TMI Unit 1 Pra,Technical Summary Rept, Vol 2
ML20155J921
Person / Time
Site: Crane Constellation icon.png
Issue date: 11/30/1987
From: Garrick B, Hubbard F, Iden D
PLG, INC. (FORMERLY PICKARD, LOWE & GARRICK, INC.)
To:
Shared Package
ML20155J777 List:
References
PLG-0525, PLG-0525-V02, PLG-525, PLG-525-V2, NUDOCS 8806210071
Download: ML20155J921 (188)


Text

__

Copy Copyright 01987, by PLG-0525 GPU Nuclear Corporation Volume 2 Three Mile Island Unit 1 Probabilistic Risk Assessment TECHNICAL

SUMMARY

REPORT Project Director B. John Garrick Project Manager Douglas C. Iden Principal Investigator Frank R. Hubbard Task Leaders Mardyros Kazarians Ali Mosleh Harold F. Perla Martin B. Sattison Donald J. Wakefield Prepared for GPU NUCLEAR CORPORATION Parsippany, New Jersey November 1987 ggg62;ggg4gggggge9 P

DCD O

Picxarc.,10we anc Garricx,Inc.

Management Consultants Applied Scientists Engineers e

e Newport Beach, CA Washington, DC

NOTICE This is a report of work conducted by individual (s) and contractors for use by GPU Nuclear Corporation. Neither GPU Nuclear Corporation nor the authors of the report warrant that the report is complete or accurate. Nothing contained in the report establishes company policy or constitutes a commitment by GPU Nuclear Corporation.

O i

"Y

SUMMARY

OF CONTENTS

/

EXECUTIVE

SUMMARY

REPORT Volume 1 Acknowledgment Foreword TECHNICAL

SUMMARY

REPORT Volume 2 PLANT MODEL REPORT Volume 3 SYSTEMS ANALYSIS REPORT Volume 4 DATA ANALYSIS REPORT Volume 5 HUMAN ACTIONS ANALYSIS REPORT Volume 6 ENVIRONMENTAL AND EXTERNAL HAZARDS REPORT Volume 7 O

O i

0540G123186

(~)

CONTENTS Section Pace LIST OF TABLES v

LIST OF FIGURES vi LIST OF ACRONYMS vii 1

INTRODUCTION 1-1

1.1 Background

1-1 1.2 Objectives 1-1 1.3 Scope of PRA 1-2 1.4 Report Organization 1-4 1.4.1 Technical Summary Report 1-4 1.4.2 Plant Model Report 1-5 1.4.3 System Analysis Report 1-5 1.4.4 Data Analysis Report 1-5 1.4.5 Environmental and External Hazards Report 1-5 1.4.6 Human Actions Analysis Report 1-6 1.5 Treatment of Current Industry Issues 1-6 1.5.1 Dependence 1.5.2 Special Initiating Events 1-9 O

1.5.3 Special Scenarios 1-11 1.5.4 Human Errors 1-14 1.5.5 Uncertainty 1-15 1.5.6 Probability and Frequency 1-16 1.5.7 Success Criteria 1-16 1.5.8 Quality Assurance of the TMI-1 PRA 1-17 1.6 Reference 1-19 2

HISTORICAL PERSPECTIVE 2-1 3

PLANT PERSPECTIVE 3-1 3.1 Description of Plant and Site 3-1 3.1.1 Reactor and Reactor Coolant System 3-1 3.1.2 Reactor Building System 3-3 3.2 Safety Functions and Hazards for the TMI Unit 1 Plant 3-3 3.3 Relationship of the PRA Model to the TMI-1 As-Built Plant 3-4 4

PRA METHODOLOGY OVERVIEW 4-1 4.1 General PRA Process 4-1 1

4.2 Qualitative Definition of Scenarios and Their Consequences 4-2 4.3 Quantification of Scenario Frequency 4-3 4.3.1 Scenario Fragment Frequencies 4-3 4.3.2 The Matrix View 4-4 O

