Summary of Operating Reactors Events Meeting 85-28 on 851223.List of Attendees & Viewgraphs EnclML20141F046 |
Person / Time |
---|
Site: |
Hatch, Browns Ferry, Palo Verde, Catawba, Sequoyah, Byron, Arkansas Nuclear, Turkey Point, Crystal River, Diablo Canyon, Waterford, Rancho Seco, McGuire, 05000000, Trojan |
---|
Issue date: |
12/30/1985 |
---|
From: |
Holahan G, Holahan G Office of Nuclear Reactor Regulation |
---|
To: |
Harold Denton Office of Nuclear Reactor Regulation |
---|
References |
---|
OREM-85-028, OREM-85-28, NUDOCS 8601080523 |
Download: ML20141F046 (17) |
|
Similar Documents at Hatch, Browns Ferry, Palo Verde, Catawba, Sequoyah, Byron, Arkansas Nuclear, Turkey Point, Crystal River, Diablo Canyon, Waterford, Rancho Seco, McGuire, 05000000, Trojan |
---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20217M5371999-10-25025 October 1999 Summary of 990901 Meeting with Licensee in Rockville,Md Re Util Planned Conversion to Improved Sts.Attendance List & Agenda Encl ML20217K8511999-10-21021 October 1999 Summary of 990914 Meeting with Cp&L,National Marine Fisheries Service & North Carolina Wildlife Resources Commission at Brunswick Plant Re Biological Opinion Issued by NMFS & Need to Reinitiate Consultation with NMFS ML20217H7031999-10-18018 October 1999 Trip Rept of 990927-30 Visit to Bnfl Offices in Richland,Wa Re Design Review Meetings on Electrical single-line Diagrams & Dgs,Hlw & Low Activity Waste Ventilation,Fire Protection Issues & Melter Design/Hazards ML20217H5711999-10-15015 October 1999 Summary of 990927 Meeting with FPC Re Plant,Unit 3 Large Bore Piping Project.List of Attendees & Matl Used in Presentation Enclosed ML20217H1001999-10-13013 October 1999 Summary of 990930 Meeting with Util in Rockville,Md Re Proposed Five Percent Power Uprate for Plant,Unit 1.List of Meeting Participants & Licensee Meeting Handout Encl ML20217F9621999-10-0707 October 1999 Summary of 990929 Meeting with Nasa in Rockville,Maryland Re Proposed Decommissioning Plans for Nasa Plumbrook Test & Mockup Reactors ML20212K8671999-09-30030 September 1999 Summaries of 971111,980317,980505,980623,980707,980806, 980917,981023,981110,981217,990114,990205,990318,990325, 990416 & 990714 Meetings with Licensee Re Implementation of plan-for-excellence Restart Issues.With Minutes & Handouts ML20212H2231999-09-24024 September 1999 Summary of 990831-0901 Meeting with STPNOC in Rockville, Maryland Re 990713 Request for 14 risk-informed Exemptions to Exclude safety-related LSSC & non-risk Significant Components from Special Treatment Requirements ML20212H1911999-09-24024 September 1999 Summary of 990819 Meeting with Util & DOT to Discuss Packaging & Applicable Regulations for Haddam Neck Rv Shipment Scheduled for September 2000 ML20217D1001999-09-24024 September 1999 Summary of 990901 Meeting with Nmpc,Nyseg & Amergen Energy Co in Rockville,Maryland Re NMPC Plans & Pending Submittal Re Transfer of NMPC Interest & Authorities Under Operating Licenses for Nine Mile Point ML20216H8631999-09-24024 September 1999 Summary of 990714 Meeting with Cyap & Bpc Re Hazards Analysis of Proposed Installation of Natural gas-fired, Turbine Driven Electric Generation Facility on Site of Haddam Neck Plant.List of Attendees & Meeting Notes Encl ML20212D1631999-09-20020 September 1999 Summary of 990908 Meeting with Myap in Rockville,Md Re Plant License Termination Plan.List of Attendees & Licensee Handouts Encl ML20212A2471999-09-15015 September 1999 Summary of 990902 Meeting with Westinghouse in Rockville,Md Re Changes That W Plan to Make in Rev 3 of AP600 Design Control Document (Dcd).List of Attendees & Handouts Encl ML20212A3101999-09-14014 September 1999 Summary of 990823 Meeting with Util in Rockville,Md to Discuss License Termination Plan.List of Attendees Encl ML20216E5571999-09-10010 September 1999 Summary of 990831 Meeting with Duke Cogema Stone & Webster & DOE Re Design of Mixed Oxide Fuel Fabrication Facility (MOX-FFF) & License Application Submittal Schedules.Agenda & List of Attendees Encl ML20211P9981999-09-0808 September 1999 Summary of 990816 Meeting with Saxton Nuclear Experimental Corp & Gpu Nuclear Corp in Saxton,Pa to Continue Discussions Started at Meeting on 990701,about Resubmission of License Termination Plan.List of Attendees & Briefing Matl Encl ML20211N2321999-09-0808 September 1999 Summary of 990701 Meeting with Utils Re Resubmission of License Termination Plan for Saxton Nuclear Experimental Facility.List of Meeting Attendees Encl ML20211N2141999-09-0808 September 1999 Summary of 990720 Meeting with Util in Rockville MD Re Amend Currently Under Review by Staff Pertaining to Control Room Habitability at Plant Units 1 & 2.List for Attendees & Licensee Handouts Encl ML20211N5371999-09-0808 September 1999 Summary of 990901 Meeting with Util in Rockville MD Re Plans for Advanced Core Monitoring Sys.List of Attendees & Licensee Agenda Encl ML20211K3471999-08-31031 August 1999 Summary of 990728 Meeting with Util Re Staff 990721 RAI Re Smud Application for ISFSI at Rancho Seco Site.Attendace List Encl ML20207H8921999-08-30030 August 1999 Summary of 990713 Meeting with Usec Re Status of Ncse/A Review & Upgrade Effort Being Conducted at Portsmouth GDP, Including Extended Completion Date for Priority 2 Portion of NCS Cap.List of Attendees & Slides,Encl ML20211F5761999-08-26026 August 1999 Summary of 990813 Meeting with Licensee in Rockville,Md to Discuss Status & Completion Schedule of Active & Soon to Be submitted,TMI-1 Licensing Issue.List of Attendees & Meeting Handouts Encl ML20210U3011999-08-16016 August 1999 Summary of 990727 Meeting with Bnfl Fuel Solutions (Bfs) & Consumers Energy in Rockville,Md Re Bfs Integrations Status, Wesflex Sys & Big Rock Point Plant Dry Storage Plans.Meeting Agenda,Attendance List & Meeting Handouts,Encl ML20210Q1841999-08-11011 August 1999 Summary of 990722 Meeting with Util Re Proposed TS for SG Water Level low-top