ML20210A699

From kanterella
Jump to navigation Jump to search
Partial Response to FOIA Request for H Schierling Documents Re Diablo Canyon Nuclear Power Plant,Units 1 & 2.App a Documents Encl & Available in PDR
ML20210A699
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/08/1986
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Holmes G
MHB TECHNICAL ASSOCIATES
Shared Package
ML16340C148 List: ... further results
References
FOIA-86-151, REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612 NUDOCS 8609170312
Download: ML20210A699 (7)


Text

_

PDR4 s

UNITED STATES a Etog

/

k NUCLEAR REGULATORY-COMMISSION g

p, w AsHINGTON, D.

C. - 20555 3

air '

+,...../-

SEP 0 8 W Mr G re tp > ry A. ; iio lmer, At 3;cew te Cvnsu.1 tant MilB Technical Asm";i a t es 1723 ; Hamil t. it Av-n e e.

Jo; t-Ut RE..! AISE I4FER Ban _Juet, CA 9512 t, TO FalA-86-251

Dear Mr. lielmes:

This.is in regard to your reuueut., pornuant to the Freedom of Information Aet, to which t.be NRC accigned the above numb ~r s

.1._

Titi a is 3 - parti:tl e-sponse

t. o your request.

W <<i l l not.ify you upon e.mpiutien of search for-end review of any addittenal re orda subject t.o year re<nt - s t The e.t a fI ha-e;. rm j u d-r:? the so.4 ruh f<>r' an; rt vi iw of records e,ubject ti ycur.reuoest, and thia to t ht. f i rw l response to your requen t Thu NRC han no records subject _to your r-Joes t.

t Recordd-subje t i_ yeur request are available fur public inspection and.erying at the NRC Public Document Room (FDP), l '717 H '? ! r~c ', NW, Washington, DC 205r.5, as net.ed un tie enelvsur-( - 1 The PDE acceusiva nuuber is ident.ifiu'l be.sid-each record deeeription.

_ Z__.

E-cords enbj-et t.

your request are being made avullable fer pubile intreetion and eviylne at the_NP.C Pub 11u Doeoment Evem (FDR),. 1-717 H Stre-t. NW, Washington, DC 20555, in the PDR flis folder onder the ab vu number und y.so e nam.-

These r -e ard.s are Iiaied on the enclosureid).

ec t i - that prended i df t nnat a ;n + beat E we e nci a : 2 a r.

"ha rc n, w.1 pr' ~ J o r-for ubtain.ine r.:cerla fram

,he _F DR.

? 5 f We r '1 y

'?

YWb4

/p @

(

Dunnie H. Grimuley. Director Divicion f hul : and 16 cord:

Office of Admini.ctration

-Enclocuru(s).

As s tat -d 8609170312 860908 4 i

PDR FOIA 4

HOLMES86-151 PDRL

)

RE:

F01A-86-151 APPENDIX A Date Description 1.

10/16/81 October 16, 1981 PG&E Seismic Audit Review Meeting (17 pages) 2.

11/9/81 Memo for JPKnight, WPHaass, ELJordan from FJMiraglia re: Seismic Verification Program at Diablo Canyon (25 pages) 3.

11/11/81 Letter for GManeatis, Attn: Mr. JRocca from RLCloud re:

Progress report of the Seismic Reverification Program for the period of November 2-10, 1981 (11 pages) 4.

11/17/81 Memo for WJDircks from HRDenton re: Transmittal of Comission-Paper Regarding the Recent Diablo Canyon Seismic Issues (15 pages) 5.

12/16/81 Memo for RHVollmer from WPHaass re: QAB Coments on PG&E Response to Items 2&3 of Comission Order (CLI-81-30) of November 19, 1981 (4'pages) 6.

12/18/81 Memo for RVollme.r thru JPKnight, FSchauer from PTKuo re:

Coments on Seismic Verification Program, Diablo Canyon Unit 1 (3pages) 7.

12/21/81 Memo for RHVollmer.thru DRMuller from SSSkjei re: Diablo Canyon Unit 1, Seismic Verification (2 pages) 8.

12/22/81 Note to RVollmer from GBagchi re: Diablo Canyon Unit 1, Quality Assurance Reviews (4 pages) 9.

