Foorwards May Status Rept Re Current Review Milestones for Std Plants (Epri,Advanced Bwr,Resar SP/90 & C-E Sys 80+)
ML20154R516
Person / Time
Site: 05000605, 05000601
Issue date: 06/02/1988
From: Rubenstein L
Office of Nuclear Reactor Regulation
To: Congel F, Partlow J, Shao L
Office of Nuclear Reactor Regulation
References
PROJECT-669R, PROJECT-675R, PROJECT-676R NUDOCS 8806070418
Download: ML20154R516 (14)


Text

,

s d ifGy

'o UNITED STATES

^.

5 8

}

AUCLEAR REGULATORY COMMISSION h

j WASHINGTON, D C. 20555 9g,.... +,o#

June 2, 1988 Docket No. 50-601 and 50-605 Project Nos. 669, 675, and 676 MEMORANDU!i FOR:

L. Shao, Director Division of Engineering and System Technology, NRR J. Partlow, Director Division of Reactor Inspection and Safeguards, NRR t

F. Congel, Director Division of Radiation Protection and Emergency Preparedness, NRR J. Roe, Director Division of Licensee Performance and Quality Evaluation, NRR R. W. Houston, Acting Director Division of Reactor Accident Analysis, RES FROM:

Lester S. Rubenstein, Acting Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, Y and Special Projects, NRR

SUBJECT:

STATUS REPORT ON STANDARD PLANT DESIGN TECHNICAL REVIEWS Attached is the May status report concerning the current review milestones for each of the standard plant projects (EPRI, ABWR, RESAR SP/90, and CE l

Systec 80+).

Note the "Due Date" column reflects dates established in the January 25, 1988 "Revised Program Plan For Standard Plant Reviews" or dates for which modifica-tion was agreed to by PDSNP and the review branch.

MS6ISc!SkR2 R

CONTACT:

T. Kenyon NRR/PDSNP Ext. 21120 i

~

l The column "Expected Input Date" reflects input from appropriate technical branch management. Category 1 items have been discussed with the appropriate Assistant Directors.

I request any problems in meeting these input dates be l

identified to me by the appropriate Assistant Director within a week of receipt of this memo.

DN Lester S. R enstein, Acting Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, Y and Special Projects, NRR

Enclosure:

As stated cc:

T. Murley J. Sniezek F. Miraglia J. Richardson C. Y. Cheng L. B. Marsh C. McCracken A. Thadani J. Joyce J. Mauk F. Rosa J. Craig M. W. Hodges B. Grimes R. Erickson D. Matthews R. Barrett L. Cunningham H. Miller A. Beach W. Regan, Jr.

J. Murphy G. Bagchi

,,w-----a 4-a

June 2, 1988 The column "Expected Input Date" reflects input from apfropriate technical branch management.

Category 1 itcms have been discussed with the appropriate Assistant Directors.

I request any problems in meeting _these input dates be identified to me by the appropriate Assistant Director within a week of receipt of this memo.

original signed by Lester S. Rubenstein, Acting Direct Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, Y and Special Projects, NRR

Enclosure:

As stated cc:

T. Murley J. Sniezek F. Miraglia J. Richardson C. Y. Cheng L. B. Marsh C. McCracken A. Thadani J. Joyce J. Mauk F. Rosa J. Craig M. W. Hodges B. Grimes R. Erickson D. Matthews R. Barrett L. Cunningham H. Miller A. Beach W. Regan, Jr.

J. Murphy G. Bagchi DISTRIBUTION:

Docket-File ' j EHylton ADR4 NRC PDK' ~

P(eech SNewberry PDSNP Reading DScaletti GVissing DCrutchfield LRubenstein TXen ' n PDSjP v A

P EU3 n:cw LE ein 05f7 88

@// /88

Date:

May 27, 1988 REVIEW STATUS REPORT ON WESTINGHOUSE RESAR SP/90 PDA REVIEW Expected Division /

Due Input Branch Reviewer Modules Subject

  • Milestone Date Date Cat.**

Coments DEST /EMTB Johnson 1, 4, 5, 688, 7, Materials Engineering Draft SER 3/31/88 4/29/88 4

Complete 10 to P.M.

