MONTHYEARML20059J7501990-09-0707 September 1990 Requests RESAR SP/90 Technical Reviewer Support During Listed ACRS Meetings.Full Committee Meeting Scheduled for 901004,05 or 06 ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20246B8331989-07-0505 July 1989 Notification of 890714 Meeting W/Util in Rockville,Md to Discuss Severe Accident & Licensing Issues on RESAR SP/90 ML20236B3751989-03-0909 March 1989 Forwards to Wj Johnson,Forwarding NRC Draft SER Re RESAR SP/90 on Listed Technical Areas.Ltrs Provided to ACRS Members of Progress in Reviewing Pda Application ML20236D5751989-03-0909 March 1989 Forwards to Wj Johnson,Forwarding NRC Draft SER Re RESAR SP/90 on Listed Technical Areas.Ltrs Provided to Inform CRGR Members of Progress in Reviewing Pda Application ML20236A9721989-03-0707 March 1989 Forwards Feb 1989 Status Rept Re Current Review Milestones for Each Std Plant Project ML20196B6081988-11-29029 November 1988 Forwards Status Rept for Nov 1988 Re Std Plant Design Technical Reviews ML20195J3231988-11-18018 November 1988 Provides Responses Re Review of Resolution of USIs & Generic Safety Issues for RESAR SP/90,per 881027 Request ML20195D6891988-10-27027 October 1988 Proposes Review Responsibilities & Review Guidelines Re Resolution of USIs & Generic Safety Issues for RESAR SP/90. Encls Provide Matrices Delineating Proposed NRR Review Responsibilities for All Applicable USIs ML20195B6131988-10-26026 October 1988 Forwards Status Rept on Std Plant Design Technical Reviews ML20154E4051988-09-14014 September 1988 Forwards Status Rept for Aug 1988 Re Std Plant Design Technical Reviews ML20207E9601988-08-0909 August 1988 Forwards Status Rept for Jul Re Current Review Milestones for Each Std Plant Project.Requests Notification within 1 Wk of Receipt of Memo If Problems W/Input Dates Encountered ML20207E1421988-07-29029 July 1988 Forwards Proprietary BNL Repts Re Probability Safety Study for RESAR SP/90.Repts Withheld (Ref 10CFR2.740) ML20150C7751988-07-0101 July 1988 Forwards Status Rept on Std Plant Design Technical Reviews ML20154R5161988-06-0202 June 1988 Foorwards May Status Rept Re Current Review Milestones for Std Plants (Epri,Advanced Bwr,Resar SP/90 & C-E Sys 80+) ML20154F9981988-05-17017 May 1988 Notification of 880608 Meeting W/Westinghouse in Rockville, MD to Discuss QA Program Intended for Application to RESAR SP/90 & Westinghouse Responses to NRC Request for Addl Info ML20151W3301988-04-25025 April 1988 Forwards Apr 1988 Status Rept Re Current Review Milestones for Each Std Plant Design.Problems in Meeting Input Dates Should Be Reported within 1 Wk of Memo Receipt ML20151L3341988-04-14014 April 1988 Requests Draft SER Discussing Acceptability of Applicable design-specific Resolutions of Listed Generic Issues No Later than 880516 ML20148H4691988-03-23023 March 1988 Notification of 880331 Meeting W/Bnl & Westinghouse in Monroeville,Pa to Discuss Results of NRC Review of PRA for RESAR SP/90 ML20148J8961988-03-23023 March 1988 Forwards Mar 1988 Status Rept Re Std Plant Design Technical Reviews ML20148H4711988-03-22022 March 1988 Forwards BNL Draft Rept, Independent Assessment of Severe Accident Risks for Westinghouse Advanced PWR Design (SP/90). Encl Withheld (Ref 10CFR2.740) ML20150D5891988-03-21021 March 1988 Forwards Wj Johnson of Westinghouse Mar 1988 Ltr Forwarding Draft SER on front-end Portion of Module 16, Probabilistic Safety Study, to Inform of Progress of Review of Pda Application.W/O Encls ML20148D7511988-03-21021 March 1988 Forwards Author Mar 1988 Ltr to Wj Johnson Transmitting Draft SER on front-end Portion of Module 16, Probabilistic Safety Study of Pda Application for RESAR SP/90 Design. Rest of Pda Application Under Review.W/O Encl ML20149L9901988-02-19019 February 1988 Forwards Feb Status Rept Re Current Review Milestones for Std Plant Projects (Epri,Abwr,Resar SP/90 & C-E Sys 80+) ML20149M0251988-01-25025 January 1988 Forwards Revised