UNITED STATES NUCLEAR REGULATORY COMMISSION y,
-)
OFFICE OF INVESTIGATIONS FIELD OFFICE, REGION V
\\....+.!
wA[ET Cn"EYN"a' FOEEsess
"^
MAR 211985 REPORT OF INQUIRY REPORTING OFFICE:
OI:RV FILE NO.:
QS-85-039 DATE OF INQUIRY:
February 28, 1985 STATUS:
CLOSED PREPARED BY:
- 0. C. Shackleton Jr.
DATE PREPARED: March 21,1985
SUBJECT:
ENRICO FERMI NUCLEAR POWER PLANT - ALLEGATION THAT A QC INSPECTOR WORKIM FOR WISMER-BECKER WAS " BLACKBAL FOR REPORTING CONCERNS ON CONSTRUCTION DETAILS
\\
Februa 2
ce, Palo Verde Nuclear called the NRC Resident Inspector s advised Reactor Inspector Jay R tion (PVNGS),(602)386-5260,and nera because of concerns he had over the qualiBALL he believed he was being " blackb 3
nstruction at the Enrico Fenni Nuclear Power Station (Exhibit 1). j cc' told BALL he was a fonne Inspector for National Inspection Inc., a subcon 'ractor of Wismer-Becker.
WILSON specifically requested to meet with someone from the NRC in order to j
give his full story.
l On February 25, 1985, Greg COOK, Publi.
fai Investigator Owen C. SHACKLETON Jr. of Officer, Region V, advised Resident Inspector's office at PVNGS. ; 00K telephon o the NRC
{
s that told BALL (supra) that he had been working at PVNGS.
worked at Fenni, time frame unknown, walkin eportedlyT;ated he i
own piping systems.
On Februa 28 Investigator SHACKLETON telephonically edi In n to the infonnation fu shed to Reactor Inspecto LL, ali Control Inspector for National Ins advised he worked as a Florida, under contract to Wismer-Becker. pection and Consultants Ft. Meyer.
During the period of April 1981 until May 1982, he was assigned a hangers doing final inspections.
nspector at Fermi in mechanical said he has some documentation he wants to show the NRC to go along w s oral testimony about his concerns members of Wismer-Becker's management.over the work done by Wis said he is not presently working.
He is waiting for a contract for a He can be contacted at his residence telephone.
ew o.
t 8701290462 870116 PDR FOIA OARDE86-202 PDR J-i
... ~. -... -
~
l
' a r.
.g.
When asked about his employment at PVNGS, he said he had no problems with the quality of work at PVNGS. He seid his concerns 1 re te to Enrico Fenni.
The matter of confidentiality was discussed wit and he did not request confidentiality.
~~
No on tracking system number was assigned to this matter 1n Region V, as, allegations all concerned Enrico Fermi and not to any nuclear si Ts in Region V (Exhibit 2).
as advised by Investigator SHACKLETON that an Investigator from
.R would be in contact with him to receive all his concerns and to look at the documentation he wanted to show the NRC.
There is no further work to be perfonned by OI:RV, so therefore this matter is CLOSED.
Prepared by:
/FM -
t/
Owen C. Shac tleton Jr., Di(ptetor Office of Investigations Field Office, Region V Authorized by:
/
Owen C. Shackleton Jr., Digkttor Office of Investigations Field Office, Region V i
l l
2 QS-85-039
,, g, L. K. C0f.'. STOCK & C0f, PANY Ui, tt c1 QC CONDUIT INSTALLATION CHECFLIST LOCATION (AREA)
///W D A CONDUIT N0(S). AND SIZE GRID (GENERAL)
[
j h - B78-Bd
/'
,Jl/}
T3
\\l [ M Q\\S Yi DCN'S, DCR'S DETROIT EDISON CONSTRUCTION g
STATUS REPORT DRAWINGS (APPROVED "FOR CONSTRUCTION" DRAWINCS)
/,2 Y j /
.A $ 0cV-3 0 N ACC REJ N/A 3.1 CONDUIT IS THE CORRECT TYPE.
[
] 7 3.2 C0hDUIT IS SUPPORTED CORRECTLY 8' INTERVALS, ETC.
OO7 3.3 FLEX USED AT EXPANSION JOINTS & VIBRATING EQUIPMENT.
OT 3.4 PULL POINTS INSTALLED CORRECTLY /WHERE REQUIRED. (270 max.)
OOI 3.5 DIV. I AND DIV. II C0lTDUITS SUPPORTED SEPARATELY.
[
3.6 SEPARATION CRITERIA HAS BEEN MAINTAINED.
3.7 CORRECT HARDWARE USED & SUPPORTED FIRMLY.
[
3.8 CONDUIT IDENTIFIED & COLOR CODED PROPERLY.
[
[
3.9 CONDUIT IS GROUNDED, AS SHOWN ON APPROVED "FOR CONSTRUCTION"
/
l DRAVING/ SPECS.
[
[/
3.10 MINIMUM BEND RADIUS HAS BEEN MAINTAINED.
[
[ [
3.11 ALL SUPPORTS AND PULLBOXES HAVE BEEN QC ACCEPTED.
1 q
I nEManxS:
Ann.,,1 zasxen,s wwo pen _n nov sea rc<s' i
D C Vi d il'rO d fo A fot ti\\ A Hu A L
- 4. 3. b oar 7A.
A.
% N YWr9 op Nwat-c-noa
- 3. 11 Pm aox on
$cs o ll6 & d d 7-Ji e N N '*
hnn EXHIBIT 12 i
AcCEPTANC DATEN.w)
REVIEWED ATF //-M(3 TOR
<htPARLD APPR OV E D ptvg5LO llTLE ORIG. DAT E Ft E V. D A T E PAGE
\\ fNB AJT TML 11/03/76 FORM #18 PROCEDURE y