5/5/88 DEST /EMEB Rajan/Bramer***

1,4,5,7, Mechanical Engineering Draft SER 7/01/880 7/01/88 3

Awaiting to P.M.

Input from W -

Expected 5/27/88 DEST /ESGB Staley 3

Hydrology Draft SER 3/31/88 3/30/88 4

Complete to P.M.

j Giese-Koch 3

Geology & Seismology Draft SER 3/31/88 3/30/88 4

Complete to P.M.

Chan 7

Civil Engineering Draft SER 4/c9/88 4/28/88 4

Complete to P.M.

o See September 29, 1987 memo for complete listing of review assignments

  • Category definitions:
1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete 20 Bramer providing assistance 0 Due date extended from 5/31/88 to 7/01/88 because of delay in W response.

Date:

May 27, 1988 REVIEW STATUS REPORT ON WESTINGHOUSE RESAR SP/90 PDA REVIEW (Cont.)

Expected Division /

Due Input Branch Reviewer Modules Subject

  • Milestone Date Date Cat.**

Comments DEST /ECEB Wing 1, 6&8, 10, 13 Chemical Engineering Draft SER 3/31/88 3/17/88 4

Complete Notley 13 Fire Protection Draft SER 6/29/88@ 6/29/88 3

Input rec'd to P.M.

4/28/88 DEST /SICB Burrows 9, 13, 15 Instrumentation &

Draft SER 3/31/88 4/07/88 4

Complete Controls to P.M.

DEST /SELB Trehan 9, 13 Electrical Engineering Draft SER 3/31/88 4/13/88 4

Complete l

to P.M.

DEST /SPLB Shum (lead) 1, 10, 13 Containment Systems Draft SER TBD#

7/25/88 2

Partial vendor to P.M.

input rec'd 5/27/88 b

See September 29, 1987 memo for complete listing of review assignments Category definitions:

1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete 0 Due date extended from 5/13/88 to 6/29/88 because of delays in W response.
  1. 4/13/88 memo requests 8 weeks for review of RAIs (upon submittaT).

f

Date:

May 27 1988 0

REVIEW STATUS REPORT ON WESTINGHOUSE RESAR SP/90 PDA REVIEW (Cont.)

Expacted Division /

Due Input Branch Reviewer Modules Subject

  • Milestone Date Date Cat.**

Comments DEST /SPLB Wagner 6&8, 7 Plant Systems Draft SER TBD#

7/25/88 2

Partial vendor (cont.)

to P.M.

input rec'd 5/27/88 Walker 7

Equipment Qualification Draft SER TBDF 7/25/88 2

Partial vendor to P.M.

input rec'd 5/27/88 Gill 4

Plant Systems Draft SER TBDE 7/25/88 2

Partial vendor to P.M.

input rec'd 5/27/88 Lee 6&8, 10, HVAC Systems, Waste Draft SER TBDE 7/25/88 2

Partial vendor 12, 13 Management. Steam &

to P.M.

input rec'd Power Conversion 5/27/88 See September 29, 1987 memo for complete listing of review assignments o

00 Category definitions:

1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete
  1. 4/13/88 memo requests 8 weeks for review of RAIs (upon submittal).

Date:

May 27, 1988 REVIEW STATUS REPORT ON WESTINGHOUSE RESAR SP/90 PDA REVIEW (Cont.)

Expected Division /

Due Input Branch Reviewer Modules Subject

  • Milestone Date Date Cat.**

Comments DEST /SPLB Raval 13 Plant Systems Draft SER TBD#

7/25/88 2

Partial vendor (cont.)

to P.M.

input rec'd 5/27/88 DEST /SRXB Liang 1, 4, 5, 688, Reactor Systems Draft SER 6/13/880 6/13/88 3

Input rec'd 9, 10, 11, 12 to P.M.

