Text
i
%o,,
UNITED STATES l'
'o NUCLEAR REGULATORY COMMISSION f
,I wAsHWG TON, D. C. 20065 October 27, 1988 Docket h. 50 601 MEH0f1NDUM 70: Distribution (SeeAttached)
FR00:
Charles L. Miller, Director Standardization end Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, Y and Special Projects, hRR
SUBJECT:
REVIEW 0F RESOLUTION OF USIs AND GSIs FOR RESAR SP/90 The purpose of this remo is to propose review responsibilities and review guidelines concerning resolution of USIs and GSIs fer RESAR SP/90. One of the criteria identified in the Corsnission's Severe Accident Policy Statement i
requires the applicant to demonstrate technical resolution of all applicable USIs and medium and high priority GSIs.
In resporise to this policy, Westinghouse submitted Module 2 to their RESAR SP/90 application in 1983. The applicant is cerratly in the process of updating the module, and, by letter dated May 23, 1988, provided plant-specific resolutions of the issues that had not been generically resolved at that time. The applicant will be submitting an update regarding 'he status of the remaining issues ta October 1968, providing a roadniap describirig the location of the resolutions to the USIs and GSIs within the RESAR; Enclosures 1 and 2 are matrices delineating proposed NRR review responsibilities (by branch) for all applicable USIs and medium and high priority GSin. Althcu9h PDSNP has discussed these matricer with certain members of the stifr', tne staff assignment shoule be reviewed for accuracy. Enclosure 3 provides a list of USIs/GSIs t5at are not considered applicable to RESAR SP/90.
In addition, since review of USIs and GSIs has been generclly beyond the purviewofthestaff,(SeeEnclosure4).I am providing review guidelines, including proposed cuntents for the SER Accordirgly, I request you provide me the following:
1.
Concurrence (or non-concurrence) with the proposed review responsibilities.
(If you believe an issue is not within the apprcpriate branch's review area, please indicate the appropriateassignee);
2.
Coments (if any) regarding the proposed review guidelines and listing of SER contents, and; 3.
An indication of the review schedule you believe can be met once the entire update to Module 21.as been received.
t CONTACT:
T. Aenyon, NRR/PDSNP 492-1120
/
ss1to70112 cs1027 5
DR ADOCK 0500 1
October 27, 1983 i,
i t
Please 3rovide me with your comments within two weeks of receipt of this memo.
If you 1 ave any questions concerning this matter, call the project manager, T. J. Kenyon at X21120.
l 2
Chk$.Y W Charles L. Miller, Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects Ill, IV,
'/ and Special Projects, NRR t
Enclosure:
As stated cc:
T. Murley C. Y. Cheng J. Shao l
D. Crutchfield F. Miraglia T. Marsh G. Holahan B. Sheron W. Morris t
G. Johnson, EMTB J. Raval, PSLB L. Reiter, ESGB J. Rajan EMEB N. Wagner, PSLB J. Joyce, SICB
/
J. Bramer H. Walker, PSLB J. Knight, SELB G. Staley, ESGB C. Liang, SRXB C. Nichols, PSIB G. Giese-Koch, ESGB F. Skopec, PRPB R. Jones, SRXB S. Chan, ESGB
!. Spickler, PRPB
- 0. Lynch, PRPB J. Wing. ECEB J. Spraul, LQAB F. Hawkins, LQAB i
D. Notley, ECEB G. Lapinski, LHFB D. Eckenrode, LHFB l
F. Burrows, SICB R. Dube, RSGB E. Chellfah, RES, PRAB N Trehan, SELB B. Mendelson, R$GB G. Arlotto Lee, PSLB A. Gill, PSLB L. Rubenstein v.
W. lia leton, EMTB P.T. Kuc, EMEB D. Shum, PSLB G. Vissing W. Long D. Scaletti j
R. Emrit, RES G. Sege, RES G. Bagchi r
W. Regan T. King, RES C. McCracken S. Newberry F. Rosa L. J. Cunningham J. Craig M. W. Hodges S. Veiss R. Erickson i
I 1
^
ii 91 DISTRIBUTION:
Ashok Thadant, Assistant Director for Systems Division of Engineering & Systems Technology, NRR Jares Richardson, Assistant Director for Engineering Division of Engineering & Systems Technology, NRR James G. Psrtlow, Director Division of Reactor Inspection &
Safeguards, NRR frank J. Congel, Director Divis!on of Radiation Protection &
Emergency Preparedness, NRR Jack W. Roe, Director Division of License Performance &
Quality Evaluation, hRR R. W. Houston, Director Division of Reactor Accident Analysis, RES d
s r
i
i
- i ATTACHMENT GSI DEFINITIONS Items to be Reviewed by the Technical Staff High High safety priority Medium Medium saf ety priority Nearly Resolved Resolution available, but not completed USI Unresolved safety issue W
Applicable to Westinghouse plant Items Not to be Reviewed by the Technical Staff D&W Applicable to Babcox & Wilcox designs DWR Applicable to DWRs CE Applicable to Combustion Engineering designs Design NA due to design of plant Drop Issue dropped as a generic issue Low Low safety priority LI Licensing issue - To be addressed by the NRC NA Not applicable NP Not prioritized
)
PS Plant Specific - NA due to the scope of plant RI Regulatory impact issue - Not a generic issue Sub Subsumed into another issue l
B(xxx)
Subsumed into issue xxx l
l Other Definitions TLRP To be re-prioritized
~~~,,
n
Pge C.
/ l'0/25G
- o ENCLOSURE I UNRE!0LitD SAFEff !$$UES APFtlCABLE TO RESAR SP/M BRANCH REVIEWER SER WMBER T!iLE FR'OR!iY FR10 Riff hA?.E TO FM DATE ECES '
//
57 EFFECTS OF FIRE FSOTECTION NEDIUM 6/68 SYSTEM ACIL!Ai!0M CN SAFETV EELATEDEGUlFFENT
[CEB
/ / 106 FIFINS AhD USE OF HIGHLY MEDIUM 11/87 CCFEUSiltLE SASES 14 VliAL ASEAS EMER
/ /
70 FORV AhD BLOCK VAL %t P.EDIUM FELIAllLlii EMEB
// 113 DYNAMIC GUALIFICAi!CW TESilNS HIGH 07/87 F LAR6E 10M HYDRAUllt SNLllERS EPIB
/ /
130 ESSENTIAL SERVICE kATER PUMP HISH 06/87 FA! LUKES AT NLf!FLANT SliES EREB
//
135 STEAM GEhERATOR AND STEAM LikE MEDIUM OVEFFILL Esil
/ /
29 80Li!N6 DE6RA Ai!CW CR FILUKES HIGH IN NUCLEAR FCsER FLANTS E7;TB
/ /
66 STEAMGENEFAT0REEQUIREMENTS h!APLY IE50Litl EMil
/ /
79 UNAMALYlED RACTOR \\tSSEL MEDIUM THEEP.AL STRESS LURlh6 h4Tb3AL CCWECTIC4 COOLOM
[568
/ /
103 DESIS4 FOR FE06ARLE PAllMUM NE/ALY 09/85 FRECIPITATION RESOLVED ESSB
/ / A-40 SE!SNIC LESIEN CRITEFIA USl LMB
/ /
82 IE1ChD CESIGN PAS!$ ACCl!Ehis Pit!UM IN SIENT FUEL FOOLS LHFB
/ / 102 HUMAN ERRCE IN EntNTS hEA4Y IWOLVlh6 hEh5 U41T OR WG6 SE50I.vED TRAIN LMB
/ / 125.1.3
!?tS AVA!LAf!Litt nEAttY 5/E8 FESOL%TD LHFS
/ /
134 RJLE CN DE6cEE AnD ElFE8!EE E h!SH 7/66 FEDU1EEFEnt$ FOR SEnlCR OFEFATORS
Page C.
2
. l'0/25/.23
- EkCLDiURE1 UhEESCt.VED SAFETY !$SLES AFPLICARLE TO RESAR SP/90 BRMON REVIEWER SER OMBER iliLE FRIOR!if PRIORITY NME TO FM OATE LHFB
/ / HFl.!
SHIFT STAFFING Hl6H
- LHFI
/ / HF4.1 INSFECi10N FROCEDURE FOR HIGH UF6PAIED ECPs LHFB
/ / HF4.4 6Ul:FLINES FOR UF6RAtlE8 OTHER H16H FRDCEDJES LHFB
/ / HF5.1 LOCAL CCNTROL STAfl0NS H16H LHFI
// HF5.2 SEVIEWCRITERIAFORHUMAN HIGH FACT 0AS ASFECis 0F ADVOCED C0ntROLS AWD INTRUMENTATICN
- s. -
LFil
//
II.C.4 RELIAllllifEN61kEERlh3 HlCH
.LDAB
//
75 6th1R!C 1RPLICAi!CNS CF AIWS NEARLY EVENTS AT ThE SALER wtLEAR RESOLVED Fthi L
LGAB
//
1.F.1 EIFAMD GA LIST HIGH FCENP
// l-64 IECOMMIS$104!nB 0F WCLEAR REARLY REACTORS RESOLitD
+-
- RPB
// 3-17 CRifERIA FOR SAFEif-GELATED MEDIUM OFERAT0A AC11045 R$GB
/ i A-29 WCLEAP. FCbER FLANT DES!6N FOR MEDIUM THE U. DUCT 10N OF MhERAtlLITT TO ICUSTRIAL SAB3tASE Sell
// 128 ELECTRICAL FCsER SELIABILlif HIGH 11/16 Mll
/ / l-56
!!ESEL FELIA!!Llif HIGH
$1C)
// 115 IEllAllLlii Of tESilhS CUSE H16H 57/86 SOLID STATE FROTICT!DN SYSTEM S!CB
/ / 4-47 SAFEff IMPLICAi!0nS OF C0t1ROL USI SYSTEMS
$1CI
/ /
!. O. 3 SAFEff SfSTER STATUS PEDlLM Rchif0E143 SFLI
/ /
43 CD4TA91hailCN OF Iv5TR;PEni MIGH 12/87 AltLikiS SFLl
/ /
51 FETOSED PEQUIEEMEniS FOR PEDIUM 1RFROV!h6 IELIA!!LITT CF CFEM CYCLE SERVICE haler SYSTEPS
1 Page C:.
3
- 10/25/3
. s EkCLOSURE I LVESOLVED SAFEff ISSLIS /JPLICABLE TD RESAR SP/90 BRANCH PEVIEWER SER WUniER fitLE PRIORlii FR10 Riff NAPE TO PM.
CATE SPLS
/ /
83 CONTROLROOMHAllfABILlif NEARLY 06/84 RE500TD SPLS
// 121 HYDA06ER CCNTROL FOR LARSE DRY Hl6H 09/85 CCETAleERTS
'SPL)
// 124.
AUI!LIARY FEEtWATER SYSTEM hE4RLt 02/86 EELIAl!Liff RESOLVED SPtl
// 125.!!.07 EEEVALUATEPROVISION10 HIGH 09/86 f
AUT0".AllCALLT ISOLATE FEECWATER FP:ft STEAM 6ENERATOR DURlh6 A L!ht IREAK SPLI
// A-17 S) STEMS It1ELACilC4 US!
SPLt
// A-48 HYDR 06EN C04T50l, REASURIS A%D US!
