This.is in regard to your reuueut., pornuant to the Freedom of Information Aet, to which t.be NRC accigned the above numb ~r s
.1._
Titi a is 3 - parti:tl e-sponse
- t. o your request.
W <<i l l not.ify you upon e.mpiutien of search for-end review of any addittenal re orda subject t.o year re<nt - s t The e.t a fI ha-e;. rm j u d-r:? the so.4 ruh f<>r' an; rt vi iw of records e,ubject ti ycur.reuoest, and thia to t ht. f i rw l response to your requen t Thu NRC han no records subject _to your r-Joes t.
t Recordd-subje t i_ yeur request are available fur public inspection and.erying at the NRC Public Document Room (FDP), l '717 H '? ! r~c ', NW, Washington, DC 205r.5, as net.ed un tie enelvsur-( - 1 The PDE acceusiva nuuber is ident.ifiu'l be.sid-each record deeeription.
_ Z__.
E-cords enbj-et t.
your request are being made avullable fer pubile intreetion and eviylne at the_NP.C Pub 11u Doeoment Evem (FDR),. 1-717 H Stre-t. NW, Washington, DC 20555, in the PDR flis folder onder the ab vu number und y.so e nam.-
These r -e ard.s are Iiaied on the enclosureid).
- ec t i - that prended i df t nnat a ;n + beat E we e nci a : 2 a r.
"ha rc n, w.1 pr' ~ J o r-for ubtain.ine r.:cerla fram
,he _F DR.
? 5 f We r '1 y
'?
YWb4
/p @
(
Dunnie H. Grimuley. Director Divicion f hul : and 16 cord:
Office of Admini.ctration
-Enclocuru(s).
As s tat -d 8609170312 860908 4 i
HOLMES86-151 PDRL
)
RE:
F01A-86-151 APPENDIX A Date Description 1.
10/16/81 October 16, 1981 PG&E Seismic Audit Review Meeting (17 pages) 2.
11/9/81 Memo for JPKnight, WPHaass, ELJordan from FJMiraglia re: Seismic Verification Program at Diablo Canyon (25 pages) 3.
11/11/81 Letter for GManeatis, Attn: Mr. JRocca from RLCloud re:
Progress report of the Seismic Reverification Program for the period of November 2-10, 1981 (11 pages) 4.
11/17/81 Memo for WJDircks from HRDenton re: Transmittal of Comission-Paper Regarding the Recent Diablo Canyon Seismic Issues (15 pages) 5.
12/16/81 Memo for RHVollmer from WPHaass re: QAB Coments on PG&E Response to Items 2&3 of Comission Order (CLI-81-30) of November 19, 1981 (4'pages) 6.
12/18/81 Memo for RVollme.r thru JPKnight, FSchauer from PTKuo re:
Coments on Seismic Verification Program, Diablo Canyon Unit 1 (3pages) 7.
12/21/81 Memo for RHVollmer.thru DRMuller from SSSkjei re: Diablo Canyon Unit 1, Seismic Verification (2 pages) 8.
12/22/81 Note to RVollmer from GBagchi re: Diablo Canyon Unit 1, Quality Assurance Reviews (4 pages) 9.
