  1. UNITED STATES 8

't NUCLEAR REGULATORY COMMISSION t gj WASHINGTON, D. C. 20555 k * . . . + ,o/ July 1, 1988 Docket No. 50-601 and 50-605 Project Nos. 669, 675, and 676 l

)

MEMORANDUM FOR: L. Shao, Director Division of Engineering and System Technology, NRR J. Partlow, Director Division of Reactor Inspection and Safeguards, NRR f F. Congel, Director l Division of Radiation Protection and Emergency Preparedness, NRR J. Roe, Director I Division of Licensee Performance and f Ouality Evaluation, NRR R. W. Houston, Acting Director Division of Reactor Accident Analysis, RES l FROM: Lester S. Rubenstein, Acting Director i Standardization and Non-Power Reactor Project Directorate <

Division of Reactor Projects III, IV,  ;

V and Special Projects, NRR )

SUBJECT:

STATUS REPORT ON STANDARD PLANT DESIGN TECHNICAL REVIEWS l l

Attached is the June status report concerning the current review milestones I for each of the standard plant projects i ?RI, ABWR, RESAR SP/90, and CE System 80+).

Note the "Due Date" column reflects dates established in the January 25, 1988 "Revised Program Plan For Standard Plant Reviews" or dates for which modifica-tion was agreed to by PDSNP and the review branch.

i CONTACT:

T. Kenycn NRR/PDSNP %0g Ext. 21120 V

\l\

8807120628 880701 PDR ADOCK 05000601 n PDC

I f

2-The column "Expected Input Date" reflects input from appropriate technical

. branch management. Category 1 items have been discussed with the appropriate Assistant Directors. I request any problems in meeting these input dates be identified to me by the appropriate Assistant Director within a week of receipt of this memo.

WS'S Lester S.

b '

ubenstein, Acting Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, Y and Special Projects, NRR

Enclosure:

As stated cc: T. Murley J. Sniezek F. Miraglia J. Richardson C. Y. Cheng L. B. Marsh C. McCracken A. Thadani J. Joyce J. Mauk F. Rosa J. Craig M. W. Hodges B. Grimes R. Erickson D. Matthews R. Barrett L. Cunningham H. Miller A. Beach W. Regan, Jr.

J. Murphy G. Bagchi

l Data: June 29, 1988 .

REVIEW STATUS REPORT ON MESTINGHOUSE RESAR SP/90 ,

PDA REVIEW Expected Divisionf Due Input Brrnch Reviewer Modules Subject

  • Milestone Data Date Cat.** Comnents I

DEST /EMTB Johnson 1, 4, 5, 688, 7, Materials Engineering Draft SER 3/31/88 4/29/88 4 Complete 10 to P.M. 5/5/88 DEST /EMEB Rajan/Brammer*** 1, 4, 5, 7, Mechanical Engineering Draft SER 8/05/880 8/05/88 '3 Awaiting to P.M. Input from E -

Expected 6/30/88 DEST /ESGB Staley 3 Hydrology Draft SER 3/31/88 3/30/88 4 Complete to P.M.

! Giese-Koch 3 Geology & Seismology Draft SER 3/31/88 3/30/88 4 Complete l to P.M.

l l

Chan 7 Civil Engineering Draft SER 4/29/88 4/28/88 4 Complete to P.M.

l

  • See September 29, 1987 memo for complete listing of review assignments
    • Category dcfinitions:
1. AD or above attention requested
2. Branch Chief attention rectuested
3. On schedule
4. Complete
      • Brassner providing assistance l

0 Due date extended from 7/01/88 to 8/05/88 because of delay in y response.

l

Cata: June 29, 1988 ,

REVIEW STATUS REPORT ON WESTINGHOUSE RESAR SP/90 '

PDA REVIEW (Cont.)

Expected "ivision/ Lue Input Branch Reviewer Modules Subject

  • Milestone Date Date Cat.** Consnents DEST /ECEB Wing 1, 6&8, 10, 13 Chemical Engineering Draft SER 3/31/88 3/17/88 4 Complete Notley 13 Fire Protection Draft SER 7/15/880 7/15/88 3 Input rac'd to P.M. 4/28/88 DEST /SICB Burrows 9, 13, 15 Instrumentation & Draft SER 3/31/88 4/07/88 4 Complete Controls to P.M.

I DEST /SELB Trehan 9, 13 Electrical Engineering Draft. SER 3/31/88 4/13/88 4 Complete to P.M.

DEST /SPLB Shum (lead) 1, 10, 13 Containment Systems Draft SER 6/21/88f 6/21/88 4 Complete to F.M.

l l l

, l

  • See September 29, 1987 memo for complete listing of review assignments
    • Category definitions:

l

1. AD or above attention requested l
2. Branch Chief attention requested
3. On schedule l 4. Complete 0 Due date extended from 5/13/88 to 6/30/88 because of delays in W response.

l m .