EFFECTS OF HitE05EN BURMS ON SAFEif EGulFriNT SPLI
// C-03 MAIN SIEAi Llht ISOLAi!O4 HIGH VALVE LEAKABE CCuil0L SYSTERS Stil
//
23 EEACTOR C00Lani PUMP SEAL HI6H FAILLSES LRll
//
94 AID!i!CMAL HIGH 07/85 LCd-TEPIERATUFE-0VEATRESSURE FF01ECTID4 FOR LIGHT WATER SEACICES S:ll
/,
99 ICS/Ent SUCT!04 Likt M16H 08/85 ItTERLOC85CXFuts SRII
// 105 14TEEFAC!nS 5151 EMS LOCA Al H16H LWRs
$211
/ / 122.2 lulilAith6 FEED-AnHLEED M164 01/B6 SAll
// A-45 SduTLCa4 tEC4Y HEAT SEGAL USl RERu!FEREhTS SAll
/ / l-61 ALLChl*.! ECCS EDUlF'tEni PEllLM OLTASE FERIC S t
stil
//
1.t.S(31 C4-Litt REACTCt SURVE!LL&h E WEARLY
$1 STEM FESOLitD
Page D.,
t' 10/25/3
..- 4 ENCLOSURE 2 RESCLVED USts/6 Sis AFPLICAPLE TO RES3 SP/90 i
IAANCH REVIEWER SER MUMIER fliLE FRIORITY 6thERIC NAME TO FM RESOLUTION EtEl
// A-15 FR!MARYCCOLAAT FEWTO k%E6/CR-2963 IECCNTAMlWAi!CN A C STEAM 6ENEF.ATCRCHEMICAt.CLEAA!hS EPEI
/ /
93 STEAM I!C!nS OF A'J11LIAlf RE50LitD 6L 98-03, NO FEEtWAfiRFUVS hid REGMTS
,LPEI
/ / A-01 WATER HA".NEA RES M ID !RP REVIS!CN
. EMES
/ / A 02 ASVPETE!CPLCGCb4LCALS RESOLVED NUSE6 0609 EMES
/ / A 13 SWUllER 0FERAi!Llif ASSUVACE RESOLVED EMIS
/ / A-26 FEACTGR VESSEL PRESS %E atSDLitD M iG-0229/!RP TRANSIENTF50TECil0N E23
/ / A-41 FRESSURl!ED THERMAL SHDCK FESOLitD RULE /
R.G.I.154 ETES
/ / l-58 FASSIVE P.iCMANICAL FAILUSES FE504.VED 0 WEd RomTS Ett
/ / C-07 Fkt SYSTEM P! PINS RE W TD WUEE6-0491 E.*El I I CIl ASSESS'ENT CF FAIL W E A4 RESOLVED N0 hf.s REE951 FEllAllLlif 0F Ft".75 AC VALVES (SEE USl A-45)
EREI
/ / C-12 FRIPAA1 SYSTEM VIIEAi!ON FESOLVED 0 kIV W CMTS ASSE! MINT E9tl
/ /
14 Fut P!FE CRatt$
REWID N3 HEW EEBJS Eall
/ / A-02 ASIPEft!CIL0ettet(045 RE W ID hiAE6-0609 Emil
/ I A-03 STEAM 6EnESATCR 10 E thTESt!TV IESOLVED h]RES-0644
-d ERTS
/ / A-Il RE RIDI stSEEL PATEEIALS BE W 1p GL 62-26 TOUbhESS Emit
/ / A 12 STEAM 3Eh!RATCt A G BE RTCt RE50Lill SRP IEVISICN CCOLA%i Ftv SuFlatiS Emil i / A-26 IEACICR VESSEL FFES!JE EE50L4TE kJ8EG-M M /55F TFAAS!Eni FutECT!C4 Entt
/ /
A-41 f EESStil!El MFML SaXt SES M ID RULEI R.8.1.154
)
Fap Ns.
2 10/25/O' E::CLC!L%E 2 RESOLVEDU51:16514 #FPLICARE TO FESAR SP/90 BGANCH FEVltutR SER W W ER T!iLE FRIOR!it 6ENERl; WME 10 FM RESOLUTION B
EMil
/ I C-12 FR! MARY SISTEM VISFAi!CN FE50L4TD h3 LEW REG 915 ASSESRENT ES68
/ /
E8 EMT C AIES Akt EFEASENCY RESOLVED N0 NEW IEGMTS FtAulN3 ESES
/ / A-12 STEAM SEk!EATOR A%) BEACTCR FESOLVED SRP 8Ev!!!0%
C00L O T Fue SUFPCRi$
ESER
/ / A-41 LCl.G TEFM SEIS9IC FR065 AM kCSOLVED WO NEW FEiMTS/NUSE6-0313 ESSI
/ / l-05 Milliff CF Tv0 WA7 SLAIS MD PiS0LtID NO WEh REG 9TS S4LL AD EUCllthS t1AV!CR OF STEELCChTA! stents LtFB
/ / HF8 MINTEMAkCE A%D S"EVE!LLM:E RESOLViD FOLCY STP.WT W3 FR06FA1 HEW FEGRTS LkFB
/ /
1.D.5(ll 0FEFATOR-Ft0 CESS COMM.WICATIC1 SE50l G o tbic' 2147 LFEB
/ /
!!.C.)
INTERIM EELIABILITY EVALLAll;n f!SOLkID 10 k!W KEtsi FF03;AM LFEl
/ I
!!.C.2 CCWT. OF luiERIM RELIA!! LITS RESDLkt0 WO hEs EEG9fS EVALL'ATION FR05AA9 FIFl
/ /
ES EAR! C AIES 4 EFERSENCY RESOLVED A0 kEW FE;9fS FL N !n3 SELB
/ /
47 LCSS Cf CFF-StiE F0v!R FISOL\\tB INTESCATED thTO ll51 A-44 SEtB
/ /
A-M n:4 SAFETY LDADS CW CLASSIE FES1 vil R.6.-l.75 iCWER SCURCES Sill
/ / A-35 ACCG9ACI CF 0FFSITE FCeER eESOLitD SRP 8.3.1 S M CES litt
/ / I 09 ELECTRICAL CAILE FEnETEAi!DNS RESXVED CAEL EEF0ii CF CthTAln'.[4T 12/76 Sell
/ /
l-N FCs!R FID F3EGtth:1 SESX4tl SEP i
!EB8A:Ai!Ch A43 EFFECT 04 FRIPAAV CCatasi P/.FS l
SICS
/ /
3 SETFClti CRIFT 14 SES1VED E.6. SEV, h3 ItSiipinTATIC4 hE4 SECMTS
" Fap No.
3'
'10/25/;3' EkCLOSUSE 2 RESOLVED LSIs/6S!s (.FPLICARE TO RESAR SP/90 MANCH' GivilWER SER NUMBER TITLE FRIOR!if GENERIC Nat 10 FM RES1UTICN
$!CB
/ /
20 EFFECTS OF ELECTRCf ASnE11C RESOLVED NUKE 6lCR-3069 PILSE CN NJCLEAR FLA41 SYSTERS SICI
/ /
45 IN0 FERAL!LITY OF InSTRUPENTS RESOL \\t0 SRP FEVIS10W DLE 10 EllSEPE COLD bEATHER
$1CI
/ /
64
!Cth11FICAi!040FFROTEtil04 RESOLVED 0 HEW FIGMTS SYSTEM lhSTRUMENT SEM lk3 LlWES S!CI
/ /
1.D.5(2)
FLA4T STATUS S FOST ACCitEhi FESAVED P.S.1.97, RP 441TORIW6 2
5108
/ /
II.F.3 InSTRLMENTS FCR NNITCtikS RESOLVED R.6. l.97, REV ACCitENT C0htil!Ch5 2
l l
SPLB
/ /
4 EO-GF '.!FE MAINTEW4CE FESOLVED SECY-81-504 t
CRITERIA SPLI
/ /
36 LOSS CF SERVICE WATER RES141) SRPSEVISICN SPLB
/ /
67.03.3 IPIROVED ACCitENT PCulT0alNS FESA'TD 6.L. 82-33 SPLP
/ /
91 TE AhSA9 ERICA CELAVAL EPIR6EnCY RE50Lita k'JRE6-1216 DIESEL SFLt I / A-24 QUALIFICAi!COF CLASS lE FESQL%TD MUREG-0588/F1 SAFETY FELATED EQUlFFENT E
STLI
/ / A-29 INCREASE 14 SFE41 FUEL STORAEE FES1VEB htC (ETTER CtJACITY 5FLI
/ / A-36 CCtTROL Cf HEAitY LCAt$ hE/.R RESA\\tD N'*E64612/SRP EFENT FLtl SICEABE 9.1.5 SP I
/ / A-44 STAil04SLACLOVi RESOLVED RJLE/F61.155 Sitt I /
A-46 SEISMIC M LIFiCA1104 0F EESOL4tD 6L 67-02 EQJ!FPEhi IN CFEFAlin6 FLAhTS SFtB
/ / l-12 CCsTAthMEni C011hi FESOLkt) SFIESE PEC IEG0!FEPEITS (k:4-LOCA)(Int)
SFLl
/ / l-C6 515JCTLS AL 14 TEEL!T10F RES1VED 0 h1W lli'IS CChi Aln"Eni FEWEIRATICWS SFL7
/ / l-36 IIVELCP, IES154. TEST!h5 AA: EIsliTO R.6.-l.14)
MAINTEku:E (RITERIA FCE ATNS CLEAkiP S15. AIR FILI FCE ESFS l \\tni.SV
P4ge C,
4 10/25/1 EWCLOSLTE 2 e -
a F.E5k VED LS!s/651s AFFLICAILE TO RESAR SP/iG L
IRAACH FEVIEhEk EER k;P.!ER TITLE FRICRiff EEhERIC N'"E TO FM RESCLUTICN SFLB
/ / C-01 ASSLCANCE CF CCattrJOUS LCNS RES0Litt CLI-8F21 TERM CA8AllLITY OF lIFMT!C SEALS C'n thC. I.C ELECT
'O EGUlFPEni SFLI
/ / C-02 STWV Or CEFEES!'.*llAllCN SY RE5141D SEF 6.2.1.1 l
14A:VERTENT SFF4Y Cf EFAlltu SPLI
/ / C-10 EFFECf!VE CFEEAtlC4 CF REEDLVED SEF 6.5.2 CChTAlh5Ett D U YS IN A LCCA Ull
/ / C-17 INTEilM ACCEFTAACE CRITERIA RE51VED FCt 51 1DIFICA11CM ASEnfS FCR PAD SXID BASTES 5FLB
/ /
II.I.8 RJLE9Atlh6 C4 DEU A:EDCC8E RE51ttl P.
AtiltChT5
- dE
/ /
II.E.4.3 CC%TAth=ENT INTEG91TV ChEft RE5% VED KJFE6-1273 r
ERtl
/ /
22 ths:VERIEnf 13 :4D!LUTIC4 RESOLVED EL B5-05 EVENil SRIB
/ /
A-(9 Athi FE51VED Rule 5 RIB
/ / A-31 FnR SHJTECtN FEQUlFEPE415 FESDL4tD 58P 5.4.7 5518
/ / A-43 (ChTA!k=Eni EPEREEACY Sua?
EE! XVED SECY-85 311 FDFCFPAW:E F6 1.62 C11
/ / l-19 TFEF":L-HVI R LIC 5tA51Liff FESOLVED GL pil I /
l-0 LC 5E FARTS PCh!TCEins StiTEMS 'iE50LbED R-h3 HEW (LFP51 JE;'til EEIB
/ / l-63
!!DLAllCg CI Ltd FfES!Ltf FES M ED HEC CK:ERS Sf5TEMS CCoECl[O TO THE SE ACICA C00LANT FFES!JEE B Lk;Au SRI)
/ /
!!.E.:.2 RESEAtCM Ch ! GAL EFEAt LCCAs FE51VED n; AEW 3E;sts n A%:aC5 TE A%51EhTS pil
/ /
!!.t.1(11)
TRIP FIR LEiEL ll5 FARE 50 FZR RES1VED LCu FRE55. h!LL In111 ATE SATETY IhJECT!:1
Page he.
1 10/25/] '
ENCLOSURE 3
)
SENERIC $ATEif ISSUES C T AFFLICABLE TO RESAR SP/90 munKR TITLE FRIOR!!fPRICRl!Y CATE BEwtRIC ConRENTS tAff RESOLVEDREIOLUT!0s s
l I
FAILLAE5INAIR-MONITORlh6, CROP CR0P AIRCLEAN!h5,ARD\\TNTILAi!0N SYSTEMS 2
FAILURE OF FECTECT!VE DEVICES NP 10/891 TBEP 04 ESSEN11AL EQUIPMEhi 5
DESIS4 C4 CK AND AUDli 0F FDP SUB 5(1.F.ll ECVIFMEnt 6
SiFARATION OF CCNTFDL R0D FROM RE50Lbt0 int
!!S tRIVE AhD luR HIGH R00 WCifWE\\tNil 7
FAILURES tut TO FLOW lhMED CG G80P vilRA110u3 8
INLhtRTEh!t.CT4ATIONOF SL1 5ll.C.11 SAFEffInJEti!04INFW4 9
$(II.K.3(5)I CAltERIA 10 SURV. AhD RAlhTEnAWCE OF CROP EROP 18A4fvtR$1NS Ikt0FE PRCIE 150LAi!CN VALVES AND SQll CHUSES 11 TURilut alSC CI6Ct!46 SL1 5tA-37) 12 ItR JE1 PJMP InTE$llif RE514Tl 9/64 h3 WEW SELMTS fWR 13 Smit IFEAK LOCA FIOM E!!ENCEO CROP EROP 0'vE04EAllhi 0F FRE!SURilER HFATEil 15 BAllai!C4EFFECT$CWREACICS LCd LCW
\\TtSEL SJF0Att 16 int BAlt $7EAM ISOLAllD4 VW.it SL1 Int, 5(C 8) l LEAK &SL C04tRA 513tEMS 17 LOSS C# 0FFSlfE KWER tW EEOP Sel5E9 Ant TO A LOCA 18 STE4't.14 liEAR ulTH SUI 5t!.C.ll C0kSE M bilAL S M L LOCA 11 SMEif IPPLICAlthS OF
$Ll
$(& 47)
Ich5M ETT 1 6 C K E R SLTFt1 ES J
Pm D.,
2 10/25/~)
EhCLOSURE 3 GENERLC SAFETY !$$UES h0i APPLICAILE TO RE5AR SP/90 h178ER flTLE FRIORITY FRICR!iY DATE 6ENERIC COMMENTS DATE RESOLVEDRESO(,UTICW 21 VIDAllCW WallFICAllC4 0F EEOP TROP EWIFMEni 24 AJTG ECCS SWlitH 10 kP 12/fli TIRP lEt!FCttAi!04 I
25 AJTO AIR HEA M R DUMP 04 IWR FE50LVED leR SCRAM 515fER 26 D6 LOAlin6 PRO KERS RELATED TO Sul 5(17)
I
$15 FESET On LOSS OF 0FF5tTE FCWER 27 RAWUAL VS, AUTOMATED A(,il0N! SU)
Sil-171 28 FRESSL'IllED TkERMAL Sh0CK SUS 5(A 49) 30 F0ftuf!AL SEntRATOR R!$51LES - CROP (ROP 6thERATOR R0iCR 31 WATURAL CIRCtLAi!CW C00LL0u4 SU) 5(1.C.ll 32 FLCW RLOCIAGE IN E55Eti!AL Sul 5(51)
I EQUlFMEkT CAUSED SY CCil!CULA t
33 00kMECTING ATMOSPHERIC CUMP Sul
$(A-47)
VALVE OFEntti UF04 LOS$ Cf It!E6AATED CCNTFDL SYSTER F0stl 34 St$ LIAK IRCP tt0P 35 N GR E Ai!CE OF InTElkAL LCW LCd IJPtRTEMAntES IN LWh 37 16 OVERFlLL A4 (C91NED 5'.'l 5(4-476 FR194RT AO SEC0h:ARY BLtetCW4 i
38 F01 RECllC 515fER FAltuRE AS A kP t/EST NP C043E M MCE OF IkJEC1104 0F
[
CCufAth*xiFAltiFLALESCR Dii4R FIRE CEI I
30 PCTTCRinRCEPMILE 5 ',,8 5(25)
ItTElatiltu M inEEu THE CRS f
l SYSTER A C k0nE55EhT1AL CCn1R3L Alt 515 FEM 40 N EAll lu TPE let SCRA3 SYSTER PE50LtTD 12/83 MFA I-65 let l
l i
i 7-l
n.
