MONTHYEARNUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20217C9891991-07-16016 July 1991 Notification of 910716 Meeting W/Util in Rockville,Md to Discuss Topics Re Certification Review of Advanced BWR ML20059J5551990-09-12012 September 1990 Submits Daily Highlight.On 900918 & 19,meeting Will Be Held W/Ge in Rockville,Md to Discuss Concept & Technologies Used in Simplified BWR in Order for NRC to Define Research User Needs for Passive Designs.Meeting Agenda Encl ML20059J7501990-09-0707 September 1990 Requests RESAR SP/90 Technical Reviewer Support During Listed ACRS Meetings.Full Committee Meeting Scheduled for 901004,05 or 06 ML20058Q2621990-08-16016 August 1990 Forwards Documents for Advanced BWR Docket Files ML20055D5351990-07-0505 July 1990 Notification of 900717 Meeting W/Ge in Rockville,Md to Discuss Design Features & Research Efforts Re GE Sbwr Plant Design ML20055C3521990-02-26026 February 1990 Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20248C8311989-09-20020 September 1989 Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action ML20247H9261989-09-0909 September 1989 Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 ML20247D9151989-09-0808 September 1989 Notification of 890912-13 Meetings W/Ge in San Jose,Ca to Discuss Review of PRA for Advanced BWR (Abwr),Including Focus on Refinements in Internal Events PRA That Have Resulted from Consideration of ABWR Design Enhancements ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20245H6451989-08-0404 August 1989 Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR ML20248D1431989-07-27027 July 1989 Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants ML20247B7541989-07-19019 July 1989 Confirms That Licensee 880711,890221 & 0630 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss, Acceptable.Licensing Action for TACs 69886,69887,69893 & 69894 Considered Complete ML20247E6721989-07-17017 July 1989 Proposes Closeout of Plant Correspondence Control Ticket Re Environ Conservation Organization Request for Notification Whenever License Amend Requests Result in Impairment of Plant Operability.Intervenor Will Be Placed on Svc List ML20246K5991989-07-12012 July 1989 Notification of 890725 Meeting W/Util in Birmingham,Al to Discuss Status of Current Licensing Activities & Corporate Initiatives for Plants.Meeting Agenda Encl ML20246L6801989-07-10010 July 1989 Notification of Significant Licensee Meeting 89-101 W/Util on 890718 in King of Prussia,Pa to Discuss Util Engineering Reorganization ML20247A9561989-07-0606 July 1989 Notification of 890717 Meeting W/Lead Plant Utils in Rockville,Md to Discuss Implementation of Revised STS ML20246B8331989-07-0505 July 1989 Notification of 890714 Meeting W/Util in Rockville,Md to Discuss Severe Accident & Licensing Issues on RESAR SP/90 ML20246H3771989-05-12012 May 1989 ALAB-913.* Advises That Time Provided within Which Commission May Act to Review Aslab Decision ALAB-913 Expired.Commission Declined Review.Decision Became Final on 890501.W/Certificate of Svc.Served on 890512 ML20246P9601989-05-10010 May 1989 Discusses 890413 Meeting W/Rosemount & Industry Re Malfunctions of Rosemount Transmitters.List of Attendess, Agenda,Nrc Info Notice 89-042 & Viewgraphs Encl ML20246J7321989-05-10010 May 1989 Notification of 890512 Meeting W/Ge in Rockville,Md to Discuss Refinements in Internal Events PAR That Have Resulted from Consideration of Recent Advanced PWR Design Safety Enhancements & External Events PRA ML20245E9781989-04-17017 April 1989 Forwards Regulatory History AC83-2 Re Licensee Action During Natl Security emergency,10CFR50 (54FR7178) ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20244E2681989-04-12012 April 1989 Summary of Operating Reactors Events Meeting 89-015 on 890412.Discussion of Events,List of Attendees & Three Significant Items Identified for Input Into NRC Performance Indicator Program & Summary of Reactor Scrams Also Encl ML20244A5461989-04-10010 April 1989 Notification of 890503 Meeting W/Util in Rockville,Md to Discuss Using Leak Before Break Methodology on Lines Connected to RCS ML20244A5571989-04-10010 April 1989 Notification of 890502 Meeting W/Util in