ML20205M574

From kanterella
Jump to navigation Jump to search

Requests Technical Assistance in Reviewing CE Submission of Hydrogeologic Investigation & Groundwater,Soil & Stream Characterization
ML20205M574
Person / Time
Site: 07000036
Issue date: 03/26/1999
From: Emeigh C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Reamer B
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
TAC-L31171, NUDOCS 9904150304
Download: ML20205M574 (3)


Text

-

90-36 as a nou

2. r et UNITED STATES a

+' .j NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 2055H001

/

k ***.** March 26, 1999 MEMORANDUM TO: Bill Heamer, Acting Chief Eng ineering and Geoscience Branch Divbion of Waste Management, NMSS FROM: CharlesW. Emeigh, Acting Chief . H y,q Licensing Branch Division of Fuel Cycle Safety and Safeguards, NMSS

SUBJECT:

TECHNICAL ASSISTANCE REQUEST - COMBUSTION ENGINEERING, INC., (CE), HYDROGEOLOGIC WORK PLAN FIRST QUARTER REPORT The FCSS Licensing Branch requests technical assistance in reviewing the following project:

PROJECT: CE's submission of the Hydrogeclogic investigation and Ground-water, Soil and Stream Characterization (Hydrogeologic Work Plan First Quarter Report), dated March 9,1999 (copy attached)

CASEWORK /RITSTI'AC NOS: 070036790S/211 AA/L31171 BACKGROUND: On June 17,1998, the NRC approved CE's Hydrogeologic Investigation and Ground-water / Surface Water Monitoring Work Plan for the Combustion Engineering, Hematite Missouri Site, Revision 1, (Work Plan). The results of the field work specified in the Work Plan will be used to determine appropriate decommissioning action for the 10 CFR 20.304 burial area at CE Hematite site. By letter dated March 9,1999, CE submitted the Hydrogeologic Work Plan First Quarter Report which is developed after the first quarter of sampling under the Work Plan. Mr. Jeff Ciocco has been previously involved with this case work.

BEQUESTED ACTION; Please review CE's March 9,1999, submittal and determine whether the information gathered in the submittal could adequately support the statements described in Section Vill, observations of the submittal. Please provide FCLB with specific ,

I comments and recommendations.

Please provide the information requested below and retum a completed copy to the Licensing Assistant (LA) or Project Manager (PM).

Name of DWM Reviewer.

/

DWM Projected Completion Date:

DWM Branch Chief Signature:

9904150304 990326 PDR ADOCK 070 6

, e

'- Bib Ream'er. ~2 CONT' ACTS: PM: Sean Soong (301) 415-8155 -

-LA: Pam Shea (301) 415-8029 The above TAC NO. should be referenced in futuis correspondence related to this request and -

on the RITS Report for recording staff time experded on this effort.

Docket 70-36 License SNM-33

Attachment:

CE ltr dtd 3/9/99 1

Distribution w/o encls (Control No. 790S)

Docket 70 36 PUBLIC NRC File Center - FCSS R/F ' NMSS R/F FCLB R/F Region ill PHiland, Rlil' [G:\cetar.wpd]

OFC FCLB- C. FCLB~2b FCLBa FCLB ,

NAME SSoong $6 PShep)[ g TPhdr[ CErskigh DATE 3/p/99 3hM 3f/1999 3D6 /99 5

.t i

~N'.

r i

..]'

?

f..Q,

~

Bill Reamer 2

. CONTACTS: PM: Sean Soong (301) 415-8155 LA: Pam Shea (301) 415-8029 The above TAC NO. should be referenced in future correspondence related to this request and on the RITS Report for recording staff time expended on this effort.

Dacket 70-36 License SNM-33

Attachment:

CE ltr did 3/9/99

. .. .. . ...... . . . . . . . . . . . . . . _ .