Text
pa ctcoq[0 UNITED STATES s j g
NUCLEAR REGULATORY COMMISSION g'
s O
- l W ASHINGTON, D. C. 20555 f
April 25, 1988
%,y..... j Cocket No. 50-601 and 50-605 ProjectNos. 669, 675, and 676 MEMORANDUM FOR:
L. Shao, Director Division of Engineering and System Tachnology, NRR-J. Partlow, Director Division of Reactor Inspection and Safeguards, NRR F. Congel, Director l
Division of Radiation Protection and Emergoney Preparedness, NRR i
J. Roe, Director Division of Licensee Performance and Quality Evaluation, NRR R. W. Houston, Acting Director Division of Reactor Accident Analysis, RES FROM:
Lester S. Rubenstein, Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, Y and Special Projects, NRR
SUBJECT:
STATUS REPORT ON STANDARD PLANT DESIGN TECHNICAL REVIEWS Attached is the April status report concerning the current review milestones j
for each of the standard plant projects (EPRI, ABWR, RESAR SP/90, and CE System 80+).
Note the "Due Date" column reflects dates established in the January 25, 1988 "Revised Program Plan For Standard Plant Reviews" or dates for which modifica-tien was agreed to by PDSNP and the review branch.
8805030361 880425 PDR ADOCK 050 1
CONTACT:
T. Kenyon NRR/PDSNP Ext. 21120
4 2
The column "Expected Input Date" reflects input from appropriate technical branch management. Category 1 items have been discussed with the appropriate Assistant Directors.
I request any problems in meeting these input dates be identified to me by the appropriate Assistant Director within a week of receipt of this memo.
oj o.a $c Q Lester S. Ru enstein, Acting Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, Y and Special Projects, NRR
Enclosure:
As stcted cc:
T. Murley J. Sniezek F. Miraglia J. Richardson C. Y. Cheng L. B. Marsh C. McCracken A. Thadani J. Joyce J. Mauk F. Rosa J. Craig M. W. Hodges B. Grines R. Erickson D. Matthews R. Barrett 4
i L. Cunningham H. Miller A. Beach W. Regan, Jr.
J. Murphy G. Bagchi
Date:
April 22, 1988 REVIEW STATUS REPORT ON WESTINGHOUSE RESAR SP/90 PDA REVIEW Expected Division /
Due Input Branch Reviewer Modules Subject
- Milestone Date Date Cat.**
Comments DEST /EMTB Johnson 1, 4, 5, 688, 7, Materials Engineering Draft SER 3/31/88 4/25/88+
2 Input Rec'd 10 to P.M.
1/7/88 DEST /EMEB Rajan/Branner***
1,4,5,7, Mechanical Engineering Draft SER 5/31/880 5/31/88 3
Awaiting to P.M.
Input from }f -
Expected 4/29/88 DEST /ESGB Staley 3
Hydrology Draft SER 3/31/88 3/30/88 4
Complete to P.M.
Giese-Koch 3
Geology & Seismology Draft SER 3/31/88 3/30/88 4
Complete to P.M.
Chan 7
Civil Engineering Draft SER 3/31/88 4/29/88+
3 Input Rec'd to P.M.
1/7/88 See September 29, 1987 memo for complete listing of review assignments
- Category definitions:
- 1. AD or above attention requested
- 2. Branch Chief attention requested
- 3. On schedule
- 4. Complete
- Brammer providing assistance O Due date extended from 5/13/88 to 5/31/88 because of delay in }r response.
+ Input dates extended because of availability of reviewer.
Date:
April 22, 1988 REVIEW STATUS REPORT ON WESTINGHOUSE RESAR SP/90 PDA REVIEW (Cont.)