Rockville,Md to Discuss Nonlinear Piping Analysis to Remove Snubbers & Pipe Supports ML20247E8051989-03-27027 March 1989 Notification of 890329 Meeting W/Ge in Rockville,Md to Discuss Conditional Containment Failure Probability Definition,Source Term & Other Severe Accident Issues Re Advanced LWR ML20247B7351989-03-24024 March 1989 Notification of 890503 Meeting W/B&W,Inel & Util in Rockville,Md to Discuss Licensing Submittals for Plants ML20236B3751989-03-0909 March 1989 Forwards to Wj Johnson,Forwarding NRC Draft SER Re RESAR SP/90 on Listed Technical Areas.Ltrs Provided to ACRS Members of Progress in Reviewing Pda Application ML20236D5751989-03-0909 March 1989 Forwards to Wj Johnson,Forwarding NRC Draft SER Re RESAR SP/90 on Listed Technical Areas.Ltrs Provided to Inform CRGR Members of Progress in Reviewing Pda Application ML20236B3261989-03-0808 March 1989 Notification of 890313 Meeting W/Ge in San Jose,Ca to Discuss Severe Accident Design of Advanced BWR & NRC Certification Process ML20236A9721989-03-0707 March 1989 Forwards Feb 1989 Status Rept Re Current Review Milestones for Each Std Plant Project ML20235S6271989-02-28028 February 1989 Notification of 890307 Meeting W/Bwr Owners Group in Rockville,Md to Discuss Items of Current Interest.Agenda Encl ML20246N3171989-02-23023 February 1989 Notification of 890313 Meeting w/C-E in Rockville,Md to Discuss Results of Salem Project & Licensing of Future C-E Projects ML20245E9441989-01-31031 January 1989 Forwards Proposed plant-specific Backfit for Improved Auxiliary Feedwater Sys Reliability Analyses for Required Improvement in Secondary DHR Capability at Plant ML20196C2701988-12-0202 December 1988 Notification of 881207 Meeting W/Util in Rockville,Md to Discuss Dcrdr Submittal of 880825 ML20196B6081988-11-29029 November 1988 Forwards Status Rept for Nov 1988 Re Std Plant Design Technical Reviews ML20206M9231988-11-23023 November 1988 Lists Questions Raised by Board Study of Licensee Environ Repts on Facilities,For Responses & Comments.Served on 881125 ML20195J0141988-11-22022 November 1988 Notification of 881214 Meeting W/Util in Rockville,Md to Discuss Licensing Actions at Plants ML20195J3231988-11-18018 November 1988 Provides Responses Re Review of Resolution of USIs & Generic Safety Issues for RESAR SP/90,per 881027 Request ML20206J6441988-11-16016 November 1988 Requests Responses to Listed Questions Re Proceeding, Including Explanation of Environ Consequences Caused by Movement of Centrifuges from State of Oh to State of Tn. Served on 881117 ML20206E6361988-11-14014 November 1988 Forwards Fr Notice Re Applications for Amends to Licenses DPR-51,NPF-6 & NPF-38,authorizing Addition of Sys Energy Resources,Inc as Licensee & Requests Comments on Antitrust Issues ML20206J5741988-11-10010 November 1988 Forwards H Thompson as Balance of NRC Response to State of Tn Re Enrichment of Naturally Occurring Radionuclides in Proposed Facilities,Per NRC ML20206J5571988-11-0909 November 1988 Forwards NRC Review & Evaluation of Facilities Security Plans Discussing Equipment & Procedures Used by Applicant to Meet Requirements in 10CFR95.W/o Encl ML20195G2581988-11-0808 November 1988 Partially Deleted Memo Re Commissioner Carr 880113-15 Visit to Plant,Meeting W/State of Mo Officials & Visit to Mallinckrodt,Inc 1994-06-29
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARNUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20217C9891991-07-16016 July 1991 Notification of 910716 Meeting W/Util in Rockville,Md to Discuss Topics Re Certification Review of Advanced BWR ML20059J5551990-09-12012 September 1990 Submits Daily Highlight.On 900918 & 19,meeting Will Be Held W/Ge in Rockville,Md to Discuss Concept & Technologies Used in Simplified BWR in Order for NRC to Define Research User Needs for Passive Designs.Meeting Agenda Encl ML20059J7501990-09-0707 September 1990 Requests RESAR SP/90 Technical Reviewer Support During Listed ACRS Meetings.Full Committee Meeting Scheduled for 901004,05 or 06 ML20058Q2621990-08-16016 August 1990 Forwards Documents for Advanced BWR Docket Files ML20055D5351990-07-0505 July 1990 Notification of 900717 Meeting W/Ge in Rockville,Md