12/22/81 Note to RHVollmer from RJBosnak re:
Diablo Canyon Coments on the Review of Design Reverification Program (2 pages)
- 10. 12/28/81 Memo for HRDenton from RHVollmer re:
Diablo Canyon Verification Program-(2 pages)
- 11. 1/19/82 Memo for DGEisenhut thru RLTedesco from BCBuckley re: Differences in R. L. Cloud Reports of October & November 12,1981(23pages)
RE:
.Date Description
- 12. 2/3/82 Memo for FMiraglia from KSHerring re: Trip-Report Review of URS/Blume Hosgri Analyses of the Diablo Canyon Auxiliary Building, Intake Structure, Containment Polar Crane, and Containment Annulus (13 pages)
- 13. 2/12/82 Memo for RHVollmer from GBagchi re: Diablo Canyon Reverification Program (2 pages)
- 14. 2/12/82 Memo for RHVollmer from SSSKjei re:
Independence of PG&E's-Proposed Contractors for Diablo Canyon Verification Program (3 pages)
- 15. 2/12/82 Memo for RHVollmer thru WVJohnston from WPHaass re: Acceptability of Cloud Verification Program to' Satisfy Comission Order on DiabloCanyon(2pages)
- 16. 2/16/82 Memo for CMichelson from HRDenton re: Proposed Abnormal Occurrence - Seismic Design Errors at Diablo Canyon Nuclear Power Plant (9 pages)
- 17. 2/18/82 Letter for GAManeatis from WECooper re: Statements Regarding Potential or Apparent Conflicts of Interest (1 page)
- 18. 2/23/82 Memo for RHVollmer, JLCrews, ELJordan from DGEisenhut re: Diablo CanyonProgramPlan(19pages)
- 19. 3/3/82 Memo for FMiraglia from KSHerring, JRFair re: Diablo Canyon Seismic Verification Program Inspections-February 22-26, 1982 (6pages)
- 20. 4/14/82 Memo for RHVollmer thru DRMuller from MMessier re: Criteria for Financial Independence of Reverification Teams (3 pages)
- 21. 5/4/82 Memo for DRMuller from RHVollmer re: Criteria for Financial Independence of Reverification Teams (1 page)
RE:
. Date
-Description
- 22. 5/17/82 Memo for RHVollmer from DGEisenhut re:
Diablo Canyon Design Verification Program - Region V Inspection Activities (6 pages)
- 23. 6/1/82 Note to DMuller from messier re: Financial Independence Criteria for Design Verification Project Teams (1 page) 24.
6/2/82 Memo for RHVollmer from DRMuller re: Criteria for Independence ofParticipantsinDesignVerificationPrograms(2pages)
- 25. 6/16/82 Memo for JLCrews from FJMiraglia re: Diablo Canyon Design Verification Program - Region V Inspection Activ; ties (2 pages)
- 26. 6/16/82 Memo for HRDenton from RHVollmer re: Diablo Canyon Review (2pages)
- 27. '6/24/82 Memo for DGEisenhut from ELJordan re: Review of First Interim Technical Report for Diablo Canyon IDVP-Phase.I (2 pages)
- 28. 7/21/82 Memo for FJMiraglia from KSHerring re:
Diablo Canyon Seismic Reverification Program Inspections May 26-28, 1982 (13 pages)
- 29. 7/23/82 Memo for DGEisenhut from RHVollmer re:
Criteria for Independence of Participants in IDVP's (2 pages)
I
- 30. 7/26/82 Memo for RCDeYoung, RHEngelken, RHVollmer from DGEisenhut re:
Diablo Canyon Design Verification Frogram - Scope of Phase I (4 pages) 31.
7/30/82 Memo for DGEisenhut from ELJordan re: Diablo Canyon Design Verification Program (1 page)
- 32. 8/5/82 M ao for DGEisenhut from RHVollmer re: Diablo Canyon Design Verification Program-Scope of Phase I (3 pages) i
- 33. 8/16/82 Memo for RJMattson from DGEisenhut re: DSI Review of Diablo Canyon Design Verification Program (2 pages)
- 34. 8/17/82 Memo for DGEisenhut from ELJordan re: Diablo Canyon Design Verification Program - Request for Coments on Phase II Plan (3 pages)-
l t
.=
RE: F01A-86-151
. Date Description
- 35. 8/23/82 Memo for DGEisenhut from RJMattson re:
DSI review of Diablo Canyon Independent Design Verification Program - Phase II Program Management Plan (2 pages)
- 36. 8/30/82 Memo for DGEisenhut from ELJordan re: Diablo Canyon Design Verification Program - Review of Phase II Program Management Plan (3 pages)
- 37. 9/7/82 Memo for HRDenton from DGEisenhut re:
Diablo Canyon - Seismic Verification Program (6 pages)
- 38. 9/15/82 Memo for RHVollmer thru WVJohnston from WPHaass re: QAB Comments on IDVP for Diablo Canyon'- Phase II (2 pages)
- 39. 9/24/82 Memo for DGEisenhut from RHVollmer re:
Financial Independence of Diablo Canyon IDVP Phase II Contractors (1 page) 40.
10/26/82 Memo for TMNovak from JPKnight re: DiabloCanyonSER(2pages)
Memo for GWKnighton from HSchierling re: Diablo Can Additional Information on Construction QA (2 pages) yon Unit.1 41, 6/10/83 42.