4.3.3 Decomposing the Scenario Frequencies 4-7 4.4 Uncertainty 4-8 4.4.1 Initiating Events 4-10 4.4.2 Plant Systems Model 4-10 111 0577G101187TSR

CONTENTS (continued)

Section Page 4.5 T'il-1 PRA Process 4-12 4.5.1 Phase I Process 4-12 4.5.2 Phase II Process 4-14 4.6 References 4-22 5

SUMMARY

OF RESULTS 5-1 5.1 Core Damage Frequency 5-1 5.2 Initiating Events Contributing to Core Demage Frequency 5-2 5.3 Scenarios Contributing to Core Damage Frecuency 5-3 5.4 Plant Systems Contributing to Core Damage Frequency 5-4 5.5 System Component Failures Contributing to Core Damage Frequency 5-6 5.6 Operator Actions Contributing to Core Damage Frequency 5-7 5.7 References 5-7 APPENDIX A:

SYSTEMS DESCRIPTION A-1 APPENDIX 3:

PRA METHODOLOGY B-1 O

O iv 0577G101187TSR

t LIST OF TABLES Table Pace j

1-1 Disposition of Issues of Current Concern 1-20 1-2 Review Responsibilities 1-21 3-1 Definition of Safety Functions Purposes 3-7 i

4-1 Scenario Table in Abstract Form 4-24 4-2 Pinch Point I - TMI-1 Initiating Event Groups 4-25 4-3 Pinch Point II - TMI-1 Damage States 4-26 4-4 Pinch Point III - Example Release Categories 4-27 4-5 Pinch Point IV - Example Damage Types 4-28 4-6 Systems Analyzed 4-29 i

5-1 Initiating Event Contributions to Core Damage Frequency 5-8 5-2 Initiating Event Categories Contributing Significantly to Core Damage Frecuency 5-10 5-3 Scenarios Contributing Significantly to Core Damage l

Frequency 5-11 5-4 Systems and Actions Contributing Significantly to the Frequency of Core Damage 5-15 5-Sa Systems Actions Contributing Significantly to the i

Frequency of Core Damage from the Control Building Ventilation System 5-20 5-5b Systems Actions Contributing Significantly to the O'

Frequency of Core Damage from the Decay Heat Removal System 5-22 l

5-Sc Systems and Actions Contributing Significantly to the Frequency of Core Damae from High Pressure Injection l

System 5-25 l

5-5d Systems and Actions Contributing Significantly to the Frequency of Core Damage from Intermediate Closed l

Cooling Water System 5-27 5-Se Systems and Actions Contributing Significantly to the Frequency of Core Damage from the Electric Power System 5-28 5-5f Systems and Actions Contributing Significantly to the Frequency of Core Damage from the Emergency Feedwater System 5-30 j

5-5g Systems and Actions Contributing Significantly to the Frequency of Core Damage from the Instrument Air System 5-32 5-5h Systems and Actions Contributing Significantly to the Frequency of Core Damage from the Nuclear Services Cooling Water System 5-33 5-6 Operator Action Failures Contributing Significantly to the Frequency of Core Damage 5-34 B-1 Yalues at Second Pinch Point - Plant Damage State I

Frequencies (& M)

B-39 B-2 Unconditional Frequency of Exceedance of Early Fatalities by Plant Damage State B-40 O