to Discuss Design Features & Research Efforts Re GE Sbwr Plant Design ML20055C3521990-02-26026 February 1990 Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20248C8311989-09-20020 September 1989 Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action ML20247H9261989-09-0909 September 1989 Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 ML20247D9151989-09-0808 September 1989 Notification of 890912-13 Meetings W/Ge in San Jose,Ca to Discuss Review of PRA for Advanced BWR (Abwr),Including Focus on Refinements in Internal Events PRA That Have Resulted from Consideration of ABWR Design Enhancements ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20245H6451989-08-0404 August 1989 Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR ML20248D1431989-07-27027 July 1989 Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants ML20247B7541989-07-19019 July 1989 Confirms That Licensee 880711,890221 & 0630 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss, Acceptable.Licensing Action for TACs 69886,69887,69893 & 69894 Considered Complete ML20247E6721989-07-17017 July 1989 Proposes Closeout of Plant Correspondence Control Ticket Re Environ Conservation Organization Request for Notification Whenever License Amend Requests Result in Impairment of Plant Operability.Intervenor Will Be Placed on Svc List ML20246K5991989-07-12012 July 1989 Notification of 890725 Meeting W/Util in Birmingham,Al to Discuss Status of Current Licensing Activities & Corporate Initiatives for Plants.Meeting Agenda Encl ML20246L6801989-07-10010 July 1989 Notification of Significant Licensee Meeting 89-101 W/Util on 890718 in King of Prussia,Pa to Discuss Util Engineering Reorganization ML20247A9561989-07-0606 July 1989 Notification of 890717 Meeting W/Lead Plant Utils in Rockville,Md to Discuss Implementation of Revised STS ML20246B8331989-07-0505 July 1989 Notification of 890714 Meeting W/Util in Rockville,Md to Discuss Severe Accident & Licensing Issues on RESAR SP/90 ML20246D8841989-06-19019 June 1989 Staff Requirements Memo Re 890601 Briefing on Operating Reactors & Fuel Facilities in Rockville,Md.Commission Expressed Disappointment in Long Term Operating Performance of Turkey Point Nuclear Power Plant ML20246H3771989-05-12012 May 1989 ALAB-913.* Advises That Time Provided within Which Commission May Act to Review Aslab Decision ALAB-913 Expired.Commission Declined Review.Decision Became Final on 890501.W/Certificate of Svc.Served on 890512 ML20246J7321989-05-10010 May 1989 Notification of 890512 Meeting W/Ge in Rockville,Md to Discuss Refinements in Internal Events PAR That Have Resulted from Consideration of Recent Advanced PWR Design Safety Enhancements & External Events PRA ML20246P9601989-05-10010 May 1989 Discusses 890413 Meeting W/Rosemount & Industry Re Malfunctions of Rosemount Transmitters.List of Attendess, Agenda,Nrc Info Notice 89-042 & Viewgraphs Encl NUREG-1353, Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-13531989-05-0202 May 1989 Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-1353 ML20245E9781989-04-17017 April 1989 Forwards Regulatory History AC83-2 Re Licensee Action During Natl Security emergency,10CFR50 (54FR7178) ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20244E2681989-04-12012 April 1989 Summary of Operating Reactors Events Meeting 89-015 on 890412.Discussion of Events,List of Attendees & Three Significant Items Identified for Input Into NRC Performance Indicator Program & Summary of Reactor Scrams Also Encl ML20244A5571989-04-10010 April 1989 Notification of 890502 Meeting W/Util in Rockville,Md to Discuss Nonlinear Piping Analysis to Remove Snubbers & Pipe Supports ML20244A5461989-04-10010 April 1989 Notification of 890503 Meeting W/Util in Rockville,Md to Discuss Using Leak Before Break Methodology on Lines Connected to RCS ML20247E8051989-03-27027 March 1989 Notification of 890329 Meeting W/Ge in Rockville,Md to Discuss Conditional Containment Failure Probability Definition,Source Term & Other Severe Accident Issues Re Advanced LWR ML20247B7351989-03-24024 March 1989 Notification of 890503 Meeting W/B&W,Inel & Util in Rockville,Md to Discuss Licensing