Trip Setpoint.List of Meeting Attendees & Handout Provided by Util Encl ML20210P9511999-08-10010 August 1999 Summary of 990722 Meeting with Util in Rockville,Md Re Recently Signed Asset Purchase Agreement Between Licensee & Amergen Energy Co & Proposed Transfer of CPS License to Be Submitted to Nrc.List Meeting Attendees & Handout Encl ML20210Q7891999-08-10010 August 1999 Summary of 990713 Conference Call with Util Re Licensee Proposed Exemption Request ,as Supplemented by Ltr Re Emergency Preparedness ML20210S7941999-08-0909 August 1999 Summary of 990723 Meeting with Stakeholders in Rockville,Md Re Responsibilities of Div of Licensing Project Mgt & Solicit Feedback on Div Ongoing Redefinition Process from Interested Stakeholders.List of Attendees Encl ML20210L5231999-08-0505 August 1999 Summary of 990708-09 Meeting with Detroit Edison Co in Rockville,Md Re Issues Related to Fermi 2 Submittal for Conversion of Current TSs to Improved Standard Tss.List of Participants & RAI Tracking Numbers Encl ML20210L6541999-08-0404 August 1999 Summary of 990713 Meeting with Util in Rockville,Md Re Licensee Proposed Mods to Reactor Building Spray Sys Operation & Hpis.List of Attendees Encl ML20210P1611999-08-0404 August 1999 Summary of 990415 Meeting with Utils in Knoxville,Tn Re Status of Mark 3 Program Designed to Determine & Validate Submerged Structure Drag Loads of Newley Installed ECCS Strainers at Perry,Grand Gulf & Clinton Facilities ML20210G0721999-07-29029 July 1999 Summary of 990617 Meeting with Licensee in Rockville,Md Re Licensing Requirements of k-eff (Rev 10).Attendees Listed ML20210H6681999-07-29029 July 1999 Summary of 990329 Meeting with Gpu in Forked River,Nj Re Possibility of Decommisssioning of Oyster Creek Nuclear Generating Station.List of Attendees & Licensee Handouts Provided ML20210H6271999-07-29029 July 1999 Summary of 990622 Meeting with EOI Re NRC Briefing by RBS on Issues Associated with Root Cause Investigation Into Fuel Cladding Failures That Occurred During Recent Cycle 8 Operation.List of Attendees Provided ML20210G2711999-07-28028 July 1999 Summary of 990707 Meeting with Util in Rockville,Md to Discuss Licensee Termination Plan.List of Attendance & Handouts Encl ML20210B7521999-07-21021 July 1999 Summary,For Docket 7200030,of 990707 Meeting with Myap,S&W & NAC Intl Re Util Plans to Store Spent Fuel Using NAC-UMS Dry Storage Sys.Attendance List,Meeting Handouts & Util Rulemaking Handout,Encl ML20210C0181999-07-20020 July 1999 Trip Rept of 990609-0611 Visit to GE-Vallecitos Facility Re Renewal of Matl License SNM-960 ML20209G6971999-07-16016 July 1999 Summary of 990624 Meeting with Util in Rockville,Md to Discuss Plant License Renewal Program.List of Meeting Attendees & Presentation Matls Discussed at Meeting Encl ML20210A6941999-07-16016 July 1999 Summary of 990628 Meeting with Util in Rockville,Md Re Arkansas Nuclear One,Unit 2 Steam Generator Operational Assessment.List of Meeting Attendees & Licensee Handout Used During Meeting Encl ML20210D7801999-07-16016 July 1999 Summary of 990715 Meeting with TVA Re TVA Evaluation of Fee Structure Compared with Recent Actual Fees & NRC Guidance in Estimating Review Effort for Licensing Actions.List of Attendees & Matl Used in Presentation Enclosed ML20210E0201999-07-16016 July 1999 Summary of 990629 Meeting with Util in Rockville,Md Re Ongoing Efforts in Planning Sf Storage Strategy,Including Licensing of Isfsi,At Plant.With Attendance List & TVA Handout ML20210D7601999-07-16016 July 1999 Summary of 990616 Meeting with TVA in Rockville MD to Brief Staff on Planned SG Replacement.List of Attendees & Handout Provided by TVA Encl ML20209E7641999-07-0707 July 1999 Summary of 990617 Meeting with Licensee Re Util Plans to Add Racks to & Replace Older Racks in Sfp.List of Attendees Encl ML20196L1131999-07-0101 July 1999 Summary of 990330 Meeting with Util in Rockville,Md to Discuss Status of NRC Review of Bge License Renewal Application for Calvert Cliffs Nuclear Power Plant,Unit 1 & 2.List of Attendees & Meeting Slides Encl ML20196K4621999-07-0101 July 1999 Summary of 990114 Meeting with Util in Rockville,Md Re Status of NRC Review of Bg&E License Renewal Application for Calvert Cliffs Npp.List of Meeting Attendees & Meeting Slides Encl ML20196J4111999-06-30030 June 1999 Summary of 990524 Meeting with Util in Rockville,Md to Discuss Technical Issues Re Proposed Rerack of Spent Fuel Pool at Plants.List of Attendees & Handouts Encl ML20196J2351999-06-29029 June 1999 Summary of 990617 Meeting with B&Wog & FTI Re B&Wog Emergency Operating Procedure Program.List of Meeting Attendees & Presentation Slides Encl ML20212J5991999-06-28028 June 1999 Summary of 990602 Meeting with Licensees to Discuss Safety & Licensing Requirements Applicable to Installation of Natural gas-fired,turbine-driven Electric Generation Facility on Site at Haddam Neck Plant ML20196H1471999-06-24024 June 1999 Summary of 990609 Meeting with Duke Energy Corp Re NRC Conclusions for TIA-98008 on Use of Compensatory Actions for Control Room Emergency Ventilation System & to Present Positions.List of Participants & Licensee Handouts Encl ML20196F8281999-06-24024 June 1999 Summary of 981203 Meeting with Representatives of & Contractors to Util in Rockville,Md Re Bge Performance on Aging Mgt Evaluation Re Susceptibility of Cast Austenitic Stainless Steel Components to Thermal Embrittlement.W/Encl ML20196G4301999-06-24024 June 1999 Summary of 981216 Meeting with Util in Rockville,Md to Discuss Status of NRC Review of Bge License Renewal Application for Plant,Units 1 & 2 1999-09-08 The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Hatch]] OR [[:Browns Ferry]] OR [[:Palo Verde]] OR [[:Catawba]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Arkansas Nuclear]] OR [[:Turkey Point]] OR [[:Crystal River]] OR [[:Diablo Canyon]] OR [[:Waterford]] OR [[:Rancho Seco]] OR [[:McGuire]] OR [[:05000000]] OR [[:Trojan]] </code>.