~

v 0577G101187TSR

l l

LIST OF FIGURES Figure Page 2-1 The Anatomy of a Decision 2-10 2-2 Alternate Formulation of the Decision Model 2-11 3-1 Reactor Coolant System Arrangement Flow Diagram 3-8 3-2 Classes of Safety Functions 3-9 3-3 Hierarchy of Core Damage Prevention Safety Functions 3-10 4-1 Representative Numerical Results from a PRA 4-30 4-2 Overview of the Assembly Process, Showing Relationships of Pinch Points, Events Trees, Frequency Vectors, and Transition Matrices 4-31 4-3 Risk Assessment Process 4-32 4-4 Risk Assessment Process Specific to the TMI-1 PRa 4-33 5-1 TMI-1 PRa Probability of Core Damage Frequency Distributions (Cumulative Probability Format) 5-37 5-2 TMI-1 PRA Probability of Core Damage Frequency Distribuitions (Probability Density Format) 5-38 B-1 Risk Curve B-41 B-2 Frequency of Fatalities due to Man-Caused Events 8-42 B-3 Risk Curve on a Log-Log Scale B-42 B-4 Risk Curve in Frequency Format B-43 B-5 Risk Curve in Probability of Frequency Format B-43 B-6 Population Variability Curve B-44 8-7 State-Of-Knowledge Curve B-44 B-8 Monte Carlo Simulation Technique B-45 8-9 Quantification Process Flow Chart--Systems Analysis B-46 B-10 Support System Analysis B-47 B-11 Event Souquence Analysis B-48 B-12 Seismic Analysis B-49 B-13 Unconditional Frequency of Exceedance of Early Fatalities by Plant Damage State B-50 9

vi 0577G101187TSR

I i

LIST OF ACRONYMS Abbreviation Definition 7

ACR air-cooled reactor AFW auxiliary feedwater ADV atmospheric dump valve A0V air-operated valve AT0G abnormal transient operational guidelines ATWS anticipated transient without scram B&W Babcock &.Wilcox Company BOP belance of plant Btu British thermal unit i

BWR boiling water reactor

[

BWST borated water storage tank j

CARS condenser air removal system l

CAS chemical addition system t

CBV control bufiding ventilation CBVS control building ventilation systen t

CCF common cause failure CDF cumulative distribution function CFT core flooding tank f)

CIV containment isolation valve j

v CSF conditional split fraction CST condensate storage tank

[

CR0 control room operator i

CWS circulating water system i

DHCCN decay heat closed cooling water DHR decay heat removal DHRS decay heat removal system i

DHRW decay heat river water i

DPD discrete probability distribution EEHR Environmental and External Hazards Report l

EFW emergency feedwater i

EOF emergency operations facility l

EPRI Electric Power Research Institute ESAS engineered safeguards actuation system l

ESD event sequence diagram i

ESF engineered safety feature j

ETC event tree code FHA fire hazards analysis FSAR Final Safety Analysis Report FTAP Fault Tree Analysis Program GCR

' gas-cooled reactor O

GPUN GPU Nuclear Ccrporation

.vii 10577G101187TSR

__.________.__,___U

LIST OF ACRONYMS (continued)

Abbreviation Definition HCR human cognitive reliability HPI high pressure injection HPIS high pressure injection system HVAC heating, ventilating, and air conditioning ICCS intermediate closed cooling system ICCW intermediate closed cooling water ICS integrated control system LBIS line break isolation system LC0 limiting condition for operation LER Licensee Event Report LOCA loss of coolant accident LOFW loss of main feedwater LONS loss of nuclear services LORI loss of reactor coolant system inventory LORW loss of river water LOSP loss of offsite power LPI low pressure injection LPIS low pressure injection system LSS low speed stop MCC motor control center MFPT main feedwater pumr> trip MFW main feedwater MGL multiple Greek letter MOV motor-operated valve MSIV main steam isolation valve MSLB main steam line break MSS main steam system MSSV main steam safety valve MSV main steam valve MUP makeup and purification NPE Nuclear Power Experience NRC U.S. Nuclear Regulatory Commission NSCCS nuclear services closed cooling system NSCCW nuclear services closed cooling water NSRW nuclear services river water NSSS nuclear steam supply system OPM Operations Plant Manual 0TSG once-through steam generator PCL panel center left PCR panel center right PDF probability density function PDS plant damage state viii OS77G101187TSR

LIST OF ACRONYMS (continued)

Abbreviation Definition PLF panel left front PLG Pickard, Lowe and Garrick, Inc.