5/20/88 DRIS/RSGB Mendelsohn 2

Physical Security Draft SER 3/31/88 3/22/88 4

Complete to P.M.

DLPQ/LQAB Spraul 13 Quality Assurance Draft SER 4/29/88 4/06/88 4

Complete to P.M.

See September 29, 1987 memo for complete listing of review assignments Category definitions:

1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete
  1. 4/13/88 memo requests 8 weeks for review of RAIs (upon submittal).

0 Due date extended from 5/16/88 to 6/13/88 because of delay in W response.

Date:

May 27, 1988 REVIEW STATUS REPORT ON WESTINGHOUSE RESAR SP/90 PDA REVIEW (Cont.)

Expected Division /

Due Input Branch Reviewer Modules Subject

  • Milestone Date Date Cat.**

Comments DLPQ/LHFB Lapinski 15 Control Room / Human Draft SER 3/31/88 5/05/88 4

Complete Factors Engineering to P.M.

DREP/PRPB Spickler 1,3,4,5, Radiological Accident Draft SER 3/31/88 5/03/88+

4 Complete 6&8, 9, 10 Analysis to P.M.

Skopec 12 Process & Effluent Draft SER TBD 7/25/88 2

Input rec'd Radiological to P.M.

3/22/88; Draft.

Monitoring & Sampling SER under SPLB' Systems review RES/PRA Chelliah/BNL 16 Probabilistic Safety Draft 2/26/88 5/27/88+

1 Workload Study - back end SER to impacting P.M.

input date o

See September 29, 1987 memo for complete listing of review assignments 00 Category definitions:

1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete

+ Input date modified due to availability of reviewer.

Date: May 27 1988 0

REVIEW STATUS REPORT ON GE ABWR FDA/DC REVIEW Expected Division /

SRP Due Input Branch Reviewer Chapter Subject Milestone Date Date Cat.*

Connents DEST /SPLB Chandrasekaran 5, 6, 15 Plant Systems RAIs to 6/15/88 6/15/88 3

SPLB issued P.M.

contract for review to SAI..

New input date established.

DEST /SRXB Thomas 4, 5, 6, 15 Reactor Systems RAIs to 6/30/88 6/30/88 3

New input date P.M.

established.

(RAIs on Sec-tion 4.6 have been received by PM.)

a o Category definitions:

i

1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete 1

4

Date: May 27, 1988 REVIEW STATUS REPORT ON.

CE SYSTEM 80+

CE3SAR-DC REVIEW Expected Division /

Due Input Branch Reviewer Chapter Subject Milestone Date Date Cat.*

Comments DEST /SRXB L. Kopp 4

Reactor RAI 07/10/88 08/30/88+

2 DEST /EMTB H. Hum 4

Reactor RAI 07/10/88 07/10/88 3

DEST /EMEB H. Shaw 5

Reactor Coolant System RAI 07/10/88 07/10/88 3

DEST /EMEB J. Rajan 5

Reactor Coolant System RAI 07/10/88 07/10/88 3

DEST /SRXB L. Kopp 5

Reactor Coolant System RAI' 07/10/88 08/30/880 2

DEST /EMTB H. Hum 5

Reactor Coolant System RAI 07/10/88 07/10/88 3

DEST /SPLB J. Raval 5

Reactor Coolant System RAI 07/10/88 07/29/880 2

DEST /ECEB F. Witt 5

Reactor Coolant System RAI 07/10/88 07/10/88 3

DRIS/RGSB B. Mendelsohn 5

Physical Security /RCS RAI 07/10/88 05/06/88 4

RAI rec'd DEST /SPLB J. Raval 9

Auxiliary System RAI 07/10/88 07/29/880 2

DEST /ECEB F. Witt 9

Auxiliary System RAI 07/10/88 07/10/88 3

DEST /SRXB L. Kopp 9

Auxiliary System RAI 07/10/88 08/30/880 2

DEST /SICB J. Stewart 9

Auxiliary System RAI 07/10/88 07/10/88 3

  • Category definition:
1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete

+ Input delayed due to delay in vendor submittal and availability of reviewer; may delay Chapter SER, but is not expected to inpact FDA schedule 0 Input delayed due to availability of reviewer.