.Page No, 3
' 10/25/],
ECLOSL9E 3 6thERIC SMETY IS$Lts hai APPtlCABLE TO RESA4 SP/90 NUMBER TITLE FRIOR!if FRIORITY CATE 6ENERIC COMMENTS CATE RESOLViB IJSOL UTICs 41 IWR SCRAM OISCF1.R6E VOLUME FESOLVED BwR Sf5fERS r
42 CC98thA1104 FE!RMY/SECCWCARY SUB
$(18,l.C.1)
LOCA 44 FAILW E CF SAlluATER C00LIWS SUB Si13)
STS)(M i
46 LOSS OF 125 VOLT O.C. BUS SUB
$06) 48 LCOFORCLASSlEVliAL SUt Sil211 luSTRUMENT IUSES IN OPERAilh6 ffACTOR5 49 lhfEPLOCil AkD LCOs FCR SUB 5(178)
IIttOANTCLASSIEi!E HEHERS l
50 REACICR VESSEL LEitL RESOLVED 09/24 PIA F-26 IWR l
lhSTRt4 NTAi!0N 14 IWRs 52 SuSFLOWBLOCrACEBYBLLt Sul 5t51)
NS5ELS i
53 CONSEGUENCIS OF A FCSTULATED CEOP lutCRDP FLCW BLOCKAGE INCit(NT la A Est 54 CulvtY Cf VALVE OFEEATCR SUS 5(ll.E.6.1)
BELATED EVEti$ OCCURR!NG DUR!b6 1978, 1U 9, AND 1980 l
55 FAILLSE OF CLASS !E SAFEtt It0P ISOP IELATED SaliCHGEAR circuli e
WEAIIRS 10 CLCSE 04 DEMAAD 56 AnAlfill Cf THE AICUAL Sul 5 + 45,I.D 1)
TRANS!Eni CFERAflh6 6UltEtttEl l
58 InCVEtikki CONTAlhPEtt CROP CEOF
~
FLOC 41N6 59 IECH SPEC EIGul5EREnti FCR
$E6 R1 l
PLANT SHUIDCe4 kWEu EEU!FPEni IMPACT FDW SVE SHUitch4 IS LESRA:{l ISSUE OR I CfEEABLE f
f 60 LAPILLAA TEMIb5 Cf FEACICR SUI StA 12)
$15TEP$ STRUCTURAt SUFFCAtl I
t
(
Page no.-
4 10/2$/O' ENRMWE 3 6ENERIC SMEff !$5lJES h0i MPtlCABLE TO RESAR SP/90 NUptER fliLE FRIORITYFRICR!if CATE 6ENERIC ComENTS CATE - RE50Ltta RESOLUtlCN 61 SRV LINE $FEAK INSIDE THE SWR RESOLVEC 1/8/86 N3hEdREGRIS BWR WEibELL AIRSPACE OF RMI I AND 11CONTAth9ENi$
62 FEACTOR SYSTEM 80Litui hP 1/691 kP MPLICATICWs i
63 USE OF ECUlFMENT h0i NP 5/89T tuR kP CLASSIFIED Al ESSENTIAL TO
$#Eff IN Det IRAN 51ENT A W i!ES j
65 f50$AllLITY OF CORE RELT CUE Sul 5(23) 10 CORF0WENT C00LluG WATER
$YSTEM FAILL*ES 67.02.1 INTE5RITY OF STEAM 6thER4f3R RE6 INTE5tATEI INTO 651 Rl(1351 TLTE SLEEVES IMPACT
!!5 l
Isstt 67.03.1 STEAM DEhERATCR CVERFILL SUI INTE6fAIED INTO US! $(4-47, l.C ll A-47 67.03.2 FE!SSURIIED THERMAL Sat.i SUI INTE5KATEDthTO051 5(4 49)
I A 49 67.03.4 FEACTOR VtSSEL INVENTORY SUI PART CF !!.F.2
$(ll.F.2)
REASUFERENT 67.04.1 KP it!P SUI FAAT OF ll.t.3(5)
$(!!.t.3t5))
67.04.2 CChit3L 50:2 CES15N PEVIEW
$UI PART OF l.D.I
$(1.$.11 67.04.3 E0Ps SUI PAAT OF l.C l 5(1.C.Il i
47.05.1 REASSESS 9ENT OF RAl!0LC6! CAL LI 3/tif Lt C0 hit M KES 67.05.2 FEEVALL;A1104 0F $$tn CE5164 L1 3/911 Li l
IA515 47.05.3 SECCCAAf$YSTEM150L41104 CSDP (40P l
i.
67.C6 CRSAh!!Ai!044L RE5FtNSES SLI
$(Ill.a.31 i
61.07 1RFE3vt0 E!C1 CtM Enf TEliS Sul INTEELATED INTO Ell 5(1351 l
135 l
i 67.H C(bitt$ Calf!RIA 8!6 INTEGRATED InTO 651 S(135) i 14CT 135 ISSUE
(
i i
+
, ~.,. -, - -
m--
, _. - -,, -. - -, - -. ~ -, -.... _ -,.,.,.
e
m PMe D,
5
- 10/250
)
ENCLOSURE 3 j
.<r e -
GENERIC SAFETV ISSUES W0i APPtlCA8LE TO RESAR SP/90 Nua9ER
!!TLE PR10RiffPRIOR!1f DATE SEhERIC CCMMENTS DATE FESOLVEDRES1UTION 67.09 IEACTOR C00LAhi SYSTEM SUB INTEGRATED INTO US! St&-45)
PFESSUitCGNTLP.
A-45 67.10 SUPPLEMENT TUBE ]kSFECil0NS L!
(I j
\\
68 FCSTUL LDSS OF AVI FEEli SYSTEM SUB
$(1241 FESult!nS FFCM Ti#t!WE-DRiktu AUt FEED F'#tP lTEM SLPPLV Llhi PUPTUFE 69 MALE-UP N0!!LE CRACKING IN B & RE50L4tD 09/84 MF A 7 8&W W Fthil 71 FAILURE OF FESIN DEMINERAll!ER MP t/691 kP SYSTERS ARD THilt EFFECTS ON FJCLEAR P0bER Pthi SAFETV
" 72 CCMTROL F00 CRIVE BUl0E ftlM NP 11/88f W
S'JPFORT PIN FA! LURES 73 MTAChED THERPAL SLEEVIS hP BIBST kP 74 REACTOR COOLANT ACT!Vlif DADP MDP LIMITS FOR OFilAflh6 REACTOES 76 1&CFCh!RIniERAtilCWS hP 12/681 hF 77 TLOCCthS CT SAFEff E M FPEkT SJ
$(A 171 COMFARTREnt$ IV LActFLCW N 006H FLOCR tRA!XS 71 lt411081460FFAllGtt hP 8/881 kP il&NSIEniLIRITSFORREACTOR C)141 SYllER 80 P!FE H E u EFFECTS 04 CA)
LOW in LCW HisA4JLICLihEiluTE MtsELLS Cf Id MM ! AaD !!
CCETAth*EtiS 11 IPtACT OF LOCLED 00CES AND CEOP
!!/fli CPDP flFP EARRIERS 04 FtMT MD FEKSchtEL 5AFEff 64 CE 'C5vs hEA41 04!i01 CE f
RES%%il B5 IEllel!Llit 0F VACLtm IAEhEIS MCP ist (Ch4ECTED TO STEM t!SCHARSE L!bES ltSIM Id C0%i41eints
Ppte CD.,
6 10/25/~,]
ENCLOSURE 3 GENERIC SAFEff ISSUES h0i WFilCABLE TO RESAR 5P/90 NUM6ER TITLE FRIORif) FRICRITV DATE 6thERIC CCME4fS CATE RESOLVEDRESOLUTION 86 L0%6 RAMEE FtA4 FOR CEALINS GE50 Lit 0 01/88 NURES0313,R2,6L BWR uliHSTRESSC0tROS!0NCRACK!h6 68-01 INBdRFIPl#6 87 FAILUPE OF HPCI STEAM L!kE HIBM 12/901 IW; WITHOUTISOLA11CM
' 49 SilFF P!FE CLAV S hP BIE8T NP 90 TECHSPECsFDAANT!C! pat 0Rt LOW LCW TRIFS l
92 FLEL CRUMPLIWS DURING A LOCA LOW LCd 95 LCSS OF EFFECT, v0Lupi FOR NP 10/987 KP COnTMTlEC!RC BAR S'CT!?W VALVE TES11tS hP 9/B61 kP 96 J
97 FbR IEACfDR CA?!if SUI S(!!1.D.3.1)
(MCONTROLLEDEIF05UFES 98 CED AttuarAATCR CHEtt VALVE CGP IOP LEALASE 100 0154 LEVEL hP 9/661 NP 101 BREAL PLL'S SIGE FAlltaE IN HIGH 03/94T IWR IWR bATER LEktL ltSTPJPf4 tai!04 104 FE WCTION OF 10804 D!LUT104 kP 11/89T ht EE?JIREREhTS 107 EEhtitC IMFi!C. OF PAlu hP 12/EST kP TRM50RRER FAILLTE 1(8 Set SuffEISSICE P0"t LCW iWR R!(LCO TEWEEATLSELIPITS 109 Ry CLC5t*E FAlltAE C4 ESF kP 3/get hP 110 E UI N ni FR0iECTIC4 IEV!CES hp 2/iff bP Site!! C0KtOSIC1 CRattinS CF L1 L!
FRESSME SCthWY FEA.fli!C STEELS 14 SELECTED Evi!8CeEnis
. FMe C:.,
7 10inl3 '
'1 ENCLOSURE 3 MNERIL SAFETY ISSUES NOT APFLICABLE TO FESAR SP/90 NUMEEA fliLE FRIOR!ifFRICRITV DATE SENERIC COMMENTS DATE RESOLVEDRESOLUTION 112 WESTINSHOUSE RPS SURVEILLANCE RI 10/65 RES IMFACT ISSUEAl FREPUENCIES JD OUT-OF4iRVICE flMES
!!4 EEISMIC I cel ) RELAY CHATTER 503 S(A 46)
!!6 ACC W ! HAdERENT WP 7/B9Y kP 117 A" e 4 TIMES FOR NP 3/B97 NP I
mia. EL;1FMENT Co.
s 118 TEE CN ANCH0FASE FAILURE NP 11/89T hP 119 PIF!kG liEVIEW CO UltiEE REG 09/85 h0i CONSitERED 651 RI I
FECCUECAi!0NS IMPAC)
ISSUE 120 CN-LIKE TESTAllLlif Of hP 10/581 kP FROTECTICN SYSTEMS 122.1.a COMPDN M00E FAlltFE OF SUI 01/86 INTE5 RATED INTO 65! S(124)
ISOLAi!ON VALVES IN CLOSED 124
[
F05111CN 121.1.b FEC0VERf CF Aul!LIARY SU3 01/E6 INTESFATED INTO 651 f(120 FEEDWATER 124 122.1.c IkiERRUFi!0N OF ALI!LIARY SUB OlIE6 INTESRATED I K 'S! $(124)
FiECWATER FLOW 124 t
122.3 FHYS! CAL SECURifY SYSTEM LCW LOW CCNSTRAINTS 123 CEFIC. IN RESULAilDMS hP 10/BST WP j
6041 Ruths CBA & SINSLE FAILUti CRiiER10N EUS. BI 6/9/'45 DAvil EESSE EVEtt l
125.1.1 AVAILAllLITY CF STA tiCP TROP i
125.1.2.s PCRV FELIA!!!, lit - TEST SUB S170) iRMH
-123.1.2.b FORV REL! AllLITY -
SUB S(70) l Subt!LLANCE t
125. I. 2.c Aut0 BLOCK VALVE CLOS AE CROP CW
~.