_ __- - __ ._.a w___- ._

Dste: Junn 29. 1988 REVIEW STATUS REPORT ON WESTINGIOUSE RESAR SP/90 PDA REVIEW ~

(Cont.)

Expected Division / .

Due input Branch Reviewer Modules Subject

  • Milestone Date Date Cat.** Consnents DEST /SPLB Wagner 688, 7 Plant Systems Draft SER 6/21/88 6/21/G8 4 Complete (cont.) to P.M.

Walker 7 Equipment Oualification Draft SER 6/21/88 6/21/88 4 Complete to P.M.

Gill 4 Plant Systems Draft SER 6/21/88 6/21//88 4 Complete to P.M.

Lee 6&8, 10, HVAC Systems, Waste Draft SER 6/21/88 6/21/88 4 Complete 12, 13 Management, Steam & to P.M.

Power Conversion

  • See September 29, 1987 memo for complete listing of review assignments
    • Category definitions:
1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete

l Date: June 29, 1988 ,

l 1

1 '

REVIEW STATUS REPORT ON WESTINGHOUSE RESAR SP/90 ,

PDA REVIEW (Cont.)

Expected Division / Due Input Branch Reviewer Modules Subject

  • Milestone Date Date Cat.** Comments DEST /SPLB Raval 13 Plant Systems Draft SER 6/21/88 6/21/88 4 Complete (cont.) to P.M.

DEST /SRXB Liang 1, 4, 5, 688, Reactor Systems Draft SER 6/28/88 6/28/88 4 Complete 9, 10, 11, 12 to P.M.

DRIS/RSGB Mendelschn 2 Physical Security Draft SER 3/31/88 3/22/88 4 Complete to P.M.

DLPQ/LQAB Spraul 13 Quality Assurance Draft SER 4/29/88 4/06/88 4 Complete to P.M.

  • See September 29, 1987 memo for complete listing of review assignments
    • Category definitions:
1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete

Date: June 29, 1988 ,

l REVIEW STATUS REPORT ON WESTINGHOUSE RESAR SP/90 '

PDA REVIEW (Cont.)

Expected Division / Due Input Branch Reviewer Modules Subject

  • Milestone Date Date Cat.** Comments DLPQ/LHFB Lapinski 15 Control Room / Human Draft SER 3/31/88 5/05/88 4 Complete Factors Engineering to P.M.

DREP/PRPB Spickler 1,3,4,5, Radiological Accident Draft SER 8/1/88 8/01/88 3 Add'l vendor 638, 9, 10 Analysis to P.M. input rec'd 5/27/88 Skopec 12 Process & Effluent Draft SER 7/15/88 7/'iS/88 3 Radiological to P.M.

Monitoring & Sampling Systems RES/PRA Chelliah/BNL 16 Probabilistic Safety Draft 2/26/88 6/30/88 1 DSER in Study - back end SER to concurrence P.M.

  • See September 29, 1987 memo for complete listing of review assignments
    • Category definitions:
1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete

Date: June 29, 1988 ,

l REVIEW STATUS REPORT ON GE ABWR ~

FDA/DC REVIEW l

Expected Division / SRP Due Input Branch Reviewer Chapter Subject Milestone Date Date Cat.* Comments DEST /SPLB Chandrasekaran 5, 6, 15 Plant Systcms RAIs to 6/30/88 6/30/88 3 SPLB issued.

P.H. contract for review to SAI.

New input date established.

DEST /SRXB Thomas 4, 5, 6, 15 Reactor Systems RAIs to 6/30/88 6/30/88 3 New input date i P.M. established.

(RAIs on Sec-tion 4.6 have

!. been received I by PM.)

4

!

  • Cctegory definitions:
1. AD or above attention requested

' 2. Branch Chief attention requested

3. On schedule
4. Complete 1

a

Date: June 29, 1988 REVIEW STATUS REPORT ON EPRI'5 ALWR REQUIREMENTS DOCUMENT Expected Division / Due Input Branch Reviewer Chapter Subject

  • Milestone Date Date Cat.* Comments DEST / EMES Rajan 5 Eng. Safety Systems DSER to 06/30/88** 3 P.it.

DEST /EMTB Tsao 5 Eng. Safety Systems DSER to 06/30/88** N/A 4 Reviewer will 4 P.M. have no input DEST /SICB Stewart 5 Eng. Safety Systems DSER to 06/30/88** 3 i

P.M.

j DEST /SELB Lazevnick 5 Eng. Safety Systems DSER to 06/30/88** -3

! P.M.

I DEST /SPLB Shum 5 Eng. Safety Systems DSER to 06/30/88** 3 P.M.

DEST /SRXB Schwenk 5 Eng. Safety Systems DSER to 06/30/88** 3 P.M.

1

  • Category Definition:
l. AD or above attention requested
2. BC attention requested
3. On schedule
4. Complete
    • Due date to be reestablished upon receipt of respor.ses to RAI

l .. .