6/17/83 Memo for LJChandler from JMTaylor re: Diablo Canyon Construction QA Response to Specific Issues (7 pages) 43, 6/22/83 Memo for RHVollmer, RJMattson, JMTaylor, JBMartin from DGEisenhut Diablo Canyon Verification Program - SER Supplement (12 pages) re:
- 44. 7/11/83 Memo for OParr from MSrinivasan re: Diablo Canyon Verification Program, Power Systems Branch, Supplemental Safety Evaluation Report (TAC 48045) (10 pages)
.g RE:
F01A-86-151 0- Date Description
- 45. 7/11/83 Memo for GLear thru LHeller from BJagannath re: Audit of Geotechnical Aspects of Diablo Canyon, Unit 1. Independent Design Verification Program (14 pages)
- 46. 7/12/83 Memo for OParr from FRosa re: Safety Evaluation Report for Diablo Canyon IDVP (14 pages)
Memo for TMNovak from LSRubenstein re: Diablo Can on
- 48. 7/15/83 Memo for PTKuo thru GLear from LWHeller re: Geotechnical Input for Supplement to Safety Evaluation Report - Independent Design Verification Program - Diablo Canyon Nuclear Power Plant, Unit 1 (67 pages)
- 49. 7/15/83 Memo for GWKnighton from WPHaass re:
Diablo Canyon Verification Program - SER Supplement (6 pages)
Program-SERSupplement(TAC #48045)(9 pages) yon Verification Diablo Can
- 50. 7/19/83 Memo for TMNovak from WVJohnston re:
- 51. 7/19/83 Memo for JPKnight from VNoonan re: Diablo Canyon Design Verification Program Supplement to Safety Evaluation Report (16pages)
- 52. 7/21/83 Memo for TMNovak from JPKnight re: CSE Input for Supplement to Safety Evaluation Report on Design Verification Pro Diablo Canyon Nuclear Power Plant, Unit 1 (120 pages) gram -
- 53. 7/29/83 Memo for Vollmer, et al., from DEisenhut re:
Review of Diablo Canyon SER Supplement on Verification Effort (4 pages)
- 54. 8/1/83 Memo for TNovak fron DMuller re:
Evaluation of IDVP Review of the Equipment Methodology (TAC 48045) (2 pages)
- 55. 8/1/83 Memo for DGEisenhut from WPHaass re: QA Branch Review of Diablo Canyon IDVP SSER (7 pages)
- 56. 9/7/83 Memo for TMNovak from WVJohnston re:
Request for Approved Deviations from the Requirements of Appendix R to 10 CFR 50, Diablo Canyon Unit 1 (TAC #52060) (66 pages)
- 57. 9/15/83 Memo for TMNovak from RWHouston re:
Diablo Canyon SER Supplement Input (2 pages)
. ~, - - -., - - - _, _ _ - -. -
---r--
RE:
. Date Description
- 58. 9/15/83-Memo for TNovak from WVJohnston rc: Technical Specifications Modification for Diablo Canyon Unit 1 (TAC No. 52310) (5 pages)
- 59. 9/29/83 Memo for Glainas from RWHouston re: Diablo Canyon Units 1 & 2 Natural Circulation Cooldown, B-66 (10 pages) 60.
10/20/83 Memo for TMNovak from LSRubenstein re:
Control of Heavy Loads-NUREG-0612-DiabloCanyonUnit2(PhaseI)(41pages) 61.
11/1/83 Memo for TMNovak from WVJohnston re: Request for Approved Deviations from the Requirements of Appendix R to 10 CFR 50 Diablo Canyon Unit 1 (TAC #52060) (54 pages) 62.
11/07/83 Memo for Chairman Palladino, Commissioner Gilinsky, Roberts, Asselstine, Bernthal from WJDircks re: Diablo Canyon (32 pages)
- 63. 11/15/83 Memo for HRDenton from RJMattson re:
Criticality Status at Diablo Canyon with Concurrent Construction and Fuel in the Core (3 pages) 64.
12/7/83 Memo for BHayes from RGoldsmith re:
Report by Harold Hudson (1page) 65.
12/14/83 Memo for RDeYoung, JKnight, RVollmer, WHaass from DGEisenhut re: Diablo Canyon Unit 1, Seismic Verification (24 pages)