Forwards Mar 1988 Status Rept Re Std Plant Design Technical Reviews
ML20148J896
Person / Time
Site: 05000000, 05000605, 05000601
Issue date: 03/23/1988
From: Rubenstein L
Office of Nuclear Reactor Regulation
To: Shao L
Office of Nuclear Reactor Regulation
References
NUDOCS 8803300422
Download: ML20148J896 (15)


Text

r s

[

k2 RIO UNITED STATES g

NUCLEAR REGULATORY COMMISSION

[

g W ASHINGTON, D. C. 20555

,E

j

%%....*/

MAR 2 31988 Docket No. 50-601 and 50-605 Project Nos. 669, 675, and 676 MEMORANDUM FOR:

L. Shao, Director Division of Engineering and System Technology, NRR J. Partlow, Director Division of Reactor Inspection and Safeguards, NRR F. Congel, Director Division of Radiation Protection and Emergency Preparedness, NRR J. Roe, Director Division of Licensee Performance and Quality Evaluation, NRR R. W. Houston, Acting Director Division of Reactor Accident Analysis, RES FROM:

Lester S. Rubenstein, Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, Y and Special Projects, NRR

SUBJECT:

STATUS REPORT ON STANDARD PLANT DESIGN TECHNICAL REVIEWS Attached is the March status report concerning the current review milestones for each of the standard plant projects (EPRI, ABWR, RESAR SP/90, and CE System 80+).

Note the "Due Date" column reflects dates established in the January 25, 1988 "Revised Program Plan For Standard Plant Reviews" or dates for which modification was agreed to by PDSNP and the review branch,

\\

h

  • U'M0500fgy1 gD ' h g

$8j3300422seo3g3 QO b

b 3

,,b]h y{3Mj CONTACT:

Q y ], {

T. Kenyon g'

fp e NRR/PDSNP Ext. 21120 4dcj

l..

The column "Expeta.ed Input Date" reflects input from appropriate technical branch managemev.

Category 1 items have been discussed with the appropriate Assistant Direct. s.

I request any problems in meet'ng these input dates be identified to me by the appropriate Assistant Directo. within a week of receipt of this memo.

w 0 l,'p?. K__7' ef f

.60s.

Lester S'. Rubenstein, Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, Y and Special Projects, NRR

Enclosure:

As stated cc:

T. Murley J. Sniezek F. t'iraglia J. Richardson C. Y. Cheng L. B. Marsh C. McCracken A. Thadani J. Joyce J. Mauk F. Rosa J. Craig M. W. Hodges B. Grimes R. Erickson D. Matthews R. Barrett L. Cunningham H. Miller A. Beach W. Regan, Jr.

J. Murphy G. Bagchi

'. The column "Expected Input Date" reflects input from appropriate technical branch management.

Category 1 items have been discussed with the appropriate Assistant Directors.

I request any problems in meeting these input dates be identified to me by the appropriate Assistant Director within a week of receipt of this memo.

Oricinal Signed By:

Lester S. Rubcnstein, Director Standardization and Non-Power i

Reactor Project Directorate Division of Reactor Projects III, IV, Y and Special Projects, NRR

Enclosure:

As stated cc:

T. Murley J. Sniezek F. Miraglia J. Richardson C. Y. Cheng L. B. Marsh C. McCracken A. Thadani J. Joyce J. Mauk F. Rosa J. Craig M. W. Hodges B. Grimes R. Erickson D. Matthews R. Barrett L. Cunningham H. Miller A. Beach W. Regan, Jr.

J. Murphy G. Bagchi DISTRIBUTION:

Docket-File EHylton ADR4 NRC PDR Pleech SNewberry PDSNP Reading DScaletti GVissing DCrutchfield LRubenstein TKenyon PDSt PDSNP El(/ yon:cw LRubenstein 03/%/88 03/a/88

~

'h)l.

Date:

March 22, 1988 REVIEW STATUS REPORT ON WESTIliGHOUSE RESAR SP/90 PDA REVIEW Expected Due Input Division /

Branch Reviewer Modules Subject

  • Milestone Date Date Cat.**

Comments DEST /EMTB Johnson 1, 4, 5, 6&8, 7, Materials Engineering Draft SER 3/31/88 3/31/88 3

Input Rec'd 10 to P.M.

1/7/88 DEST /EMB Hou/Brammer***

1,4,5,7, Mechanical Engineering Draft SER 4/29/889 4/29/88 3

Awaiting to P.M.

Input from W -

Expected 3/31/88 DEST /ESGB Staley 3

Hydrology Draft SER 3/31/88 3/31/88 3

Input Rec'd to P.M.

