Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARNUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20217C9891991-07-16016 July 1991 Notification of 910716 Meeting W/Util in Rockville,Md to Discuss Topics Re Certification Review of Advanced BWR ML20059J5551990-09-12012 September 1990 Submits Daily Highlight.On 900918 & 19,meeting Will Be Held W/Ge in Rockville,Md to Discuss Concept & Technologies Used in Simplified BWR in Order for NRC to Define Research User Needs for Passive Designs.Meeting Agenda Encl ML20059J7501990-09-0707 September 1990 Requests RESAR SP/90 Technical Reviewer Support During Listed ACRS Meetings.Full Committee Meeting Scheduled for 901004,05 or 06 ML20058Q2621990-08-16016 August 1990 Forwards Documents for Advanced BWR Docket Files ML20055D5351990-07-0505 July 1990 Notification of 900717 Meeting W/Ge in Rockville,Md to Discuss Design Features & Research Efforts Re GE Sbwr Plant Design ML20044A2331990-06-15015 June 1990 Notification of 900619 Meeting W/Westinghouse in Rockville, MD to Discuss Views of Level of Design Detail Required for Design Certification ML20033E2411990-03-0505 March 1990 Notification of 900307 Meeting W/Ge in Rockville,Md to Discuss Potential Power Reactor Upgrades ML20055C3521990-02-26026 February 1990 Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20248C8311989-09-20020 September 1989 Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action ML20247H9261989-09-0909 September 1989 Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 ML20247D9151989-09-0808 September 1989 Notification of 890912-13 Meetings W/Ge in San Jose,Ca to Discuss Review of PRA for Advanced BWR (Abwr),Including Focus on Refinements in Internal Events PRA That Have Resulted from Consideration of ABWR Design Enhancements ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20245H6451989-08-0404 August 1989 Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR ML20248D1431989-07-27027 July 1989 Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants ML20247B7541989-07-19019 July 1989 Confirms That Licensee 880711,890221 & 0630 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss, Acceptable.Licensing Action for TACs 69886,69887,69893 & 69894 Considered Complete ML20247E6721989-07-17017 July 1989 Proposes Closeout of Plant Correspondence Control Ticket Re Environ Conservation Organization Request for Notification Whenever License Amend Requests Result in Impairment of Plant Operability.Intervenor Will Be Placed on Svc List ML20246K5991989-07-12012 July 1989 Notification of 890725 Meeting W/Util in Birmingham,Al to Discuss Status of Current Licensing Activities & Corporate Initiatives for Plants.Meeting Agenda Encl ML20246L6801989-07-10010 July 1989 Notification of Significant Licensee Meeting 89-101 W/Util on 890718 in King of Prussia,Pa to Discuss Util Engineering Reorganization ML20247A9561989-07-0606 July 1989 Notification of 890717 Meeting W/Lead Plant Utils in Rockville,Md to Discuss Implementation of Revised STS ML20246B8331989-07-0505 July 1989 Notification of 890714 Meeting W/Util in Rockville,Md to Discuss Severe Accident & Licensing Issues on RESAR SP/90 ML20042D1901989-06-0808 June 1989 Memorandum Forwarding Partially Deleted Summary of Discussions During NRC 890517-18 Mgt Meeting Re Problem Plants & Addl Topics.Task Assignments & List of Attendees Also Encl ML20246H3771989-05-12012 May 1989 ALAB-913.* Advises That Time Provided within Which Commission May Act to Review Aslab Decision ALAB-913 Expired.Commission Declined Review.Decision Became Final on 890501.W/Certificate of Svc.Served on 890512 ML20246P9601989-05-10010 May 1989 Discusses 890413 Meeting W/Rosemount & Industry Re Malfunctions of Rosemount Transmitters.List of Attendess, Agenda,Nrc Info Notice 89-042 & Viewgraphs Encl ML20246J7321989-05-10010 May 1989 Notification of 890512 Meeting W/Ge in Rockville,Md to Discuss Refinements in Internal Events PAR That Have Resulted from Consideration of Recent Advanced PWR Design Safety Enhancements & External Events PRA ML20246C9811989-05-0303 May 1989 Provides Update of 881122 Low Power License Recommendation for