Expected Due Input Division /
Brrnch Reviewer Modules Subject
- Milestone Date Date Cat.**
Comments DEST /ECEB Wing 1, 688, 10, 13 Chemical Engineering Draft SER 3/31/88 3/17/88 4
Complete Notley 13 Fire Protection Draft SER 5/13/880 5/13/88 3
Draft input to P.M.
received i
4/18/88 DEST /SICB Burrows 9, 13, 15 Instrumentation &
Draft SER 3/31/88 4/07/88 4
Complete Controls to P.M.
I DEST /SELB Trehan 9, 13 Electrical Engineering Draft SER 3/31/88 4/13/88 4
Complete to P.M.
DEST /SPLB Shum (lead) 1, 10, 13 Containment Systems Draft SER TBDf 6/24/88 2
Awaiting input to P.M.
from W -
Expected 4/29/88 o
See September 29, 1987 memo for complete listing of review assignments Category definitions:
- 1. AD or above attention requested
- 2. Branch Chief attention requested
- 3. On schedule
- 4. Complete 0 Due date extended from 4/29/88 to 5/13/88 because of delays in W response.
- 4/13/88 memo requests 8 weeks for review of RAIs (upon submittaT); Input dste inconsistent with 1/25/88 "Program Plan for Standard Plants."
Date:
April 22, 1988 REVIEW STATUS REPORT ON WESTINGHOUSE RE5AR SP/90 PDA REVIEW (Cont.)
Expected Division /
Due Input Branch Reviewer Modules Subject
- Milestone Date Date Cat.**
Comments DEST /SPLB Wagner 688, 7 Plant Systems Draft SER TBD#
6/24/88 2
Awaiting input (cont.)
to P.H.
from W -
Expected 4/29/88 Walker 7
Equipment Qualification Draft SER TBD#
6/24/88 2
Awaiting input to P.M.
from W -
Expected 4/29/88 Gill 4
Plant Systems Draft SER TBD1 6/24/88 2
Awaiting input to P.M.
from W -
Expected 4/29/88 Lee 688, 10, HVAC Systeps, Waste Draft SER TBD#
6/24/88 2
Awaiting input i
12, 13 Management, Steam &
to P.M.
from W -
1 Power Conversion Expected 4/29/88 See September 29, 1987 memo for complete listing of review assignments Category definitions:
- 1. AD or above attention requested
- 2. Branch Chief attention requested
- 3. On schedule
- 4. Complete i
f 4/13/88 memo requests 8 weeks for review of RAls (upon submittal); Input d;te inconsistent with 1/25/88 "Program Plan for Standard Plants."
i i
I
Date:
April 22, 1988 REVIEW STATUS REPORT ON WESTINGHOUSE RESAR SP/90 PDA REVIEW (Cont.)
Expected Division /
Due Input Brcnch Reviewer Modules Subject
- Milestone Date Date Cat.**
Conments DEST /SPLB Raval 13 Plant Systems Draft SER TBD#
6/24/88 2
Awaiting input (cent.)
to P.M.
from W -
Expected 4/29/88 DEST /SRXB Liang 1, 4, 5, 688, Reactor Systems Draft SER 5/16/88 5/16/88 3
Draft input 9, 10, 11, 12 to P.M.
received 4/18/88 Awaiting res-ponses to Os from 4/21/88 mtg DRIS/RSGB Mendelsohn 2
Physical Security Draft SER 3/31/88 3/22/88 4
Complete to P.M.
DLPQ/LOAB Spraul 13 Quality Assurance Draft SER 4/29/88 4/06/88 4
Conplete to P.M.
See Septen6er 29, 1987 memo for complete listing of review assignments
- Category definitions:
- 1. AD or above attention requested
- 2. Branch Chief attention requested
- 3. On schedule
- 4. Complete f 4/13/88 memo requests 8 weeks for review of RAIs (upon submittal); Input d;te inconsistent with 1/25/88 "Program Plan for Standard Plants."
Data:
April 22, 1988 REVIEW STATUS REPORT ON WESTINGHOUSE RESAR SP/90 PDA REVIEW (Cont.)