.---,,y
---,--.--------n
,--,,n,e.
,---w.-----.--------~s n
v, ele No.,
8 10/25/]
~.
EhCLOSURE 3 6ENERIC SAFEif !$$UES NOT MPLILABLE TO RESAR SP/90 NUBSER flTLE FRIORITY PRIORITY DATE SEhERIC COMMENTS DATE RES0tVED RESOL.UTION 125 *.2.6 EQ FCR FEED & BLEED SUB SIA-45)
ENVIRCeENT 125.1.4 PLANT SPECIFIC $1NULA10R CFDP OROP 125.1.5 SAFEffSYSTEMSTESTEDINALL NP 8/581 NP CONDITICNSREGUIREDBVOESISN IASIS ANAttSIS 125.1.6 VALVE 1057)E LIMIT S ItFASS CROP tKOP SWITCH SEfilh6S 125.1.7.4 RECOVERFAILEDEQUlFMENT LFDP CPOP 125.I.7.b FEALISilt HANDS-ON TEA!N!N6 CROP DROF 125.1.8 FFOCEtuRES n STAFFINS FOR CROP DROP REPORilNS 10 hRC EMERSENCY RESPCNSF CENTER 125.li.01.a TW3 TRAIN ATW FILIA81LITY CMP CROP 125.11.01.14 REVIEW EIISTINS AFW SYSTEMS SUB 10/86 INTEGRATED INTO ES! $(1241 FOR S!WSLE FilLURE 124 125.l!.01.;
NURE6-0737 RELIAllLITY CRCP IMP 1RFROVEMENTS 123.11.01.1 AFW STEAM & FECIWATER RUPTU3t-
$$0P CCNil0L SYSTEM /!CS INTERACT! CMS IN 8 5 W FLANTS 125.!!.02 ALEGUACY CF E!!311NS tFCr LROP MAINTENANCE RE7J1FEPENTS FOR SAFETY RELATED SYSTEMS 125.11.03 REVIEW STEAM / FEED tlhE 35EAK CR3P (ROP MITISU l0N SiSTEn$ FOR SINSLE FAILLSC 125.1.'/>8 0T56 (RtN1 IAD RE300D IMP DROF EFFEtiS 125.II.C5 THERML NfMAUlit EFFECTS OF MOF IROP LOSS n RE$iCRATION CF FEEtWATER CN FR! MARY SYSTER C09CMENTS 125.!!.06 REEIA81kE FRA ESTIMTES OF CRC 8 CRCP CORE CA W E RISK FROM LOSS OF ALL FEEthATER
Pep t.,
9 10/25/06 ENCLOSURE 3 BENERIC SAFEIT !$5UES h0i APPLICABLE TO RESAR SP/90 NLiMEER fliLE FRIC4!if FRIORiiY DATE 6EkERIC CCMMENTS DATE RESOLVEDFESOLUIl0N 125.!!.08 FEASSESS CRITC in FOR FEED & CRCP IROP SLEEDINIT!4TICM 125.11.09 ENHANCE FEED L BLEED SUS 5(A-45)
CAFAllLITY 123.l!.10 HIER4RCHV 0F IMFRGMPTO CROP LROP OFFRAf0R ACTICNS 125.11.11 RECCVERY OF MAIN FEttWATER AS DROP DRCP flRP ALTERNATIVE TO AFW 125.1112 ACEQUACY CF TRAININS FE6MDING DROP MDP PORY OFEEAi!CN 125.11.13 0FERATOR JCB Alt $
CECP DROP TERP 125.II.14 RE50TE OFERAi!ON CF E90!FRENT LON LOW WHICH MUST NCW IE OFERATED LOCALLY 126 FEllallLilY 0F PWR MAINSTEAM L1 03/69 LICENS!h5 ISS.
LlflRP SAFETY VALVES 127 MAINTENANCE AND TElflNS OF Ltu LOW PAWAL VALVES IN SAFEft-RELATEDSYSTEMS 129 VALVE INTERt0Cl3 TO FREVENT WP 10/BBT kP VESSEL DRAlhASE 0$ 1N3 SMUTDCv1 C00LIW8 131 FOT. SEISMIC INTEFACTICN NP 10/661 k8 INTJLV. POVABLE IN-CORE FLUI MFPINS $15. tu W PLANTS 132 FHR Fvi51%Si!{ C04TAlhaihi hF 11/881 kP 133 LF: ATE POLICV STATERENT ON L1 2/89T LI WJCLEAR FLLhi STAFF WORtthS HOURS 136 ST08ASE n USE OF LUGE L1 3/63 LI TIRP PJANilTIES OF CRtCSINIC C09hSilitES CN $1TE 137 FEFLEllks CAVITY SEAL FAILL?E hF
?
hP 138 E(IkERT!h5 UFCN DISCOVERY OF kP
?
WP F:CS LEM AGE
/
Pete No.,
10 10/25/]
ENCLCSURE3 6ENERIC SAFETY 15SLt$ NOT AFFilCABLE TO RESAn !8/90 MJMBER TITLC FRIOR!if Fh!0RITY DATE 6thERIC COMMENTS DATE RESOLVED RESRUil0W 139 TM!nWlh6 0F CAhD04 STEEL hP
?
NP P!P!ki :1 thRs 140 FIR $1'uFRODUCTEEMOVALIf NP
?
kP LOWTAltENT SFSAYS 141 LAVA IREAK LOCA WifH NP
?
kP C04SE00EETIAL SGTR 142 LEAKASE THROUGH ELECTRICAL NP
?
NP
- !SOLAIMS 143 M AILAl!Llif 0F Cd!LLED WATER kP
?
WP SISTEMS 144 SCFM VliHOUT NP
?
NP TUR514E-BENESA104 TRIP A-04 STEAM 6EkEEATCR TUTE INTIBRITY USI 09/6ST CE
- CE A-05 9 L W STEAM EENEFATCR TUIE USl C9/BST 9iW lhTESRiff A-06 PAIK I SHCRT TEEM FR36RA9 RESAVID thR A-07 MARY ! LCMS TERM FROGEM RES1VID IdR A-03 PA5K 11 C04tAINMEhi FOOL RESX\\tB isR CikAMIC LCAES A-10 IWR FEtteATER N32.'LE CIACKINS RES XVED
!*R A-14 FLAW CETECTIC1 (30F tRCP 4-16 STEAM EFFCCTS C4 inR CCRE RE!OL,tTC 03/B3 PJA D-12 lhR SFEAT t!STRitui!C4 A-19 PIFE RUFTUFE DES!E4 CRITERIA DR f-IR3F A-ll D16tfALCCMPVTERFFCTECTICt LI 4/811 11RP Ll StSTEPS a-20 IPFACTS OF THE CCAL FUEL CICLE Li LI A-21 RSLI thSI:E CCETA!k? INT LCd Ltd EvaLUATIDh CF EN/llCh', INTAL CCulil:hSFDREG
Page No.
11
'f0/15/O' J. '
ENCLOSLAE 3 c
GENERIC S?fEiY ISSUES NOT AFFLICABLE TO SESAR SPIT 0 WUMBER TITLE FR10RlfYFRICRiff CATE 6ENERIC CCMENTS -
CATE RESOLVEDFES0LutlCN A-22 FWR MSLB - CCRE, REACTOR DROP CRCP VESSEL, A G CONTAlkMENT IVILDlh5FESPONSE A-23 CCNTA!NME%T LEf3 TESilh6 RI RI
'A-27 FILOADf.PPLICAll0%S LI L1 i
A-30 ADEGUACY OF SAFETV4 ELATED SUB S(12B1 O.C. FCWER SUFFLIES A-32 MISSILE EFFEtti SL'8 StA37,A38,568)
I i
A-33 NEPA REVIEb3 0F ACCIDENT RISES RE50LitD EW I
A-34 thSTR. FDA MCN!10 RING SUB 5(l!.F.3)
I rat!ATICN A C FROCESS VARIABLESLURINGACCIDENTS A-37 TURllut MISSILES CEOP DFCP I
A-38 TOEnADOMISSILES LOW Ltd f
I A-39 CETERMINAi!CM OF SRV FOOL RES01,VED 10/82 58.PFEVISICN IWR e
DnARICLCAS A u TEMFERATURE LIMITS FOR IWR CCATAln T NTS t
A-42 FIFE CIAtt5 !N IWKs F.E501 VCD IWR B 01 ENVIRCh".ERTAL TECH SFICs RESOLVED E FS 8-02 FCSICAST!nb ELECip!Clit CEMC RESOLVED E FA
{
6-03 EvtNTCATESCRilAitCt D50F 3 ROP l
l-04 (CES8tLIA!!LITT SUI 5(ll.E.3.21 I-06 LCAD LCAD CCFBIkAi!CN iilSW SLB thTEEFATED lt'0 651 $(llft STIESSLin!TS 119 l
l-07 SECChARf f.CCIIENT CC%5E0tENCE IIDF C40P PCLELLins B-08 LOCKlh5 0UT Cf ECCS CEDF IRC' FCutR-05EFATED VASTS I-10 IEMVICR OF thR PAIK 111 RESOLVED 09/64 50 SEVISION IWR j
CCh1Alettil
[
i I
t
7 PageC.$
12 I'0125C ENCLOSLtf 3 EENERIC SAFEff ISSUES NOT AFPLICABLE TO FESAR SP/90 NUPBEA iliLE FRICRITY FRICRifY CATE SENERIC.
CCVENTS IATE RESOLVEDRESOLUT1CN 3-11 SulCCVARTMENT STAk:ARD -
Li L1 FRCBLE"5 l-13 MARVitENTESTIATAEVALUAf!CNSL1 LI I-14 STU;T OF HYDROSEN M11th6
$US
$(4-491 CAFA3!LITY IN CCNTAIN9ENT POST-LOCA B-15 C0hTEv i C09 UTER CCCE tRCP CFDP MAINTENANCE B-16 FROTECT!D1 ASAINST FOSTULATED SUB
$(A ll)
P! FINS FAILURES IN FLUID
$1 STEPS OUTSitt CONTAl eENT
)
8-18 t0RTEI SiffRESS10N SUB S(A 43)
REQUIRE"ENTS FOR CCNTAl eENT feFS B-20 SiptARD FROILER &%ALYSIS LI LI B-21 COREPHYSICS DROP DROP t-22 LhR FUEL LI 4/E9T TitP l-23 LPJ5R FUEL (RCP LMFIA B-24 SEISMIC CUALIFICAi!ON Cf SUI SIA 46)
ELECTRICAL AND PECHANICAL l
CCVC4ENTS I 25 FIF!h5IEh>MAFKFR^4LE".S L!
Lt l-27 IVtEPINTAi!CN AnD I;5E CF LI LI Sul5ECil;N >F 1-28 Rat!CNUCLitE/ set!MEni RESMTD 2163 kJE6/CR-2423 FS TFDSPCAT FROSRA9 l-29 EFFECilkTVtt CF tafiPlTI HEAT LI 3/E91 FS TIRP
$!k1tS i
i 8-30 CESISN BASIS FLCCOS Att Ll BIEli IIRP LI i
FF01Ai!Llif I-31 CAM FAllt*E Pa*El R1 06/68 flRP
[
I-32 ICE EFFECTS CN SAFETY-5 ELATED L!
12/651 FS LI fiKP NATER SUFL!ES i
Fate No.
13 10/25/3 EhCLOSi/E 3 BENER' ',AFETY ISSUES NOT AFFLICAILE TO FESAR SP/90 EMIER TITLE FA!0RITY FRICRiiY CATE GENERIC CCMENTS DATE FESOLVED RESOLUTIO4 l-33 00SE ASSESSMENT METH0XLOGY L!