Plant,Reporting Closure of Technical Issue Associated W/ Agastat 7000 Series Relays.Advises of Plant Readiness to Conduct Initial Criticality & Low Power Testing Operations ML20245E9781989-04-17017 April 1989 Forwards Regulatory History AC83-2 Re Licensee Action During Natl Security emergency,10CFR50 (54FR7178) ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20244E2681989-04-12012 April 1989 Summary of Operating Reactors Events Meeting 89-015 on 890412.Discussion of Events,List of Attendees & Three Significant Items Identified for Input Into NRC Performance Indicator Program & Summary of Reactor Scrams Also Encl ML20244A5571989-04-10010 April 1989 Notification of 890502 Meeting W/Util in Rockville,Md to Discuss Nonlinear Piping Analysis to Remove Snubbers & Pipe Supports ML20244A5461989-04-10010 April 1989 Notification of 890503 Meeting W/Util in Rockville,Md to Discuss Using Leak Before Break Methodology on Lines Connected to RCS ML20247E8051989-03-27027 March 1989 Notification of 890329 Meeting W/Ge in Rockville,Md to Discuss Conditional Containment Failure Probability Definition,Source Term & Other Severe Accident Issues Re Advanced LWR ML20247B7351989-03-24024 March 1989 Notification of 890503 Meeting W/B&W,Inel & Util in Rockville,Md to Discuss Licensing Submittals for Plants ML20236B3751989-03-0909 March 1989 Forwards to Wj Johnson,Forwarding NRC Draft SER Re RESAR SP/90 on Listed Technical Areas.Ltrs Provided to ACRS Members of Progress in Reviewing Pda Application ML20236D5751989-03-0909 March 1989 Forwards to Wj Johnson,Forwarding NRC Draft SER Re RESAR SP/90 on Listed Technical Areas.Ltrs Provided to Inform CRGR Members of Progress in Reviewing Pda Application ML20236B3261989-03-0808 March 1989 Notification of 890313 Meeting W/Ge in San Jose,Ca to Discuss Severe Accident Design of Advanced BWR & NRC Certification Process ML20236A9721989-03-0707 March 1989 Forwards Feb 1989 Status Rept Re Current Review Milestones for Each Std Plant Project ML20235S6271989-02-28028 February 1989 Notification of 890307 Meeting W/Bwr Owners Group in Rockville,Md to Discuss Items of Current Interest.Agenda Encl ML20246N3171989-02-23023 February 1989 Notification of 890313 Meeting w/C-E in Rockville,Md to Discuss Results of Salem Project & Licensing of Future C-E Projects ML20245E9441989-01-31031 January 1989 Forwards Proposed plant-specific Backfit for Improved Auxiliary Feedwater Sys Reliability Analyses for Required Improvement in Secondary DHR Capability at Plant ML20117P9051988-12-15015 December 1988 Forwards Info Re IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings, for Region I Plants for Semiannual Status Rept ML20196C2701988-12-0202 December 1988 Notification of 881207 Meeting W/Util in Rockville,Md to Discuss Dcrdr Submittal of 880825 ML20196B6081988-11-29029 November 1988 Forwards Status Rept for Nov 1988 Re Std Plant Design Technical Reviews ML20206M9231988-11-23023 November 1988 Lists Questions Raised by Board Study of Licensee Environ Repts on Facilities,For Responses & Comments.Served on 881125 ML20195J0141988-11-22022 November 1988 Notification of 881214 Meeting W/Util in Rockville,Md to Discuss Licensing Actions at Plants ML20246C9601988-11-22022 November 1988 Provides Update to Original Region I Assessment & Recommendation for Issuance of Low Power OL for Plant. Advises That Region I Continues to Recommend Low Power OL Issuance for Plant W/Special Note of Items Listed 1994-06-29
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARNUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20217C9891991-07-16016 July 1991 Notification of 910716 Meeting W/Util in Rockville,Md to Discuss Topics Re Certification Review of Advanced BWR ML20059J5551990-09-12012 September 1990 Submits Daily Highlight.On 900918 & 19,meeting Will Be Held W/Ge in Rockville,Md to Discuss Concept & Technologies Used in Simplified BWR in Order for NRC to Define Research User Needs for Passive Designs.Meeting Agenda Encl ML20059J7501990-09-0707 September 1990 Requests RESAR SP/90 Technical Reviewer Support During Listed ACRS Meetings.Full Committee Meeting Scheduled for 