Date: June 29, 1988 ,

REVIEW STATUS REPORT ON EPRI'S ALWR REOUIREMENTS DOCUMENT '

(Cont.)

Expected

, Division / Due Input Branch Reviewer Chapter Subject

  • Milestone Date Date Cat.* Comments DREP/RPB Branagan 5 Eng. Safety Systems DSER to 06/30/88** 3 P.M.

DEST /ECEB Parczewski 5 Eng. Safety Systems DSER to 06/30/88** 3 P.M.

DREP/RAB Kelly 5 Eng. Safety Systems DSER to 06/30/88** 3 P.M.

1 i

  • Category Definition:
1. AD or above attention requested i
2. BC attention requested l 3. On schedule l 4. Complete
    • Due date to be reestablished upon receipt of responses to RAI ..

Date: June 29, 1988 REVIEW STATUS REPORT ON CE SYSTEM 80+ '

CESSAR-DC REVIEk' Expected Division / Due Input Branch Reviewer Chapter Subject Milestone Date Date Cat.* Comments DEST /SRXB L. Kopp 4 Reactor RAI 07/10/88 06/21/88 4 Complete DEST /ENTB H. Hum 4 Reactor RAI 07/10/88 07/10/88 3 DEST /EMEB H. Shaw 5 Reactor Coolant System RAI 07/10/88 07/10/88 3 DEST /EMEB J. Rajan 5 Reactor Coolant System RAI 07/10/88 07/10/88 3 DEST /SRXB L. Kopp 5 Reactor Coolant System RAI 07/10/88 06/21/88 4 Complete DEST /EMTB H. Hum 5 Reactor Coolant System RAI 07/10/88 07/10/88 3 DEST /SPLB J. Raval 5 Reactor Coolant System RAI 07/10/88 07/29/88@ 2 DEST /ECEB F. Witt 5 Reactor Coolant System RAI 07/10/88 06/23/88 4 Complete 4

DEST /SPLB J. Raval 9 Auxiliary System RAI 07/10/88 07/29/880 2 DEST /ECEB F. Witt 9 Auxiliary System RAI 07/10/88 07/10/88 3 f DEST /SRXB L. Kopp 9 Auxiliary System RAI 07/10/88 06/21/88 4 Complete DEST /SICB J. Stewart 9 Auxiliary System RAI 07/10/88 07/10/88 3

\

  • Cctegory definition:
1. AD or above attention requested
2. Branch Chief attention requested 1 3. On schedule
4. Complete 1 0 Input delayed due to availability of reviewer.

Date: June 29, 1988 ,

REVIEM STATUS REPORT ON SYSTEM 80 CESSAR-F ,

REVIEW l

l Expected-l Division / Due Input t

Branch Reviewer Chapter Subject Milestone Date Date Cat.* Consnents DEST /SRXB C. Liang TAC 66400, ASPSS ISSUE Final SER 6/30/88 6/30/88** 3- On schedule to P.M. ,

DEST /EMEB J. Rajan TAC 66401, Steam Gen. Tube Vibration RAIs to open open 3- Awaiting input P.M. from applicant DEST /EMTB W. Wickman TAC 66401, Steam Gen. Tube Vibration RAIs to open open 3 Awaiting input P.H. from applicant

  • Category definition:
1. AD cr above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete
    • Close out issue

~.

Date: June 29, 1988 REVIEW STATUS REPORT ON I CE SYSTEM 80+

l CESSAR-DC REVIEW

  • ARSAP TOPIC PAPERS l

Expected Division / Due Input l Branch Reviewer Chapter Subject Milestone Date Date Cat.* Comments i

RES/SAIB C. Ferrell Topic Paper Set 10 ARSAP Issues RAI 06/15/88 C6/30/88 2 Comments No. I provided-CE at meeting 6/21/88 l

l l

l

  • Category definition:
1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete I

.,, .- ,j _,

July 1, 1988 e

2 The column "Expected Input Date" reflects input from appropriate technical branch management. Category 1 items have been discussed with the appropriate Assistant Directors. I request any problems in meeting these input dates be identified to rre by the appropriate Assistant Director within a-week of receipt of this memo, original signed by Lester S. Rubenstein, Acting Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, Y and Special Projects, NRR

Enclosure:

As stated cc: T. Murley J. Sniezek F. Miraglia J. Richardson C. Y. Cheng L. B. Marsh C. McCracken A. Thadani J. Joyce J. Mauk F. Rosa J. Craig M. W. Hodges B. Grimes R. Erickson D. Matthews R. Ba-rett L. Cunningham H. Miller A. Beach W. Regan, Jr. ,

J. Murphy '

G. Bagebi DISTRIBUTION:

l Docket File EHylton ADR4 NRC PDR PLeech SNewberry <

PDSNP Reading DScaletti A l

GVissing DCrutchfield y LRubenstein TKeny n l

i

\

]f \

PD 'T 1

}h on:cw AS LRu h tein U6 D/88 05/l/88 1

_