LI l-!4 OCCuf Ai!CNAL RADIAt!D4 SUB S(lil.D.3.ll EIPOSUFE FEDUCTICN 3-35 CCWFIRM OF AFP 1 M0tELS FCR LI LI
'CALCS OF RELEASES OF FAD MAT'LS IN 6AS L LIQ EFFLU FR09 thRs' l-37 CHIM! CAL CISCHAREES TO EW FS RECEIV!n3VATERS l-38 SECtkMA1854CE LEVEL tF07 CFDP INVElllBAilCWS l 39 il4591SSION L1hES CIGP IROP l-40 EFFECTS OF PCWER FLAhi DROP tROF EETRAlk3ENT CN PLAETCW B-41 IPJACTS C4 FISFERIES IRCP JRDP 3-42 SOC 10ECCWCM!C thV!R N EhTAL RE50LtID FS l'JACTS l-43 VALUE OF AERIAL FHOTOS;AFHS EW FS FCR Slit EVALL'AT104 l-44 FCLECASTS OF EEhEFAi!n3 COSTS LESOLtID FS OF COAL DD WCLEAR Pl u TS l-45 WEED FCR FCtER - EWElif SUB S(I 2)
C04SERVA110N 1-46 CCSTS OF ALTER 4ATIVES 14 CFCP LROP ENVIKOk9 ENTAL DES!EM l 47 INSERVICE InSFECTION Ct!TERIA IRDF (SDP F0 SL* FORTS 3 D 10(11%$ OF CL ASS 1, 2,.hD 3 AC PC CC90%Et15 l-48 ist CCETE'A FCD ti!VE FESDLVED inR MEChultAL FAILLFE l-49 lhSEEVICE Iki>ECTICW CtlTERIA L1 LI W CCIGSIC4 FREVEnflta 91TtM A FCA CChialta.IkiS
/
l J
f ett C'.
,'l4 10/25/O ENCLOSURE 3 GEhERIC SAFETY !$5UES NOT AFFt! CABLE TO RESAR SP/90 NUPSER TITLE FRIOR!iYFRIOR!!Y DATE ffNERIC CCMMENTS CATE RISCLVED RESOLU1104 8-50 POST CFERAT!k3 IASIS LCW LGW EARTH 00 RE lhSFECTIC4 C-51 ASSESSMENT OF INELA$ilt SUB S(A-40)
ANALYSIS TECHNiiPJES FCR
' EG'J1FPENT AC CCPSONEhtS B-52 FLTL ASSERPLY SEISP!C AND LOCA SUB S(A 2)
RESPONSES
. 53 LCADIREAKSd!TCH 11 1 07/2B/53SEP8.2 R!
l-54 ICE CthCENSER CONTAlh9ENTS RESOLtTD 10/22/64 N'JRESICR 4001 CES!64 B-55 IPIROVEO EEllAllLITY CF T 4 GET PEDILM 03/811 f*R PDCK SAFEff RELIEF VAL \\tS l-57 STATION EL4Ct0JT SUB S(4-44)
B-51 N-1 LOCP OFERATION In futs AU Al 04/E5 7/64 SER FOR tv-l RI FhRs B-62 SEEIAM ri rich BA3IS FC9 CPGP CfDP EStaBL1541ksSts-LSS$s,A4 RTACICR FROTECil04 SYSTEM TRIP FLuti! CMS l
l-65 100thE SFl[lh5 CCP CADP l-66 CONTROLRD09IkF;LTRATION RE50LtTO MEASUREPENTS l-67 EFTLUENT A C FROCESS SUB StP 11.3 6 15.7.3 S(!!!.D.2.11 PittiCR!h5 B-67 EFFLUEh1 AC FiOCESS SUS SAP 11.3 L 15.7.3 5(111.B.2.1)
M04170RlW6 6 6B FtPP 0'itRSFED D $lh5 A LOCA OROP CE7 H9 ECCSLEHAEEEl-CCNTAlk?Eni SLI S(!!!.C.I.l(11)
B-71
!kCIMMT IESPCMSE SUS S(l!!.A 3 ll I-72 bIALTH EFFECTS A O LIFE LI L!
SCRTEhlh5 FRCR LSAAluM Au l
CCatFUELCYCLES l-73 NC41TORlh5 FOR EICES$ltt SUB SIC-121 VIEE ATICt 1% RIM Tb1 REACIDE FRESStit VESSEL
og Pap D.
15
,I
'i 10/25/Q-
'l s <
e E%CL355 E 3
~
6EhERIC SAFEif ISSUES NOT APft! CABLE TO RESAR SP/90 g
Nu!9En fliLE FRIORlifFR10RiiY CATE GEntRIC COMMENTS
~
CATE FESOLVED RESNI'11CW
-C43 145ULAi!04 USABE W!iN!N SUB
$(4-43) l CCVTAlhMENT C-04 STATISTICAL METHCDS FOR ECCS FE6 07/86 5/B5 SECT 63-472 R! S(A 43)
ANAliSIS IMPACT ISSLt C-05 CECAYHEATUFDATE REG 06/56 5.65 AhS!/ANS SiO. 5.1 91 IPfACT ISSUE i
C-06 LOCA HEAT SOURCES RE6 06/96 5/B5 SECV 65 472 R1 IMFACT
!$5cE C-09 RKR HEAT EICHAhtER T'JBE TROP 12/6ST A OP TSRP FAllt*ES C-13 Ch-tACOM FAILUEES SUB
$( A-ID C-14 STORM SURBE PC EL FCR COASTAL kP 5/EB DRCPTIRP SITES C-15 rJ8E6 REFCRT FOR LIQUID TAW CR3P CROP FAILURE A4ALYSIS C-16 ASSESS OF 45R! CULTURAL LAG IN CICP CRDP FELATIC4TOFCWERFLA4TStilhG AC CC0 Lins SYSTEM SELECTICM D-01 AIVI 9 i!LitY CF A SEISMIC L0u LCW SCRAM D-02' ECCS CAFA!!LITY FCR FUTutt SUS I/IST StA-45) TIRP FtANil 6-03 CONTROL FC) LEOP ACCIIENTS REStutt ist (IWFil 171.2 ens!hEER!nS EIFERT!!E EN SHIFT PESOL\\tD 10/28I8540kEWFEMIS FS HFl.3 6'JitNE C4 LIM 115 AV FE5001) 6/26/66 N0 WEW RENTS FS CC C ITICES OF SWIFT WMK HF2.1 EVALL4TE ICUSTRY TFAlW!h3 L1 hRC HF2.2 E\\ALU4TE IWO ACCFE!!TAitC4 LI htC hf2.3 FEVISE SU SECTICW 13.2 L1 hit
Fage D.
16 10/25/]
ENCLOSURE 3 BENERIC SAFETY !$5UES NOT UFilCABLE TO RE$tJt SP/10 WUMDER TITLE FRIORlifFRIORITT 1 ATE 6ENERIC CCPPENTS TATE RE$0LVCDPESOLUTION HF3.1 IEVELOP JCB LMCWl. EDGE CATALO6 L1 NRC hF3.2 CEtTLCP LICENSE EIM!hAi!CN
'LI kRC hah)lC0K W3.3 IEVELOF CRITERIA FOR NUCLEAR Sul MCIS(!. A.4.2)
FCWER FtA4151MJLATDAS W3. 4 EIulnATICW EEOU!IEPENTS SUB EC/S(1.A.2.61 h73.5 DEVELCP C09UTERl!E0 EIM LI 12/64 MC SYSTEM W4.2 FFOCEDURES SERIAAtlCN PACFASE L1 kRC EFFEtilVEtESS TRAlk!h6 W4.3 ERITEnlA FOR SAFETY-RELATED SUB EC/S(B-17)
CFERATCR ACTICNS s
HF4.5 UFilCAilCW 0F AUTOP.AilDN Ah) SLB NIC/S(HF5.21 AAi!FICIAL thTELLIBEkCE HF5.3 EVALUAi!DW CF 0FERATIC uL A!D SUI kh/S(HF5.2)
SYSTEMS i
HF3.4 CC VUTERS AAD CO9 UTER SL1 KC/S(HF5.2!
l DISPLAYS W6.1 IEVELOF FE641ATORY FOS 11104 C4 Stil 6C/S(1.1.1.1)
PAuBEPiNTAt3CASAh!!ATICH W6.2 REBULATCRYPOSit!CNCW SUB HCIS(1.l.i.ll MAAAGEP.Ett A%'t CRG ullATICE At 0FElailh6 FEACTCES W7.1 R,MM ERK:t CATA ACCUISli!CM L!
EC
^
W7.2 K,P,At E U CR DATA STC5ASE AC Li ktC
[
Kiit! EVAL I
W7.3 BELIAllLitY EVALUATIC4 L1 WC l
S1ECIALIST AltS W1.4 SATETY EVEET A ul)S!$ FESUlfS L1 Wit j
APFilCAi!C4 t
t f
1.4.1.4 LChi-TER4 4/ERAD!ne OF FESOL%10 01/0!/84FLtE FS 0ERAtlh6 FEES 0 MIL I
i
' Pap C:.
17 10/25/O EhCLCSUFE 3 6EWERIC SAFETY ISSUES NOT AFPtlCARE TO RESAR SP/90 NUMBER TITLE Fl!0RITVFRIC8tif DATE 6EWERIC COMENTS DATE REE LVED RESMTION
!.A.2.2 TRAIN!h$ % QUALIFICAi!Dh5 0F RE50 Lit 0 06/24/65 POLICT STATEPEkT PS CFERai!NS FERSchWEL 1.A.2.4 hER H.Ri!CIFATION IN ins!ECTOR L1 LI TRAININS
!.A.2.5 FtMT DRILLS RESOLVED FS 1.A.2.6(l)
REVISE R.6. l.3 RESOLVED C5/87 R.6. 1.8 kRC 1.A.2.6(2)
STAFF REVIEN OF NRR 80-117 FE50LitD WRC 1.4.2.6(31 FEVISE 10 CFR 55 SUB
$(1.A.2.21 1.A.2.6(4)
Of D ATOR bbu SHGFS RESOLVED 09/25/t5N3kEWFEG9fS FS 1.4.2.6(51 IEVELOP INSFEti!Ch FSOCEDUKES 9E50LVED hAC FCR TRaltthS FROERM i
1.A.2.6(O W3 CLEAR PCvER FUh: VInTALS CROF CKGF 1.A.2.7 ACC'tDilAi!CN OF TRA14th$
RESOL'KD C6/24tB5 FOLICT STATEPEMT FS lhSllTUTICh3 1.A.3.2 CFtRATCR LICEkSIW3 FFWM FESCLVED FS CFAASES 1.A.3.3 FEQUIREMENTS FOR CFEFATCR FES0010 0'.187 N3 WEW IEEMIS FS FITNESS 1.A.3.4 LICEWS!h6 CF AtD!TitnAL FESOLVED 02/12/25 FOLICY STATEPInt FS OFEPAtlCESFER$Ch%EL 1.4.3.5 ESTAlt!$H STATEPEht 7 Li LI U4;ER$1AClk6 httH INFO L DOE I.A.4.lill EHORT TElm STUt' OF TFA!NING FISOLVED FS
$1MAATCIS 1.A.4.l(2) 1%TERIP, CR43ES IN TFAltlh5 FESQLVED FS SIPULATUS 1.A 4.!(1)
FE5EAtk CN TRA!kikS FESOLVED 05/87 R.S. 1.149, ht 1 FS
$!MULATCRS 1.4.4.2(2)
UF U tt TR4th!h5 S!PULATCA FESOLVED FS STAGAits 1.A.4.2(3)
R.6. CW TRAltlk3 SIPJLATCES RE50 BID n;C 1
s---,-_..-
,.m..
Fate C)..
II 10/25/98 EhCLCSURE 3 6ENERIC SAFEff ICSUES NOT AFFt! CABLE 70 AISAR SP/90 NUMBER TITLE PRIORlifFRICRITY DATE SEWERIC COMPJXTS Daft IESOLVED RESOLui!C4 1.A.4.2(41' 51 VIEW $1MULAIDRSFCR RES0010 C5/68 RULE FS
' CONFORMANCE TO CRITERI A I.8.4.3 FEAS181LITYSTUDf0F Li L1 i
FROCUREMENT OF h*C TRAIN!h6
$!MULATOR l.A.4.4 FEAS!IILITT STLiCY LF hRC Li LI ENSIWEERIEGCCMFUTER t
I.B.I.ltti 0F6A4!!ATIC4 & P M BEREnf -
RESOLVED 01/87 NO NEW REEMTS WRC FREPAREC4AFTCR! FERIA 1.E.1.l(21 GR6AN!!ATION & MMASEMENT -
RESOLVED 01/E7 N3 NEW FEGMTS kRC FREFA8E COMMIS$104 FAFER j
l.l.1.l(3)
CASAWi!ATION & PMASEMENT -
RES0010 01/87 h0 NEW IIGMTS WRC L
!SS RECMIS FOR UFERA3!k6 MAhSPINT & TECH FIS00RCES
!.1.1.l(4)
OR$4 !!Ai!CM & MANASEPEti -
RES0010 01/87 N3 NEW REGMit FS REVIEM RESPCNIES TO DETEMINE 1
ACCEPTA31LliY 1.t.l.l(5) 0F6A !!Ai!DN n P 3ASEMENT -
RES1VED NFC 2
REVIEW IRPLEMENTAtlCN CF I
I UF6AADING AtilVITIES 1.8.1.l(6)
REVISE R.6.s 1.33 &l.8 Sul
$(l.A.2.6(ll) 1.1.1.l(7)
ISSUE R.6.s 1.33 n 1.8
$U3
$(1. A.2.6(t h t
I.l.l.2 EVALUATIC4 CF Ce6411ATIC4 & RESOLVED FS MAkASIMENT IMFRO'triki$ Cf L
i WTOLs
[
i l.l.l.3 LOSS CF SutTY FUNCTICW LI LI l.B.2.1 REVISE O!E INIFICilot FROSIAM L!
