March 19, 1987 Distribution Central File L01shan PAD #5 Peadin9 svarga Gray Lile 3.1
. Sl,ong '.
VNerses l
MEMORANDUM FOR:
Thomas M. Novak, Acting Director Division of PWR Licensing-A Office of Nuclear Reactor Reaulation THRU:
Steve Lono, Pro.iect Manager PWR Project. Directorate #5 Division of PWR Licensino-A FROM:
Lenny 01shan, Pro.iect Manager PWR Proiect Directorate #3 Division of PWR Licensing-A
SUBJECT:
STATUS OF WESTINGHOUSE RESAR-SP/90 PEVIEW On. March 10, 1987, you requested that I assess the status nf the review for the Westinghouse RESAR-SP/90 design. To determine the status, I-had extensive discussions with S. Long and C. Patel, the present and previous Project Managers; with Westinghouse, and with the NRC reviewers.
In an attempt to-locate any missing documentation, I searched the available_ files in Mr. Long'.s possession and obtained a printout of all the reviewers that-charged time to SP/90 since Octobdr 2, 1983.
Due to higher priority projects there has been very.little-review accomplished in the last year.
In many cases, all-the reouired information has been submitted but the reviewers have not been able to complete their review and write an SER.
In several instances, reviewers have. completed their SER's but management has not yet concurred.
j At this point, most of the technical material needed for'the review has been submitted.,It appears that much'of the SP/90 review could be completed within several months if a priority is established to obtain the necessary pro.iect management and technical review resources within NRC.
j Please let me kno'w if any clarification is required or if any further effort-l to assess the review status is needed.
'q i
/s/
Lenny Olshan, Project Manager PWR Project Directorate #3 Division of PWR Licensing-A Enclosures PAD #3:
Slong L01shan f // /87
.) /19 /87 f
274 y 9 53 (9 g) 3 7
- ~.
~~
3 MODULE 1 - PRIMARY SAFEmlARDS SYSTEMS Section 5.4.7 Residual Heat Removal Peviewer:
W. Lynn, PARS Status: All responses received.
SER Section not yet written.
Section 6.1.1 ESF Materials Reviewers:
D. Smith, PAEB; S. Kjrslis, CEB Status: Smith SER issued 7/15/85; Kirslis SER on Post-Accident Cool,ing Vater Chemistry issued 8/28/85.
n Section 6.1.2 Oroanic Materials Reviewer:
S. Kirslis, CEB Status: SER issued 8/28/85 Section 6.3 Emergency Core Cooling System Reviewer:
W. Lyon, PARS Status: All responses received.
SER section not yet written.
Section 6.5.2~ Containment Spray System Reviewer:
.J.
Read, CEB Status: SER issued 3/28/85 Comments: Module 10 needed to complete review.
Section 15.6 LOCA Analysis Reviewer:
W. Lyon, PARS Status: All responses received.
SER section not yet written.
i MODULE 2 - REGULATORY CONFORMANCE i
Reviewers:
W. Minners, SPEB; T. Dunning, ICSB q
Status: Minners Draft SER sent to Westinghouse 10/4/84; Dunning SER 1
issued 7/24/84 (not sent to Westinghouse)-
Comments: Westinghouse will not respond to comments in Draft SER until.
l later in the review process.
NPC decided to address Severe Accident Policy issues during review of other modules,'and not' issue an SER for-Module-2.
r
~.....
PODULE 3 - INTRODUCTION 1. SITE Reviewers:
W. Lyon, PARS; G. Giese-Koch, GSB (now PAER)
Status: Lyon draft SER dated 12/12/85 (no manaapment.cnncurrence);
Giese-Koch memo of 8/12/85 identifies SBE/0BE problem.
MODULE 4 - REACTOP COOLANT SYSTEM Section 4.4.6 Loose Parts Monitor Reviewers:
H. Richings/G. Schwenk, CPB Status: SER issued 2/6/85.
Section 5.2.2, 5.2.3 Integrity of RCPB Reviewers:
W. Lyon, PARS; D. Smith, PAEB; G. Johnson, PAEB Status: Smith SER issued 4/12/85, Johnson SER issued 8/19/85 Comments: Smith SER asks for additional information: extent of conformance to R.G. 1.34, 1.36, 1.71, 1.43 and 1.50.
Section 5.2.4 RCPB Inservice Inspection and Testing Reviewer:
.G. Johnson, PAEB Status: SER issued 8/19/85.
Comments: PSI program needed.
Section 5.2.5 RCPB Leakage Detection Reviewer:
R. Giardina, PAPS Status: Review not started.
Section 5.3,. Reactor Vessel
-1 l
.k Reviewe'r:
G. Johnson, PAEB-
)
Status: SER issued 8/19/85.
j J
Section 5.4 Component and system Design 1
i Reviewers:
G. Johnson, PAEB; D. Smith, PAEB 3
Status: Johnson SER on 5.4.2.4, Steam Generator Materials, issued 8/19/85; Smith identified additional.information needed in.4/12/85.
I draft SER.
Section 15 Accident Analysis
. Reviewer:. W. Lyon, PARS (Sections 15.3.1, 15.3.2, 15.3.3, 15.3.'4,'15.4.4, 15.5.1, 15.5.2, 15.6.1' and part of 15.0)
Status: All responses received.
..1 I
i l
- a >
a em PODULE 5 - REACTOR SYSTEMS Section 3.9 Mechanical Systems and Components Reviewer:
S. Hou,.PAEB; D. Sellers, PAEB Status: Hou reviewed about 10% complete; Sellers not started.
Section 4.2 Fuel System Design Reviewer:
S. L. Wu, CPR Status: SER issued 5/20/85.
Section 4.3 Nuclear Design Reviewer:
H. Richings/G. Schwenk,-CPB Status: SER issued 2/6/85.
Comments: SER incomplete with respect to N16 and four segment excore neutron detector surveillance and protection systems.