Std Plant Review Program Plan. Four Standardization Projects & Expected Westinghouse Advanced Passive Plant Design Listed.Issuance of Revised Program Plan Constitutes Completion of Task Assignment 3 Per 871116 Memo ML20207L4251988-01-25025 January 1988 Forwards Info Re Advanced LWR Performance Goals.Info Assembled After Discussion W/Knowledgeable NRC Staff Members & During 880119 Meeting W/Erpi Representatives ML20148C9131988-01-19019 January 1988 Forwards Status Rept on Std Plant Design Technical Reviews for Jan 1988.Problems W/Meeting Listed Input Dates Requested within 1 Wk of Memo Receipt ML20237B3631987-12-14014 December 1987 Forwards Review Status Repts on GE Advanced Bwr,Westinghouse RESAR SP/90,C-E Sys 80+ & EPRI Advanced Lwr.Repts Will Be Issued Periodically Re Current Review Milestone for Each Std Plant Project.Expected Input Date Discussed ML20236J1531987-11-0202 November 1987 Advises That Technical Reviewers for Standardized LWR Plants Should Be Reminded of Responsibility for Assuring That safety-related Structures,Sys & Components within Scope of Review Classified as safety-related by Applicant ML20236J2401987-10-28028 October 1987 Notification of 871030 Meeting W/Nrc in Bethesda,Md to Discuss Westinghouse PWR Licensing Initiatives.Agenda Encl ML20235K8271987-09-29029 September 1987 Forwards Final List of Review Assignments Including Currently Assigned Review Staff,Former Reviewers,Psar Sections Listed by Branch & Staff Members & Listing of Draft SERs Received to Date ML20235K6431987-09-29029 September 1987 Notification of 871119 Meeting W/Westinghouse in Monroeville,Pa to Discuss Engineering & Human Factors Design Aspects of Westinghouse Advanced Control Room That Will Be Utilized in RESAR SP/90 Facility Design ML20237F8671987-08-27027 August 1987 Notification of Rescheduled 870903 Meeting to 870910 W/Westinghouse in Bethesda,Md to Provide NRC W/Background Info Re RESAR SP/90 Design.General Layout of Nuclear Power Block & Unique Features of Design to Be Discussed ML20237K9001987-08-25025 August 1987 Notifies of Meeting W/Westinghouse to Discuss General Layout & Unique Plant Design Features Due to Large Number of Staff Members Assigned to Review RESAR SP/90.Meeting Will Be Similar to June 1987 Meeting ML20237K9121987-08-25025 August 1987 Notification of 870903 Meeting W/Westinghouse in Bethesda,Md to Discuss RESAR SP/90 Design,Including General Layout of Nuclear Power Block & Unique Design Features ML20215M1261987-06-22022 June 1987 Discusses Review of Draft Sandia Rept, Observations on Sabotage Protection Capabilities of Advanced Pwr. Use of Relative Risk Techniques to Determine If Design Has Sabotage Weak Links Encouraged ML20215H3891987-06-18018 June 1987 Submits Addl Questions for Westinghouse Re Modules 2 & 3 of RESAR-SP/90 Preliminary Design Approval Application on Design Features to Reduce Sabotage Vulnerability ML20214P7881987-05-27027 May 1987 Forwards Notification of Meeting on 870603 to Discuss RESAR SP-90.Westinghouse Will Be Making Presentation Re General Layout & Unique Features of Plant Design.W/O Encl ML20214M8711987-05-21021 May 1987 Notification of 870603 Meeting W/Westinghouse in Bethesda,Md to Provide NRC W/Background Info Re RESAR SP/90 Design, Including General Layout of Nuclear Power Block & Unique Design Features ML20213H0521987-05-12012 May 1987 Requests Assignment of Technical Reviewers to Westinghouse Oct 1983 Advance PWR (RESAR SP/90) Application.Brief History & Status of Project,Tentative Review Schedule & Listing of Issued Sers,Former Reviewers & PSAR Modules Encl ML20206B6771987-04-0707 April 1987 Forwards 870319 Memo Detailing Status of Westinghouse RESAR-SP/90 Review & Safety Evaluations.W/O Encls ML20215G2641987-03-19019 March 1987 Submits Assessment of Status of Review for Westinghouse RESAR-SP/90 Design,Per 870310 Request.Most Technical Matl Needed for Review Submitted.Review Could Be Completed within Several Months If