Submittals for Plants ML20236B3751989-03-0909 March 1989 Forwards to Wj Johnson,Forwarding NRC Draft SER Re RESAR SP/90 on Listed Technical Areas.Ltrs Provided to ACRS Members of Progress in Reviewing Pda Application ML20236D5751989-03-0909 March 1989 Forwards to Wj Johnson,Forwarding NRC Draft SER Re RESAR SP/90 on Listed Technical Areas.Ltrs Provided to Inform CRGR Members of Progress in Reviewing Pda Application ML20236B3261989-03-0808 March 1989 Notification of 890313 Meeting W/Ge in San Jose,Ca to Discuss Severe Accident Design of Advanced BWR & NRC Certification Process ML20236A9721989-03-0707 March 1989 Forwards Feb 1989 Status Rept Re Current Review Milestones for Each Std Plant Project ML20235S6271989-02-28028 February 1989 Notification of 890307 Meeting W/Bwr Owners Group in Rockville,Md to Discuss Items of Current Interest.Agenda Encl ML20246N3171989-02-23023 February 1989 Notification of 890313 Meeting w/C-E in Rockville,Md to Discuss Results of Salem Project & Licensing of Future C-E Projects NUREG/CR-5176, Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants1989-02-14014 February 1989 Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants ML20245E9441989-01-31031 January 1989 Forwards Proposed plant-specific Backfit for Improved Auxiliary Feedwater Sys Reliability Analyses for Required Improvement in Secondary DHR Capability at Plant ML20196C2701988-12-0202 December 1988 Notification of 881207 Meeting W/Util in Rockville,Md to Discuss Dcrdr Submittal of 880825 ML20196B6081988-11-29029 November 1988 Forwards Status Rept for Nov 1988 Re Std Plant Design Technical Reviews ML20206M9231988-11-23023 November 1988 Lists Questions Raised by Board Study of Licensee Environ Repts on Facilities,For Responses & Comments.Served on 881125 ML20195J0141988-11-22022 November 1988 Notification of 881214 Meeting W/Util in Rockville,Md to Discuss Licensing Actions at Plants ML20195J3231988-11-18018 November 1988 Provides Responses Re Review of Resolution of USIs & Generic Safety Issues for RESAR SP/90,per 881027 Request ML20206J6441988-11-16016 November 1988 Requests Responses to Listed Questions Re Proceeding, Including Explanation of Environ Consequences Caused by Movement of Centrifuges from State of Oh to State of Tn. Served on 881117 ML20206E6361988-11-14014 November 1988 Forwards Fr Notice Re Applications for Amends to Licenses DPR-51,NPF-6 & NPF-38,authorizing Addition of Sys Energy Resources,Inc as Licensee & Requests Comments on Antitrust Issues 1994-06-29
[Table view] |
Text
_ _ _ _ _ _ _ _ _ -
- UNITED STATES 8
't NUCLEAR REGULATORY COMMISSION t gj WASHINGTON, D. C. 20555 k * . . . + ,o/ July 1, 1988 Docket No. 50-601 and 50-605 Project Nos. 669, 675, and 676 l
)
MEMORANDUM FOR: L. Shao, Director Division of Engineering and System Technology, NRR J. Partlow, Director Division of Reactor Inspection and Safeguards, NRR f F. Congel, Director l Division of Radiation Protection and Emergency Preparedness, NRR J. Roe, Director I Division of Licensee Performance and f Ouality Evaluation, NRR R. W. Houston, Acting Director Division of Reactor Accident Analysis, RES l FROM: Lester S. Rubenstein, Acting Director i Standardization and Non-Power Reactor Project Directorate <
Division of Reactor Projects III, IV, ;
V and Special Projects, NRR )
SUBJECT:
STATUS REPORT ON STANDARD PLANT DESIGN TECHNICAL REVIEWS l l
Attached is the June status report concerning the current review milestones I for each of the standard plant projects i ?RI, ABWR, RESAR SP/90, and CE System 80+).
Note the "Due Date" column reflects dates established in the January 25, 1988 "Revised Program Plan For Standard Plant Reviews" or dates for which modifica-tion was agreed to by PDSNP and the review branch.
i CONTACT:
T. Kenycn NRR/PDSNP %0g Ext. 21120 V
\l\
8807120628 880701 PDR ADOCK 05000601 n PDC
I f
2-The column "Expected Input Date" reflects input from appropriate technical
. branch management. Category 1 items have been discussed with the appropriate Assistant Directors. I request any problems in meeting these input dates be identified to me by the appropriate Assistant Director within a week of receipt of this memo.