PAID piping and instrumentation drawing PMR-Plant Model Report PORY power-operated relief valve PRA probabilistic risk assessment PRF panel right front PSHX primary to secondary heat transfer PSV pressurizer safety valve PTS pres'surized thermal shock PWR pressurized water reactor RBCU reactor building cooler unit RBEC reactor building emergency cooling RBD reliability block diagram RBS reactor building spray i

RBSS reactor building spray system RCDT reactor coolant drain tank RCP reactor coolant pump RCS reactor coolant system O

RPS reactor protection system RSS Reactor Safety Study J

SCCW secondary closed cooling water SCM subcooled margin SGTR steam generator tube rupture SLB steam line break SLRDS steam line rupture detection system SR0 senior reactor operator SRW secondary river water SSCCS secondary services closed cooling system SSE safe shutdown earthquake SSS support state system STA shift technical advisor TBV turbine bypass valve TMI-1 Three Mile Island Nuclear Generating Station, Unit 1 TPRA THI-l probabilistic risk assessment i

TSR Technical Summary Report ULO unit load demand 0

0 ix

.0577G101187TSR_,

1.

INTRODUCTION This document, the Technical Summary Report of the probabilistic risk assessment of TMI-1, is intended to provide an overview of the PRA performed by Pickard, Lowe and Garrick, Inc., and General Public Utilities Nuclear Corporation of the-Three Mile Island Nuclear Station Unit 1.

This section describes the background and the objectives of the study.

Also described briefly is the approach.followed in performing the PRA. The section ends with a summsry of the contents of this document and of the individual sections and a treatment of current industry safety issues.

1.1 BACKGROUND

The TMI-1 PRA was undertaken by GPUN in the fall of 1983.

The consulting firm of PLG was retained as the primary contractor for the conduct of the study.

Its terms of reference were a Level 1 PRA, as defined by the PRA Procedures Guide (Reference 1-1), and treatment of external events.

GPUN's motivation for undertaking such a study was the desire to adopt the PRA as a risk management tool in management decision making that i

would address issues of multiple objectives, including safety, plant

)

availability, and economic costs and benefits.

1.2 OBJECTIVES The overall objectives of the TMI-1 PRA were to:

o Perform an independent and plant-specific assessment of the level of safety of the operation of TMI-1 to ensure that GPUN is carrying out

)

its corporate responsibility to generate electricity in a manner that affords adequate protection for the health and safety of its employees and the public.

e Improve GPU Nuclear's functional capabilities to use PRA as a ;ool for decision making and resource allocation for possible modifications to the plant configuration, operation, maintenance, and emergency planning, Provide a quantitative measure of risk independent of regulatory o

criteria with the documentation of results and methods in a form suitable for detailed technical review and public presentation.

To meet these objectives, specific goals in the course of the PRA have been to:

e Develop a quantitative assessment of the safety of TMI-1 in terms of accident sequences, their consequences, and the associated uncertainty.

Identify the significant contributors to risk, considering accident e

O precursors both internal and external to the plant.

e Rank plant systems and components quantitatively in terms of their impact on overall plant safety.

1-1 05 66G100287TSR

e Develop a plant risk model (including system models) and the tools for its eventual modification by GPUN in future TMI-1 risk management applications, e

Develop and organize a data base, with provisions for periodic updating, consistMt with the requirements of the plant risk model and its tools.

e Establish a plan whereby GPUN can periodically update the TMI-1 risk assessment indeoerdently, o

Establish a plan by which GPUN, using in-house resources, can formally incorporate the methods and results of the risk assessment in the decision-making and resorce allocation process for TMI-1, 1.3 SCOPE OF PRA The TMI-1 probabilistic risk ascessmer,t is a plant-specific assessment of care damage and plant damage state frequency including simple initiators such as pipe breaks as well as the effect of floods, earthquakes, fires, and other more complex initiating events.

It includes consideration of all alleviating

  • systems and all systems whose performance might adversely impact the consequences of an initiating event.

Both so-called safety and nonsafety systems were considered for any favorable or unfavorable contribution they might make to influence the frequency of core damage at TMI-1 during normal operations.