LI 1.8.2.2 SES! Dent inSFECTOR A1 DRs Li LI HEC I. l. 2. 3 Rti!CN R EVALUATICMS Li LI kb l
[
1.3.2.4 btRVIEW GF LICEkSEE L1 LI HEC FERFOR m CE 4
1.C l(4)
CChf!RMTCRY AkuY!ES Cf RISCu1D hic i
SELECTED TIAMSl[NTS I
Page he,
' 15
- 1.10/25/ O -
ENCLOSLSE 3 y+'i GEllERIC SAFETY ISSUES lof AFFtlCABLE TO RESAR SP/90 18?lER TITLE FRIDAliY FFICRify CATE 6(NERIC CCVENTS NTE RESOLVFJ RESOLUT!04 1.C.9 LOW 5-TER!t FROGRM FLAN FOR RESOLVED 4/07/65 NO HEW RFCMIS FS UF6KADlh5 FAOCELURES 1.0.4 CCNT50t. R00r DES 164 St u! AID RESOLVED 03/66 N0hEWIEG915 htC I.D.5(4)
CChfROL R30't 16C IESEMCH -
RESOLVED NONEWREGifS K;C FF0CESSh0*lTORINE INSiiUMENTATIO4 1.0.5(51 CChiECL ROOM ILC RESEARCH -
Li Li D!$TURIACE MRYSIS SYSTEMS 1.9.6 TEth40LC5Y TRANSFER CC T EREn:E Li LI
!.E.1 0FFICE FCA A% 4YSIS n EVAL. OF LI LI i
CfERATICWALIATA 1.E.1 FFC653 0FFICE OFERAi!04AL Li Lt CATA EVALUAtlCu
!.E.1 0FERATICWAL SAFETY CATA L1 Li AulYSIS 1.E.4 COCSDlui!CN CF LICENSEE, Li Li
! O USilf, L RESULATORY FE05tuS i
l.E.5 WUCLEAR FtMT EEL!Al!LliY DATA Li LI SYSTER I.E.6 EEF'ORiin6IEG9fS Li L1 1.E.7 FCFE!64 SOURCES Li LI i
1.E.S R/M EFA0R RATE Aul1515 LI LI l.F.2(ll GA - ASSU8E !OEFENMh:E Cr (CW Ltd 0854 1!Ai!0% FERF03M!nS 4
CFECRlh5 FU%CT104 1.F.2(2)
InCLLIE GA FERS;WEL IN BEVIEW KESOLVED FS
& AFFRCVAL OF F1hi FACCEtLIES
!.F.2(3) thCLU E CA FEES 0 EEL lu ALL RESD'JED FS DES!B4,COnSTEUCTICE, ItSTAAL4f104,TESI!Ei,n DFEFATICE ACTIVITIES 1.F.2(41 ESTAILISHCRITERIAFOR LCW Ltd CETIEMit!45GASEGMTSFCR SFEt!FIC CLASSES OF ECUlf.
f Pfi t.
' 20,,
10F25/O EkttOSURE 3 KNERIC 5AFETY !$5Lil h0i APPLICAlti TO $ESAR $P/90 t
NUM6ER TITLE FR10RITTFRIOR!if CATE GENERIC CCmENil CATE RESCLVED RESOLU110N j
l.F.2($1 ESTAfttl5H QUALIFIC4t!ON RECMTS LOW LCW hRC FCR GA 6 GC FEFSchhEL l.F.2(6)
INCREASE THE 51!E OF FESXVED SEP F05PER LCW LICEN3EE'S GA $TAFF i
1.F.2(7)
CLARIFT THAT GA FF0EA', is LOW LCW WCC r
CCutlilCN OF CP L DL l.F.2(t!
CCRFME N;C CA PlGMit 10 THOSE LCW LCW htC Or OikER AGENCIES
!.F.2(9)
CtAAIFfORGAW!!QlO%L FESOLVED SEP FORPER - LOW REFCRTINS LEVF5$ FOl THE GA 0FSAt!!A1104 l
1.F.2(!C)
(TARIFF FEQ915 FOR PalhtEhANCE LCW LCW Dr as.lu!Li' CDCUMETAi!ON
!~'.2(11)
DEFIEE POLE OF GA IN tEll64 & LOW LCW AkALYSIS ACTIVli!ES r
1.6.2
$CCfE OF FEEUFERAi!CNAL L FE50 Lit) 10/05/84k0PEWREQ915 F5 LCW-P0W'ATEST!h6FF0ERAM 11.A.1 511!kSPOLICYFEF00ULat!C4 FESQLi10 09/C0/64160 kTWFliM16 NFC FS tl.A.2
$1TE EVALUAtlCh 0F E1151155 Sul 3(V.A.ll FACillflES 11.9.5 3ESEAFChC4FFEMMMA L1 ll ASSOCIATED WITH CCRE IEERAC41104 L FUEL PELT!W5 l
[
!! t.t Fl$t FIFKilC4 FCR CRs At
$f50Litt 09/C5/65 h3 HEW i.!GMTS P5
$1TES WIH!BN F0FULATICE
!!Eli!E5 t
f 11.8.7 Amaltill CF HitAC6EM (CnTPOL SUI
$(11.8.11
!!.C.3 Sf5TEMSInTEtati!CN SLI
$(A-171 j
11.9.2 EEFEARCH Ch IELIEF & $AFEff LOW LOW GAtti Tili RiiMS i
II.E.1.3 Let4TE !EP n CE\\t10P R.S. CN FE50L\\tl h5C AUI FEE;b4TER 515 FEM l-I
!!.E.2.1 FElianCE 04 ECCS 5'JS 5(II.E.3tl71) r I
l l
" Pm C:.
21.
-10/25/:3
'e ENCLOSURE 3 6thERIC CATEff 155UES ET APFLICABLE TO RESAR SP/90 NUMBER TITLE PR10AlifFt10RITY DATE BEWERIC CCRMENTS CATE RISOLVESPE51UT!0N
!!.E.2.3 UNCERTAINTIESINFERF0FaANCE LOW LOW FREDICTIC45 ll.E.3.2 DECATHEATRECVAL-$15 FEM 5 stb 5(A45)
RELIAllLlif II.E.3.3 C003CINATED STUtf DF SKl1DChN 5U8 5(4-45)
HEATRECVALRECM15 ll.E.3.4 DECAT HE&i FENYfL - ALTERNATE FESOLVED N0 hEt IEGMil NRC CONCEP!S RESEARCH
!!.E.3.5 5E6. SUIM OM IECAT HEAT SLI 5(A 4$)
REMOVAL SYSTEMS
!!.E.4.4(1) pvt 31n6 - !! SUE LETTER 10 FESOLVED
!!/ B/78 LETTER FS L!CEh5EE5 RIN(5I!NS LIP. lied FURS!h6
!!.E.4.4(2)
FLtBlWS - 155. LETTER 10 IESl\\t3 10/22/79 LETTER F5 LIC~kSEE5 KII. IkF0 ON 151Ai!DN LETTER
!!.E.4.4(3)
PutSths - ISSUE LETTER 10 8E50 Lit 0 09/27/79 LETTER F5 LICEh5EE5DNYALVEOFEtellLitY
'!!.E.4.4(8)
FUR 5ths - EVALUATE FUR $lkB 5 PESOLVED h3 NEW FECMil F5 FORPER - LCW
\\thiltaDUR!n3N00's DiEtAtlCh
!!.E.4.4(51 FVf5ths - 155it RCDIFIED FE50(,\\TD N3k!WFEGMTS F5 Ft36thB 5 VFnflh6 8EWitERINH
[
i II.E.5 CEl!E4 SEh51TIVliV CF lu I!50Ls10 01f17/i4 htSEBICR 3132 flu FE&CTOR5 II.E.6.1 IN 5ITU TEST!K3 CF VALVE 5 -
PI)!U=
F5 TESTA:EWACTSTUDY ll.F.4 STU:Y OF CCNTSCi. 5 f t0TEti!\\E CGP IRDF f.CT!*tEttlitREt915 ll.F.5 CL&551FICAi!04 0F ILC. AL2 Ll LI 1
ELCCillCAL EWIP i
ll W.!
- AltTAlb (AFEff Cf TR! 2 %
FE51uD TMI 2
}
}
M!n!n!!I EWit0haEhTAL IMF ACT
?'
!!.H.2 OITAl4 TECW CATA Of( C0c11T!045 W168 TM! 2 l
IN5tkE TMI 2 CC4TAIVEhi r
STMCTi.$E
Pne uc.
22 10/25/~)
ENCLDSviit 3 GEhERIC SMEft ISSUES h0i #FtlCABLE TO FESAR SFl10 NLMER fliLE FRIORITT FRICRITT CATE BEMEtic COMPEN15 CATE FE50tVEDRESOLUTIC4 II.H.3 Evt.LCATE 4 FEttBACK thTO SUI 5(ll.N.2)
CITA!nED FVA iMI*2 II.M.4 CETESMIC IMFACT CF TMI CN Li Ll SCC!CECChCMIC L REAL PROFE9ff VALUE5
!!.l.1 nthDOR INSFECTION FFOCRM L1 LI II.l.2 CChSTRUCil04 INSFECTICu Li LI tt05Flin 11.2.3 M3AGEMENT FOR tES164 L Sul 5(1.1.1.11 CCustRUCilNi 11.3.4.1 REVl!E CCFICIENCT lEFCll!h6 hEAU,T kRC REPt3 FESOLVED
!! t.itti EEVIEE TRI 2 FNs & CHROE106Y RESAVED TRI-2 F ACCIDENT ll.t.l(21 AEVIEW TRMS. SIMILAR TG iMI-2 FES M ID llW l
ibni FAVE OCCLEED AT OihEt FACIL. & htC EVAL Or l
IAV!l-EESSE EVEni ll.K.l(3i REVIEu 0FERAi!n3 PEOCE MIES FE50Litt F5 FCt REC 064!!!ni, PIEVENiin3. L Mlf!6Ai!NG VOIS FORPA1104 14 TRA45. 6 ACC
!!.t.itti.
FEVIEW CFEFATIh3 FE0CEttill i FESCLVED F5 ilAlt!NG IkttRUCittn3
!!.f l(5)
SMEtt4FLATED VAut F051TICE SUI 5(1.C.2,l.C.61 (15C5171104 11.r.l(6)
IIVIEM C0aTAlh*ENT 150LATICM SUR
$(!!.E.4.21 lulf!Ai!CE CE5164 L FRDCED#ES II.t.l(71
!M!t[REni NS!1til FOSITION RESOL \\tl 1&W CCnit0L5 CM VALVES ThAT COAD C0HUl!E CE IEFEAT UW FLCW ll.t.itil IPPtimEkT PRXECWES THAT 5E500tB FS A55ett TWO !4EFEhMht INI M W FL0u FATKS II.t.l(91 ity!Ed FiWEICEES TO A5505.E RE51st)
FS THAT RA!!CAC11VE LIO. L EASES A/E het Int.;VEti 18 M SFER.
Out W CC47.
Page C.
23
- 10I25/^2
~
ENC 1.05URE1
~
6ChERIC SM ETT ISSUE 5 WOf U FtlCABLE TO RESAR 5F/90
.. ubMBER.,
ilTLE FRIC#titFR10alTV DATE EEnERIC COMPENil MIE FESOLVEDRE50LU11CN II.E.l(101 REVIEW L MODIFY FF0CEDutEl FOR RE5001D F5 IEMOV!n6 54Eff-EELATED SYSTEMSFROMSERVICE
!!.t.ltill Matt ALL CF n MAINT. FERf 04hEL RESOLVED Fi A6ARE OF SER. n CtW5EG. OF THE EER.Atf10n5CAUllWSTHETRI2 ACCID.
II.E.itl2) 0%E HOUR N3TIF. EEQP.i n LEIDutB FS CCni!N. CCMMUNICAlla Chah% Ell ll.i l(13)
FROFDSE TECH SF 4 CHA46El FE50utD F5 BEFLEClini IMPLE. OF ALL WLLEi!N ITEMS
!!.t.itlO EEVIEW 0FEtAi!N5 MON S n SUI It!!.l.4,+1 FRDCEDURES TO LEAL WITH $16N.
AMINil 0F NCF06EN
!!.t.l(15)
FCR FACIL. W/NON-AUTO Ms RE50GTD tt$154 IN!ilAllD4, FROV. DED.