Expected Due Input Division /
Branch Reviewer Modules Subject
- Milestone Date Date Cat.**
Comments DLPQ/LHFB Lapinski 15 Control Room / Human Draft SER 3/31/88 5/16/88(e) 2 DSER in Factors Engineering to P.M.
typing DREP/PRPB Spickler 1,3,4,5, Radiological Accident Draft SER 3/31/88 4/29/88+
2 658, 9, 10 Analysis to P.M.
Skopec 12 Process & Effluent Draft SER 4/29/88 4/29/88 3
Input rec'd Radiological to P.M.
3/22/88 Monitoring & Sampling Systems RES/PRA Chelliah/BNL 16 Probabilistic Safety Draft 2/26/88 4/29/88+
1 Workload Study - back end SER to impacting P.M.
input date-See September 29, 1987 memo for complete listing of review assignments
- C tegory definitions:
- 1. AD or above attention requested
- 2. Branch Chief attention requested
- 3. On schedule
- 4. Complete
+ Input date modified due to availability of reviewer.
D:to: April 15. 1988 REVIEW STATUS REPORT ON GE ABWR FDA/DC REVIEW Expected Division /
SRP Due Input l
Brrnch Reviewer Chapter Subject Milestone Date Date Cat.*
Consnents
{
DEST /SPLB Chandrasekaran 5, 6, 15 Plant Systems RAIs to 6/15/88 6/15/88 3
SPLB issued P.M.
contract for review to SAI.
l New input date established.
DEST /SRXB Thomas 4, 5, 6, 15 Reactor Systems RAIs to 6/30/88 6/30/88 3
New input date P.M.
established.
(RAIs on Sec-tion 4.6 have been received by PM.)
l
- Category definitions:
- 1. AD or above attention requested I. Eranch Chief attention requested
- 3. On schedule
- 4. Complete l
Data: April 15, 1988 REVIEW STATUS REPORT ON CE SYSTEM 80+
CESSAR-DC REVIEW Expected Division /
Due Input Branch Reviewer Chapter Subject Milestone Date Date Cat.*
Comunents J
DEST /EMEB Horace Shaw Licensing Review Bases Comunents 02/28/88 3/15/88 4
Comunents rec'd l
DEST /EMEB J. Rajaa Licensing Review Bases Cosunents 02/28/88 3/15/88 4
Cosaments rec'd DOAE/0TSB R. Giardina Licensing Review Bases Coments 02/28/88 02/28/88 4
Coussents rec'd DRAA/PRAB E. Chelliah Licensing Review Bases Conenents 02/28/88 02/28/88 4
Comunents rec'd 1
- Cctegory definition:
- 1. AD or above attention requested
- 2. Branch Chief attention requested
- 3. On schedule
- 4. Complete j
L-- -
Data: April 15, 1988 REVIEW STATUS REPORT ON SYSTEM SO CESSAR-F REVIEW Expected Division /
Due Input Branch Reviewer Chapter Subject Milestone Date Date Cat.*
Comunents DEST /SRXB C. Liang TAC 66400, ASPSS ISSUE Final SER 5/16/88 5/16/88**
3 On schedule to P.M.
DEST /EMEB J. Rajan TAC 66401, Steam Gen. Tube Vibration RAIs to open open 3
Awaiting input P.M.
from applicant DEST /EMTB W. Wickman TAC 66401, Steam Gen. Tube Vibration RAIs to open open 3
Awaiting input P.M.
from applicant Cctegory definition:
- 1. AD or above attention requested
- 2. Branch Chief attention requested
- 3. On schedule
- 4. Complete
- Close out issue
D:to: April 15, 1988 l
REVIEW STATUS REPORT ON EPRI'5 ALWR REQUIREMENTS DOCUMENT l
l l
Expected Division /
Due Input I
Brrnch Reviewer Chapter Subject
- Milestone Date Date Cat.*
Comments DEST /EMEB Hartzman 3
Reactor Coolant Systems DSER to 03/15/88 04/18/88** 2 In typing, infor-P.M.
mal copy received Hartzman 4
Reactor Systems DSER to 03/15/88 04/18/88** 2 In typing, infor-P.M.
mal copy received Rajan 5
Eng. Safety Systems RAI to 03/21/88 03/29/88** 4 P.M.
