Trip Rept of Attendance at 860829 Basemat Confirmatory Analyses Audit in New York,Ny W/Bnl,Util & Ebasco Re Calculations & Results for Horizontal Analysis.List of Attendees Encl
ML20210C206
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/11/1986
From: Joshua Wilson
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8609180281
Download: ML20210C206 (5)


Text

___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ______

d 'o UNITED STATES

[" 3 ,'g; NUCLEAR REGULATORY COMMISSION

.. g ., j WASHINGTON, D. C. 20555

%...../ SEP 111986 Locket No.: 50-382 LICENSEE: Louisiana Power and Light Company FACILITY: katerford Steam Electric Station, Unit 3

SUBJECT:

Trip Report for Basemat Confirmatory Analyses Audit August 29, 1986 An audit of the Waterford 3 basemat confirmatory analyses was held in New York between the NRC staff and its consultants, Brookhaven National Laboratory (BNL) and Louisiana Power and Light Company and its consultants, EBASCO. A list of attendees at the audit.is provided in Enclosure 1. The main focus in this audit was the calculations and results for the horizontal analysis.

At the conclusion, the NRC staff and BNL presented their conclusions regarding i the basemat confirmatory analyses program. These conclusions are listed below.

1. The horizontal analysis appears to be complete and was performed using ,

acceptable methodology. The calculational results indicate an acceptable I basemat analysis has been provided.

2. Four specific areas should receive additional discussions in the Final Report for the purpose of clarification. These areas are: (a) discussion of selected cut-off frequency for the horizontal analysis; (b) discussion of cracked vs. uncracked sections and their effect on stiffness and response; (c) statement clarifying that the purpose of the unembedded horizontal analysis was to approximate the original model, rather than accurately represent existing conditions so that the effect of basemat flexibility can be clearly established; and (d) provide a discussion con-cerning the potential for future radial cracking as a result of positive Ferding moments in portions of the basemat.
3. The staff and its consultants have now reviewed all five parts of the confirmatory analysis program committed to by LP&L in their letter of February 25, 1985, which was incorporated into the license as para-f graph 2.C.17, and conclude that the licensee's approach is acceptable.

LP&L states that they expect to submit the Final Report of the entire basemat 8609180281 860911 PDR ADOCK 05000382i+

P PDR w

s

.- confirmatory analysis program to the NRC by October 1, 1986. Proposed changes to the basemat surveillance program to address NRC comments on instrumentation and the newly-updated crack map will be submitted at a later date.

/4 James H. Wilson, Project Manager PWR Project Directorate No. 7

. Division of PWR Licensing-B

Enclosure:

As stated

.cc: See next page PBD7 h PBEB D: h7' GW Knighton JHWil9. n/es PTKu 9/f/86 9//O/86 9/ ll/86

SEP 11-1986 MEETING

SUMMARY

DISTRIBUTION DocketNo(s): 50-382 NRC PDR Local PDR PBD-7 Reading JPartlow GWKnighton -

BGrimes-ACRS(10)

EJordan Attorney, oGC-Bethesda GWKnighton Project Manager JHWilson NRC PARTICIPANTS P. Kuo J. Wilson l

l i

bec: Applicant & Service List

a Mr. Jerrold G. Dewease Louisiana Power & Light Company Waterford 3 cc:

W. Malcolm Stevenson, Esq. Regional Administrator, Region IV Monroe & Leman U.S. Nuclear Regulatory Commission 1432 Whitney Building Office of Executive Director New Orleans, Louisiana 70103. for Operations 611 Ryan Plaza Drive, Suite 1000 Mr. E. Blake Arlington, Texas 76011 Shaw, Pittman, Potts and Trowbridge 1800 M Street, NW Carole H. Burstein, Esq.

Washington, D.C. 20036 445 Walnut Street

/ New Orleans, Louisiana 70118 Mr. Gary L. Grcesch P. O. Box 791169 Mr. Charles B. Brinkman, Manager New Orleans,. Louisiana 70179-1169 Washington Nuclear Operations Combustion Engineering, Inc.

Mr. F. J. Drummond 7910 Woodmont Avenue, Suite 1310 Project Manager - Nuclear Bethesda, Maryland 20814 Loui...na Power and Light Company 142 Delaronde Street New Orleans, Louisiana 70174 Mr. K. W. Cook Nuclear Support and Licensing Manager Louisiana Power and Light Company 142 Delaronde Street New Orleans, Louisiana 70174

- Resident Inspector /Waterford hPS P. O. Box 822 Killona, Louisiana 70066 Mr. Ralph T. Lully Manager of Quality Assurance Middle South Services, Inc.

P. O. Box 61000 New Orleans, Louisiana 70161 Chairman Louisiana Public Service Commission One American Place, Suite 1630 Baton Rouge, Louisiana 70804 4

- - - , - , w w ,- -

, -. . Enclosure 1 List of Attendees at August 29, 1986 Audit of Waterford 3 Basemat Confirmatory Analyses and Their Affiliation NRC P. Kuo-J.. Wilson BNL C. Costantino C. Miller LP&L' R. Burski