WS'S Lester S.
b '
ubenstein, Acting Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, Y and Special Projects, NRR
Enclosure:
As stated cc: T. Murley J. Sniezek F. Miraglia J. Richardson C. Y. Cheng L. B. Marsh C. McCracken A. Thadani J. Joyce J. Mauk F. Rosa J. Craig M. W. Hodges B. Grimes R. Erickson D. Matthews R. Barrett L. Cunningham H. Miller A. Beach W. Regan, Jr.
J. Murphy G. Bagchi
l Data: June 29, 1988 .
REVIEW STATUS REPORT ON MESTINGHOUSE RESAR SP/90 ,
PDA REVIEW Expected Divisionf Due Input Brrnch Reviewer Modules Subject
- Milestone Data Date Cat.** Comnents I
DEST /EMTB Johnson 1, 4, 5, 688, 7, Materials Engineering Draft SER 3/31/88 4/29/88 4 Complete 10 to P.M. 5/5/88 DEST /EMEB Rajan/Brammer*** 1, 4, 5, 7, Mechanical Engineering Draft SER 8/05/880 8/05/88 '3 Awaiting to P.M. Input from E -
Expected 6/30/88 DEST /ESGB Staley 3 Hydrology Draft SER 3/31/88 3/30/88 4 Complete to P.M.
! Giese-Koch 3 Geology & Seismology Draft SER 3/31/88 3/30/88 4 Complete l to P.M.
l l
Chan 7 Civil Engineering Draft SER 4/29/88 4/28/88 4 Complete to P.M.
l
- See September 29, 1987 memo for complete listing of review assignments
- 1. AD or above attention requested
- 2. Branch Chief attention rectuested
- 3. On schedule
- 4. Complete
- Brassner providing assistance l
0 Due date extended from 7/01/88 to 8/05/88 because of delay in y response.
l
Cata: June 29, 1988 ,
REVIEW STATUS REPORT ON WESTINGHOUSE RESAR SP/90 '
PDA REVIEW (Cont.)
Expected "ivision/ Lue Input Branch Reviewer Modules Subject
- Milestone Date Date Cat.** Consnents DEST /ECEB Wing 1, 6&8, 10, 13 Chemical Engineering Draft SER 3/31/88 3/17/88 4 Complete Notley 13 Fire Protection Draft SER 7/15/880 7/15/88 3 Input rac'd to P.M. 4/28/88 DEST /SICB Burrows 9, 13, 15 Instrumentation & Draft SER 3/31/88 4/07/88 4 Complete Controls to P.M.
I DEST /SELB Trehan 9, 13 Electrical Engineering Draft. SER 3/31/88 4/13/88 4 Complete to P.M.
DEST /SPLB Shum (lead) 1, 10, 13 Containment Systems Draft SER 6/21/88f 6/21/88 4 Complete to F.M.
l l l
, l
- See September 29, 1987 memo for complete listing of review assignments
l
- 1. AD or above attention requested l
- 2. Branch Chief attention requested
- 3. On schedule l 4. Complete 0 Due date extended from 5/13/88 to 6/30/88 because of delays in W response.
l m .
_ __- - __ ._.a w___- ._
Dste: Junn 29. 1988 REVIEW STATUS REPORT ON WESTINGIOUSE RESAR SP/90 PDA REVIEW ~
(Cont.)
Expected Division / .
Due input Branch Reviewer Modules Subject
- Milestone Date Date Cat.** Consnents DEST /SPLB Wagner 688, 7 Plant Systems Draft SER 6/21/88 6/21/G8 4 Complete (cont.) to P.M.
Walker 7 Equipment Oualification Draft SER 6/21/88 6/21/88 4 Complete to P.M.
Gill 4 Plant Systems Draft SER 6/21/88 6/21//88 4 Complete to P.M.
Lee 6&8, 10, HVAC Systems, Waste Draft SER 6/21/88 6/21/88 4 Complete 12, 13 Management, Steam & to P.M.
Power Conversion
- See September 29, 1987 memo for complete listing of review assignments
- 1. AD or above attention requested
- 2. Branch Chief attention requested
- 3. On schedule
- 4. Complete
l Date: June 29, 1988 ,
l 1
1 '
REVIEW STATUS REPORT ON WESTINGHOUSE RESAR SP/90 ,
PDA REVIEW (Cont.)
Expected Division / Due Input Branch Reviewer Modules Subject
- Milestone Date Date Cat.** Comments DEST /SPLB Raval 13 Plant Systems Draft SER 6/21/88 6/21/88 4 Complete (cont.) to P.M.