Priority Established IA-87-309, Submits Assessment of Status of Review for Westinghouse RESAR-SP/90 Design,Per 870310 Request.Most Technical Matl Needed for Review Submitted.Review Could Be Completed within Several Months If Priority Established1987-03-19019 March 1987 Submits Assessment of Status of Review for Westinghouse RESAR-SP/90 Design,Per 870310 Request.Most Technical Matl Needed for Review Submitted.Review Could Be Completed within Several Months If Priority Established ML20206J0821986-06-24024 June 1986 Notification of 860708 Meeting W/Westinghouse in Bethesda,Md to Outline Content & Discuss Format for Module 15 of RESAR-SP/90.Module 15 Will Contain Section 18 & Portions of Section 7 of PSAR Re Human Factors Issues & Control Room ML20155E0091986-04-10010 April 1986 Notification of 860423-24 Meetings W/Westinghouse in Monroeville,Pa to Discuss Preliminary Questions on Instrumentation & Control Section of Module 9 of RESAR-SP/90.Agenda Encl ML20155D9991986-04-10010 April 1986 Notification of 860423-24 Meetings W/Westinghouse in Monroeville,Pa to Discuss Preliminary Questions on Instrumentation & Control Section of Module 7 of RESAR-SP/90.Agenda Encl.W/O Encl ML20138R9501985-11-14014 November 1985 Notification of 851119-20 Meetings W/Westinghouse in Monroeville,Pa to Discuss PRA Submitted in RESAR-SP/90 ML20209G6011985-09-16016 September 1985 Notification of 850924 Meeting W/Westinghouse in Bethesda,Md to Discuss Questions on RESAR SP/90,Sections 1 & 15 of Module 1, Primary Side Safeguard Sys 1990-09-07
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20059J7501990-09-0707 September 1990 Requests RESAR SP/90 Technical Reviewer Support During Listed ACRS Meetings.Full Committee Meeting Scheduled for 901004,05 or 06 ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20246B8331989-07-0505 July 1989 Notification of 890714 Meeting W/Util in Rockville,Md to Discuss Severe Accident & Licensing Issues on RESAR SP/90 ML20236B3751989-03-0909 March 1989 Forwards to Wj Johnson,Forwarding NRC Draft SER Re RESAR SP/90 on Listed Technical Areas.Ltrs Provided to ACRS Members of Progress in Reviewing Pda Application ML20236D5751989-03-0909 March 1989 Forwards to Wj Johnson,Forwarding NRC Draft SER Re RESAR SP/90 on Listed Technical Areas.Ltrs Provided to Inform CRGR Members of Progress in Reviewing Pda Application ML20236A9721989-03-0707 March 1989 Forwards Feb 1989 Status Rept Re Current Review Milestones for Each Std Plant Project ML20196B6081988-11-29029 November 1988 Forwards Status Rept for Nov 1988 Re Std Plant Design Technical Reviews ML20195J3231988-11-18018 November 1988 Provides Responses Re Review of Resolution of USIs & Generic Safety Issues for RESAR SP/90,per 881027 Request ML20195D6891988-10-27027 October 1988 Proposes Review Responsibilities & Review Guidelines Re Resolution of USIs & Generic Safety Issues for RESAR SP/90. Encls Provide Matrices Delineating Proposed NRR Review Responsibilities for All Applicable USIs ML20195B6131988-10-26026 October 1988 Forwards Status Rept on Std Plant Design Technical Reviews ML20154E4051988-09-14014 September 1988 Forwards Status Rept for Aug 1988 Re Std Plant Design Technical Reviews ML20207E9601988-08-0909 August 1988 Forwards Status Rept for Jul Re Current Review Milestones for Each Std Plant Project.Requests Notification within 1 Wk of Receipt of Memo If Problems W/Input Dates Encountered ML20207E1421988-07-29029 July 1988 Forwards Proprietary BNL Repts Re Probability Safety Study for RESAR SP/90.Repts Withheld (Ref 10CFR2.740) ML20150C7751988-07-0101 July 1988 Forwards Status Rept on Std Plant Design Technical Reviews ML20154R5161988-06-0202 June 1988 Foorwards May Status Rept Re Current Review Milestones for Std Plants (Epri,Advanced Bwr,Resar SP/90 & C-E Sys 80+) ML20154F9981988-05-17017 May 1988 Notification of 880608 Meeting W/Westinghouse in Rockville, MD to Discuss QA Program Intended for Application to