901004,05 or 06 ML20058Q2621990-08-16016 August 1990 Forwards Documents for Advanced BWR Docket Files ML20055D5351990-07-0505 July 1990 Notification of 900717 Meeting W/Ge in Rockville,Md to Discuss Design Features & Research Efforts Re GE Sbwr Plant Design ML20044A2331990-06-15015 June 1990 Notification of 900619 Meeting W/Westinghouse in Rockville, MD to Discuss Views of Level of Design Detail Required for Design Certification ML20033E2411990-03-0505 March 1990 Notification of 900307 Meeting W/Ge in Rockville,Md to Discuss Potential Power Reactor Upgrades ML20055C3521990-02-26026 February 1990 Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20248C8311989-09-20020 September 1989 Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action ML20247H9261989-09-0909 September 1989 Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 ML20247D9151989-09-0808 September 1989 Notification of 890912-13 Meetings W/Ge in San Jose,Ca to Discuss Review of PRA for Advanced BWR (Abwr),Including Focus on Refinements in Internal Events PRA That Have Resulted from Consideration of ABWR Design Enhancements ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20245H6451989-08-0404 August 1989 Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR ML20248D1431989-07-27027 July 1989 Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants ML20247B7541989-07-19019 July 1989 Confirms That Licensee 880711,890221 & 0630 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss, Acceptable.Licensing Action for TACs 69886,69887,69893 & 69894 Considered Complete ML20247E6721989-07-17017 July 1989 Proposes Closeout of Plant Correspondence Control Ticket Re Environ Conservation Organization Request for Notification Whenever License Amend Requests Result in Impairment of Plant Operability.Intervenor Will Be Placed on Svc List ML20246K5991989-07-12012 July 1989 Notification of 890725 Meeting W/Util in Birmingham,Al to Discuss Status of Current Licensing Activities & Corporate Initiatives for Plants.Meeting Agenda Encl ML20246L6801989-07-10010 July 1989 Notification of Significant Licensee Meeting 89-101 W/Util on 890718 in King of Prussia,Pa to Discuss Util Engineering Reorganization ML20247A9561989-07-0606 July 1989 Notification of 890717 Meeting W/Lead Plant Utils in Rockville,Md to Discuss Implementation of Revised STS ML20246B8331989-07-0505 July 1989 Notification of 890714 Meeting W/Util in Rockville,Md to Discuss Severe Accident & Licensing Issues on RESAR SP/90 ML20246D8841989-06-19019 June 1989 Staff Requirements Memo Re 890601 Briefing on Operating Reactors & Fuel Facilities in Rockville,Md.Commission Expressed Disappointment in Long Term Operating Performance of Turkey Point Nuclear Power Plant ML20042D1901989-06-0808 June 1989 Memorandum Forwarding Partially Deleted Summary of Discussions During NRC 890517-18 Mgt Meeting Re Problem Plants & Addl Topics.Task Assignments & List of Attendees Also Encl ML20246H3771989-05-12012 May 1989 ALAB-913.* Advises That Time Provided within Which Commission May Act to Review Aslab Decision ALAB-913 Expired.Commission Declined Review.Decision Became Final on 890501.W/Certificate of Svc.Served on 890512 ML20246J7321989-05-10010 May 1989 Notification of 890512 Meeting W/Ge in Rockville,Md to Discuss Refinements in Internal Events PAR That Have Resulted from Consideration of Recent Advanced PWR Design Safety Enhancements & External Events PRA ML20246P9601989-05-10010 May 1989 Discusses 890413 Meeting W/Rosemount & Industry Re Malfunctions of Rosemount Transmitters.List of Attendess, Agenda,Nrc Info Notice 89-042 & Viewgraphs Encl ML20246C9811989-05-0303 May 1989 Provides Update of 881122 Low Power License Recommendation for Plant,Reporting Closure of Technical Issue Associated W/ Agastat 7000 Series Relays.Advises of Plant Readiness to Conduct Initial Criticality & Low Power Testing Operations NUREG-1353, Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-13531989-05-0202 May 1989 Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-1353 ML20245E9781989-04-17017 April 1989 Forwards Regulatory History AC83-2 Re Licensee Action During Natl