Text
__
~
UNtitD ST ATES LU Ecuu :a r ::vw/::c 8 i'
REGION 4H
{
g,
3. ;
s, n =:ese s c. -== *o aj,f,,:
- .:, s.. s....c s n n March 1, 1985 MEMORANDUM FOR:
C. H. Weil, Investigation and Compliance Specialist FROM:
R. C. Knop, Chief, Reactor Projects, Section 1C
SUBJECT:
ALLEGATION:
DRYLABING INSPECTIONS, AITS RIII-85-A-0039 On February 28, 1985, DRP was informed that an allegation had been received from the Fermi site via an 01 investigator who was onsite February 27th.
We were advised by 01 that in speaking with a level ES ins tor @,
he alleged that he heard that another NES inspector
_had perfomec inspections "at his desk" and did not actuall go out il the f Id to do
)
these inspections. According to the alleger, I was later fired i
for doing UT examinations without having a ca b ion block with him at I
the ins ction,atrea.
We understand tha worked at the site during the Itime frame and that he s currently employed at the Nine Mil oint Un facility.
Subsequently, Messrs. Kalkman, Knop and Ward called the alleger M on I
February 28, 1985.
He stated he had no first hand infomation re a doing inspec-tions at his desk.
He stated he hear at followe that practice.
He reiterated that he believed was fired for not carrying a calibra-tion block during his UT inspec ions.
believes memo was sent down to NES over this incident.
He stated that could add more information on this subject.
_n 8
'I was called on March 1, 1985.
He stated tha1(,
was y
valified a a le nR MT, Pt and UT.
He was also a leve ~ III in c.
UT.
He said tha employment was from some time in 1979 to some time
,1 in 1982.
?>
9 his desk but he discounted it as being something tha -did inspection tests at
.t He stated that he had heard the rumor that some e said w ile he
,2 was angry.
He felt the rumor was hogwash.
He sttted that as not firedbutresignedbecauseofdifferencesbetween{some 1s production e suggested that more infomation might rom some of the people m
worked with at the Fermi site.
8701290222 870116 hoh
~
02 PDR
-~
EXEM'T ROM
-il DISCLOSURE
x C. H. Weil March 1, 1985 w s called. h had worked witt[
On Mar 985 at Fermi.
opin on was t t
had done a good job Dn training and fel he Was honest.
In response to the rumor about McDerTna 'd (oing inspections at his desk, had not heard the rumor and stated
.coul d not believe it.
/
/
This information was discussed with DRS and we have jointly agreed as to the method in which we plan to approach this allegation.
At this point the allegation is very general.
Further review is planned as stated in the attached resolution of allegation, orc R. C. Knop, Chief Reactor Projects, Section 1C
Attachment:
Resolution of Allegation cc w/
Attachment:
A. B. Davis C. E. Noreliu-s i
E. G. Greenman R. F. Warnick J. McCormick-Barger R. L. Spessard J. F. Streeter l
l i
EXEMPT FROM DISC _OSURE
Attachment Resolution to Allegation Following are the step, we plan to take in resolving this allegation".
1.
Coordinate with 01 Region 111 to assure a uniform approach.- Complete 2 2.
Interview th alle er and others who performed similar work to that conducted by or who were familiar with his work.
In progress.
See memo.
3.
Ask the Detroit Edison Company about this individual to determine what type of work was done and during what period of time.
Also, in view of the allegation that the individual was fired for improper activities, detemine if any additional actions are required.
DRP.
4.
Talk to Safeteam to determine if there were any similar allegations that relate to this individual on this type of work, which have already been reviewed by them.
DRP.
5.
Determine what additional steps, if any, are required.
6.
Request Senior Resident inspector at Nine Mile Point to talk with to determine the time of work at Fermi and the type of work perfomed.
(
Depending on the time and sequence of the above, we need to make a detemination of the impact on the hardware involved that may affect a decision as to whether or not to recomend a license.
EXEMPT FROM DISCLOSUrG
... E T:G,*/i:2 '. S T /. W S i.5 C C :,?
j set nor;s i s. v-i se w co, p :e:.w...
. s, e c.-i.,..., s., ca.. :.e n io. c.,e..
.e... :o,. i -e c,.. ect.. c 5, i e 3' :.. eepe ting pe'.od. ino.:re ho Cesep' en the ra wa bio o. Aee; tne o'.;,na. in tr e ca se 4. e e
- se c'* c: p, se he. A.,,rs OH.c, of Inver ptions C< AJ'.'9 f m CATEG0mv 08 0 sCE o Detm&Te%G miaCTOst I
IAD t'DsAt LeCfASLE (C gpg,oja
],,.,,,,',m,.t
,v,6 OIF0:RIII Q3-84-020
]
V %EhDom E. ot ee t a FERMI II: QC weld document falsification & QC
.ir.c~io To J. N. Kalkman oersonnel harassment & intimidation.
STATUS ispecify care ena cro. roe e D'*** cescnctertl 10/19/84 - This allegation was received in RIII on 5/23/83. Allegation regarding welds that were reworked af ter QC acceptance without required inspection.
It was also alleged that QC inspectors who objected to this practice were harassed
& intimida.ted. The sub-contractor is Weismer/Becker. ECD Unknown.
10/31/84 - No Change t.'
D.
11/30/84 - 01:RIII has made several attempts to locate the Weismer/Becker alleger with no success to date.
12/31/84 - This allegation is under active 01:RIII investigation by I'nvestigator J. Kalkman. Estimated completion date is April 1985.
01/31/85 - Plans are being made to interview alleger as soon as possible.
l 02/28/85 - Unsuccessful attempts have been made to locate a former Wismer & Becker weld supervisor re:
intimidation. Additional interviews are anticipated.
i i
PAGE 2 UA. NUCLEAR RE!ULATORY COMMISSION seRC PORM M5 INVESTIGATION STATUS RECORD 19sSTT;UCTIONS. This brm o to tie completed wherever sagn font activety has ocaerred rotative to e case or et least every E days If no chenge hos occurred dar.no the E doy reporting period, iruf.cste "No Change" in the status tHock Keep the orsynel with the caos fde and send one copy to Headcewarters.
O,e. of inve.i..si.on..
Case seveseen Cava Gon y op pect 0 OPERafiseG mgacT0n I
seeDeviDual L8CEssSt 4 OIF0:RIII Q3-84-020 x c ggga
..vt.,aw,ul6 V VlisDom I OTMER
- vo'c' FERMI - QC Weld Document Falsification and ass.o E D 'o JN Kalkman QC Personnel Harassment and Intimidation STATUS fiesesfy dere, W picmcar e enef descrieren/
03/31/85 - 01 Report of Investigation in draft, to be forwarded in April 1985. No further investigation anticipated.
04/30/85 - Report of Inquiry submitted to 01:HQ on 04/22/85.
Investigation complete.
This Inquiry is CLOSED.