RESAR SP/90 & Westinghouse Responses to NRC Request for Addl Info ML20151W3301988-04-25025 April 1988 Forwards Apr 1988 Status Rept Re Current Review Milestones for Each Std Plant Design.Problems in Meeting Input Dates Should Be Reported within 1 Wk of Memo Receipt ML20151L3341988-04-14014 April 1988 Requests Draft SER Discussing Acceptability of Applicable design-specific Resolutions of Listed Generic Issues No Later than 880516 ML20148H4691988-03-23023 March 1988 Notification of 880331 Meeting W/Bnl & Westinghouse in Monroeville,Pa to Discuss Results of NRC Review of PRA for RESAR SP/90 ML20148J8961988-03-23023 March 1988 Forwards Mar 1988 Status Rept Re Std Plant Design Technical Reviews ML20148H4711988-03-22022 March 1988 Forwards BNL Draft Rept, Independent Assessment of Severe Accident Risks for Westinghouse Advanced PWR Design (SP/90). Encl Withheld (Ref 10CFR2.740) ML20150D5891988-03-21021 March 1988 Forwards Wj Johnson of Westinghouse Mar 1988 Ltr Forwarding Draft SER on front-end Portion of Module 16, Probabilistic Safety Study, to Inform of Progress of Review of Pda Application.W/O Encls ML20148D7511988-03-21021 March 1988 Forwards Author Mar 1988 Ltr to Wj Johnson Transmitting Draft SER on front-end Portion of Module 16, Probabilistic Safety Study of Pda Application for RESAR SP/90 Design. Rest of Pda Application Under Review.W/O Encl ML20149L9901988-02-19019 February 1988 Forwards Feb Status Rept Re Current Review Milestones for Std Plant Projects (Epri,Abwr,Resar SP/90 & C-E Sys 80+) ML20149M0251988-01-25025 January 1988 Forwards Revised Std Plant Review Program Plan. Four Standardization Projects & Expected Westinghouse Advanced Passive Plant Design Listed.Issuance of Revised Program Plan Constitutes Completion of Task Assignment 3 Per 871116 Memo ML20207L4251988-01-25025 January 1988 Forwards Info Re Advanced LWR Performance Goals.Info Assembled After Discussion W/Knowledgeable NRC Staff Members & During 880119 Meeting W/Erpi Representatives ML20148C9131988-01-19019 January 1988 Forwards Status Rept on Std Plant Design Technical Reviews for Jan 1988.Problems W/Meeting Listed Input Dates Requested within 1 Wk of Memo Receipt ML20237B3631987-12-14014 December 1987 Forwards Review Status Repts on GE Advanced Bwr,Westinghouse RESAR SP/90,C-E Sys 80+ & EPRI Advanced Lwr.Repts Will Be Issued Periodically Re Current Review Milestone for Each Std Plant Project.Expected Input Date Discussed ML20236J1531987-11-0202 November 1987 Advises That Technical Reviewers for Standardized LWR Plants Should Be Reminded of Responsibility for Assuring That safety-related Structures,Sys & Components within Scope of Review Classified as safety-related by Applicant ML20236J2401987-10-28028 October 1987 Notification of 871030 Meeting W/Nrc in Bethesda,Md to Discuss Westinghouse PWR Licensing Initiatives.Agenda Encl ML20235K8271987-09-29029 September 1987 Forwards Final List of Review Assignments Including Currently Assigned Review Staff,Former Reviewers,Psar Sections Listed by Branch & Staff Members & Listing of Draft SERs Received to Date ML20235K6431987-09-29029 September 1987 Notification of 871119 Meeting W/Westinghouse in Monroeville,Pa to Discuss Engineering & Human Factors Design Aspects of Westinghouse Advanced Control Room That Will Be Utilized in RESAR SP/90 Facility Design ML20237F8671987-08-27027 August 1987 Notification of Rescheduled 870903 Meeting to 870910 W/Westinghouse in Bethesda,Md to Provide NRC W/Background Info Re RESAR SP/90 Design.General Layout of Nuclear Power Block & Unique Features of Design to Be Discussed ML20237K9001987-08-25025 August 1987 Notifies of Meeting W/Westinghouse to Discuss General Layout & Unique Plant Design Features Due to Large Number of Staff Members Assigned to Review RESAR SP/90.Meeting Will Be Similar to June 1987 Meeting ML20237K9121987-08-25025 August 1987 Notification of 870903 Meeting W/Westinghouse in Bethesda,Md to Discuss