Proposed Tech Specs Removing Pages 3/4 3-60 & 3/3 3-61 & Inserting Pages 3/4 3-60 & 3/4 3-61
ML20206C298
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 11/07/1988
From:
GEORGIA POWER CO.
To:
Shared Package
ML20206C288 List:
References
VL-76, NUDOCS 8811160208
Download: ML20206C298 (3)


Text

_ -_ _. _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ . _ - _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _

~

deorgialbwer d ENCLOSURE 3 PLANT V0GTLE - UNIT 1 NRC DOCKET 50-424 OPERATING LICENSE NPF-68 REQUEST TO REVISE TECHNICAL SPECIFICATION 3.3.3.6

' INSTRUCT!0NS^FOR-INCORPORATION-The proposed amendment to the lechnical Specifications (Appendix A to Operating License WPF-68) would be incorporated as follows:

Remove Page Insert Page 3/4 3-60 3/4 3-60 3/4 3-61 3/4 3-61 1

i l

4 t

l 4

1

$$$ $$ff E3-1 7'

Ai2' 11/07/88 l

TABLE 3.3-8 (Continued) ,

b ACCIDENT MONITORING INSTRUMENTATION p .

' TOTAL MINIMUM NO. OF CHANNELS E INSTRUMENT CHANNELS OPERABLE ACTION w

e- 12. Condensate Storage Tank Level 2/ tank 1/ tank 31e l (Loop 5101, 5111, 5104 & 5116)

13. Auxiliary Feedwater Flow 2/ feed line 1/ feed line 314 l (Loop 5152, 15152, 5153, 15153, 5151, 15151, 5150 & 15150)
14. Containment Radiation Level (High Range) 2 1 33 1

(Loop M & 0006)

15. Steam 1!ne Radiation Monitor 1/sta. line 1/sta. line 33

, (Loop 13119, 13120, 13121 & 13122) s

[ 16. Core Exit Thermocoeples 4/ quad / train 2/ quad / train 30 E 17. Reactor Coolant System Si& cooling 2 1

~

314. l

18. Neutron Flux (Extended Range) 2 1 314.

(Loop 13135A & 131358) l j

19. RVLIS 2 1 34
20. Containment Hydrogen Concentration 2 1 316 l (Loop 12979 & 12980)
21. ContainmentPressure(ExtendedRah) 2 1 31a.

(Loop 10942 & 10943) l

22. Containment Isolation Valve Position Indication
  • 1/ valve 1/ valve 36 -

"Applicable for containment isolation valve position indication designated as post-accident monitoring instru- ,

mentation (containment isolation valves which receive containment isolation Phase A or containment ventilation isolation signals).

~

TABLE 3.3-8 (Continued)

ACTION STATEHENTS ACTION 30 - a. Vith the number of OPERABLE channals one less than the Total Hamber of Channels requirements, restore the inoperable channel to OPERABLE status within 31 days, or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

b. With the number of OPERABLE channels two less then the Total Number of Channels requirement, restore at least one inoperable channel to OPERABLE status within 7 days, or be in at least HOT SHUTDOWN within the next 12 hourt,
c. With the number of OPERABLE channels less than the Minimum Chan- t nels Operable requirement, restore at least one inoperable chan-nel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in HOT SHUT 00WN with the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. .
d. The provisions of Specificatinn 3.0.4 are not applicable.

ACTION 31a- a. With the number of OPERABLE channels one less than the Total l Number of Channels requirements, restore one inoperable channel to OPERABLE status within 7 J:ys, or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />,

b. With the number of OPERABLE channels less than the Minimum Channels Operable requirements, restore at least one inoperable ,

i channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, or be in HOT SHUTDOWN i within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />,

c. The provisions of Specificatica 3.0.4 are not applicable.

I ACTION 32 With the number of OPERABLE channels less than the Minimum Chan-  !

nels Operable requirements, restore at least une inoperable chan-nel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The provisions of Specification 3.0.4 are not applicable. -

ACTION 33 - With the number of OPERABLE channels less than the minimum channels OPERA 8LE requirement, initiate the alternate method of monitoring the parameter within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and either restore the inoperable channel (s) to OPERA 8LE status within 7 days or prepare .

and submit a Special Report to the Commission, pursuant to Spect-fication 6.8.2, within 14 days that provides actions taken, cause  :

of the inoperability, and the plans and schedule for restoring the channels to OPERABLE status. The provisions of Specifica-tion 3.0.4 are not applicable. '

Acrieg $th .t. With FA e tw / er e C CrEK4dLE c l. w n e /s len h,, the l

( Tcb/ h a<< J C/ m h rej"' m 'T cen-p/7 wi% t/c par .w n .s e? 3pcdFa u tien 3.c.v'./.
b. T4c frwh ie as ef byechu&n 3.u. / ar c sk r ffl'WIc. i V0GTLE - UNIT 1 3/4 3-61 1

____.._.,m _ _ _ _ . - _ _ . .