Security emergency,10CFR50 (54FR7178) ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20244E2681989-04-12012 April 1989 Summary of Operating Reactors Events Meeting 89-015 on 890412.Discussion of Events,List of Attendees & Three Significant Items Identified for Input Into NRC Performance Indicator Program & Summary of Reactor Scrams Also Encl ML20244A5461989-04-10010 April 1989 Notification of 890503 Meeting W/Util in Rockville,Md to Discuss Using Leak Before Break Methodology on Lines Connected to RCS ML20244A5571989-04-10010 April 1989 Notification of 890502 Meeting W/Util in Rockville,Md to Discuss Nonlinear Piping Analysis to Remove Snubbers & Pipe Supports ML20247E8051989-03-27027 March 1989 Notification of 890329 Meeting W/Ge in Rockville,Md to Discuss Conditional Containment Failure Probability Definition,Source Term & Other Severe Accident Issues Re Advanced LWR ML20247B7351989-03-24024 March 1989 Notification of 890503 Meeting W/B&W,Inel & Util in Rockville,Md to Discuss Licensing Submittals for Plants ML20236D5751989-03-0909 March 1989 Forwards to Wj Johnson,Forwarding NRC Draft SER Re RESAR SP/90 on Listed Technical Areas.Ltrs Provided to Inform CRGR Members of Progress in Reviewing Pda Application ML20236B3751989-03-0909 March 1989 Forwards to Wj Johnson,Forwarding NRC Draft SER Re RESAR SP/90 on Listed Technical Areas.Ltrs Provided to ACRS Members of Progress in Reviewing Pda Application ML20236B3261989-03-0808 March 1989 Notification of 890313 Meeting W/Ge in San Jose,Ca to Discuss Severe Accident Design of Advanced BWR & NRC Certification Process ML20236A9721989-03-0707 March 1989 Forwards Feb 1989 Status Rept Re Current Review Milestones for Each Std Plant Project ML20235S6271989-02-28028 February 1989 Notification of 890307 Meeting W/Bwr Owners Group in Rockville,Md to Discuss Items of Current Interest.Agenda Encl ML20246N3171989-02-23023 February 1989 Notification of 890313 Meeting w/C-E in Rockville,Md to Discuss Results of Salem Project & Licensing of Future C-E Projects NUREG/CR-5176, Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants1989-02-14014 February 1989 Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants ML20245E9441989-01-31031 January 1989 Forwards Proposed plant-specific Backfit for Improved Auxiliary Feedwater Sys Reliability Analyses for Required Improvement in Secondary DHR Capability at Plant ML20117P9051988-12-15015 December 1988 Forwards Info Re IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings, for Region I Plants for Semiannual Status Rept ML20196C2701988-12-0202 December 1988 Notification of 881207 Meeting W/Util in Rockville,Md to Discuss Dcrdr Submittal of 880825 ML20196B6081988-11-29029 November 1988 Forwards Status Rept for Nov 1988 Re Std Plant Design Technical Reviews 1994-06-29
[Table view] |
Text
r s
[
k2 RIO UNITED STATES g
NUCLEAR REGULATORY COMMISSION
[
g W ASHINGTON, D. C. 20555
,E
- j
%%....*/
MAR 2 31988 Docket No. 50-601 and 50-605 Project Nos. 669, 675, and 676 MEMORANDUM FOR:
L. Shao, Director Division of Engineering and System Technology, NRR J. Partlow, Director Division of Reactor Inspection and Safeguards, NRR F. Congel, Director Division of Radiation Protection and Emergency Preparedness, NRR J. Roe, Director Division of Licensee Performance and Quality Evaluation, NRR R. W. Houston, Acting Director Division of Reactor Accident Analysis, RES FROM:
Lester S. Rubenstein, Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, Y and Special Projects, NRR
SUBJECT:
STATUS REPORT ON STANDARD PLANT DESIGN TECHNICAL REVIEWS Attached is the March status report concerning the current review milestones for each of the standard plant projects (EPRI, ABWR, RESAR SP/90, and CE System 80+).
Note the "Due Date" column reflects dates established in the January 25, 1988 "Revised Program Plan For Standard Plant Reviews" or dates for which modification was agreed to by PDSNP and the review branch,
\\
h
$8j3300422seo3g3 QO b
b 3
,,b]h y{3Mj CONTACT:
Q y ], {
T. Kenyon g'
fp e NRR/PDSNP Ext. 21120 4dcj
l..
The column "Expeta.ed Input Date" reflects input from appropriate technical branch managemev.