RESAR SP/90 Design,Including General Layout of Nuclear Power Block & Unique Design Features ML20215M1261987-06-22022 June 1987 Discusses Review of Draft Sandia Rept, Observations on Sabotage Protection Capabilities of Advanced Pwr. Use of Relative Risk Techniques to Determine If Design Has Sabotage Weak Links Encouraged ML20215H3891987-06-18018 June 1987 Submits Addl Questions for Westinghouse Re Modules 2 & 3 of RESAR-SP/90 Preliminary Design Approval Application on Design Features to Reduce Sabotage Vulnerability ML20214P7881987-05-27027 May 1987 Forwards Notification of Meeting on 870603 to Discuss RESAR SP-90.Westinghouse Will Be Making Presentation Re General Layout & Unique Features of Plant Design.W/O Encl ML20214M8711987-05-21021 May 1987 Notification of 870603 Meeting W/Westinghouse in Bethesda,Md to Provide NRC W/Background Info Re RESAR SP/90 Design, Including General Layout of Nuclear Power Block & Unique Design Features ML20213H0521987-05-12012 May 1987 Requests Assignment of Technical Reviewers to Westinghouse Oct 1983 Advance PWR (RESAR SP/90) Application.Brief History & Status of Project,Tentative Review Schedule & Listing of Issued Sers,Former Reviewers & PSAR Modules Encl ML20206B6771987-04-0707 April 1987 Forwards 870319 Memo Detailing Status of Westinghouse RESAR-SP/90 Review & Safety Evaluations.W/O Encls ML20215G2641987-03-19019 March 1987 Submits Assessment of Status of Review for Westinghouse RESAR-SP/90 Design,Per 870310 Request.Most Technical Matl Needed for Review Submitted.Review Could Be Completed within Several Months If Priority Established IA-87-309, Submits Assessment of Status of Review for Westinghouse RESAR-SP/90 Design,Per 870310 Request.Most Technical Matl Needed for Review Submitted.Review Could Be Completed within Several Months If Priority Established1987-03-19019 March 1987 Submits Assessment of Status of Review for Westinghouse RESAR-SP/90 Design,Per 870310 Request.Most Technical Matl Needed for Review Submitted.Review Could Be Completed within Several Months If Priority Established ML20206J0821986-06-24024 June 1986 Notification of 860708 Meeting W/Westinghouse in Bethesda,Md to Outline Content & Discuss Format for Module 15 of RESAR-SP/90.Module 15 Will Contain Section 18 & Portions of Section 7 of PSAR Re Human Factors Issues & Control Room ML20155E0091986-04-10010 April 1986 Notification of 860423-24 Meetings W/Westinghouse in Monroeville,Pa to Discuss Preliminary Questions on Instrumentation & Control Section of Module 9 of RESAR-SP/90.Agenda Encl ML20155D9991986-04-10010 April 1986 Notification of 860423-24 Meetings W/Westinghouse in Monroeville,Pa to Discuss Preliminary Questions on Instrumentation & Control Section of Module 7 of RESAR-SP/90.Agenda Encl.W/O Encl ML20138R9501985-11-14014 November 1985 Notification of 851119-20 Meetings W/Westinghouse in Monroeville,Pa to Discuss PRA Submitted in RESAR-SP/90 ML20209G6011985-09-16016 September 1985 Notification of 850924 Meeting W/Westinghouse in Bethesda,Md to Discuss Questions on RESAR SP/90,Sections 1 & 15 of Module 1, Primary Side Safeguard Sys 1990-09-07
[Table view] |
Text
I .
.(.
September 7, 1990 Docket No. 50-601 MEMORANDUM FOR: Those On Attached List-FROM: Loren F. Donate 11, Project Manager Standardization Project Directorate Division of Reactor Projects - III, 1 IV, Y and Special Projects
SUBJECT:
- RESAR SP/90 TECHNICAL REVIEWER SUPPORT DURING UPCOMING :1 ACRS MEETINGS The final safety; evaluation report has been submitted to the Advisory Comittee on Reactor Safeguards (ACRS) for review.. The intent is to meet with the:subcomittee on September 20, 1990, to discuss the background of this 1 review'and address any questions raised by the'suucomittee, i An additional meeting with the full comittee will be required to request-their letter _to the Commission related to the RESAR;SP/90. The full comittee j meeting willLtake place on October 4, 5 or 6,1990. !