Rajan 5
Eng. Safety Systems DSER to 06/30/88*** 06/30/88 3
P.M.
DEST /ENTB Tsao 5
Eng. Safety Systems DSER to 06/30/88***
N/A 4
Reviewer will P.M.
have no input DEST /SICB Stewart 5
Eng. Safety Systems RAI to 02/29/88 03/31/88 4
P.M.
5 Eng. Safety Systems DSER to 06/30/88*** 06/30/88 3
P.M.
DEST /SELB Lazevnick 5
Eng. Safety Systems RAI to 04/01/88 03/30/88 4
P.M.
5 Eng. Safety Systems DSER to 06/30/88*** 06/30/88 3
P.M.
DEST /SPLB Shum 3
Reactor Coolant Systems DSER to 03/15/88 03/29/88 4
P.M.
Category Definition:
- 1. AD or above attention requested
- 2. BC attention requested
- 3. On schedule 1
- 4. Cor9 ete Expected input date extended because of reviewer's workload
- Due date subject to receipt of responses to RAI by 04/29/88
_'5 Dat2: April 15, 1988 l
REVIEW STATUS REPORT ON EPRI'5 ALWR RE0VIREffENT5 DOCUMENT (Cont.)
Expected Division /
Due Input Brrnch Reviewer Chapter Subject
- Milestone Date Date Cat.*
Comments DEST /SPLB Shum 4
Reactor Systems DSER to 03/15/88 03/29/88 4 (cont.)
P.M.
Shum 5
Eng. Safety Systems DSER to 06/30/88*** 06/30/88 3 P.M.
DEST /SRXB Schwenk 5
Eng. Safety Systems RAI to 04/11/88 TBD 2
Complete except P.M.
for possible input from Warren Lyon 5
Eng. Safety Systems DSER to 06/30/88*** 06/30/88 3 P.M.
DREP/RPB Branagan 5
Eng. Safety Systems DSER to 06/30/88*** 06/30/88 3 P.M.
DEST /ECEB Parczewski 5
Eng. Safety Systems RAI to 04/01/88 04/04/88 4 P.M.
5 Eng. Safety Systems DSER to 06/30/88*** 06/30/88 3 P.M.
DREP/RAB Kelly 5
Eng. Safety Systems DSER to 06/30/88*** 06/30/88 3 P.M.
Category Definition:
o
- 1. AD or above attention requested
- 2. BC attention requested
- 3. On schedule
- 4. Complete
- Due date subject to receipt of responses to RAI by 04/29/88
O April 25, 1988 i
The column "Expected Input Date" reflects input from appropriate technical branch management. Category 1 items have been discussed with the appropriate Assistant Directors.
I request any problems in meeting these input dates be identified to me by the appropriate Assistant Director within a week of receipt of this memo, original signed by Lester S. Rubenstein, Acting Director j
Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, Y and Special Projects, NRR
Enclosure:
As state 0 cc:
T. Murley J. Sniezek F. Miraglia J. Richardson l
C. Y. Cheng i
L. B. Marsh C. McCracken 4
A. Thadani J. Joyce i
J. Mauk
)
i F. Rosa J. Craig i
{
M. W. Hodges B. Grimes
)
R. Erickson D. Matthews R. Barrett L. Cunningham H. Miller i
A. Beach j
W. Regan, Jr.
J. Murphy G. Bagchi DISTRIBUTION:-,
-: Docket File EHylton ADR4 NRC PDR Pleech SNewberry PDSNP Reading DScaletti GVissing DCrutchfield l
LRubenstein TKen3tn a
PQS Ps Ah j
ENg on:cw L Mben tein' 1
04/ /88 04/2f/88 j