DEST /SRXB Liang 1, 4, 5, 688, Reactor Systems Draft SER 6/28/88 6/28/88 4 Complete 9, 10, 11, 12 to P.M.
DRIS/RSGB Mendelschn 2 Physical Security Draft SER 3/31/88 3/22/88 4 Complete to P.M.
DLPQ/LQAB Spraul 13 Quality Assurance Draft SER 4/29/88 4/06/88 4 Complete to P.M.
- See September 29, 1987 memo for complete listing of review assignments
- 1. AD or above attention requested
- 2. Branch Chief attention requested
- 3. On schedule
- 4. Complete
Date: June 29, 1988 ,
l REVIEW STATUS REPORT ON WESTINGHOUSE RESAR SP/90 '
PDA REVIEW (Cont.)
Expected Division / Due Input Branch Reviewer Modules Subject
- Milestone Date Date Cat.** Comments DLPQ/LHFB Lapinski 15 Control Room / Human Draft SER 3/31/88 5/05/88 4 Complete Factors Engineering to P.M.
DREP/PRPB Spickler 1,3,4,5, Radiological Accident Draft SER 8/1/88 8/01/88 3 Add'l vendor 638, 9, 10 Analysis to P.M. input rec'd 5/27/88 Skopec 12 Process & Effluent Draft SER 7/15/88 7/'iS/88 3 Radiological to P.M.
Monitoring & Sampling Systems RES/PRA Chelliah/BNL 16 Probabilistic Safety Draft 2/26/88 6/30/88 1 DSER in Study - back end SER to concurrence P.M.
- See September 29, 1987 memo for complete listing of review assignments
- 1. AD or above attention requested
- 2. Branch Chief attention requested
- 3. On schedule
- 4. Complete
Date: June 29, 1988 ,
l REVIEW STATUS REPORT ON GE ABWR ~
FDA/DC REVIEW l
Expected Division / SRP Due Input Branch Reviewer Chapter Subject Milestone Date Date Cat.* Comments DEST /SPLB Chandrasekaran 5, 6, 15 Plant Systcms RAIs to 6/30/88 6/30/88 3 SPLB issued.
P.H. contract for review to SAI.
New input date established.
DEST /SRXB Thomas 4, 5, 6, 15 Reactor Systems RAIs to 6/30/88 6/30/88 3 New input date i P.M. established.
(RAIs on Sec-tion 4.6 have
!. been received I by PM.)
4
!
- 1. AD or above attention requested
' 2. Branch Chief attention requested
- 3. On schedule
- 4. Complete 1
a
Date: June 29, 1988 REVIEW STATUS REPORT ON EPRI'5 ALWR REQUIREMENTS DOCUMENT Expected Division / Due Input Branch Reviewer Chapter Subject
- Milestone Date Date Cat.* Comments DEST / EMES Rajan 5 Eng. Safety Systems DSER to 06/30/88** 3 P.it.
DEST /EMTB Tsao 5 Eng. Safety Systems DSER to 06/30/88** N/A 4 Reviewer will 4 P.M. have no input DEST /SICB Stewart 5 Eng. Safety Systems DSER to 06/30/88** 3 i
P.M.
j DEST /SELB Lazevnick 5 Eng. Safety Systems DSER to 06/30/88** -3
! P.M.
I DEST /SPLB Shum 5 Eng. Safety Systems DSER to 06/30/88** 3 P.M.
DEST /SRXB Schwenk 5 Eng. Safety Systems DSER to 06/30/88** 3 P.M.
1
- l. AD or above attention requested
- 2. BC attention requested
- 3. On schedule
- 4. Complete
- Due date to be reestablished upon receipt of respor.ses to RAI
l .. .
Date: June 29, 1988 ,
REVIEW STATUS REPORT ON EPRI'S ALWR REOUIREMENTS DOCUMENT '
(Cont.)
Expected
, Division / Due Input Branch Reviewer Chapter Subject
- Milestone Date Date Cat.* Comments DREP/RPB Branagan 5 Eng. Safety Systems DSER to 06/30/88** 3 P.M.
DEST /ECEB Parczewski 5 Eng. Safety Systems DSER to 06/30/88** 3 P.M.
DREP/RAB Kelly 5 Eng. Safety Systems DSER to 06/30/88** 3 P.M.
