ML20203J987

From kanterella
Jump to navigation Jump to search
Suppls 731023 Response to AEC Re Violations Noted in Insp Rept 50-259/73-13.Corrective Actions:Sample Audit of Storeroom Will Be Conducted to Ensure Proper Matl Segregation & Identification
ML20203J987
Person / Time
Site: 05000000, Browns Ferry
Issue date: 12/17/1973
From: Gilleland J
TENNESSEE VALLEY AUTHORITY
To: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML082390329 List: ... further results
References
FOIA-85-782 NUDOCS 8604300296
Download: ML20203J987 (1)


Text

,s TENNEO"'EE VALLEY AUTHORITY l

CHATTANOOGA, TENNES'i'EE 37401 40 December 19, 1973 ANNIVERSARY 05RYNNs"H$

Mr. Norman C. Moseley, Director Directorate of Regulatory Operations U.S. Atomic Energy Commission Region II - Suite 818 230 Peachtree Street, NW.

Atlanta, Georgia 30303

Dear Mr. Moseley:

This is in further response to Directorate of Regulatory Operations letter RO:II:WSL 50-259/73-13, dated October 1, 1973, to which we replied initially on October 23, 1973. In addition to our initial responses, we wisit to add the following information:

1. A l.h.-Contrary to Criterion XV of Appendix B to 10 CFR 50, a nonconforming head gasket was installed on the drywell by TVA.

A sample audit of our plant storeroom will be conducted to ensure proper material segregation and identification. This audit will be completed by January 1974.

1. A,1.d.-Contrary to paragraphs 3.5.F. and 4.5.F. of tha Technical Specifications, the reactor pressure was ICf not immediately reduced to less than 122 psig or was the

" HPblS immediately demonstrated to be operable upon fail-ure of the reactor core isolation cooling system (RCICS).

The need for absolute adherence to the letter of the Technical Speci-fications has been reemphasized to all plant employees.

Very truly yours,

,b-L f

J. E. Gilleland b

Assistant to the Manager of Power CC:

Mr. R. B. Beers TVA Project General Electric Company Atomic Power Equipment Department San Jose, California 95125 8604300296 860317 RO 782 PDR f

/

'/

es s

Form 11-1 (11/72) s Inspection Report Distribution Desig tion

  • Licenscc W A -

nemt k/M l Beport No. $D

  • 2 5 9

~) $ 4 3 Dispatch of Report (Standard Distribution Yes' No)

'(Form II-2) 1.

EnforecTent rer.ponse case 2.

Ho enforececnt respcase case (Form II-3) 3.

RO:HQ for Action case (Form 11-4)

Initial }biling of Letter (Standard Dietribution

'es No) 1.

Enforcement responce case (Form II-2) 2.

No enforcement response case (Form II-3)

Licensac Response to Enforcement (Standard Distribution Yes No) 7gf 1.

Acccptable v/

(Form IT-2) gc, c(>

2.

Not,*,cceptable

_(Fore. II-2) /

Lice.v.ca Respon:c to reapric cry Information 1.

Nonc desigauted

's/

(Form II-13)

(

___ Form II-12) 2.

Designated a.

Accepted by Region b.

Rejected by Rculen l

(1) HQ accepts Regional posit, ion (2) HQ disagrees with Regiont' position Distribution other than standard distribution -(state why) e Is this case in hearing notice stage?

Yes No O

W(

,ia

.