Category 1 items have been discussed with the appropriate Assistant Direct. s.
I request any problems in meet'ng these input dates be identified to me by the appropriate Assistant Directo. within a week of receipt of this memo.
w 0 l,'p?. K__7' ef f
.60s.
Lester S'. Rubenstein, Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, Y and Special Projects, NRR
Enclosure:
As stated cc:
T. Murley J. Sniezek F. t'iraglia J. Richardson C. Y. Cheng L. B. Marsh C. McCracken A. Thadani J. Joyce J. Mauk F. Rosa J. Craig M. W. Hodges B. Grimes R. Erickson D. Matthews R. Barrett L. Cunningham H. Miller A. Beach W. Regan, Jr.
J. Murphy G. Bagchi
'. The column "Expected Input Date" reflects input from appropriate technical branch management.
Category 1 items have been discussed with the appropriate Assistant Directors.
I request any problems in meeting these input dates be identified to me by the appropriate Assistant Director within a week of receipt of this memo.
Oricinal Signed By:
Lester S. Rubcnstein, Director Standardization and Non-Power i
Reactor Project Directorate Division of Reactor Projects III, IV, Y and Special Projects, NRR
Enclosure:
As stated cc:
T. Murley J. Sniezek F. Miraglia J. Richardson C. Y. Cheng L. B. Marsh C. McCracken A. Thadani J. Joyce J. Mauk F. Rosa J. Craig M. W. Hodges B. Grimes R. Erickson D. Matthews R. Barrett L. Cunningham H. Miller A. Beach W. Regan, Jr.
J. Murphy G. Bagchi DISTRIBUTION:
Docket-File EHylton ADR4 NRC PDR Pleech SNewberry PDSNP Reading DScaletti GVissing DCrutchfield LRubenstein TKenyon PDSt PDSNP El(/ yon:cw LRubenstein 03/%/88 03/a/88
~
'h)l.
Date:
March 22, 1988 REVIEW STATUS REPORT ON WESTIliGHOUSE RESAR SP/90 PDA REVIEW Expected Due Input Division /
Branch Reviewer Modules Subject
- Milestone Date Date Cat.**
Comments DEST /EMTB Johnson 1, 4, 5, 6&8, 7, Materials Engineering Draft SER 3/31/88 3/31/88 3
Input Rec'd 10 to P.M.
1/7/88 DEST /EMB Hou/Brammer***
1,4,5,7, Mechanical Engineering Draft SER 4/29/889 4/29/88 3
Awaiting to P.M.
Input from W -
Expected 3/31/88 DEST /ESGB Staley 3
Hydrology Draft SER 3/31/88 3/31/88 3
Input Rec'd to P.M.
10/26/87 Giese-Koch 3
Geology & Seismology Draft SER 3/31/88 3/31/88 3
Awaiting to P.M.
Input from W -
Reviewer writing DSER w/open items Chan 7
Civil Engineering Draft SER 3/31/88 3/31/88 3
Input Rec'd to P.M.
1/7/88 o
See September 29, 1987 memo for complete listing of review assignments Category definitions:
- 1. AD or above attention requested
- 2. Branch Chief attention requested
- 3. On schedule
- 4. Complete coo Brammer providing assistance i
9 Duo date extended from 3/31/88 to 4/29/88 because of delay in W response.
Date:
March 22, 1988 REVIEW STATUS REPORT ON WESTINGHOUSE RESAR SP/90 PDA REVIEW (Cont.)
Expected Due Input Division /
Branch Reviewer Modules Subject
- Milestone Date Date Cat.**
Comments DEST /ECEB Wing 1, 6&8, 10, 13 Chemical Engineering Draft SER 3/31/88 3/17/88 4
Complete Notley 13 Fire Protection Draft SER 4/29/880 4/29/88 3
Awaiting input to P.M.
from W -
Expected 3/23/88 DEST /SICB Burrows 9, 13, 15 Instrumentation &
Draft SER 3/31/88 3/31/88 3
Input Rec'd Controls to P.M.