12/22/81 Note to RHVollmer from RJBosnak re:

Diablo Canyon Coments on the Review of Design Reverification Program (2 pages)

10. 12/28/81 Memo for HRDenton from RHVollmer re:

Diablo Canyon Verification Program-(2 pages)

11. 1/19/82 Memo for DGEisenhut thru RLTedesco from BCBuckley re: Differences in R. L. Cloud Reports of October & November 12,1981(23pages)

RE:

F01A-86-151 2

.Date Description

12. 2/3/82 Memo for FMiraglia from KSHerring re: Trip-Report Review of URS/Blume Hosgri Analyses of the Diablo Canyon Auxiliary Building, Intake Structure, Containment Polar Crane, and Containment Annulus (13 pages)
13. 2/12/82 Memo for RHVollmer from GBagchi re: Diablo Canyon Reverification Program (2 pages)
14. 2/12/82 Memo for RHVollmer from SSSKjei re:

Independence of PG&E's-Proposed Contractors for Diablo Canyon Verification Program (3 pages)

15. 2/12/82 Memo for RHVollmer thru WVJohnston from WPHaass re: Acceptability of Cloud Verification Program to' Satisfy Comission Order on DiabloCanyon(2pages)
16. 2/16/82 Memo for CMichelson from HRDenton re: Proposed Abnormal Occurrence - Seismic Design Errors at Diablo Canyon Nuclear Power Plant (9 pages)
17. 2/18/82 Letter for GAManeatis from WECooper re: Statements Regarding Potential or Apparent Conflicts of Interest (1 page)
18. 2/23/82 Memo for RHVollmer, JLCrews, ELJordan from DGEisenhut re: Diablo CanyonProgramPlan(19pages)
19. 3/3/82 Memo for FMiraglia from KSHerring, JRFair re: Diablo Canyon Seismic Verification Program Inspections-February 22-26, 1982 (6pages)
20. 4/14/82 Memo for RHVollmer thru DRMuller from MMessier re: Criteria for Financial Independence of Reverification Teams (3 pages)
21. 5/4/82 Memo for DRMuller from RHVollmer re: Criteria for Financial Independence of Reverification Teams (1 page)

RE:

F01A-86-151

. Date

-Description

22. 5/17/82 Memo for RHVollmer from DGEisenhut re:

Diablo Canyon Design Verification Program - Region V Inspection Activities (6 pages)

23. 6/1/82 Note to DMuller from messier re: Financial Independence Criteria for Design Verification Project Teams (1 page) 24.

6/2/82 Memo for RHVollmer from DRMuller re: Criteria for Independence ofParticipantsinDesignVerificationPrograms(2pages)

25. 6/16/82 Memo for JLCrews from FJMiraglia re: Diablo Canyon Design Verification Program - Region V Inspection Activ; ties (2 pages)
26. 6/16/82 Memo for HRDenton from RHVollmer re: Diablo Canyon Review (2pages)
27. '6/24/82 Memo for DGEisenhut from ELJordan re: Review of First Interim Technical Report for Diablo Canyon IDVP-Phase.I (2 pages)
28. 7/21/82 Memo for FJMiraglia from KSHerring re:

Diablo Canyon Seismic Reverification Program Inspections May 26-28, 1982 (13 pages)

29. 7/23/82 Memo for DGEisenhut from RHVollmer re:

Criteria for Independence of Participants in IDVP's (2 pages)

I

30. 7/26/82 Memo for RCDeYoung, RHEngelken, RHVollmer from DGEisenhut re:

Diablo Canyon Design Verification Frogram - Scope of Phase I (4 pages) 31.

7/30/82 Memo for DGEisenhut from ELJordan re: Diablo Canyon Design Verification Program (1 page)

32. 8/5/82 M ao for DGEisenhut from RHVollmer re: Diablo Canyon Design Verification Program-Scope of Phase I (3 pages) i
33. 8/16/82 Memo for RJMattson from DGEisenhut re: DSI Review of Diablo Canyon Design Verification Program (2 pages)
34. 8/17/82 Memo for DGEisenhut from ELJordan re: Diablo Canyon Design Verification Program - Request for Coments on Phase II Plan (3 pages)-

l t

.=

RE: F01A-86-151

. Date Description

35. 8/23/82 Memo for DGEisenhut from RJMattson re:

DSI review of Diablo Canyon Independent Design Verification Program - Phase II Program Management Plan (2 pages)

36. 8/30/82 Memo for DGEisenhut from ELJordan re: Diablo Canyon Design Verification Program - Review of Phase II Program Management Plan (3 pages)
37. 9/7/82 Memo for HRDenton from DGEisenhut re:

Diablo Canyon - Seismic Verification Program (6 pages)

38. 9/15/82 Memo for RHVollmer thru WVJohnston from WPHaass re: QAB Comments on IDVP for Diablo Canyon'- Phase II (2 pages)
39. 9/24/82 Memo for DGEisenhut from RHVollmer re:

Financial Independence of Diablo Canyon IDVP Phase II Contractors (1 page) 40.

