August 25, 1987
' Docket No. 50-601
{
MEMORANDUM T0: Distribution (See next page) 1 FROM:
Thomas J. Kenyon, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects, NRR
SUBJECT:
MEETING ON RESAR SP/90 Due to the large number of new staff that have been recently assigned to review RESAR SP/90, I have set up another meeting with Westinghouse to discuss the general layout and unique features of the plant design (see attached i
meeting notice). This meeting will be similar to the one held in June 1987.
If you have been recently assioned to this project or missed the earlier meeting, I recommend you attend this general' introduction to the plant design if possible.
If you have any questions, I can be reached at X28206.
origina'i signed by Thomas J. Kenyon, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects, NRR
Enclosure:
As stated DISTRIBUTION:
(DocketFile.1 NRC"PDR PDSNP Reading TKeyon EHytlon LRubenstein
).
P)fh (DSIG 6}on LRubenstein T(6)A/87 08/g/87 on 08/pl/87 08 8708270336 870G25 PDR ADOCK 05000601 A
August-25, 1987
- t. -.
f l
- I
. Docket No. 50-601 o
MEM0MNDUM TO: Distribution (See'next page)
FROM:
Thomas J. Kenyon, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects, NRR
SUBJECT:
'liEETING ON RESAR SP/90
/
Du to the'1arge number of new staff that have been recently assigned to review RESAR SP/90, I have set.up another meeting with Westinghouse to discuss the general layout and unique features of the plant design (see attached meeting notice).. This meeting will be similar to the one held in June 1987.
If you have been recently assigned to this project or missed the earlier 1
meeting, I recommend you attend this general introduction to the plant design j
if.possible.. If you have any questions I can be reached at X28206.
I original aigned by
'"~ ^
Thomas J. Kenyon, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects, NRR
Enclosure:
As stated DISTRIBUTION:
l Docket File NRC PDR PDSNP Reading TKeyon EHytlon LRubenstein
,7 P
Pp
[D
(
on W
on LRubenstein 08/pl/87 08
/87 08/gf87 l
i i
J
e, pH OIG 7
d,'
O UNITED STATES g
NUCLEAR REGULATORY COMMISSION' e
ff $;
-Q' W ASHINGTON, D. C. 20555
/
At)G 2 51987 N..+
Lf Decket'Wo. 50-601 5
MEMORANDUM T0: Distribution (See next page)
(fhi:
Thomas J. Kenyon, Project Manager q
Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects, NRR
SUBJECT:
MEETING ON RESAR SP/90 Due to the large number of new staff that have been recently assigned to
. review RESAR SP/90, I have set up another meeting with Westinghouse to discuss the general layout and unique features of the plant design (see attached meeting notice). This meeting will be similar to the one held in June 1987.
If you have been recently assigned to this project or missed the earlier meeting, I recommend you attend this general introduction to the plant design if possible.
If you have any questions, I can be. reached at X28206.
l l'
l l
omas J.
nyon,. Project Manager Standard ation and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects, NRR
)
Enclosure:
As stated
1 4
o.
t, _
L 4
(
s V
t L DISTRIBUTION:J C..Y. Cheng G. Johnson D. Sellers 3
T. Marsh
+
J.. Bramer
~-t S. flou V
~
. (L ' 83gchi.
.1.'? Rei tir-i,~
G. Giera,hhch-S. Chan: \\c j;,:
R. Pichumani xJ' G. Staley
-4 C. McCracken t
t J. Wing
[
a D. Notley
't J. Joyce
- F. Bijrrows -
1 4
C
.\\
FiRosa y.
J. Knight i-
?
't N. Trshe+
s,,,{.
, '4
~~
by d'-
J. Craig.
- A e
.h Wermiel D. Schum G4'
-(
s.
.kudricks
'.s a.. a v
J.'W. Hodges
- h. -
M.
i,
- ~ <
k R. Fell A.-Gill O
1 J. Lee h
N C
J. Raval-
?-
~
s s
N. Wagner V
- IN ks
.s H. Walker S
R. Jones S. Diab
?
A. Beech s
F. flaskins J. Spraul 3
W. Regan S. Wiss G. lapinsky w 3, R. Erick. son
,i R. Dubev B. Menecisohn J. Murphy H. Vandermolen i
B. Hardir.
'I R. Barrett A. El-Bassioni S. Long g
L-T. Dorian l
L. Rubenstein s
P. Leech ',
N,'
G. Vissing 1
at i
s