Containment safety features were included as vell. The support systems, including ventilation, cooling water, and electric power systems, were given particular attention because of their gi eater risk potential.

Current emergency, operating, and maintenance procedures were analyzed in detail to ensure accurate predictions of the likelihood of both beneficial and deleterious operator actions.

Both normal mitigating actions and actions to recover failed systems were considered along with a few errors of commission; i.e., instances wherein misleading indications might cause an operator to intrude and make things worse.

All analysis assumptions were reviewed with GPUN personnel prior to their incorporation into the PRA model.

The nominal performance of the plant in respcnse to all initiating events was reviewed in detail on the basis of event sequence diagrams by personnel from GPUN over a number of montns.

All assumptions about operator response included in the human actions analysis were also reviewed extensively at TMI.

Plant-specific data were gathered from the TMI archives on operating logs, tag-out records, and the like to ensure that the data base used for estimating system performance and initiating event frequency reflected TMI's operating history.

  • The term "alleviating" is used throughout the THI-1 PRA reports in Webster's New Collegiate Dictionary sense of "b.

to partially remove or correct." Other synonymous terms such as "mitigate" are reserved for other special applications, such as, "to mitigate the consequences of core damage."

1-2 0566G100287TSR

Much time was spent at the plant walking down systems to ensure that the drawings used for systems analysis accurately represented the as-built plant configuration. The systems analysis performed for this PRA was based on PLG's extensive previous experience with the analysis of the B&W plants. The TMI-l system models and split fractions were different from.

l those used for any other plant that PLG has examined.

In a truly plant-specific risk assessment such as this, each new plant j

seems to reveal its own set of dominant risk contributors.

Consequently, we found it wise to conduct this PRA in tuo phases to accelerate the process of learning TMI-1 plant-specific design and operations and to identify issues requiring technical resolution by GPU?1 and PLG as early as possible.

Phase I was an abbreviated though comprehensive scoping analysis intended to facilitate a more detailed and lengthy second I

phase.

The conduct of Phase I consisted of an approximate or focusing PRA to give early warning of those systems and assumptions that require more information or more detailed analysis prior to their incorporation in the final risk model.

In the case of TMI, for instance, the control building ventilation system was found to be one whose failure would lead directly to core damage, but little was known about its failure history; for example, given system failure, it was not known how long it would take to heat up the rooms, at what temperature components in these rooms would begin to fail, etc.

The results of Phase I precipitated a study that lasted more than a year prior to incorporation of these issues in the detailed Phase II PRA model.

Od Phase II analyzed very closely the systems and scenarios important to plant safety with the ultimate goal of determining if any design or operation changes are recommended.

The Phase II risk model evolved over 1

2 years including four major revisions to reflect the expected TMI plant performance accurately.

Each major revision was followed by further analysis to refine assumptions about plant systems and operator performance.

In fact, to date, this PRA contains the most extensive set t

of operator actions ever incorporated in any PRA.

These varied from the calibration of sensors to manual actuation of failed systems for which automatic actuation was not available.

In addition to producing the risk model, the scope of the PRA included the transfer of PRA technology including the use of all computer codes on the GPU?1 computer system for complete quantification.

These codes were packaged in a set, a subset of which was developed specifically to simplify the quantification of the TMI PRA model.

As part of the technology transfer, all the members of the Technical Functions Risk Analysis Group were exposed to most aspects of the generation and the quantification of the TMI risk model.

They have participated actively in all aspects of the PRA from performing systems analysis and event trees to quantifying them.

The Technical Functions Risk Analysis Group was more involved in this process than any other utility group with which PLG has worked.

The input of its members contributed significantly to the flavor and the perspective of this PRA.

Most of the initial effort on the TMI PRA used the mean value3 to estimate the uncertainty in all calculations.

In the final analysis, the full probability of frequency distributions for component failure rates 1-3 y

0566G100287TSR

and initiating event occurrence rates were used to represent uncertainty.