[Table view]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Hatch]] OR [[:Browns Ferry]] OR [[:Palo Verde]] OR [[:Catawba]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Arkansas Nuclear]] OR [[:Turkey Point]] OR [[:Crystal River]] OR [[:Diablo Canyon]] OR [[:Waterford]] OR [[:Rancho Seco]] OR [[:McGuire]] OR [[:05000000]] OR [[:Trojan]] </code>. Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20217M5371999-10-25025 October 1999 Summary of 990901 Meeting with Licensee in Rockville,Md Re Util Planned Conversion to Improved Sts.Attendance List & Agenda Encl ML20217K8511999-10-21021 October 1999 Summary of 990914 Meeting with Cp&L,National Marine Fisheries Service & North Carolina Wildlife Resources Commission at Brunswick Plant Re Biological Opinion Issued by NMFS & Need to Reinitiate Consultation with NMFS ML20217H5711999-10-15015 October 1999 Summary of 990927 Meeting with FPC Re Plant,Unit 3 Large Bore Piping Project.List of Attendees & Matl Used in Presentation Enclosed ML20217H1001999-10-13013 October 1999 Summary of 990930 Meeting with Util in Rockville,Md Re Proposed Five Percent Power Uprate for Plant,Unit 1.List of Meeting Participants & Licensee Meeting Handout Encl ML20217F9621999-10-0707 October 1999 Summary of 990929 Meeting with Nasa in Rockville,Maryland Re Proposed Decommissioning Plans for Nasa Plumbrook Test & Mockup Reactors ML20212K8671999-09-30030 September 1999 Summaries of 971111,980317,980505,980623,980707,980806, 980917,981023,981110,981217,990114,990205,990318,990325, 990416 & 990714 Meetings with Licensee Re Implementation of plan-for-excellence Restart Issues.With Minutes & Handouts ML20216H8631999-09-24024 September 1999 Summary of 990714 Meeting with Cyap & Bpc Re Hazards Analysis of Proposed Installation of Natural gas-fired, Turbine Driven Electric Generation Facility on Site of Haddam Neck Plant.List of Attendees & Meeting Notes Encl ML20217D1001999-09-24024 September 1999 Summary of 990901 Meeting with Nmpc,Nyseg & Amergen Energy Co in Rockville,Maryland Re NMPC Plans & Pending Submittal Re Transfer of NMPC Interest & Authorities Under Operating Licenses for Nine Mile Point ML20212H1911999-09-24024 September 1999 Summary of 990819 Meeting with Util & DOT to Discuss Packaging & Applicable Regulations for Haddam Neck Rv Shipment Scheduled for September 2000 ML20212H2231999-09-24024 September 1999 Summary of 990831-0901 Meeting with STPNOC in Rockville, Maryland Re 990713 Request for 14 risk-informed Exemptions to Exclude safety-related LSSC & non-risk Significant Components from Special Treatment Requirements ML20212D1631999-09-20020 September 1999 Summary of 990908 Meeting with Myap in Rockville,Md Re Plant License Termination Plan.List of Attendees & Licensee Handouts Encl ML20212A2471999-09-15015 September 1999 Summary of 990902 Meeting with Westinghouse in Rockville,Md Re Changes That W Plan to Make in Rev 3 of AP600 Design Control Document (Dcd).List of Attendees & Handouts Encl ML20212A3101999-09-14014 September 1999 Summary of 990823 Meeting with Util in Rockville,Md to Discuss License Termination Plan.List of Attendees Encl ML20216E5571999-09-10010 September 1999 Summary of 990831 Meeting with Duke Cogema Stone & Webster & DOE Re Design of Mixed Oxide Fuel Fabrication Facility (MOX-FFF) & License Application Submittal Schedules.Agenda & List of Attendees Encl ML20211N5371999-09-0808 September 1999 Summary of 990901 Meeting with Util in Rockville MD Re Plans for Advanced Core Monitoring Sys.List of Attendees & Licensee Agenda Encl ML20211P9981999-09-0808 September 1999 Summary of 990816 Meeting with Saxton Nuclear Experimental Corp & Gpu Nuclear Corp in Saxton,Pa to Continue Discussions Started at Meeting on 990701,about Resubmission of License Termination Plan.List of Attendees & Briefing Matl Encl ML20211N2141999-09-0808 September 1999 Summary of 990720 Meeting with Util in Rockville MD Re Amend Currently Under Review by Staff Pertaining to Control Room Habitability at Plant Units 1 & 2.List for Attendees & Licensee Handouts Encl ML20211N2321999-09-0808 September 1999 Summary of 990701 Meeting with Utils Re Resubmission of License Termination Plan for Saxton Nuclear Experimental Facility.List of Meeting Attendees Encl ML20211K3471999-08-31031 August 1999 Summary of 990728 Meeting with Util Re Staff 990721 RAI Re Smud Application for ISFSI at Rancho Seco Site.Attendace List Encl ML20207H8921999-08-30030 August 1999 Summary of 990713 Meeting with Usec Re Status of Ncse/A Review & Upgrade Effort Being Conducted at Portsmouth GDP, Including Extended Completion Date for Priority 2 Portion of NCS Cap.List of Attendees & Slides,Encl ML20211F5761999-08-26026 August 1999 Summary of 990813 Meeting with Licensee in Rockville,Md to Discuss Status & Completion Schedule of Active & Soon to Be submitted,TMI-1 Licensing Issue.List of Attendees & Meeting Handouts Encl ML20210U3011999-08-16016 August 1999 Summary of 990727 Meeting with Bnfl Fuel Solutions (Bfs) & Consumers Energy in Rockville,Md Re Bfs Integrations Status, Wesflex Sys & Big Rock Point Plant Dry Storage Plans.Meeting Agenda,Attendance List & Meeting Handouts,Encl ML20210Q1841999-08-11011 August 1999 Summary of 990722 Meeting with Util Re Proposed TS for SG Water Level low-top Trip Setpoint.List of Meeting Attendees & Handout Provided by Util Encl ML20210P9511999-08-10010 August 1999 Summary of 990722 Meeting with Util in Rockville,Md Re Recently Signed Asset Purchase Agreement Between Licensee & Amergen Energy Co & Proposed Transfer of CPS License to Be Submitted to Nrc.List Meeting Attendees & Handout Encl ML20210Q7891999-08-10010 August 1999 Summary of 990713 Conference Call with Util Re Licensee Proposed Exemption Request ,as Supplemented by Ltr Re Emergency Preparedness ML20210S7941999-08-0909 August 1999 Summary of 990723 Meeting with Stakeholders in Rockville,Md Re Responsibilities of Div of Licensing Project Mgt & Solicit Feedback on Div Ongoing Redefinition Process from Interested Stakeholders.List of Attendees Encl ML20210L5231999-08-0505 August 1999 Summary of 990708-09 Meeting with Detroit Edison Co in Rockville,Md Re Issues Related to Fermi 2 Submittal for Conversion of Current TSs to Improved Standard Tss.List of Participants & RAI Tracking Numbers Encl ML20210P1611999-08-0404 August 1999 Summary of 