CFERaf 0R TO OPERATE MW ll.t.ll!H 1RPL. PROC. THAT I M NTIFY Pit FE500tl FS FCtv ' OPE 4' Int!C. n THAT DIRECT CEER. TO CLCSE RAW'JALLY AT FESET ITFT s
ll.t.ll 01 CEVELCP FROCEDURES & TI A!E RE5001D FS QPEpATCE$ C4 MITC$ OF
[$fAFL. L PAlti. NaTUS AL CIRCULAT104 11.t.1110 tESCl!!E CEllEN n Fh0CEDURE SE50013 Itu M0:5. TO REDUCE LinEllHCCD CF AUTO Fr PCRV ACit'ailCN 14 TFA45:Dt3 II.E.l(Ni F80V FSOC. L TRAIN. TO CIER. SE500TD P$ 1%W FCA FEC9T MA4. RE ACT.191F FCALOFW,TT,P51VCLCS, LOOP, ETC.
II t.l(2tl FROV. AUTO SVETV EJADE Lit!C. FE50LiTD KJ REActCR it!P FOR LCFW, II, CF
!ECREASE in 55 LE51L ll.t.l(22)
IESC. A'JTO n Mat. ACTICNS FCR EES00tl ist FEOFER FlpCT. OF AJI FEAT RE C AL SYSTEMS W4 4 Fu SYSTEM h0i 07E3Al;E li iig'
E Pay he.
24 '
10/25/98 e"
EhCLOSURE 3 GECRICSAFETY155UESNOTAFFtirAILETOFESARIP/90 h0MNR fliLE FR1041TiPRICElit TATE BEutSIC CCmENTS DATE RESOLVID RES1UTICE II.t.l(231 MSC. RV LEVEL th31 CATION FOR RESOLVED IWR AUTO L MAN. IN!ilATIC4 SAFETT
$YSTEMS tl.K.l(24)
FEU. LOCA Ahnt$15 FCt FAW6E Stil
$ll.C.11 0F $5 LOCA 51!ES n FA4GE OF i!Pi LAPSES IETu. lEACTOR fitP
& $CP TRIP f
II.T.IIIS) tutLCP OFERATCR Atil0N FE50LVE)
F5 i
6UIDEllhti ll.t.l(26)
REVl!E EPIE6EhCf PROCEDutES n FE50LVED FS TRAIN R0s & SRh II.t.l(271 FR0Vitt AMAL151$ & IEVELOP
$U)
$(l.C.1,+)
60!!EL!n!! L FROC. FOR ICC CC4D111043 l
!!.K.l(26)
F OVI M DE5164 T 4T t!LL SUB
$(!!.K.3(5))
l ASSUKl AUTD RCP TRIP FCR ALL CitCUPSTACESkHEFEIEG'D II.K.2(1)
UF5FA;E TIMEllWESS &
FE50LitD ILW f
REllAllLITT OF AFW StifEM
!!.t.2(2)
FROC. & TRAIN. TO lulilATE n SE51\\tB 11W r
CChfRA tFW IntiFEn:Eni 0F ICS l
li.t.2(31 FMD u!EED C0hTE0L-6 KALE RESOLitD llu AR11C. SEACTCA it!PS
?
ll.t.2(41 SMALL-IRIAt LOCA AEEllit, FE50L\\tD ILW i
i l
P10C., 4 OFEIATCft TI&!ulu3 l
l l
ll.t.2(5)
C04tETETel-2SIMJLAT04 FE51VED Its FS TRA!n!hl FOR ALL CFEKAT0tS I
F i
!I t.2(6)
IEEVALLATE AulY515 FCA ME FE51ktl itW i
LEVE1 $EfPT CC4Tita I
l l
II.E.2(71 IEEVALUATE TKasi!Ehi 0F EE51VED llu l
t/24/77 I
l i
l
!!.r.2(l)
CthilhJED L75Aa !h6 CE aft EUI 5(ll.E.1.1)
$15 TEM
{
\\
II.T.2(12)
IIAA$lfEI AGLtill n
$;)
$(l.C.l(31)
[
FCCE0'.*ES FCA PMASE*Eli
[
i i
I r
Fap C.
25 10,25G ENCLOS'JRE 3 CNEI!C SMETY 155UE5 Ci APPLICABLE 10 PESAR 5P/80 NUMER f!TLE FRICRITY FFICRITT CATE 6EWERIC CCVEnf5 CATE FESOLVEDRE50LuflCN ll.t.2(18)
ANALTS15 W LOS$ Of FEttvAtti SUI 5(1.C.l(31) 5 0Thit ANTICIPATED TRAt$lini$
ll.F.2(21)
LCFT L31 FFEllCTIONS RESOL \\tD 15W ll.t.3(4)
SEVIEW 5 UF51A:{ FELIAi!Llif i 5LB 5(ll.C.I,2,3)
FEts tAACY OF O n-SU ETV EDVIP FCA SWL 15EAK LOCA Pli!64 TIC 4 II.t.3161 ILiiRJP.Ehini!CN 10 VERIFY SUI 5(1.C l(31, +1 hATUSAL CIRCULAT10E II.t.3(t) lim F CCv51CERATIC4 W HEED Sul Sill.C.I.+)
!!.t.3(23)
CEnip AL water lek 1L RECCRDlk$ SUB 5(1.D.2,*)
!!.r.3(24)
Stutf EFFECT CN Ext IEllAl. OF Sul 5til.E.2.1) 115 l5E FCR FLELF-00L C00Llh5
!!.r.3(32)
FROVlt{ EIFER. VERIF. CF SUB 5(ll.E.2.2)
TWO-F8ASE hafdAL CllCULAi!C4 fCELS 11.t.3(331 Ev&LUATE EllP!WATICM CF FCU SUB 5(ll.C.11 FUhCTION li.t.3(34)
IELAP-4 P0;C. IF41LCFPENT Set 5(!!.E.2.2) l l
II.t.3(35)
Ev&LUATIC4 0F EFFEtil y COAE SJ1 5(1.C.l(31) i FLOCD Tha !NJECTIC4 CW l
! PALL ilEAt LtCAs I
!!.t.3(36)
AID'l STAFF DJ)lf CALCS W ILW SL'S 5(!.Cl(3))
5ML-18EAK LOCA AARY515 II.t.3(371 AR1515 CF 11b EE!IChil 10 SLI 5(1.C.l(31)
ISOLATED SWL-ilER LOCA
!!.t.311tl AnALilli CF FtANT IEIFD45E 10 SL) 5tl.C l(31)
A EPALL 18EAK LOCA it ikE FZR
!PL&? L!k!
II.t.3(341 EkAL. N EFFECTS CF WATER SLI 5(1.C.l(311 SLLi$ la FIP!n3 Cavit! IV HPl 5 CFT FLCs5 L.
.T u
~Page D.
26 -
10/25/98 o"
EnttCSLSE 3 6 C RIC SAJElY ISSUES Ici AFFLICAILE TO R SAA SP/90 huRIER fliLE PRIORITYFRICRITT DATE 6thERIC COMMEhTS CATE RESCLVEDRESOLUT!0W II.K.2(l61 EVAL. CF RCP $EAL CMAGE 6 500
$(!!.t.2(1611 LEki.6E M!bS A $ PALL-tFEAK LOCA II.C.3(4ti SUHliFEEDICilCh5FORLOFT Stl sti C l(30 TEST L3 6 WITH FCFs tuhelN6 II.t.3(42)
SUMIT FECUESTED INFO ON THE SUI
$(l.C.l(3H EFFECTS OF WC4-C04:BS!!LE E45($
II.t.3(431 EVAL. OF PICHAt! CAL [FFEC15 0F Sul S(ll.t.2(1511 SLL6 FLCW 04 $6 ftPES II.K.3(4fl TEST FFC64t.M FOR 5%LL ESEAK SLI 5(i.C.!(3),*)
l LOCA RZR VEFIF. FRETE$i l
FEET., TEST FAL, L RCCEL iTt!F.
II.t.3(48)
ASSESS CMW5E la SAFEIT Sul 5(!!.C.1,+1 RELIAS AS A RESLt.T OF IMPLER.
SMIFLECCM.
t II.F.3(40 FEVltu 0F FRXEMES (htti SUI
$(1.C.8,l.C.9) ll.t.3(501 FETIEW CF FRXEMES (E553 SLI
$(1.C.7,l.C.9) i 51 0 055) ll.t.3($11 51MFTCM IASED EPEREEN:t SU1 5(1 *,.91 FAXEDLft$
!!.r.3t!21 CFERAILA AeAEEEEtS Of IEv!$El SUI fil.l.l.1, 4 EMEtiuCT FIXEME$
t II.I.3(53) is3 0FE'ATCAS In COnTR1 FOCR SLI
$(l.A.I.31 6
!! t.3(50
$1MULATCR tF68ADE FC8 t'ALL SL1
$(1.A.4.l(211 58 eat LOCAs t
l
!!.t.3t55)
CFEIATCA P;nlTORlh6 0F CthTF X Sul 5(1.t.l(31,*l i
K.*.R 3
[
II.t.3tS61
$1nA AT04 TEAlv!W5 KEG 9tS SUI
$(1.A.2.6(31,+)
III.A.I.3(l)
INIICII'lL0Ct!bSAEhi FCA RE51YEt F5 6:4E15 i
i
!!!.A.I.3(2)
TW1R310-K 0CL!ni AEthi FDA ikE EE51%Il (t r.5 FOLICV STATEPEtt FS NEIC
}
i i
Fage D.
27 10/25/]
ENCLOSURE 3 6EERIC SAFETY ISSLYS N31 AFFilCABLE TO FESAR SPl90 hun 0Et f!TLE FRIOR!ifFRICRl!Y DATE SEERIC COVEni$
CATE RESOLVED RESOLUi!CN
!!!.A.3.1 hRC IOLE 14 FESFCAD!ki 10 RESUtB HC WCLEAR EMEESEstlES 111.A.3.2 IMMOSE OFERAi!CES CENTERS RE50Dil FS
!!!.A.3.3 CCven!CAi!DNSIW145 PE50L\\tC PS EPEE 6EktY Ill.A.3.4 WCLEAR DATA LINK FESOLVED 06/26/85 N3 WEd FTCMTS F$
!!!.A.3.5 TRathth6, CAILLS, i TEltl FESJOTI FS fil.A.3.6 14TERACTIC4 0F kRC 6 CikER FE50016 kSC ASEhCIES 111.3.1 TRANSFER CF $ESK h5111LITIES RE50Ltt'J ktC l
TO FEPA h
111.8.2 1RP;IRENTATIC4 CF WRC L FEM RESCLVED hRC l
RESFCR$111L!!!ES
!!!.C.!
MAVE IkFO A'.'AILAltE FOR kEWS L!
LI l
Pit!A L TWE FL'ittC l
l
.til.C.2 CEktLOP FCLICY n FitV!M L1 L1 l
TFAlutti FOR ltTERFAC!E6 W!iH THE kEtS PEDIA
!!!.l.1.101 EEVIEW Ikr0 04 FACVISIC%5 FCE 'IRP fitP LEAK (ETECT104
!!!.l.1.l(3)
MhtLCP FF0FCSED SYSTEM TISP TitP ACCEFTA4CE CRITEp!A LE Fi!MRI C01 Auf DJ151tE CChiAlk'Ett l
111.1.1.1 FA)!Dati!VE 645 mi. LASE N ni LEOF tt0F
!!!.8.1.3(11 MCIN mktintR LICEhiEES ti?
IADP Ek M 3 FEU CFR tit 3!El i K !Fi \\Ent!LAi!De 5t51EM 111.5.1.3(21 IEVIEd n REVISE fiP IE ttCP ga0P niti!LATIC4SillEM i
!!!.l.1.3(31 EEi LICEhSEES TD WEU:t IRCP tt:P FILitATICA llSTERS
!!I.t.1.3itt S RsSta ST4 1E5 TO EVALLATE IE Sb'.t kit C W CCAL A:S:31Et
Fap Q.