10/26/87 Giese-Koch 3

Geology & Seismology Draft SER 3/31/88 3/31/88 3

Awaiting to P.M.

Input from W -

Reviewer writing DSER w/open items Chan 7

Civil Engineering Draft SER 3/31/88 3/31/88 3

Input Rec'd to P.M.

1/7/88 o

See September 29, 1987 memo for complete listing of review assignments Category definitions:

1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete coo Brammer providing assistance i

9 Duo date extended from 3/31/88 to 4/29/88 because of delay in W response.

Date:

March 22, 1988 REVIEW STATUS REPORT ON WESTINGHOUSE RESAR SP/90 PDA REVIEW (Cont.)

Expected Due Input Division /

Branch Reviewer Modules Subject

  • Milestone Date Date Cat.**

Comments DEST /ECEB Wing 1, 6&8, 10, 13 Chemical Engineering Draft SER 3/31/88 3/17/88 4

Complete Notley 13 Fire Protection Draft SER 4/29/880 4/29/88 3

Awaiting input to P.M.

from W -

Expected 3/23/88 DEST /SICB Burrows 9, 13, 15 Instrumentation &

Draft SER 3/31/88 3/31/88 3

Input Rec'd Controls to P.M.

3/15/88 DEST /SELB Trehan 9, 13 Electrical Engineering Draft SER 3/31/88 4/08/88+

3 Input Rec'd to P.M.

12/17/87 DEST /SPLB Shum (lead) 1, 10, 13 Containment Systems

. Draft SER 5/06/887 5/06/88 3

Awaiting input to P.M.

from W -

Expected 3/31/88 o

See September 29, 1987 memo for complete listing of review assignments 00 Category definitions:

1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete 0 Due date extended from 3/31/88 to 4/29/88 because of delays in W response.

+ Input date extended because of availability of reviewer.

  1. Due date extended from 3/31/88 to 5/06/88 because of delays in W response; SAI may complete review.

Date:

March 22, 1988 REVIEW STATUS REPORT ON WESTINGHOUSE RESAR SP/90 PDA REVIEW (Cont.)

Expected Due Input Division /

Branch Reviewer Modules Subject

  • Milestone Date Date Cat.**

Comments DEST /SPLB Wagner 6&8, 7 Plant Systems Draft SER 5/06/88# 5/06/88 3

Awaiting input (cont.)

to P.M.

from W -

Expected 3/31/88 Walker 7

Equipment Qualification Draft SER 5/06/88# 5/06/88 3

Awaiting input to P.M.

from W -

Expected 3/31/88 Gill 4

Plant Systems Draft SER 5/06/88f 5/06/88 3

Awaiting input to P.M.

from W -

Expected 3/31/88 Lee 688, 10, HVAC Systems, Waste 6 raft SER 5/06/88# 5/06/88 3

Awaiting input 12, 13 Management, Steam &

to P.M.

from W -

Power Conversion Expected 3/31/88 See September 29, 1987 memo for complete listing of review assignments Category definitions:

1. A0 or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete
  1. Dua date extended from 3/31/88 to 5/06/88 because of delays in W response; SAI may complete review.

Date:

March 22, 1988 REVIEW STATUS REPORT ON WFSTINGHOUSE RE5AR SP/90 PDA REVIEW (Cont.)

Expected Division /

Due Input Branch Reviewer Modules Sub,1ect*

Milestone Date Date Cat.**

Comments DEST /SPLB Raval 13 Plant Systems Draft SER 5/06/88f 5/06/88 3

Awaiting input (cont.)

to P.M.

from W -

Expected 3/31/88 DEST /SRXB Liang 1, 4, 5, 688, Reactor Systems Draft SER 5/16/88+ 5/16/88 3

Awaiting input 9, 10, 11, 12 to P.M.

from W -

ExpecY 4/15/88 DRIS/RSGB Mendelsohn 2

Physical Security Draft SER 3/31/88 3/31/88 3

Awaiting to P.M.

Input from )[

DLPQ/LQAB Spraul 13 Quality Assurance Draft SER 4/29/880 4/29/88 3

Awaiting

.to P.M.

Input from )[

See September 29, 1987 memo for complete listing of review assignments

    • Category definitions:
1. AD or above attention requested j
2. Branch Chief attention requested
3. On schedule
4. Complete 0 Due date extended from 3/31/88 to 4/29/88 because of delays in W response.

+Duadateextendedfrom3/31/88to5/16/88becauseofdelaysinHresponse cnd availability of reviewer; additional RAIs/ concerns expected;

  1. Due date extended from 3/31/88 to 5/06/88 because of delays in )[ response; SAI may complete review.

l

Date:

March 22, 1988 REVIEW STATUS REPORT ON WESTINGHOUSE RESAR SP/90 PDA REVIEW (Cont.)