990415 Meeting with Utils in Knoxville,Tn Re Status of Mark 3 Program Designed to Determine & Validate Submerged Structure Drag Loads of Newley Installed ECCS Strainers at Perry,Grand Gulf & Clinton Facilities ML20210L6541999-08-0404 August 1999 Summary of 990713 Meeting with Util in Rockville,Md Re Licensee Proposed Mods to Reactor Building Spray Sys Operation & Hpis.List of Attendees Encl ML20210G0721999-07-29029 July 1999 Summary of 990617 Meeting with Licensee in Rockville,Md Re Licensing Requirements of k-eff (Rev 10).Attendees Listed ML20210H6681999-07-29029 July 1999 Summary of 990329 Meeting with Gpu in Forked River,Nj Re Possibility of Decommisssioning of Oyster Creek Nuclear Generating Station.List of Attendees & Licensee Handouts Provided ML20210H6271999-07-29029 July 1999 Summary of 990622 Meeting with EOI Re NRC Briefing by RBS on Issues Associated with Root Cause Investigation Into Fuel Cladding Failures That Occurred During Recent Cycle 8 Operation.List of Attendees Provided ML20210G2711999-07-28028 July 1999 Summary of 990707 Meeting with Util in Rockville,Md to Discuss Licensee Termination Plan.List of Attendance & Handouts Encl ML20210B7521999-07-21021 July 1999 Summary,For Docket 7200030,of 990707 Meeting with Myap,S&W & NAC Intl Re Util Plans to Store Spent Fuel Using NAC-UMS Dry Storage Sys.Attendance List,Meeting Handouts & Util Rulemaking Handout,Encl ML20210A6941999-07-16016 July 1999 Summary of 990628 Meeting with Util in Rockville,Md Re Arkansas Nuclear One,Unit 2 Steam Generator Operational Assessment.List of Meeting Attendees & Licensee Handout Used During Meeting Encl ML20210D7601999-07-16016 July 1999 Summary of 990616 Meeting with TVA in Rockville MD to Brief Staff on Planned SG Replacement.List of Attendees & Handout Provided by TVA Encl ML20210D7801999-07-16016 July 1999 Summary of 990715 Meeting with TVA Re TVA Evaluation of Fee Structure Compared with Recent Actual Fees & NRC Guidance in Estimating Review Effort for Licensing Actions.List of Attendees & Matl Used in Presentation Enclosed ML20210E0201999-07-16016 July 1999 Summary of 990629 Meeting with Util in Rockville,Md Re Ongoing Efforts in Planning Sf Storage Strategy,Including Licensing of Isfsi,At Plant.With Attendance List & TVA Handout ML20209G6971999-07-16016 July 1999 Summary of 990624 Meeting with Util in Rockville,Md to Discuss Plant License Renewal Program.List of Meeting Attendees & Presentation Matls Discussed at Meeting Encl ML20209E7641999-07-0707 July 1999 Summary of 990617 Meeting with Licensee Re Util Plans to Add Racks to & Replace Older Racks in Sfp.List of Attendees Encl ML20196K4621999-07-0101 July 1999 Summary of 990114 Meeting with Util in Rockville,Md Re Status of NRC Review of Bg&E License Renewal Application for Calvert Cliffs Npp.List of Meeting Attendees & Meeting Slides Encl ML20196L1131999-07-0101 July 1999 Summary of 990330 Meeting with Util in Rockville,Md to Discuss Status of NRC Review of Bge License Renewal Application for Calvert Cliffs Nuclear Power Plant,Unit 1 & 2.List of Attendees & Meeting Slides Encl ML20196J4111999-06-30030 June 1999 Summary of 990524 Meeting with Util in Rockville,Md to Discuss Technical Issues Re Proposed Rerack of Spent Fuel Pool at Plants.List of Attendees & Handouts Encl ML20196J2351999-06-29029 June 1999 Summary of 990617 Meeting with B&Wog & FTI Re B&Wog Emergency Operating Procedure Program.List of Meeting Attendees & Presentation Slides Encl ML20212J5991999-06-28028 June 1999 Summary of 990602 Meeting with Licensees to Discuss Safety & Licensing Requirements Applicable to Installation of Natural gas-fired,turbine-driven Electric Generation Facility on Site at Haddam Neck Plant ML20196H1471999-06-24024 June 1999 Summary of 990609 Meeting with Duke Energy Corp Re NRC Conclusions for TIA-98008 on Use of Compensatory Actions for Control Room Emergency Ventilation System & to Present Positions.List of Participants & Licensee Handouts Encl ML20196G4301999-06-24024 June 1999 Summary of 981216 Meeting with Util in Rockville,Md to Discuss Status of NRC Review of Bge License Renewal Application for Plant,Units 1 & 2 ML20196F8281999-06-24024 June 1999 Summary of 981203 Meeting with Representatives of & Contractors to Util in Rockville,Md Re Bge Performance on Aging Mgt Evaluation Re Susceptibility of Cast Austenitic Stainless Steel Components to Thermal Embrittlement.W/Encl ML20195J8561999-06-16016 June 1999 Summary of 990518 Meeting with Dlc & Westinghouse to Discuss Dlc License Amend Request to Revise TS Limiting Safety Sys Setpoints to Be More Conservative ML20195J6631999-06-16016 June 1999 Summary of 990519 Meeting with Usec Re Intent to Amend Portsmouth Gaseous Diffusion Plant Moderation Technical Safety Requirements.List of Attendees & Handout Encl 1999-09-08 The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Hatch]] OR [[:Browns Ferry]] OR [[:Palo Verde]] OR [[:Catawba]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Arkansas Nuclear]] OR [[:Turkey Point]] OR [[:Crystal River]] OR [[:Diablo Canyon]] OR [[:Waterford]] OR [[:Rancho Seco]] OR [[:McGuire]] OR [[:05000000]] OR [[:Trojan]] </code>.
[Table view]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Hatch]] OR [[:Browns Ferry]] OR [[:Palo Verde]] OR [[:Catawba]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Arkansas Nuclear]] OR [[:Turkey Point]] OR [[:Crystal River]] OR [[:Diablo Canyon]] OR [[:Waterford]] OR [[:Rancho Seco]] OR [[:McGuire]] OR [[:05000000]] OR [[:Trojan]] </code>. |
Text
F DEC30febi MEMORANDUM FOR: Harold R. Denton, Director Office of Nuclear Reactor Regulation FROM: Gary M. Holahan, Director Operating Reactors Assessment Staff
SUBJECT:
SUMMARY
OF THE OPERATING REACTORS EVENTS MEETING ON DECEMBER 23, 1985 - MEETING 85-28 On December 23, 1985, an Operating Reactor Events meeting (85-28) was held to brief the Office Director, the Division Directors and their representatives on events which occurred since our last meeting on December 16, 1985. The list of attendees is included as Enclosure 1.
The events discussed and the significant elements of these events are presented in Enclosure 2. In addition, the assignment of follow-up review responsibility was discussed. The assignments made durin,q this meeting and the status of previous assignments are presented in Enclosure 3.
