Discusses Proposed Criteria for Judging Independence of Companies Chosen to Conduct Design Verification Programs at Facility.Rl Cloud Assoc,Inc & Teledyne Engineering Svcs Fail Test of Independence Due to Conflict of Interest
ML20210A793
Person / Time
Site: Diablo Canyon 
Issue date: 12/21/1981
From: Skjei S
Office of Nuclear Reactor Regulation
To: Vollmer R
Office of Nuclear Reactor Regulation
Shared Package
ML16340C148 List: ... further results
References
FOIA-86-151 IEB-79-02, IEB-79-2, NUDOCS 8609170340
Download: ML20210A793 (2)


Text

.

no uq#o, UNITED STATES c

[I

,)

NUCLEAR REGULATORY COMMISSION

s.,

,.p

.j WASHINGTON, D. C. 20555

/o#

sr a

\\

December 21, 1981 h T [I MEMORANDUM FOR:

R. H. Vollmer, Director Division of Engineering D. R. Muller, Assistant Director /N[8 V

l THRU:

1 for Environmental Technology i

FROM:

S. S. Skjei, Chief d-Antitrust and Economic Anal sis Branch

SUBJECT:

DIABLO CANYON UNIT 1, SEISMIC VERIFICATION The December 14 Eisenhut memo lists six proposed criteria for judging the independence of the companies chosen to conduct the design verification programs at Diablo Canyon.

Based on our examination of the material currently in hand, we conclude that PG&E has not demonstrated the independence of either Robert L. Cloud Associates, Inc. (Cloud) or Teledyne Engineering Services (TES) under these criteria.

Two of the criteria deal with previous work done on Diablo Canyon:

(1) Whether or not the companies or individuals had any previous involvement in any way with the activities at Diablo Canyon that they will now be reviewing; (2) Whether or not the individuals or companies involved had been previously hired by PG&E to do any seismic design l

work.

Both Cloud and TES fail the test of independence under the second criteria.

Cloud was previously retained by PG&E for work on Diablo Canyon including a minor project on whip restraints in 1979, and a major project on Seismic System Interaction that began in October,1979. Teledyne Engineering Services was also retained by PG&E for a $1.2 million project in response to NRC I & E Bulletin 79-02 concerning pipe support systems plus other consulting work.

An additional conflict of interest may exist between Cloud and TES.

Cloud and William Cooper both worked at TES during the period 1969-1971 l

l 8609170340 860908 l

PDR FOIA l

HOLMES86-151 PDR

i l

l 2

In addition, Cloud and Cooper have been members of the ASME Boiler and Pressure Vessel Code sub-committee, which is currently chaired by R. F. Reedy, subcontractor to Cloud.

Clear conclusion cannot be drawn at this time with respect to the Com-mission other three criteria for independence, (3) whether or not any individual involved had been previously employed by PG&E; (4) whether or not the individual owns or controls significant amounts of PG&E stock; and (5) whether or not any relatives are employed by PG&E in a manage-ment capacity.

According to Moody's there are neither interlocking directors between Teledyne and PG&E nor does either company own a controlling interest in the other. We will continue to explore the question of financial interests.

Finally, previous employment (criteria 3) and employment by relatives (criteria 5) are probably not relevant in detennining the independence of the proposed contractors except for individuals who had been managers of PG&E within the past ten years. Only PG&E could provide' this infonnation to the staff on a timely basis. Such individuals should not own or control any PG&E stock at the time they accept a contract for the PG&E verification programs.

J.

~

Steph n S. Skjef, Chief Antitrust and Economic Analysis Branch Division of Engineering i

Office of Nuclear Reactor Regulation l