3/15/88 DEST /SELB Trehan 9, 13 Electrical Engineering Draft SER 3/31/88 4/08/88+
3 Input Rec'd to P.M.
12/17/87 DEST /SPLB Shum (lead) 1, 10, 13 Containment Systems
. Draft SER 5/06/887 5/06/88 3
Awaiting input to P.M.
from W -
Expected 3/31/88 o
See September 29, 1987 memo for complete listing of review assignments 00 Category definitions:
- 1. AD or above attention requested
- 2. Branch Chief attention requested
- 3. On schedule
- 4. Complete 0 Due date extended from 3/31/88 to 4/29/88 because of delays in W response.
+ Input date extended because of availability of reviewer.
- Due date extended from 3/31/88 to 5/06/88 because of delays in W response; SAI may complete review.
Date:
March 22, 1988 REVIEW STATUS REPORT ON WESTINGHOUSE RESAR SP/90 PDA REVIEW (Cont.)
Expected Due Input Division /
Branch Reviewer Modules Subject
- Milestone Date Date Cat.**
Comments DEST /SPLB Wagner 6&8, 7 Plant Systems Draft SER 5/06/88# 5/06/88 3
Awaiting input (cont.)
to P.M.
from W -
Expected 3/31/88 Walker 7
Equipment Qualification Draft SER 5/06/88# 5/06/88 3
Awaiting input to P.M.
from W -
Expected 3/31/88 Gill 4
Plant Systems Draft SER 5/06/88f 5/06/88 3
Awaiting input to P.M.
from W -
Expected 3/31/88 Lee 688, 10, HVAC Systems, Waste 6 raft SER 5/06/88# 5/06/88 3
Awaiting input 12, 13 Management, Steam &
to P.M.
from W -
Power Conversion Expected 3/31/88 See September 29, 1987 memo for complete listing of review assignments Category definitions:
- 1. A0 or above attention requested
- 2. Branch Chief attention requested
- 3. On schedule
- 4. Complete
- Dua date extended from 3/31/88 to 5/06/88 because of delays in W response; SAI may complete review.
Date:
March 22, 1988 REVIEW STATUS REPORT ON WFSTINGHOUSE RE5AR SP/90 PDA REVIEW (Cont.)
Expected Division /
Due Input Branch Reviewer Modules Sub,1ect*
Milestone Date Date Cat.**
Comments DEST /SPLB Raval 13 Plant Systems Draft SER 5/06/88f 5/06/88 3
Awaiting input (cont.)
to P.M.
from W -
Expected 3/31/88 DEST /SRXB Liang 1, 4, 5, 688, Reactor Systems Draft SER 5/16/88+ 5/16/88 3
Awaiting input 9, 10, 11, 12 to P.M.
from W -
ExpecY 4/15/88 DRIS/RSGB Mendelsohn 2
Physical Security Draft SER 3/31/88 3/31/88 3
Awaiting to P.M.
Input from )[
DLPQ/LQAB Spraul 13 Quality Assurance Draft SER 4/29/880 4/29/88 3
Awaiting
.to P.M.
Input from )[
See September 29, 1987 memo for complete listing of review assignments
- 1. AD or above attention requested j
- 2. Branch Chief attention requested
- 3. On schedule
- 4. Complete 0 Due date extended from 3/31/88 to 4/29/88 because of delays in W response.
+Duadateextendedfrom3/31/88to5/16/88becauseofdelaysinHresponse cnd availability of reviewer; additional RAIs/ concerns expected;
- Due date extended from 3/31/88 to 5/06/88 because of delays in )[ response; SAI may complete review.
l
Date:
March 22, 1988 REVIEW STATUS REPORT ON WESTINGHOUSE RESAR SP/90 PDA REVIEW (Cont.)
Expected Division /
Due Input Branch Reviewer Modules Subject
- M'lestone Date Date Cat.**
Comments DLPQ/LHFB Lapinski 15 Control Room / Human Draft SER 3/31/88 6/30/88#
1 Workload Factors Engineering to P.M.
impacting input date DREP/PRPB Spickler 1,3,4,5, Radiological Accident Draft SER 3/31/88 4/29/88+
2 Workload 6&B, 9,10 Analysis to P.M.
impacting input date Skopec 12 Process & Effluent Draft SER 4/29/880 4/29/88 3
Awaiting input Radiological to P.M.
from W -
l Monitoring & Sampling Expected Systems 3/23/88 RES/PRA Chelliah/BNL 16 Probabilistic Safety Draft 2/26/88 3/25/88 1
Work 1 cad Study - back end
'SER to impacting i
P.M.
input date See September 29, 1987 memo for complete listing of review assignments Category definitions:
- 1. AD or above attention requested
- 2. Branch Chief attention requested
- 3. On schedule
- 4. Complete
+ Input date modified due to availability of reviewer.
l 0 Du2 date extended from 3/31/88 to 4/29/88 because of delays in W response.