Completion dates have been assigned for items in Enclosure 3. Each assignee should review Enclosure 3 with regard to their respective responsibilities.
Note that several assignees are approaching the due date. Please be responsive and advise ORAB (D. Tarnoff, x29526) if the target completion date cannot be met.
Gary M. Holahan, Director Operating Reactors Assessment Staff
Enclosures:
As stated cc w/ encl:
See next page DISTRIBUTION Central Files NRC PDR ORAB Rdg ORAB Members i
sA p0 ./}
OR C:0 RAS W D/0 RAS P W P D f:dm RWessmanN GHolahanb' M(8lM fp/85 is l'c/85 v/s/85 y ')0 ,D
_ (O
,u-8601080523 851230 / 1 PDR ADOCK 05000250 [/
S PDR
- 'o UNITED STATES
, g 8 o NUCLEAR REGULATORY COMMISSION
, ;; .E WASHINGTON, D. C. 20555
- .....** DEC 30 N6 MEMORANDUM FOR: Harold R. Denton, Director
. Office of Nuclear Reactor Regulation FROM: Gary M. Holahan, Director Operating Reactors Assessment Staff
SUBJECT:
SUMMARY
OF THE OPERATING REACTORS EVENTS MEETING ON DECEMBER 23, 1985 - MEETING 85-?8 On December 23, 1985, an Operating Reactor Events meeting (85-28) was held to brief the Office Director, the Division Directors and their representatives on events which occurred since our last meeting on December 16, 1985. The list of attendees is included as Enclosure 1.
The events discussed and the significant elements of these events are presented in Enclosure 2. In addition, the assignment of follow-up review responsibility was discussed. The assignment made during this meeting and '.he status of previous assignments are presented in Enclosure 3.
Completion dates have been assigned for items in Enclosure 3. Each assignee should review Enclosure 3 with regard to their respective responsibilities.
Note that several assignees are approaching the due date. Please be responsive and advise ORAB (D. Tarnoff, x29526) if the target completion date cannot be met.
, \ .A . . .x l c. ,
Gary M. Holahan, Director Operating Reactors Assessment Staff
Enclosures:
As stated cc w/ encl:
See next page
', Harold R. Denton cc: D. Eisenhut E. A. Licitra J. Taylor R. Lee C. Heltemes G. Rivenbark T. Murley, Reg. I- D. Muller J. Nelson Grace, Reg. II L. Olshan J. Kepp,ler, Reg. III V. Noonan R. D. Martin, Reg. IV G. Knighton J. B. Martin, Reg. V S. Israel R. Starostecki, Reg. I R. Singh R. Walker, Reg. II C. Norelius, Reg. III E. Johnson. Reg. IV D. Kirsch, Reg. V H. Thompson F. Miraglia R. Bernero T. Speis W. Russell T. Novak F. Schroeder W. Houston B. Sheron D. Ziemann J. Knight D. Crutchfield G. Lainas V. Benaroya W. Regan D. Vassallo E. Jordan E. Rossi R. Baer E. Weiss R. Hernan K. Seyfrit l
ENCLOSURE 1 LIST OF ATTENDEES OPERATING REACTORS EVENTS BRIEFING (85-28)
DECEMBER 23, 1985 NAME ,
DIVISION NAME DIVISION H. R. Denton NRR T. S. Rotella NRR/ DBL /BWD#1 D. Eisenhut NRR W. Regan NRR/PWR-B/FOR D. Ziemann DHFT K. Mitchell NRR/ADLB-B D. Tarnoff NRR/0 RAS B. Sheron DSR0 R. Lee NRR/PBD-7 T. Speis DSR0 E. Butci.cr DHFT/TSCB L. Kelly NRR/0 RAS J. Stone IE/VPB F. Miraglia NRR/PWR-B G. Rivenbark NRR/PD#2 S. Varga NRR/PWR-A R. Bosnak NRR/DSR0 D. Muller NRR/ DBL
- 0. Parr NRR/PWR-B C. Rossi IE/DEPER/EAB R. Benedict NRR/8-FOB R. Bernero NRR/ DBL G. Edison NRR/PWR-B V. Noonan NRR/PWR-A J. Stolz NRR/PWR-B M. Virgilio NRR/0 RAS C. Ader OCM M. Clausen OCM V. Benaroya NRR/PWR-A/F0B J. Knight NRR/PWR-A J. Wilson NRR/PWR-B/#7 R. Singh IE/DEPER/EAB E. Weiss IE/DEPER/EAB E. Leeds AEOD/R0AB D. Zukor AEOD/ROAB K. Seyfrit AE00/R0AB I. Ahmed NRR/PEICSB/PSB-B' R. Wright NRR/DPLB/ADTS J. A. Calvo NRR/DPLB/PEICSB S. Israel NRR/DPLA/F0B F. Ashe AE0D/ROAB M. Licitra NRR/DPLB
. OPERATING REACTORS EVENTS BRIEFING 85-28 DECEMBER 23, 1985 PALO VERDE UNIT 1 ESFAS ACTUATION, REACTOR TRIP AND COMPONENT MALFUNCTIONS ARKANSAS NUCLEAR ONE UNIT 2 INOPERABLE REACTOR TRIP BREAKERS HATCH UNIT ] FLOODING OF SAFETY RELATED AREAS BYRON UNIT 1 LOSS OF SERVICE WATER
b' PALO VERDE UNIT 1 - ESFAS ACTUATION, REACTOR TRIP AND COMPONENT MALFUNCTIONS
. DECEMBER 16, 1985, (E.A. LICITRA, NRR)
PROBLEMS:. B0P ESFAS ACTUATION (A-TRAIN), LOSS OF POWER (A-TRAIN)
. AND REACTOR TRIP (2% POWER)
MALFUNCTION OF LOAD SEQUENCER (A-TRAIN), ESSENTIAL CHILLER (B-TRAIN) AND AFW PUMP INSTRUMENTATION, SIGNIFICANCE:. CHALLENGES TO SAFETY SYSTEMS AS A RESULT OF RELAY CABINET OVERHEATING CIRCUMSTANCES:
PLANT AT 50% POWER T0'FIX CONDENSER LEAKS, FAN ON AUXILIARY RELAY CABINET FAILED ( A-TRAIN),
CABINET OVERHEATED AND LOAD SEQUENCER MALFUNCTIONED, SEQUENCER TRIPPED FEEDER BREAKER TO 4160V BUS (S03),
A-TRAIN DIESEL STARTED BUT BREAKER TO S03 BUS COULD NOT BE CLOSED UNTIL SE0llENCER CIRCUIT FUSES REMOVED, B-TRAIN ESSENTIAL CHILLER TRIPPED AND PLANT. SHUTDOWN INITIATED, AT 2% POWER UNABLE TO MAINTAIN S.G, LEVEL IN MANUAL FEEDWATER MODE, PLANT TRIPPED FROM S.G. LOW LEVEL INDICATION, FOLLOWUP:
POST EVENT REVIEW DETERMINED:
SEQUENCER MALFUNCTION CAUSED BY OVERHEATING IN CABINET, SEQUENCER MALFUNCTION ACTIVATED ESFAS SYSTEM AND PREVENTED REENERGIZING S03 BUS, ESSENTIAL CHILLER TRIP CAUSED BY LEAKING REFRIGERANT.