Further meeting details will be provided when they are received. 'I am not-anticipating tae need for presentations by any_ staff member other than.myself-for these meetings, however, I _am asking for reviewer support to! address -the many anticipated questions raised by the- ACRS.
The duration of the meetings is uncertain at this time. . I.have asked for a- !
half day for the subcomittee but_ realistically-anticilate a whole day will be ;
required. Because of the nature-of this meeting I pro) ably will not be able~ !
to provide a firm hour-by-hour schedule for the meeting.: For your planning; y purposes you should expect that the technical reviewer will-be in attendance- l' for the entire day.
I appreciate your support in this matter. Please let me know if I can provide ,!
any further clarification.
OriginalSigned By:
9009200152 900907I'", Loren F. Donatell, Project Manager- !
PDR ADOCK 05000601.:
A ' Standardization Project Directorate :
PNUN Division of Reactor Projects - III, i IV, Y and Special Projects -
j i I JJoyce THurley MRubin (OGC) 2 NRC PDR .CYLiang FMiragila PMcKee PUST R/F DShum JPartlow LCunningham-PShea CHichols DCrutchfield AGody LDonatell DNotley JWilson JWermiel Schan' BMendelsohn CCheng BSheron GJohnson JLee GBagebi MCunningham- ,
JBrammer JWiggington SNewberry WTravers i NTrehan JSpraul FRosa TWambach RCorreia EChelliah, CMcCracken . DScaletti ;
LMarsh WRussell RJones AHsia PDST:
PShea PDST:
LDo :cw D:PDST CHillekp gy 09/ /0 09/ 90 09/1/90 t DOCUMENT NAME: MEM0 FOR UPCOMING ACRS MTG
(( '\A0
- - . - - --_ - .-- - _ - . . - - . . ~ . . - - . . - . _ . - . -
.\ umTEo STATES NUCLEAR REGULATORY COMMISSION i [ S i &
I wASHwof oN,0, C. M66 I September 7. 1990
%....+ j Docket No. 50-601 MEMORANDUM F0ft: Those On Attached List l Loren F. Donate 11,' Project Manager l FROM:
l Standardization Project Directorate l
Division of Reactor Projects - III, ;
IV, Y and Special Projects ;
SUBJECT:
RESAR SP/9rl TECHNICAL REVIEWER SUPPORT DURING UPCOMING ACR$ MEET *,NGS I
i The-final sefety evaluation report has been submitted to the Advisory '
Constittee on Reactor Safeguards (ACRS) for review. The intent is to meet with the subcontr.ittee on September 20, 1990, to discuss the background of this '
review and address any questions raised by the subcomittee.
An additional meeting with the full comittee will be required to request.
their letter to the Comission related to the RESAR SP/90. The full comittee ;
meeting will take place on October 4, 5 or 6,1990.
- Further meeting details will be provided when they are received. .I am not
.eting the need for presentations by any staff member other than syself to, snese meetings, however I am asking for reviewer support to address the many antictpted questionr eised by the ACRS.
The duration of the meetic,gs is uncettua at this time. I have asked for a '
half day for the subcomittee but realistically anticipate a whole day will be required. Because of the nature of this meeting I probably will not be able
- o provide a finn hour-by-hour schedule for the meeting. For your p1&nning '
purposes you should expect that the technical reviewer will be in attendance for the entire day.
I cppreciate your support in this matter. Please let me if I can provide any further clarification. ,
64G6r4 :
Loren F. Donate 11, Project Manager l Standardization Project Directorate D wision of Reactor Projects - III, IV, V and Special Projects l
I
. r
. , . - , . , , - _ , , . . _ , _ . . . . _ , . . _ - . _ . . _ . , _ _ _ , . , _ . . . - . . _ _ _ _ . . . , , . , _ , . . _ . . ~ . _ . , . . _ . ,_ . -- . . . .
+
Acdressees - Memorandum dated September 07. 1990 '
l James E. Richardson Director, DET, 8H3 '
Ashok C. Thadani, Director, DST, SE2 Brian K. Grimes Director, DRIS, 9A2 Frank J. Congel,, Director DREP,10E2 Jack W. Roe, Director, DLPQ, IONS .
Charles E. Rossi, Director, DOEA, 11E4 '
l Prian W. Sheron, Director, RES/DSR, NLS007 l
I r