Expected Division /

Due Input Branch Reviewer Modules Subject

  • M'lestone Date Date Cat.**

Comments DLPQ/LHFB Lapinski 15 Control Room / Human Draft SER 3/31/88 6/30/88#

1 Workload Factors Engineering to P.M.

impacting input date DREP/PRPB Spickler 1,3,4,5, Radiological Accident Draft SER 3/31/88 4/29/88+

2 Workload 6&B, 9,10 Analysis to P.M.

impacting input date Skopec 12 Process & Effluent Draft SER 4/29/880 4/29/88 3

Awaiting input Radiological to P.M.

from W -

l Monitoring & Sampling Expected Systems 3/23/88 RES/PRA Chelliah/BNL 16 Probabilistic Safety Draft 2/26/88 3/25/88 1

Work 1 cad Study - back end

'SER to impacting i

P.M.

input date See September 29, 1987 memo for complete listing of review assignments Category definitions:

1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete

+ Input date modified due to availability of reviewer.

l 0 Du2 date extended from 3/31/88 to 4/29/88 because of delays in W response.

  1. Br;nch cannot support 4/29/88 input date required to support DSER issuance date; reviewers working on SPDS Generic Letter; Input promised 6/30/88.

l

Date: March 22, 1988 REVIEW STATUS REPORT ON GE ABWR FDA/DC REVIEW Expected Division /

SRP Due Input Branch Reviewer Chapter Subject Milestone Date Date Cat.*

Comments DEST /SPLB Chandrasekaran 5, 6, 15 Plant Systems RAIs to 6/15/88 6/15/88 3

SPLB issued P.M.

contract for review to SAI.

New input date established.

DEST /SRXB Thomas 4, 5, 6, 15 Reactor Systems RAIs to 6/30/88 6/30/88 3

New ir.put date P.M.

established.

(RAIs on Sec-tion 4.6 have been received by PM.)

  • Category definitions:
1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Coniplete m

Date: March 22, 1988 REVIEW STATUS REPORT ON CE SYSTEM 80+

CESSAR-DC REVIEW Expected Division /

Due Input Branch Reviewer Chapter Subject Milestone Date Date Cat.*

Coments DEST /EMTB Martin Hum Chapter 10 Steam and Power RAI 02/28/88 02/28/88 4

RAI 3/ll/88C Conversion Licensing Review Bases Coments 02/28/88 02/28/88 4

Coments recvd DEST /SPLB Janak Raval Chapter 10 Steam and Power RAI 02/28/88 02/28/88 4

RAI 3/15/88C Conversion Licensing Feview Bases Coments 02/28/88 02/28/88 4

Coments reevd DLPQ/LQAB Jack Spraul Chapter 17 Licensing Review Bases RAI 02/28/88 02/28/88 4

RAI 2/26/88C 2

Licensing Review Bases Comments 02/28/88 02/28/88 4

No coments DEST /EMEB Horoce Shaw Licensing Review Bases Comments 02/28/88 3/15/88 4

Coments coming DEST /EMEB J. Rafaa Licensing Review Bases

. Coments 02/28/88 3/15/88 4

Coments coming DEST /ECSB N. Romney Licensing Review Bases Corsnents 02/28/88 02/28/88 4

No comments

  • Category definition:
1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete

Date: March 22, 1988 REVIEW STATUS REPORT ON CE SYSTEM 80+

CES5AR-DC Review (Cont.)

Expected Due Input Division /

Branch Reviewer Chapter Subject Milestone Date Date Cat.*

Consnents DEST /SICB James Stewart Licensing Review Bases Comants 02/28/88 02/28/88 4

No comments DEST /SELB

0. Chopra Licensing Review Bases Coments 02/28/88 02/28/88 4

No comments DEST /SRXB Larry Kopp Licensing Review Bases Comments 02/28/88 02/28/88 4

No comments DREP/PEPB Richard VanHiel Licensing Review Bases Comments 02/28/88 02/28/88 4

Comments recvd DREP/PRAB G. Kelly Licensing Review Bases Coments 02/28/88 02/28/88 4

Comments recvd DREP/PRPB T. Essic Licensing Review Bases Coments 02/28/88 02/28/88 4

Comments recvd DOAE/0TSB R. Giardina Licensing Review Bases Coments 02/28/88 02/28/88 4