Section 4.4 Thermal-Hydraulic Design Reviewer:
H. Richings/G. Schwenk, CPR Status: SER issued 2/6/85.
Comments: Staff must complete review of CHF test ~ data which models fuel assembly and use of 1.17 DNBR safety limit.
Section 4.5 Reactor Materials
.)
Reviewer:
D. Smith, PAEB Status: Draft SER issued 4/12/85 on 4.5.1.
j Coments: Question on 4.5.1 concerning aging'and tempering. temperatures
'J used in control rod drive mechanism; not enough on--4.5.2 to review.
Section 4.6 Reactivity Control System Reviewer:
R. Giardina, PAPS Status: SER issued 4/4/86.
'i Section 15 Accident Analysis
.j Reviewer:
H. Richings/G. Schwenk, CPB i
Status: SER issued 2/6/85 on 15.4.1, 15.4.2, 15.4.3, 15.4.7.and 15.4.8.
i o
t
1 l
1 F0DULE 6 AND 8 - SECONDARY SIDE SAFEGUACDS i
SYSTEMS /5 TEAM AND POWER CONVERSION SYSTEM I
l Section 6.0' Engineered Safety Features
'l Reviewers:
W. L_ yon, PARS; Sellers, PAEB' Status:
Review not started.
I
'Se: tion 10.3 -Main Steam Supply System Reviewers:
R. Giardina, PAPS; S.' Kirslis, CE8 -
Status:
Responses to Giardina's questions received 11/86, not yet reviewed; Kirslis SER on 10.3.5 issued 8/28/85.
Section 10.4 Other Features
)
Reviewers:
R. Giardina, PAPS; J. Lee, METR; S. Kirsif s, CEB Status: Responses to Giardina's questions received 11/86, not yet-reviewed;LeeSERon10.4.2and10.4.3 issued?/%8/85;KirslisSER on 10.4.6 and 10.4.8 issued 8/28/85.
.Section 15 Accident Analyses
)
i Reviewer:
W. Lyon, PARS (Sections 15.1, 15.2, and 15.6)
Status:
Review not started.
i
.I i
I i
l
i
.,o,.,
)-
i MODULE'7 - STRUCTURAL /EQUIPPENT DESIGN Section 3.0, 3.1, 3.2 Design and Classification of Structures, Components, Equipment and Systems-Reviewers:
R. Kirkwood, MEB; S. Chan, PAEP Status: Responses to Kirkwood's questions received 5/PM, Chan has not completed review of responses (about 10% complete),
j Section 3.3 Wind and Tornado Loadinap j
Reviewer:
S. Chan, PAEB Status: Review not started.
]
Section 3.4 Water Level (Flood) Design and 3.5 Missile Protection.
Reviewer:. R. Giardina, PAPS Status: Review not started.
Section 3.6 Protection Against Effects of Pipe Breaks Reviewer:
S. Chan, PAER Status: Review not started.
Section 3.7 Seismic Design-1 Reviewers:'
S. Chan, PAEB; G. Giese-Koch, PAEB' Status: Giese-Koch memo of 8/25/85 identifies'SSE/0BE problem.
Section 3.8 Design of Category I Structures and 3.9 Mechanica1' Systems and Components Reviewe'r:' S.'Than, PAEB i
Status: Review not started.
l Section 3.10 Seismic and Dynamic Qualification Reviewer:
.1. Jackson, E0B i
Status: SER issued 8/23/85.
Section 3.11 Environmental Desion of Mechanical / Electrical Equipment' Reviewer: Not identified, PAPS Status: Review not started.
k 4
i
\\
1 j
.j 1
F0DllLE 9 --1
& C AND ELECTRIC POWED q
'Section 7.0 Instrumentation and Controls j
. Reviewer:
F. Burrows, PAEl Status: All reponses received,' SER about 70% complete.
Section 8.0 Electric Power
.-Reviewer:
P. Gill, PAEI.
i Status: All ' responses received '//86, 'not yet reviewed.
.]
1
't MODULE 10 - CONTAINMENT SYSTEMS 1
4
)
l Status: Module 10 "in the mail" 3/87.
No review started'(PAEB)'
s
-)
i l
u o
.. j s
s
^
i i)
MODULE 11 - RADIATION PROTECTION 1
Section 12.0 Radia'. ion Pro +ection
)
Reviewer:
F. Sknpec, PAPS j
Status: SER completed b.v Skopec, no manacement concurrence.
j 1
MODULE I? - k'ASTE MANAGEMENT Section 11.0 Waste Management i
Reviewer:
R. Fell, PAPS Status:
Review not started.
l MODULE 13 - AUXILIARY SYSTEMS Status: Module 13 submitted 11/86.
No review started (PAPS),
t 4
.v, s.
MODilLE 15 - CONTROL ROOM HtlMAN FACTORS ENGINEERING Section 7.8 Control Room Peviewer:
F. Burrows, PAEI Status: Module 15 submitted 10/86, review not started.
-Section 7.9 Plant Computers Reviewer: Not identified, PAEI l
Status: Module 15 submitted 10/85, review not started.
'l Section'18.0 Human Factors Engineerino Reviewer:
S. Saba, PAEI Status: Module is submitted 10/86, review not started.
1 1
PODULE 16 - PROBABILISTIC RISK ANALYSIS j
Reviewer:
B. Hardin, PRAB and Brookhaven National Laboratory (BNL)
Status: Work suspended at BNL since NRC had not provided' FY-87. funds i
or extended availablity of remaining FY-86 funds Effort should begin again as soon as funding process (now in progress) is completed by NP.C.