- Br;nch cannot support 4/29/88 input date required to support DSER issuance date; reviewers working on SPDS Generic Letter; Input promised 6/30/88.
l
Date: March 22, 1988 REVIEW STATUS REPORT ON GE ABWR FDA/DC REVIEW Expected Division /
SRP Due Input Branch Reviewer Chapter Subject Milestone Date Date Cat.*
Comments DEST /SPLB Chandrasekaran 5, 6, 15 Plant Systems RAIs to 6/15/88 6/15/88 3
SPLB issued P.M.
contract for review to SAI.
New input date established.
DEST /SRXB Thomas 4, 5, 6, 15 Reactor Systems RAIs to 6/30/88 6/30/88 3
New ir.put date P.M.
established.
(RAIs on Sec-tion 4.6 have been received by PM.)
- 1. AD or above attention requested
- 2. Branch Chief attention requested
- 3. On schedule
- 4. Coniplete m
Date: March 22, 1988 REVIEW STATUS REPORT ON CE SYSTEM 80+
CESSAR-DC REVIEW Expected Division /
Due Input Branch Reviewer Chapter Subject Milestone Date Date Cat.*
Coments DEST /EMTB Martin Hum Chapter 10 Steam and Power RAI 02/28/88 02/28/88 4
RAI 3/ll/88C Conversion Licensing Review Bases Coments 02/28/88 02/28/88 4
Coments recvd DEST /SPLB Janak Raval Chapter 10 Steam and Power RAI 02/28/88 02/28/88 4
RAI 3/15/88C Conversion Licensing Feview Bases Coments 02/28/88 02/28/88 4
Coments reevd DLPQ/LQAB Jack Spraul Chapter 17 Licensing Review Bases RAI 02/28/88 02/28/88 4
RAI 2/26/88C 2
Licensing Review Bases Comments 02/28/88 02/28/88 4
No coments DEST /EMEB Horoce Shaw Licensing Review Bases Comments 02/28/88 3/15/88 4
Coments coming DEST /EMEB J. Rafaa Licensing Review Bases
. Coments 02/28/88 3/15/88 4
Coments coming DEST /ECSB N. Romney Licensing Review Bases Corsnents 02/28/88 02/28/88 4
No comments
- 1. AD or above attention requested
- 2. Branch Chief attention requested
- 3. On schedule
- 4. Complete
Date: March 22, 1988 REVIEW STATUS REPORT ON CE SYSTEM 80+
CES5AR-DC Review (Cont.)
Expected Due Input Division /
Branch Reviewer Chapter Subject Milestone Date Date Cat.*
Consnents DEST /SICB James Stewart Licensing Review Bases Comants 02/28/88 02/28/88 4
No comments DEST /SELB
- 0. Chopra Licensing Review Bases Coments 02/28/88 02/28/88 4
No comments DEST /SRXB Larry Kopp Licensing Review Bases Comments 02/28/88 02/28/88 4
No comments DREP/PEPB Richard VanHiel Licensing Review Bases Comments 02/28/88 02/28/88 4
Comments recvd DREP/PRAB G. Kelly Licensing Review Bases Coments 02/28/88 02/28/88 4
Comments recvd DREP/PRPB T. Essic Licensing Review Bases Coments 02/28/88 02/28/88 4
Comments recvd DOAE/0TSB R. Giardina Licensing Review Bases Coments 02/28/88 02/28/88 4
Coments in typing DLPQ/LHFB G. Lapinsky Licensing Review Bases
, Comments 02/28/88 02/28/88 4
No coments DRAA/PRAB E. Chelliah Licensing Review Bases Consnents 02/28/88 02/28/88 4
Comments coming
- 1. AD or above attention requested
- 2. Branch Chief attention requested
- 3. On schedule
- 4. Complete I
Dste: March 22, 1988 REVIEW STATUS REPORT ON SYSTEM 80 CESSAR-F REVIEW Expected Division /
Due Input Branch Reviewer Chapter Subject Milestone Date Date Cat.*
Coments DEST /SRXB C. Liang TAC 66400, ASPSS ISSUE Final SER 5/16/889 5/16/88**
3 On schedule to P.M.
DEST /EMEB J. Rajan TAC 66401, Steam Gen. Tube Vibration RAIs to open open 3
Awaiting input P.M.