10/26/82 Memo for TMNovak from JPKnight re: DiabloCanyonSER(2pages)

Memo for GWKnighton from HSchierling re: Diablo Can Additional Information on Construction QA (2 pages) yon Unit.1 41, 6/10/83 42.

6/17/83 Memo for LJChandler from JMTaylor re: Diablo Canyon Construction QA Response to Specific Issues (7 pages) 43, 6/22/83 Memo for RHVollmer, RJMattson, JMTaylor, JBMartin from DGEisenhut Diablo Canyon Verification Program - SER Supplement (12 pages) re:

44. 7/11/83 Memo for OParr from MSrinivasan re: Diablo Canyon Verification Program, Power Systems Branch, Supplemental Safety Evaluation Report (TAC 48045) (10 pages)

.g RE:

F01A-86-151 0- Date Description

45. 7/11/83 Memo for GLear thru LHeller from BJagannath re: Audit of Geotechnical Aspects of Diablo Canyon, Unit 1. Independent Design Verification Program (14 pages)
46. 7/12/83 Memo for OParr from FRosa re: Safety Evaluation Report for Diablo Canyon IDVP (14 pages)

Memo for TMNovak from LSRubenstein re: Diablo Can on

47. 7/14/83 Verification Program - SER Supplement (TAC 48045) y(68 pages)
48. 7/15/83 Memo for PTKuo thru GLear from LWHeller re: Geotechnical Input for Supplement to Safety Evaluation Report - Independent Design Verification Program - Diablo Canyon Nuclear Power Plant, Unit 1 (67 pages)
49. 7/15/83 Memo for GWKnighton from WPHaass re:

Diablo Canyon Verification Program - SER Supplement (6 pages)

Program-SERSupplement(TAC #48045)(9 pages) yon Verification Diablo Can

50. 7/19/83 Memo for TMNovak from WVJohnston re:
51. 7/19/83 Memo for JPKnight from VNoonan re: Diablo Canyon Design Verification Program Supplement to Safety Evaluation Report (16pages)
52. 7/21/83 Memo for TMNovak from JPKnight re: CSE Input for Supplement to Safety Evaluation Report on Design Verification Pro Diablo Canyon Nuclear Power Plant, Unit 1 (120 pages) gram -
53. 7/29/83 Memo for Vollmer, et al., from DEisenhut re:

Review of Diablo Canyon SER Supplement on Verification Effort (4 pages)

54. 8/1/83 Memo for TNovak fron DMuller re:

Evaluation of IDVP Review of the Equipment Methodology (TAC 48045) (2 pages)

55. 8/1/83 Memo for DGEisenhut from WPHaass re: QA Branch Review of Diablo Canyon IDVP SSER (7 pages)
56. 9/7/83 Memo for TMNovak from WVJohnston re:

Request for Approved Deviations from the Requirements of Appendix R to 10 CFR 50, Diablo Canyon Unit 1 (TAC #52060) (66 pages)

57. 9/15/83 Memo for TMNovak from RWHouston re:

Diablo Canyon SER Supplement Input (2 pages)

. ~, - - -., - - - _, _ _ - -. -

---r--

RE:

F01A-86-151

. Date Description

58. 9/15/83-Memo for TNovak from WVJohnston rc: Technical Specifications Modification for Diablo Canyon Unit 1 (TAC No. 52310) (5 pages)
59. 9/29/83 Memo for Glainas from RWHouston re: Diablo Canyon Units 1 & 2 Natural Circulation Cooldown, B-66 (10 pages) 60.

10/20/83 Memo for TMNovak from LSRubenstein re:

Control of Heavy Loads-NUREG-0612-DiabloCanyonUnit2(PhaseI)(41pages) 61.

11/1/83 Memo for TMNovak from WVJohnston re: Request for Approved Deviations from the Requirements of Appendix R to 10 CFR 50 Diablo Canyon Unit 1 (TAC #52060) (54 pages) 62.

11/07/83 Memo for Chairman Palladino, Commissioner Gilinsky, Roberts, Asselstine, Bernthal from WJDircks re: Diablo Canyon (32 pages)

63. 11/15/83 Memo for HRDenton from RJMattson re:

Criticality Status at Diablo Canyon with Concurrent Construction and Fuel in the Core (3 pages) 64.

12/7/83 Memo for BHayes from RGoldsmith re:

Report by Harold Hudson (1page) 65.

12/14/83 Memo for RDeYoung, JKnight, RVollmer, WHaass from DGEisenhut re: Diablo Canyon Unit 1, Seismic Verification (24 pages)

_