ML20206C061

From kanterella
Jump to navigation Jump to search
Application for Amend to License DPR-59,eliminating Requirement to Perform Type a Primary Containment Integrated Leak Rate Test During 1988 Refueling Outage & Allowing Replacement of HPCI Turbine Exhaust Line Manual Block Valve
ML20206C061
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 11/09/1988
From: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20206C035 List:
References
NUDOCS 8811160081
Download: ML20206C061 (1)


Text

. _ - _ _ _____- ._

\

' l REFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION in the Matter of )

NEWYORK POWER AtJTHORi1Y ) Docket No. 50 333 James A. FitiPatrick Nuclear Power Plant )

APPL lCATION FOR AMENDMENT TO OPERATING l.lCENSE Pursuant to Section 50.90 of the regulations of the Nuclear Regulatory Commission, the New York Power Authority, as holder il Facility Operating Ucense No. DPR.59, hereby applies for an Amendment to the Technical Specificatia's contained in Appendia A of tbi license.

The purpose of the proposed change climinates the requirement for the Authority to perform a Type A primary containment integrated leak rate test (ILRT) during the 1988 refueling outage due to the prosisjon of the Technical Specifications. The proposed change aho allows the replacement of the itPCI turbine eshaust line manual block sahe,23-11P111, without hasing to perform an 11.RT as otherwise required by Technical Specifications. Tbc inboard welds connecting this vaht to the containment perattation cannot be isolated to ellow performance of a 'ocalleak rate test.

1411Pl.11 was replaced as part of a program to improw the overall leakage characteristics of the FitiPatrick containment structure. Thh containment bolation vaht replacement program b the key element of a propmed Corrective Action Pisu which the Authority has proposed in lieu of performing an II.RT this outage.

The propos :I change resises Technical Specifications 4.7.A.la(10) and 4.7.A.2.f oc psges 170 and 174 respecthtly.

The proposed changes to the Technical Specifications are Attachment I to this Application for Amendment to the Operating Uceme. The Safety Evaluation for the proposed changes is included as Attachment II.

New York Power Authority A

lohn C. Brons dsecuthe Vice President Nuclear GeneratkTa STATE OF NEW YORK COUNTY OF WT.STCHE%'TER Subscribed and sworn to t< fore me this cf c6 day of Nowmber IN.

Opk A4L Notary Publ6c WesA Hot.cce assunge=4= meevee e,e 0=:. su 6311160091 691100 PDR ADOCK 05000 333 P FDC