Coments in typing DLPQ/LHFB G. Lapinsky Licensing Review Bases

, Comments 02/28/88 02/28/88 4

No coments DRAA/PRAB E. Chelliah Licensing Review Bases Consnents 02/28/88 02/28/88 4

Comments coming

  • Category definition:
1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete I

Dste: March 22, 1988 REVIEW STATUS REPORT ON SYSTEM 80 CESSAR-F REVIEW Expected Division /

Due Input Branch Reviewer Chapter Subject Milestone Date Date Cat.*

Coments DEST /SRXB C. Liang TAC 66400, ASPSS ISSUE Final SER 5/16/889 5/16/88**

3 On schedule to P.M.

DEST /EMEB J. Rajan TAC 66401, Steam Gen. Tube Vibration RAIs to open open 3

Awaiting input P.M.

from applicant DEST /EMTB W. Wickman TAC 66401, Steam Gen. Tube Vibration RAIs to open open 3

Awaiting input P.M.

from applicant i

Category definition:

1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete
    • Close out issue 9 Due date extended from 3/31/88 to 5/16/88 to suppert RESAR SP/90 review schedule

Date: March 22, 1988 REVIEW STATUS REPORT ON EPRI'5 ALWR REQUIREMENTS DOCUMENT Expected Division /

Due Input Br:nch Reviewer Chapter Subject

  • Milestone Date Date Cat.* Comments DEST /EMEB Hartzman 3

Reactor Coolant Systems DSER to 03/15/88 03/30/88** 2 P.M.

Hartzman 4

Reactor Systems DSER to 03/15/88 03/30/88** 2 P.M.

Rajan 5

Eng. Safety Systems RAI to 03/21/88*** 03/21/88** 3 In typing P.M.

DEST /EMTB Tsao 3

Reactor Coolant Systems DSER to 03/15/88 03/04/88 4

P.M.

4 Reactor Systems DSER to 03/15/88 03/08/88 4

P.M.

5 Eng. Safety Systems RAI to 02/29/88 N/A 4

Reviewer will P.M.

have no RAI Category Definition:

1. AD or above attention requested
2. BC attention requested
3. On schedule
4. Complete Expected input date extended because of reviewer's workload
      • Due date extended because of extra time needed by new reviewer.

}

Date: March 22, 1988 REVIEW STATUS REPORT ON EPRI'5 ALWR REQUIREMENTS DOCUMENT (Cont.)

Expected Due Input Division /

Branch Reviewer Chapter Subject

  • Milestone Date Date Cat.* Comments u;.l/SICB Stewart 3

Reactor Coolant Systeins DSER to 03/15/88 03/1/88 4

P.M.

4 Reactor Systems DSER to 03/15/88 03/1/88 4

P.M.

5 Eng. Safety Systems RAI to 02/29/88 03/25/88 2 In typing, informal P.M.

copy in hand DEST /SELB Lazevnick 3

Reactor Coolant Systems DSER to 03/15/88 03/21/88 4 Complete P.M.

4 Reactor Systems DSER to 03/15/88 03/21/88 4 Complete P.M.

5 Eng. Safety Systems RAI to 04/01/88 04/01/88 3 P.M.

DEST /SPLO Shum 3

Reactor Coolant Systems DSER to 03/15/88 03/23/88 2 In typing P.M.

Category Definition:

1. AD or above attention requested
2. BC attention requested
3. On schedule
4. Complete

1.-

Dato: March 22, 1988 REVIEW STATUS REPORT ON EPRI'5 ALWR REQUIREMENTS DOCUPENT (Cont.)

Expected Division /

Due Input Branch Reviewer Chapter Subject

  • Milestone Date Date Cat.* Comments DEST /SPLB Shum 4

Reactor Systems DSER to 03/15/88 03/23/88 2 In typing (cont.)

P.M.

Shum 5

Eng. Safety Systems RAI to 02/29/88 02/23/88 4 P.M.

DEST /SRXB Schwenk 5

Eng. Safety Systens RAI to 04/11/88***

TBD 3

P.M.

DREP/RPB Branagan 5

Eng. Safety Systems RAI to 02/29/88 02/29/88 4 P.M.

DEST /ECEB Parczewski 3

Reactor Coolant System DSER to 03/15/88 03/16/88 4 P.M.

4 Reactor Systems DSER to 03/15/88 03/16/88 4 P.M.

5 Eng. Safety Systems RAI to

, 04/01/88***

TBD 3

P.M.

Category Definition:

1. AD or above attention requested
2. BC attention requested
3. On schedule
4. Complete
      • Due date established on basis reviewer would obtain any needed informaticn in meeting with EPRI consultants. RAIs to be provided ahead of such meetings to assist EPRI preparation.

1

-