SEQUENCER CARD REPLACED AND CHECKED OUT, LEAK IN ESSENTIAL COOLER REPAIRED, PLANT RESTARTED ON DECEMBER 17, 1985,
.. ._ - . _ . - _. .= - - - -
ARKANSAS NUCLEAR ONE UNIT ?-INOPERABLE REACTOR TRIP BREAKERS,
, j DECEMBER 18, 1985 (R, SINGH, IE) l PROBLEM: UNDERVOLTAGE ARMATURES OF TWO RTBS FOUND IN MID-POSITION SIGNIFICANCE:
TWO RTBS INOPERABLE DUE TO BREAKDOWN OF ADMINISTRATIVE CONTROLS CIRCUMSTANCES:
UNIT IN MODE 1
- MONTHLY SURV TESTING 0F RPS B CHANNEL IN PROGRESS UNDERVOLTAGE ARMATilRES OF BOTH RTBS FOUND IN MID-POSITION FAILURE MECHANISM WAS PREVIOUSLY DESCRIBED IN IE IN 83-76
- UNDERVOLTAGE ARMATURE POSITIONS MAY NOT HAVE BEEN VERIFIED AFTER PREVIOUS OPERATION MAINT, OPENED THE BKRS MANUALLY, RESET AND TESTED THEM SUCCESSFULLY NO PROBLEMS WITH OTHER SIX RTBS FOLLOWUP
NONE t
i
. , _ _ . . . . , , , _ . - , - ._ ..~-,-_., _. _ _ , . _ _ . . . . , , , , _ . , . . . _ _ . _ _ , , . _ _ _ _ . . _ _ , , _ _ . , _ _ , , ._..,,,_ _,,_ ,-. .__. , ._ - ,._ ,-..._. -
Attachment 1 IN 83-76 e, November 2,1983
!o iI i :
TRIP SHAFT I UNDERVOLTAGE TRIP PADDLE ma
/
\,,,O.......<,.....,.
.. . . . . . . +1 .-
u.s.m , .
~'
(
2, kl [ -
(ma :.
ARMATURE i Copper -
l Shading , I Ring H 3
C k( l Adjusting Screw h gda l l (Air Gap) -3 l l U E
c- ')T V !
d l eFRAME l 1 - T l [~1 f C3IL I
Q l l ) h'N (
U g' Figure 1. Undervoltage Trip Device, Coil Energized Position
,__r ., _- - m.----, -.--- _ - - ,-
HATCH-UNIT 1 - FLOODING 0F SAFETY-RELATED AREAS DECEMBER 21,1985 (G, RIVENBARK, NRR)
PROBLEM !
RHR PUMP ROOM ACCIDENTALLY FLOODED DURING MAINTENANCE 0THER ROOMS CONTAINING SAFETY-RELATED EQUIPMENT SUBSE0VENTLY FLOODED TO LOW LEVELS SIGNIFICANCE POOR MAINTENANCE PROCEDURE i
POSSIBLE INTERACTION OF DRAIN SYSTEM CIRCUMSTANCES UNIT TOTALLY DEFUELED MAINTENANCE BEING PERFORMED ON ISOLATION VALVE IN RHR TORUS SUCTION LINE SINGLE AIR-0PERATED VALVE RELIED ON FOR ISOLATION OF TORUS LOSS OF ELECTRIC POWER TO ACTUATOR SOLEN 0ID DUE TO DIESEL TESTING RESULTED IN OPENING ISOLATION VALVE WATER FLOWED BY GRAVITY THROUGH VALVE ON WHICH MAINTENANCE WAS BEING PERFORMED RHR ROOM FLOODED 14 FEET DEEP SUBSEQUENT DRAINING OF RHR ROOM RESULTED IN WATER BEING INTRODUCED TO OTHER SAFETY EQUIPMENT ROOMS FOLLOW-UP
- REGION II SENDING GR0llP TO SITE TO EVALUATE DAMAGE, MAINTENANCE PRACTICES, AND POTENTIAL DRAIN SYSTEM
-INTERACTION i
, . . - , . - - - - - - - - - -- ,---n--,,, ,, .,- . , , , . -- , , . - - - ,- - - , -- .-e -
l D'
e""m a-
! $ 0 E
39t E
g ; lI l 3
"E l ilj 1 -
2 -y K ,.
[ ,
- g g
- fa4 z a=
I W h5 si N -8 g*D ,
g11- i!.!
g; 5
~
0)
T I
E})'
- D.g . ..- =
g- : ....
e=. 1 @ '
@ x
$ $h l {p_ n . ._ ., . . $ _
N.
!N l , liSY !.,. $
e_ Ing f g = j gh k <
Ig 3 e.-
S eI se N 'fi~*1
- l I-
,. .. ..- +-
1, Al
1N!
'g) (:
e , ' . ,; * \. ._ . ._
4 d
- h. ,.
1 j. C:
^
%-- l- (
ki
},if-g ,
M' ,, ,Y u
.e I i
- '; l e- O d \< B i aH i , : .
s1 'j p g
- 1 M :\ h!
$3!!!
l$8!k? ..
gfg . ,,
j
%' i [lal Il3 I
s l i; __ . .+ 1 1 w-3_ _
L h:,._-. _
S/- --
v Utg L, ,: n. gl .
it g
-- ' -[ !
~I s h$ifif
'S g7 dy 9 .. s)f-!RlMM g f -
4 r
ii R ,18wD si,r$ fili. k e, , ,
_wI,l 'di! b = i ) rh, 40fI aw n e
4 h M 4 e f ,e,.
ekt -
ie an. J
l t
l e- . =
&-- Tn
,[g ..;. g .
. js { . . .......................... g
).'".:.W $~ @
l h.' . - .
~
"f.;..
- -. 6 ,
] e. qt" -
,a'h c:3 .
e**_~.L ,~p N ' **N f i :
y
- s. ;;; u,w.44 . g . a'ir$.1 - *O -
.,=.. f ,,.
t
}'f
- . ; {f_; N
? e1
@.3.8 r. - -. v. . - 1 2 - E ;m .
l :
.i .=.
=:
.m, .e W:V.. , 6 a%m R~ ,. *.
. <MW-wd .
I _l :s-e- - b .
_ o ~ 3. .
1.
ern._.
![h."*
M.
f.
1:_ A l _,,
"' G -- ,' -
,,;, c.:;-
= *
=
1;:; ....n....., . . .
O
. O M 4Mn.