28
'10/25 0 ENCLOSURE 3 N*
ENER!C 5AFETY 165JE5 NOT AFFL!CAlti TO RESAA SP/90 NUMKR flTLE FR!0RiffFRICRiff DATE 6ENELIC COMMENTS F)TE Rt30LVilRE50LUTIC4 1
l l
111.0.1.4 5A:4ASTE SY5tER CE5!WI DRDP CFCP fEATLAE5 TO A!D IN ACCitENT
}
Ftth ERT 6 DECONTAM!NAi!0N
!!!.l.2.1 RAll0LDEICAL K4!iDR146 0F LOW LCW l
[FFLUENil l
111.9.2.2(l)
PEEF0AM ETU0f C# RADIO!C !kE, FE50LVil hRC Call 04-14. 6 TRiflUM HHAVIOR 111.8.2.2(21 (Yt.LUATE 04T4 COLLECTED Ai SUI 5(111.D.2.51 l
QUADClflES
!!!.B.2.2(31 MiERM!nt!!5tRIBUT1040F SJI 5(111.0.2.51 CHERICAL SIECIE5 0F RADl010 !ht in A!R-uATER-5ftAM i
MllIUEEi
!!!.0,2.2(4) 5EVISE SRP % R.6. IE FAta AY SL) 5(lli.D.2.51 1
CC5! Oialf 515 111.0.2.3 L!t'J18 FAf4Af taa!0LC6! CAL FE50 Lit) 08/28/85 (L7P EEV!5104 F5 C04TRA
!!!.t.2.4(ll STUDT FEA5131Llif 0F SE!XitD F5 thvil h"tutAL K4110tS i
!!!.l.2.4(2)
FLACE 50 TLDs AF0W3 E&CW litt Li L1 III.S.2.5 CH51TE CC5! CALC. MWJAL RESOLVU cl/17/64 4'JFl6/CI-3332 F5 l
!!!.t. 2. 6 It!EFEhXhifAD10Lc4! CAL Lt Li MEASLSEME4TS 111.t.3.1 KittR fallA110h FI:1Etf104 3E50 Lit)
(5/19/86 ha WEW 11;9T5 F5 L
7ths i
111.9.3.2 MALTM fwllt5 IWiQtmEtil Li Li L
Ill.9.3.It21 In-FtAtt 3A3 O lf.- SET FE5X4tl StP, t.l.l.97. SIV 2 hit Cl1TERIA 111.5.3.3(3)
In-PtAnt I A3. Ntti.- 155'.I RE51\\tl 10 CFI 54.501(d MC l'JLt t
111.9.3.3t4)
In-Ftant i A3. Olt.- 15LT BEllitt R.6.845 kiC Itl. 6'J!tt
[
t
!!!. 9. 3. 5 la!!AT134 O tER (1705 #!
LI Ll I
f 1
)
tage No.
29 10/25Q o
'o EbCLOSURE 3 6thERIC SAFEVY ISSut5 NOT APPtlCABLE VD RESAR SP/90 WUMllt TITLE FRICAlifFRIORITY CATE 6thttlC COMENTS PATE ret M ES RESOLUTION IV.A.!
SEEK Lt615L4 Tint AUTH3 Riff TO L1 Li STREhSTHEN EVORCEPINT FK0 CESS IV.A.2 REVISEEMDFCEPluiFRICY ll LI IV.3.1 btvist FFACTICES FOR 155. OF Li LI th5TRUCilCtS n 1450 TO LICtWWE5 P
IV.C.I tifFh3(t!$CW5LtuMDFRCM RE50'.Vt3 04/15/83 N3 Ntr if H il FC TP! TO OTHER htC FROMMS IV.I.1 HEC 5fMFflAlt!N3 LI Ll IV.E.1 (IFAE3 EE5EAICH 04 GUAnilF. Cf LI LI EVtti t(C15104-Mtth6 IV.E.2 Ft M FOR (ARLY BI5X Ui!CW Cf Li Li
!&TEif !$1UES l
IU.t.1 FtA4 FCR SE50LV!kG 155Lil AT L1 Li TWE (P STA5E IV.t.4 EESMt f0ERIC 15%F.5 If LI L1 RULESt!a6 IV.t.5 455t$$CVtt4TLYOfttAflW3 FE51\\t3 H /25/65 43 HEW IECMTS WC t
it&CTCE1 IV.F.I trJ E4!!) Ott SClu1Iul CF TWI RE!XitD b5C FCett ASCth5!04 itsi FlWM tv.F.2 (VAluatl !P/Atil Cf F!kAhCIAL PE! M Tl hat l
!!!!rt:11btl TO Eutif 0F i
n',ttiu FMt Ptuts IV.6 1RfeetIJFETIEUL(Pulh6 Li Li
(
FRXth8E5 iv. col
CIPAi!5 in T4 Li LI l
FAICfCANCIL V.4.1 FDLICfITAftmEhT L1 LI i
i s
r v.l.1 STLtv 6 EEC0VIh! [ Lim!LATICu L!
Li l
OF h35ATIit Et!P;h5!!! Lit!!!
r V.C 4:VI&31 (C MITTEE5 L!
LI f
I
(
Pete D.
30 10/25 0 thCLOS'At 1 MERIC $#ETY ISSUES Ci PPLICAILE TO RESAR SP/90 IANCR flTLE FRIC4tifFR10 Riff DAT(
6(WERIC CCMENTS
~ Nit RISCLVtb RISOLUTIC4 v.O LICE 451NS FRXI$$
LI L!
V.t.1 ITU3f in NED FOR iMI-RMD I.1 L1 Lt61RAf!C4 V.F Csku!!Af ttu 6 P AMERI4T L1 LI l
V.8 CCtS0ll!Afitt 0F FC L0C4f1045 LI LI LASTL7Hi[
bJ.fl 0933, Suf PLE%NT 7, 83CW 1968 41T$, THill GUARTER, FY El, AJ50$i1,19El h
t l
t I
I f
I i
l I
J l
[
I e
I L
I l
i f
,. a Cuidelines for USI/GS! Review RESAR SP/90 One of the criteria identified in the Commission's Severe Accident policy Statement requires the applicant to demonstrate technical resolution of all applicable USIs and redium and high priority GS!s.
The March 14, 1988 Merorandum of Agreement between NRR and RES defined the responsibilities for carrying out reviews of propcsed resolutions of these generic issues on standard plant designs, as follows:
a)
The responsibility for development of generic technical resolution of the US!s and GS!s is assigned to various divisions within RES.
b)
US!s aad medium and high priority GSIs for which generic resolutions have not been identified most have design-specific resolutions (or be shown they provida a negligible contribution to risk for the plant).
NRR will evaluate the adequacy of design-specific features that are proposed as resolution of issues, and will consult with RES relative to the current status and prognosis for generic resolution.
Those issues where proposed resolutions are based on the applicant's PRA will be reviewed by RES, and the risk findings transnitted to NRR who will evaluate the adequacy of issue resolution.
Festinghouse is in the process of updating their submittal on USIs and GSIs.
By letter dated May 23, 1988, the applicant proposed plant-specific resolutions to the issues that had not been generically resolved at that time.
The remainder of the issues will be addressed by Westinghouse in October 1988.
The applicant will be providing a roadmap describing the location of the resolutions to the US!s and GSis within the FESAR.
To assist in the staff's review, Enclosures 1 and 2 of this package provide ratrices delineating proposed review responsibilities for NRR technical review branches.
The following is a brief discussion providing guidelines to be used in reviewing the applicant's USI/GS! submittal, and listing iter?s that should be in the SER discussing the results of this review.
Revitw Approach The types of resolutien of the USIs and GSIs should fit into one of the following categories:
1.
Issues that are not applicable to RESAR SP/90, because they are BWR issues, low priority issues, igsues that have been dropped, issues that have not byen prioritized,or issues that are beyond the scope 1.
Issues that are prioritized between 8/01/88 and issuance of the PDA must be addressed by Westinghouse. The plant specific resciution will be reviewed by the staff using these guidelines.
Notification will be provided to the staff should such action be required.
4 m.
2 of RE.AR SP/90. Enclosure 3 is a list of these items.
(Enclosures 1 and 2 of this package do not include any of these issues.)
2.
Issues that have been resolved by edopting the generic solution approved by the staff.
i 3.
Issues for which Westinghouse has proposed a plant-specific resolution, lists those applicable US!s and medium and high priority GSIs for which resolution has not been issued by the staff. We recomend you consult i
with appropriate RES members relative to the status and prognosis for generic resolution. NUREG 0933 and the Generic Issue Management Control System (GIMCS)
Report (see R. Emrit) provides background information on each issue.
To satisfy the Severe Accident policy Statement, Westinghouse must propose plant-specific solutions to these issues which should eliminate the concern.
To determine acceptability Westinghouse must:
demonstrate that the design of the fe:111ty (plant la i
1.
design, hardware design, and/or associated sof tware) yout, system prevents the occurrence of the concern raised by the US!/GSI, and/or i
2.
denonstrate through probabilistic analysis that the concern is not a credible event for RESAR SP/90, or poses insignificant public risk.
Technical resolution must be fully demonstrated by the applicant's submittal.
l A comitment to resolve the issue at some tire in the future, or generalized resolution goals without detailed technical justification is not acceptable.
If the applicant proposes resolution through some assessmeiiE or evaluation progran which iequires a more corplete design, complete information and l
technical justification must be provided for the program. An exarple of such an issue would be US! A17. Systems Interaction.
Even though the physical acts asso:tated with plant walk down1 cannot be conducted at thi: stage, it is conceivable that the applicant would propose an acceptable program for
(
resolving this issue. Such a program would have to be corplete and robust, i
and provide full direction for inpletrenting the resolution actions, i
Hitigation in lieu of prevention sheuld only be accepted as a solution when r
prevention can not be satisfactorily demonstrated and/or when mitigation is the subject of the US!/GSI. Because there are no SRP guidelines in these satters, engineering judgerent rust be relied upon in the determination of acceptability of the applicant's proposed resolutions.
For general guidance, we can refer to sore specific issues in the initial Westinghouse US!/GS! submittal (Hay 1988). The treata,ent of !ssue 23, Reactor Coolant Pump Seal Failures. appears complete. Auernately, the discusrion on US! A17 prcmises future actions / studies but does not provide sufficient technical basis to deternine satisfactory resolution of the systen interaction issues.
t i
l l
l
3 For those USIs and redium and high priority GSIs for which resolutuh has been a) proved by the staff, the technical reviewer should have already <!ctermined tae acceptability of the design during the norral SRP review. Hetneos of generic resolution take the fom of a change in Fegulatory Guides W the SRP, or issuance of an IE Bulletin, NUREG, Generic Letter, or other method of written connunication.
For your infomation, I have provided a listing of these issues (by branch) that are applicable to RESAR SP/90 and the method of staff generic resolution in Enclosure 2 of this package, i
Issues considered not to be applicable to RESAR SP/90 (Enclosure 3) should be reviewed by the staff to assure agreement regarding the non. applicability of the issues. The project manager should be notified of any areas of disagreement as soon as practicable to ensure a quick response from the applicant should a response be required.
Definitions of tems used in the enclosures are provided as an attachrent to this document. The enclosures are based on infomation obtained from Supplement 7 to NUREG 0933 (March 1988) and the 3rd quarter GIMCS report, dated August 1, 1988.
Contents of SER l
In general, the staff should review the apolicant's update to Module 2 (using the above guidelines), request additional information, if necessary and write a brief SER on each of the applicable issues for which saneric resolution has not been detemined (Enclosure 1). All of these SERs will be corpiled into an AppendiF to the SER supporting the PDA for RESAR SP/90. These SERs shculd be i
in narrative form, and include the following information' 1.
A brief staterent of the concern l
2.
status of the generic resolution of the cencern i
3.
A trief description of Westinghouse's method of resolution, and 4
A discussicn of the acceptability of the resolution, providing a basis for ycur conclusions, r
No additional SEPs on the remaining applicable issues (Enclosure 2) are required, since these should have been reviewed (and, if necessary, addressed) f during the nomal SRP review. However, we request you review Enclosure 2 to t
ensure those iters in your assigned area have been reviewed and found
[
acceptable (or ocn. acceptable), and provide a general staterent to that effect.
[
I
October 27, gges j
e s.
l
' l Please provide me with your coments within two weaks of receipt of this memo.
l If you iave any questions concerning this matter, call the project manager, i
T. J. Kenyon at X21120.
[
l
/s/
Charles L. Miller. Director Standardization and Non-Pomer Reactor Project Directorate Division of Reactor Projects !!!, IV, Y and Special Projects, NRR
Enclosure:
As stated cci T. Hurley C. Y. Cheng J. Shao D. Critchfield F. Miraglia T. Marsh G. Holahan B. Sheron W. Morris G. Johnson, EMTB J. Raval, PSLB L. Reiter, ESGB J. Rajan, EMEB N. Wagner, PSLB J. Joyce, SICB J. Bramer H. Walker, PSLB J. Knight, SELB G. Staley, ESGB C. Liang, SRXB C. Nichols, PSLB G. Giese-Koch, ESCB F. Skopec, PRPB R. Jones, SRXB
- 5. Chan, ESGB
!. Spickler, PRPB
- 0. Lynch, PRPB J. Winge,y,CEB J. Spraul, LQAB F. Hawkins, LQAB E
D. Not ECEB G. La)inski, LHFB D. Eckenrode, LHFB F. Burrows, SICB R. Duse R$GB E. Ctelliah, RES, PRAB H. Trehan, SELB B. Mendelson, R$GB G. Arlotto J. Lee, PSLD A. Gill, PSLB L. Rubenstein
- 9. Hazleton, EMTB P.T. Kuo. EMEB D. Shum, PSLB G. Vissing W. Long D. Scaletti R. Emrit, RES G. Sege, R25 G. Bagcht W. Regan T. King, RES C. McCracken S. Newberry F. Rosa L. J. Cunningham J. Craig M. W. Hodges S. Weiss R. Erickson NRC PDR6 PDSNP Reading TKenyon EHylton LRubenstein Cl4 e
PDShb PD)
D PDSNP ADRFr Etylton TKe yon:cw CMiller LRubenste n M
10/.] /88 10/f/88 1046/88 10/t//88 I