1 i
- 1. AD or above attention requested i
- 2. BC attention requested l 3. On schedule l 4. Complete
- Due date to be reestablished upon receipt of responses to RAI ..
Date: June 29, 1988 REVIEW STATUS REPORT ON CE SYSTEM 80+ '
CESSAR-DC REVIEk' Expected Division / Due Input Branch Reviewer Chapter Subject Milestone Date Date Cat.* Comments DEST /SRXB L. Kopp 4 Reactor RAI 07/10/88 06/21/88 4 Complete DEST /ENTB H. Hum 4 Reactor RAI 07/10/88 07/10/88 3 DEST /EMEB H. Shaw 5 Reactor Coolant System RAI 07/10/88 07/10/88 3 DEST /EMEB J. Rajan 5 Reactor Coolant System RAI 07/10/88 07/10/88 3 DEST /SRXB L. Kopp 5 Reactor Coolant System RAI 07/10/88 06/21/88 4 Complete DEST /EMTB H. Hum 5 Reactor Coolant System RAI 07/10/88 07/10/88 3 DEST /SPLB J. Raval 5 Reactor Coolant System RAI 07/10/88 07/29/88@ 2 DEST /ECEB F. Witt 5 Reactor Coolant System RAI 07/10/88 06/23/88 4 Complete 4
DEST /SPLB J. Raval 9 Auxiliary System RAI 07/10/88 07/29/880 2 DEST /ECEB F. Witt 9 Auxiliary System RAI 07/10/88 07/10/88 3 f DEST /SRXB L. Kopp 9 Auxiliary System RAI 07/10/88 06/21/88 4 Complete DEST /SICB J. Stewart 9 Auxiliary System RAI 07/10/88 07/10/88 3
\
- 1. AD or above attention requested
- 2. Branch Chief attention requested 1 3. On schedule
- 4. Complete 1 0 Input delayed due to availability of reviewer.
Date: June 29, 1988 ,
REVIEM STATUS REPORT ON SYSTEM 80 CESSAR-F ,
REVIEW l
l Expected-l Division / Due Input t
Branch Reviewer Chapter Subject Milestone Date Date Cat.* Consnents DEST /SRXB C. Liang TAC 66400, ASPSS ISSUE Final SER 6/30/88 6/30/88** 3- On schedule to P.M. ,
DEST /EMEB J. Rajan TAC 66401, Steam Gen. Tube Vibration RAIs to open open 3- Awaiting input P.M. from applicant DEST /EMTB W. Wickman TAC 66401, Steam Gen. Tube Vibration RAIs to open open 3 Awaiting input P.H. from applicant
- 1. AD cr above attention requested
- 2. Branch Chief attention requested
- 3. On schedule
- 4. Complete
~.
Date: June 29, 1988 REVIEW STATUS REPORT ON I CE SYSTEM 80+
l CESSAR-DC REVIEW
Expected Division / Due Input l Branch Reviewer Chapter Subject Milestone Date Date Cat.* Comments i
RES/SAIB C. Ferrell Topic Paper Set 10 ARSAP Issues RAI 06/15/88 C6/30/88 2 Comments No. I provided-CE at meeting 6/21/88 l
l l
l
- 1. AD or above attention requested
- 2. Branch Chief attention requested
- 3. On schedule
- 4. Complete I
.,, .- ,j _,
July 1, 1988 e
2 The column "Expected Input Date" reflects input from appropriate technical branch management. Category 1 items have been discussed with the appropriate Assistant Directors. I request any problems in meeting these input dates be identified to rre by the appropriate Assistant Director within a-week of receipt of this memo, original signed by Lester S. Rubenstein, Acting Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, Y and Special Projects, NRR
Enclosure:
As stated cc: T. Murley J. Sniezek F. Miraglia J. Richardson C. Y. Cheng L. B. Marsh C. McCracken A. Thadani J. Joyce J. Mauk F. Rosa J. Craig M. W. Hodges B. Grimes R. Erickson D. Matthews R. Ba-rett L. Cunningham H. Miller A. Beach W. Regan, Jr. ,
J. Murphy '
G. Bagebi DISTRIBUTION:
l Docket File EHylton ADR4 NRC PDR PLeech SNewberry <
PDSNP Reading DScaletti A l
GVissing DCrutchfield y LRubenstein TKeny n l
i
\
]f \
PD 'T 1
}h on:cw AS LRu h tein U6 D/88 05/l/88 1