ML20058D594

From kanterella
Jump to navigation Jump to search
Summary of 900912 Meeting W/Util Re Proposed Changes in Security Plan.List of Meeting Attendees Listed
ML20058D594
Person / Time
Site: Waterford 
Issue date: 11/01/1990
From: Wigginton D
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 9011060172
Download: ML20058D594 (4)


Text

. _

~..

4 r g

1-November 1, 1990 t

h = ' ' Dockei No. 50-382

'o LICENSEE: Entergy Operations,_ Incorporated FACILITY: Waterford Steam Electric Station

SUBJECT:

SUMMARY

OF MEETING HELD ON SEPTEMBER 12, 1990 WITH ENTERGY OPERATIONS,

~1NCORPORATED-AND REGION IV TO DISCUSS PROPOSED CHANGES IN THE SECURITY PLAN On September 12, 1990,.the staff met with the licensee and Region IV staff to discuss pr?90 sed changes to the Physical Security Plan. The list of meeting attent es is e closed.

The details from the meeting contain safeguards information. Handouts were

' distributed, but were. retained by the licensee to protect the information.

The Physical Security Plan is to be issued in the near future cor.sistent with the information discussed. The licensee did announce that many of the changes would be made on September 14, 1990.

ORIGINAL SIGNED BY:

-i David Wigginton, Senior Project Manager.

o-Project Directorate IV-1 e

Division of Reactor Projects - III, IV, Y and Special Projects =

Office of Nuclear' Reactor Regulation

Enclosure:

L As stated L

i cc w/ enclosure:-

i

}

Seenextjpage:

DISTRIBUTION'.

1 GEREFT157 tNRC PDR; R

Local?PDR PD4-l' Reading 1M.;Virgilio MS 13E4

' o ',

'.TLQuay'

_0

- L. nBerry 1

LL Y

D. Wigginton-KT

' OGC'MS15B187 1

W lE. Jordan MNBB 3701 in,

?ACRS-(10)MSP-315 1.l m

PD4-1 PlantLFile 1:,

00FC

. :PD4-1/LA

PD4-1 PM
PD4-1/D l

0------1-------t-


:----f

.------:----- p ----:------------- ::---- -*------ ::-------------

.NAME; :LBerry.

DWigg nton:1h-:TQuay s

lDATE ':/0 M...........:..............:.............:..............:..............:.............

/

90

ll/'-/90 i O/1 /90

~

- OFFIC,IAL RECORD CCPY

. Document Name: MEETING

SUMMARY

SEP 12-1

_g 9011060172 901101 i

L PDR ADOCK 05000382

\\

,t

, O,\\.

F PDC

/

2

'y*

. -[ smog %-

UNITED STATES I

.['.

'I p NUCLEAR REGULATORY COMMISSION es L ;2 ' -- I $

0 E WASHINGTON, D. C. 20555 -

k:... ;. g' November 1, 1990 c

Docket No. 50-382 r

t,

-LICENSEE: Entergy' Operations, Incorporated FACILITY: Waterford Steam Electric Station

. f

SUBJECT:

SUMMARY

OF MEETING ~ HELD ON SEPTEMBER 12, 1990 WITH ENTERGY OPERATIONS, INCORPORATED AND REGION IV TO DISCUSS PROPOSED CHANGES IN THE SECURITY PLAN On' September-- 12, 1990, the staff met with the licensee and Region IV staff to' L'

discuss proposed changes to the Physical Security Plan. The list of meeting.

attendees is. enclosed.

1:

b

The details.from the meeting contain safeguards information. Handouts were 1

distributed,:but were retained by the licensee to protect the information.

L L

.The Physical Security Plan:is +o be issued in the near future consistent with

L r

.the information discussed. The:1icensee did announce.that many of the changes i

-would be'made.on September 14. 1990.

-}

}

L M

i l< '

David W

.inton,' Senior Project Managerf L.

Project Directorate IV-1 1

Division of Reactor Projects - III, i

IV, V and:Special Projects Office of Nuclear ~ Reactor' Regulation

]

i

Enclosure:

?

lAs stated; t

p cc w/ enclosure:

/See next page-y j

ll ?

[

c t

l

]

f,

/

'g'

)

g

?

q g

L-.

O,

. Mr. Ross P. Barkhurst -

Waterford 3 Entergy Operations, 3rne.

CC'-

W. Malcolm Stevenson, Esq.

_ Regional Administrator,' Region IV Monroe & Leman U.S. Nu,: lear Regulatory Comission 201 St. Charles Avenue, Suite 3300 Office of Executive Director for New Orleans, Louisiana 70170-3300 Operations 611 Ryan Plaza Drive, Suite 1000 Mr. E. Blake -

Arlington, Texas 76011 Shaw,' Pittman, Potts & Trowbridge 2300-N Street, NW.

Mr. Glen Miller, Administrator Washington, D.C.

20037 Radiation Protection Division Office of Air Quality and Nuclear Energy Residentilnspector/Waterford NPS Post Office Box 14690 Post Office Box 822 Baton Rouge, Louisiana' 70898-K111ona, Louisiana 70066

~ President -Parish Council Mr. Gerald W. Muench St. ' Charles: Parish -

Vice President, Operations Hahnv111e, Louisiana 70057.

Support Entergy. Operations, Inc.

'Mr.~ Donald C. Hintz.

P. O. Box 31995 Executive Vice. President and-Jackson,-Mississippi 39286 Chief Operating Officer-Entergy Operations, Inc.

William A. Cross P. 0. Box'31995 Bethesda~ Licensing Office

' Jackson ~, Mississippi '39286 3 Metro Center Suite 610 F

Chairman

Bethesda, Maryland 20814' Louisiana Public Service Comission-One American Place,~ Suite-1630 Mp. Robert B. Mc(ehee Baton: Rouge, Louisiana: 70825-1697 Wise, Carter, ChiM & Caraway.

P.-0. Box 651 Mr. R. F.:Burski, Director Jackson,",ississtppi 39205 y

Nuclear Safety 4

Entergy Operations, Inc.

.Mr. J. R. M,;Gaha,'Jr.

317 Baronne Street General Manager Plant Operations New Orleans, Louisiana 70112 Entergy Operations, Inc; P. 0.: Box B Mr. l. W. Laughlin,-Site Licensing Killona, Louisiana 70066.

Support Supervisor' S

.,N Entergy.0perations, Inc.

.Mr. Jerrold G. Dewease-P. 0. Box-B' Sr. Vice President m

Killona, Louisiana 70066 Pbnning'& Assurance

.Entergy Operations, Inc.

V Post Ofice Box 31995 Jackson, Mississippi 39286-1995

'.i t ;+ - '.

MEETING ATTENDEES September-12, 1990 Regarding Security Plan Changes lName-Organization D. Wigginton NRR -'PD4-1

. Don Haase.

Entergy Operations, Inc.

Ray _Burski Entergy Operations, Inc.

Chuck Cain -

NRC, Region IV

- Barry Mendelsohn NRR/RSGB Barry.Manili NRR/RSGB

B. Ronda Loetzerich Entergy Operations, Inc. - W3

' R. W. Lailheugue-Entergy Operations, Inc. - W3

. L. W. Laughlin Entergy Operations, Inc. - W3-i i

k a

h

., 4 l

~l

.aN t

T