,l i
'- :Q) d,,d 8 .Ix,:-
u,
.ly
=a . (;;;; 56 7 dEve
=a-;
kjf C
"b *;@"; @ . -?K'Af;*3IT
- 2. - c::U.
h
. g' r.; . .
w c,t 'o!
t g l <, _
! I .g 5f. i q..-
3 3, =
v,, r,.l q_
g .,_
. ~
.....~i.,
. . . g, ,, , ,
1i
' 5 ~pn i 5C.'**@rB ii i ss 1 E
" i. .=
l BEL.B s
~.
/. @R t- 't --w "6 o ; e. t.~ ; r.= g** T*
r.o ,.,.,,,u
.. .. , . . ,.u
.................. ....a 4,
V"tcb..>i .1..
}...
- - i -4_.1 1 a .!.
y'""
.l hg. m ff h.h. ,.. .*:l.a. .
g .
~
% . .. ~* . -.;. - '
~$s. .y . um ,
.=
l & =a-.,,=, .
.au ll3,.n'~ ~
H It RHR SYSTEM P&ID A EDWIN 1. HATCH GeorgiaPower mA nucuan n. ant - u=ir i FIGURE 7.4-7 (SHEET 2 OF d
. - - . . _ - - _ _ _ - . ---_-_.- - _ . - --- . -. =
i l- BYRON UNIT 1 - LOSS OF SERVICE WATER S, ISRAEL L
PROBLEM: LOSS OF BOTH SERVICE WATER TRAINS (PRA SEQUENCE) l .
i ,
j -
SIGNIFICANCE: RCP SEAL LOCA WITH CONSEQUENTIAL LOSS OF ECCS CIRCUMSTANCES:
REVIEW 0F LICENSEE'S SIMPLIFIED PRA
- BROOKHAVEN IDENTIFIED A NEW CORE MELT SEQUENCE WITH HIGH LIKELIHOOD IN 5 X 10-4/RY IF OPERATING SERVICE WATER TRAIN FAILS AND STANDBY TRAIN IS NOT
- AVAILABLE OR FAILS
A. CCW PUMP TRIPS IN SIX MINUTES (CCW COOLS RCP SEALS, CHARGING PUMPS, ECCS PUMPS) l j B. RCP SEALS FAIL (N0 CCW NOR CHARGING FLOW)
C. ECCS FAILS FOLLOWUP:
l LICENSEE ~HAS MADE AVAILABLE A THIRD SERVICE WATER PUMP i (FROM UNIT 2), .THIS WAS ACCOMPLISHED PRIOR TO RETURN TO POWER I
(DECEMBER 18)
~
l SURVEY OF W PLANTS DOES NOT INDICATE SIMILAR DEPENDENCE ON
- ONLY TWO SW PUMPS (BRAIDWOOD TO TMPLEMENT CROSSTIE)
SURVEY OF OTHER PWR'S IN PROGRESS 1 l
l '
l l
l l
. - _ . _ . _ _ - ~ , - _ - _ _ . _ - - = . , _ - . . _ _ . . _ _ . _ . _ . . . _ - _ . - . . . , . _ - . ~ _ _ , - _ - . - _ _ _ . _ _ _ _ , . ,
.1
~
REACTOR SCRAt1 EUMMARY I WEEK ENDING 12/22/85 I. PLANT SPECIFIC DATA i
DATE SITE UNIT POWER RPS CAUSE COMPLI- YTD
- CAT. IONS TOTAL 1
1 4 12/17/85 PALD VERDE 1 2A PERSONNEL NO --
12/19/05 W AT ERFDP*.; - 3 100 A EQUIP /E M VLV NO -
12/20/E5 PALO VERDE 1 41 A PERSONNEL NO -
! 12/20/85 CATAWBA 1 100 A EQUIP /MFW VLV NO --
12/21/85 DIABLD CANYON 2 50 A EDUIP/MFW VLV NO -
I 12/22/E5 MCGUIRE 1 100 A EQUIP /V POW SUP NO -
t o
h 5
)
i 1
I I.
f-1 a
l J -
i 4
f i
i(
l I
i
.- -,,-. ---; ..,-, , , ,.~ . ,..-.---n,. - - - - , , , , ,--w,, ,..,,...,.,,,,.~_n._,,,nw,.,.,. .,,-,w,.--r,-,---.,,,, ...,,-.,--r--+-,,,,,-,,,,,w1
II. COMPARISON OF WEEKLY STATISTICS WITH INDUSTRY AVERAGCC SCRAMS FOR WEEK ENDING
- 12/22/E5 SCRAM CAUSE FOWER NUMBER NUMBER 1984 OF NORMALIZED (6) WEEELY SCRAMS (5) TO 1984 AVERAGE (3) (4)
EQUIF. RELATED >15% 4 3.6 3.9 (60%)
PERS. RELATED (7 ) >15% 1 0.9 1.8 (25%)
OTHER(S) >15% 0 0.0 0.8 (12%)
5 4.5 6.5
EDUIP. RELATED <15% 0 0.0 1.4 (46%)
FERS. RELATED <15% 1 0.9 1.4 (46%)
OTHER <15% 0 0.0 0.2 (8%)
1 0.9 ~.0
MANUAL VS AUTO SCRAMS i TYPC NUMBER NUMBER 1984 OF NORMALIZED WEEKLY SCRAMS TO 1984 AVERAGE MANUAL SCRAMS (9) 0 0.0 1.1 AUTOMATIC SCRAMS (9) 6 5.4 8.4
[
. *g. _ ,
i$. NOTES (1) PLANT SPECIFIC DATA BASED ON INITIAL REVIEW OF 50.72 REPORTS FOR THE WEEK OF INTEREST. PERIOD IS MIDNIGHT SUN. THROUGH !
l MIDNIGHT SUN SCRAMS ARE DEFINED AS REACTOR PROTECTIVE ACTUATIONS WHICH RESULT IN R0D MOTION, AND EXCLUDE PLANNED TESTS OR SCRAMS AS PART OF' PLANNED SHUTDOWN IN ACCORDANCE WITH A PLANT PROCEDURE.
(2) RECOVERY f_0MPLICATED BY EQUIPMENT FAILURES OR PERSONNEL ERRORS UNRELATED TO CAUSE OF SCRAM
! (3) 1984 'INFORMATION DERIVED FROM AEOD TRENDS AND PATTERNS REPORT OF UNPLANNED REACTOR TRIPS IN 1984, DATED 9/11/85. (SEE TABLES i 2.0-2, 2.1-4, AND 2.2-1) WEEKLY DATA DETERMINED BY TAKING-TOTAL
. _ TRIPS IN A GIVEN CATEGORY AND DIVIDING BY 52 WEEKS / YEAR.
(4) IN 3984, THERE WERE A TOTAL OF 492 AUTOMATIC AND MANUAL REACTOR l,
TRIPS AT 83 REACTORS (HOLDING FULL POWER LICENSES). THIS YIELDS AN AVERAGE RATE OF 5.9 TRIPS PER REACTOR PER YFAR AND AN AVERAGE l RATE OF 9.5 TRIPS PER WEEK FOR ALL REACTORS.
l (5) BASED ON 92 REACTORS HOLDING A FULL POWER LICENSE, AS OF 11/30/85.