from applicant DEST /EMTB W. Wickman TAC 66401, Steam Gen. Tube Vibration RAIs to open open 3
Awaiting input P.M.
from applicant i
Category definition:
- 1. AD or above attention requested
- 2. Branch Chief attention requested
- 3. On schedule
- 4. Complete
- Close out issue 9 Due date extended from 3/31/88 to 5/16/88 to suppert RESAR SP/90 review schedule
Date: March 22, 1988 REVIEW STATUS REPORT ON EPRI'5 ALWR REQUIREMENTS DOCUMENT Expected Division /
Due Input Br:nch Reviewer Chapter Subject
- Milestone Date Date Cat.* Comments DEST /EMEB Hartzman 3
Reactor Coolant Systems DSER to 03/15/88 03/30/88** 2 P.M.
Hartzman 4
Reactor Systems DSER to 03/15/88 03/30/88** 2 P.M.
Rajan 5
Eng. Safety Systems RAI to 03/21/88*** 03/21/88** 3 In typing P.M.
DEST /EMTB Tsao 3
Reactor Coolant Systems DSER to 03/15/88 03/04/88 4
P.M.
4 Reactor Systems DSER to 03/15/88 03/08/88 4
P.M.
5 Eng. Safety Systems RAI to 02/29/88 N/A 4
Reviewer will P.M.
have no RAI Category Definition:
- 1. AD or above attention requested
- 2. BC attention requested
- 3. On schedule
- 4. Complete Expected input date extended because of reviewer's workload
- Due date extended because of extra time needed by new reviewer.
}
Date: March 22, 1988 REVIEW STATUS REPORT ON EPRI'5 ALWR REQUIREMENTS DOCUMENT (Cont.)
Expected Due Input Division /
Branch Reviewer Chapter Subject
- Milestone Date Date Cat.* Comments u;.l/SICB Stewart 3
Reactor Coolant Systeins DSER to 03/15/88 03/1/88 4
P.M.
4 Reactor Systems DSER to 03/15/88 03/1/88 4
P.M.
5 Eng. Safety Systems RAI to 02/29/88 03/25/88 2 In typing, informal P.M.
copy in hand DEST /SELB Lazevnick 3
Reactor Coolant Systems DSER to 03/15/88 03/21/88 4 Complete P.M.
4 Reactor Systems DSER to 03/15/88 03/21/88 4 Complete P.M.
5 Eng. Safety Systems RAI to 04/01/88 04/01/88 3 P.M.
DEST /SPLO Shum 3
Reactor Coolant Systems DSER to 03/15/88 03/23/88 2 In typing P.M.
Category Definition:
- 1. AD or above attention requested
- 2. BC attention requested
- 3. On schedule
- 4. Complete
1.-
Dato: March 22, 1988 REVIEW STATUS REPORT ON EPRI'5 ALWR REQUIREMENTS DOCUPENT (Cont.)
Expected Division /
Due Input Branch Reviewer Chapter Subject
- Milestone Date Date Cat.* Comments DEST /SPLB Shum 4
Reactor Systems DSER to 03/15/88 03/23/88 2 In typing (cont.)
P.M.
Shum 5
Eng. Safety Systems RAI to 02/29/88 02/23/88 4 P.M.
DEST /SRXB Schwenk 5
Eng. Safety Systens RAI to 04/11/88***
TBD 3
P.M.
DREP/RPB Branagan 5
Eng. Safety Systems RAI to 02/29/88 02/29/88 4 P.M.
DEST /ECEB Parczewski 3
Reactor Coolant System DSER to 03/15/88 03/16/88 4 P.M.
4 Reactor Systems DSER to 03/15/88 03/16/88 4 P.M.
5 Eng. Safety Systems RAI to
, 04/01/88***
TBD 3
P.M.
Category Definition:
- 1. AD or above attention requested
- 2. BC attention requested
- 3. On schedule
- 4. Complete
- Due date established on basis reviewer would obtain any needed informaticn in meeting with EPRI consultants. RAIs to be provided ahead of such meetings to assist EPRI preparation.