimmer Station Superintendent E. ' E. Galloway, Principal Environmental Engineer G. M. Pemberton, Principal Licensing Engineer H. E. Crail, Assistant Principal Structural' Engineer Sargent and Lundy:

R. Schuetz, Environmental Engineer (ER Coordinator)

J. Tseng, Environmental Engineer / Health Physicist L. Pocalujka, Meteorologist R. K. Kennedy, Plant Ecologist NRC:

J. D. Jackson (10:00 AM to 4:00 PM)

J. S. Bland (10:00 AM to 4:00 PM D. A. Nash (10:00-AM to 1:30 PM) )

, i l I j J. R. Kline (2:00 PM to 4:00 PM '

J. C. Lehr (2:00 PM to 4:00 PM))

T. D. Cain (2:00 PM to 4:00 PM)

A. Steen (2:00 PM to 4:00 PM)

Meetin'g between D. A.' Nash, CBAB and Ohio-Kentucky-Indiana (OKI) Regional Council of Governments (1:30 PM to 3:30 PM)*

9

j. __ ._ Ama- - n:na a 2"'* A ' ' ' ^ " ' "

} . . .

L. b,

.r .

' - 1 I I

I .

v. ,

j.

t i'

WEONESDAY, OCTOBER 8, 1975 Site Visit, Wm. H. Zimmer Nuclear Power Station (9:30 AM to 2:30 PM)

CG&E: ,

R. Link  !

NRC:

J.D. Jackson (9:30AMto1:00PM) t

J.S. Bland (9:30AMto1:00PM)  !

J. R. Kline (9:30 AM to 1:00 PM) .

J. C. Lehr (9:30 AM to 2:30 PM)  !

T. D. Cain (9:30 AM to 2:30 PM)

A. Steen (9:30 AM to 2:30 PM) i Cicmont County Library: i D. Connor (9:30 AM to 11:30 PM) ,

l Tour of Moscow, Ohio (12:30 PM to 1:00 PM)

NRC:

Same as for Site Visit ,

inspection of Local Public Document Room, Clemont County Library, f Batavia Ohio (2:00 PM to 2:30 PM) j 1

i I

NRC: 3 J. D. Jackson  ;  !

J. S. Bland l J. R. Kline l I

Clemont County Library:

0. Connor THURSOAY, OCTOBER 9, 1975 J Helicopter Fly-over of Site and Transmission Right-0f-Way (9:00 AM to l l 11:00 AM)

NRC:

J. R. Kline l l i '

J. S. Bland '

J. C. Lehr }

T. D. Cain l A. Steen 1

r M . , .

1

4.. r

.j

. ] ,

e i

Meeting Between J. D. Jackson and Clemont Coirnty Commissioners (9:00 AM

~

4 to 10:00 AM) ,

'j NRC: '

J.'D. Jackson l

' Clemont County Commissioners: 1 T. Hogan ..>

Citizen of' Moscow:

B. Whitford.

Cincinnati Enquirer (Batavia Bureau): '

.,\

unidentified reporter i

' Meetino Between J. D. Jackson '(in lieu of D. A. Nash) and the Ohio

[,

Department of Transportation (11:00 AM to 12:00 N00N) i NRC:

'J. D. Jackson i.

Ohio Department of Transportation: '

i K. Feller District: Traffic Engineer  !

R. Palmer Assistant District Traffic Eng:neer -i Meeting with State level Public Officials, Columbus, Ohio (2:00 PM to 4:00 PM)

Ohio Environmental Protection Agency:  ;

i-E. Richards, Assistant Director ,

i G. Wright, Environmental Assessment D. Goodwin, Industrial Wastewater  !

G. Garrett, Water Quality Standards )

?

Ohio Power Siting Commission:  !.

H. W. Kohn, EPA Liaison L E

Y. Park, Nucicar Engineer .

i 4

1

. .- 3,

. A

' 4 N 4

m. ..

. _ . . _ _ L._ j i-

\

j.

, . 1,'

l, -

4..

Ohio Department of Health,:  ;

J. Wynd, Radiological Unit NRC:

1 J. D. Jackson J. S. Bland T. D. Cain J. C. Lehr J. R. Kline i

A. Steen l

i i

I i Details of meetings CBAB will be discusse(d in a separate trip report. October 6 and 7) b 6

)

( .

f i i ,

I

m ,_m.. m,. . .m...* &--- --

^ ^ ^ ^ ~ ~ " ~. ,, ,

~ ^