4

4 Date: May 27. 1988 REVIEW STATUS REPORT ON SYSTEM 80 CESSAR-F REVIEW Expected Division /

Due Input Branch Reviewer Chapter Subject Milestone Date Date Cat.*

Comments DEST /SRXB C. Liang TAL 66400, ASPSS ISSUE Final SER 6/30/88 6/30/88**

3 On schedule to P.M.

DEST /EMEB J. Rajan TAC 66401, Steam Gen. Tube Vibration RAIs to open open 3.

Awaiting input-P.M.

from applicant DEST /EMTB W. Wickman TAC 66401, Steam Gen. Tube Vibration RAIs to open open 3

Awaiting input P.M.

from applicant e

Category definition:

1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete
    • Close out issue

Date: May 27, 1988 REVIEW STATUS REPORT ON CE SYSTEM 80+

CESSAR-DC REVIEW ARSAP TOPIC PAPERS Expected Division /

Due Input Branch Reviewer Chapter Subject Milestone Date Date Cat.*

Comments RES/SAIB C. Ferrell Topic Paper Set 10 ARSAP Issues RAI 06/15/88 06/15/88 3

No. 1 t

b d

7

}

  • Category definition:
1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete i

I

Date: May 27, i988 REVIEW STATUS REPORT ON EPRI'S ALWR REQUIREMENTS DOCUMENT Expected Division /

Due Input Branch Reviewer Chapter Subject

  • Milestone Date Date Cat.*

Comments DEST /EMEB Hartzmar.

3 Reactor Coolant Systems DSER to 03/15/88 04/18/88 4

P.M.

Hartzman 4

Reactor Systems DSER to 03/15/88 04/18/88 4

P.M.

Rajan 5

Eng. Safety Systems DSER to 06/30/88**

3 P.M.

DEST /EMTB Tsao 5

Eng. Safety Systems DSER to 06/30/88**

N/A 4

Reviewer will P.M.

have no input DEST /SICB Stewart 5

Eng. Safety Systems DSER to 06/30/88**

3 P.M.

DEST /SELB Lazevnick 5

Eng. Safety Systems DSER to 06/30/88**

3 P.M.

DEST /SPLBe Shum 5

Eng. Safety Systems DSER to 06/30/88**

3 P.M.

DEST /SRXB Schwenk 5

Eng. Safety Systems DSER to 06/30/88**

3 P.M.

i Category Definition:

1. AD or above attention requested 2, BC attention requested
3. On schedule
4. Complete Due date to be reestablished upon receipt of responses to RAI a

Date: May 27, 1988 REVIEW STATUS REPORT ON EPRI'S ALL'R REQUIREMENT 5 DOCUMENT (Cont.)

Expected Division /

Due Input Branch Reviewer Chapter Subject

  • Milestone Date Date Cat.*

Comments DREP/RPB Branagan 5

Eng. Safety Systems DSER to 06/30/88**

3 P.M.

DEST /ECEB Parczewski 5

Eng. Safety Systems DSER to 06/30/88**

3 P.M.

DREP/RAB Kelly 5

Eng. Safety Systems DSER to 06/30/88**

3 P.M.

d Category Definition:

1. AD or above attention requested
2. BC attention requested
3. On schedule
4. Complete 4
    • Due date to be reestablished upon receipt of responses to RAI

.