1 l- (6) NORMALIZED VALUES ALLOW COMPARISON TO 1984 DATA BY MULTIPLYING
! ACTUAL 1985 VALUE BY: (83 REACTORS IN 1984)= 0.90 l (92 KEACTORS IN 1985)
I (7) PERSONNEL RELATED PROBLEMS, AS USED IN AEOD TRENDS AND PATTERNS REPORT, INCLUDE HUMAN ERROR, PROCEDURAL DEFICIENCIES, AND MANUAL STEAM GENERATOR LEVEL CONTROL PROBLEMS.
I (8) "0THER" INCLUDES AUTOMATIC SCRAMS ATTRIBUTED TO SOME COMBINATION i 0F HARDWARE FAILURE'AND HUMAN ERROR, ENVIRONMENTAL CAUSES
! (LIGHTNING), SYSTEM DESIGN, OR UNKNOWN CAUSE, l
(9) MANUAL SCRAMS ONLY AND AUTOMATIC SCRAMS ONLY ARE DERIVEn FROM TOTAL AUTOMATIC AND MANUAL SCRAMS DATA PROVIDED IN TABLE 2.0-2 0F AEOD REPORT.
- _,. - . - .. .. .. . -_ ~ . _ . _ -_ _- . - . -
t 1'
Page No. 1 12/:7/!:
2 OPERATING REAtiGRS EVENTS MEET!NS FDLLOWUP ITEMS AS OF MEETINS 85-28 DN DE: EMBER 23,1985 (IN ASCEN !NS MEETINS CATE, NSSS VENDUR, FA !LITY ORDER)
REETINS FA:!LITY RESFCN!!PLE TASrt!!:RIPTICN SCHEDULE CLOSED DATE CCMMENTS l
E !!RI NSSS VENOM / DIVISICU CC'!?LET. SY DOCU*ENT,
- REETINE EVENT!!SC;1P. IN !V! DUAL DATE(S) EETING,ETC.
! SUE I ,
, CRYSTA' . RIVER 3 ICSB/ ROSA,F. CONS!?ER NEEt FCR A::!TIONAL 12/30/25 OPEN / / ICSS CONSitERINS
! 0!!C /25 BM / TEM'. LDSS / REQUIREMENTS ON ALARMS / 09/30/85 OCONIE 1 LCSS OF
! 0: N't! 12/:S/84 AN O :!ATCES 07/30/S: ANNUN:lA.
(4/25/851 IN ANAL.
.CF REGUIREMENTS.
E5-13 TURKEY P !NT 3 !!! /FARR, D. REV!EW A!ECUA:Y OF 60VERNCR 01/05/86 0 FEN / /
08/13/E5 W /FDEi-TRIP / CES!SX CN TURF!NE l RIVEN AFW 10/13/S5 LCSS CF AFW PUMFS / /
B5-14 SE2 D AM EL / STAT. C INITIATE STAFF REVIEW CF TVA 12/30/95 OPEN / /
CE/26/55 W / UNITS 1 & 2 /- SUEMITTALS 09/30/E5 VOLUNTA;Y 'l /
l 'SH"T::WN EY TVA BE:AUSE C* EC INA:EEUA:!ES
, 85-21 TRO:AN ESI /WERMIEL J REEIAM!NE NEED FOR THIS 01/31/86 0 FEN / /
10/22/85 / IN RFECT / INSTALLATICN AND GENERIC / /
, SETFDINTSFOR AFFLICA!!LITY / /
- TRIP GF AFW I
P!N S ON LDW SL'OTICN FRES$"!E l 8!-23 BR gN! FERRY IE /F KA% TOR DISCUSS WITH FEMA NRC POSITICN 01/30/E6 OPEN / / TO EE t!SCUSSED
!!/18/S5 / CFFSITE / WITH FESARD TC EMER6EN:Y PLAN 12/18/95 DUtlN3 hEIT-CONTAM!N. EIEF:ISE / / FEMA /NRC STEERINS j IN:!LEhi DURING COMP!TTEE MONTHLY EMERSEN:YPLAN MEETINS j EXEF:!!!
! 65-26 RANCHO SEOD DHFS/ RUSSELL R WILL REVIEW WITH H R DENTON THE 12/31/85 OPEN / /
. 1 /09/25 - / PEA !CF TF!F / E!!!T!NS FDLICY ON INFORMATION / /
- PLA;ED IN LICENSED OPEFATOR / /
FILE l
] 83-26 RAM:F SE:0 RSB /LAN!! E DETERf!!NE THE NEED FOR 01/30/E6 DPEN / /
j 12/C9/25 / FEA TCR TRIP / OPERATION 0F THE HIGH FRESSURE / /
! INJECTION SYSTEM DURING THE / /
! DEC. 5,1985 CVERHEATIN6 EVENT 4
ATRAN;MOSECO 1 i 23-25 FAL: VIF:! ! NFF /CE"!CHTIEL: ASSESSMENT OF STARTUP AND CF. 01/30/26 OPEN / /
l 12/23/85 CE / ESFAS / EIFERIEN;E FOR PALO VERDE UNITS //
A:TUAT!:N,REACTO _IL2. / /
R TRIF, AND COMPCNENT l -MALFUN:T!DNS
! I Pa;e Ms. 2 .
e DFERATING REntTORS EVENTS Mi* TINS FOLLONUP ITEMS AS OF EETING B5-28 DN DECEMBER 23,1985 1
(IN ASCENDIN6 MEETINS DATE, NSSS VENDDR, FA !LITY ORDER)
MET NS FA:!LITY RESFDNSIBLE TASKCESCRIPTICN SCHEDULE CLOSED DATE COMMENTS
-NUM!ER/ NSSS VENDOR / DIVISION / COMFLET. BY D0tuMENT, MEETINS EVENT IESCRIP. INDIVIEUAL DATE(S) MEETINS,ETC.
DATE 85-28 HATCH 1 NRR /HOLAHAN, 6 INFORM SHDRENAM P.M. OF HATC4 12/31/85 CLOSED 12/27/E5
- 12/23/25 6E / FLC00!%S OF / FLDC:lNS EVENT / /
SUMMARY
OF SAFETY RELATED / / PAICH FLOD !N3 AREAS- RHR ROOM EVENT SENT TC 14 FT DEEF $93REHAM 12/27/85
! E!-28 M1TI NRR /HDLAHAh, 6
SUMMARY
FOR CALENDAR YEAR 1985 01/15/56 0CEN //
12/23/25 NA / FALD VERIE / OF 0.R. EVENTS' BRIEFINGS / /
STARTUF PRESENTATICNS ON A PEE- PLANT //
DIFFIC:7.T!ES BASIS i
I i
1 e
N i
i
.. . _ . , - . . , - - -- , , , _