ML20206B677

From kanterella
Jump to navigation Jump to search
Forwards 870319 Memo Detailing Status of Westinghouse RESAR-SP/90 Review & Safety Evaluations.W/O Encls
ML20206B677
Person / Time
Site: 05000601
Issue date: 04/07/1987
From: Novak T
Office of Nuclear Reactor Regulation
To: Schroeder F
Office of Nuclear Reactor Regulation
References
NUDOCS 8704100007
Download: ML20206B677 (1)


Text

April 7, 1987 (0 MEMORANDUM FOR: F. Schroeder Deputy Director DISTRIBUTION Division of PWR Licensing-B lEcTeTTTW[ '

Office of Nuclear Reactor Regulation NRC PDR Local PDR FROM: T. Novak, Acting Director PD#3 Rdg.

Division of PWR Licensing-A C. Rossi Office of Nuclear Reactor Regulation L. 01shan C. Vogan

SUBJECT:

STATUS OF WESTINGHOUSE RESAR-SP/90 REVIEW In the new organization, project management responsibility for review of the Westinghouse RESAR-SP/90 design will be under your direction. To assist you, I have enclosed (Enclosure 1) a March 19, 1987 memorandum which details the status of the review. All the Safety Evaluations referred to in the March 19, 1987 memorandum are included in Enclosure 2.

Safety Evaluations by D. Smith, G. Giese-Koch and F. Skopec are being completed and concurred upon and will be forwarded to you in the near future.

Thomas M. Novak, Acting Director Division of PWR Licensing-A Office of Nuclear Reactor Regulation cc: w/o

Enclosures:

S. Long T. Kenyon H. Berkow S. Varga L. 01shan

/

' PD#3 <0MV

' T_Noyak L01shan y 4/ 7 /87 4/ /87 t

. 50-#

O'704100007 870407 PDR ADOCK 05000601 A PDR