These distributions were then propagated through the model to produce uncertainty distributions on the scenario and core damage frequencies.

The TMI-1 PRA produced three products:

1.

A set of final reports, including this summary report and an executive summary.

2.

The PRA model, including event trees, system models, and computer code input.

3.

Recommendations to reduce risk through changes suggested to l

procedures and equipment at TMI-1 during the course of the study.

1.4 REPORT ORGANIZATION The T'il-1 PRA results are documented in seven detailed reports, each one consisting of one or more volumes and an executive summary.

This technical summary is the first report.

The others are:

o Plant Model Report e

Systems Analysis Report e

Data Analysis Report e

Envircnmental and External Hazards Report e

Human Actions Analysis Report

{

Separate reports were developed to reflect the major tasks of the risk l

assessment and to facilitate parallel preparation and review of task l

documentation. Most tasks were interactive; only the Plant Model Report i

depended extensively on the results of all other tasks.

l 1.4.1 TECHNICAL

SUMMARY

REPORT The purpose of the Technical Summary Report is to provide, in a single coherent volume, a dcscription of the main elements of the TMI-1 PRA and its results.

If a reader only has a limited amount of time and wants to know in general terms what this PRA is all about, he should read this report.

It is hoped it will whet his curiosity for reading more of the details in the other volumes of this report.

Most of the why and how of this PRA is described in the detailed reports.

Section 1 of the Technical Summary Report describes the background, objectives, and scope of this PRA.

Section 2 describes the historical perspective and technical background for the use of the PRA and for its methods.

Section 3 and Appendix A briefly describe the plant; the safety functions used in this PRA and the relationship between the plant as analyzed and as it currently exists are also described in Section 3.

Section 4 describes PLG's general PRA methodology and some of the specifics of how that general methodology was applied to TMI-1.

Section 5 summarizes the results of the PRA. Appendix B contains some details of the PRA methodo'ogy contained in the individual reports.

1-4 0566G100287TSR 1

qQ 1.4.2 PLANT MODEL REPORT The Plant Model Report contains a description of all the event sequence diagrams and event trees defining the scenarios that make up the plant I

i model for TMI-1.

It describes the initiating events, the plant damage f

states, and the detailed results.

Section 1 puts the plant model into the general perspective of the risk assessment methodology described in Section 4 of this Technical Summary Report.

The initiating events and support system model are described in Sections 2 and 3, respectively.

Section 4 of the Plant Model Report describes the three-segment plant model and presents each frontline system event tree. Success criteria are described in Section 4.1.2.

Section 5 defines the plant model end states or plant damage states used in the PRA, and Section 6 presents detailed results from the l

quantification of scenario and of core damage frequencies.

1 1.4.3 SYSTEM ANALYSIS REPORT The Systems Analysis Report presents all of the system performance models used to calculate the numbers used for evaluating the event trees and thereby producing scenario frequencies.

In addition, the interactions between systems are specified. The report first breaks down all systems into three categories (frontline, support, and systems of lesser consequence to the PRA that were not analyzed).

Section 1 presents an D

overview of the calculational procedures used in the analysis, and d

Sections 2 through 17 each present the analysis of one of the 16 systems that were analyzed in detail.

1.4.4 OATA ANALYSIS REPORT The Data Analysis Report presents the basic component data base developed for use in the TMI-1 PRA systems and initiating event frequency analysis.

Section 4.5.2.3 of this report provides a discussion of some of the techniques used and steps taken in developing the data base.

Section 1 of the Data Analysis Report presents four general areas comprising the scope of the data analysis; namely, component failure rates, common cause failure parameters, component maintenance frequency and duration, and initiating event frequencies.

Section 2 cescribes the general data analysis approach used for each of these creas. This approach is bned on the concept of generic data usage.

Section 3 provides TM1-1 plant-specific operating data as the cornerstone for a Bayesian update of the data estimates.

Several other types of data, such as component fragility curves used in the seismic analysis, fire frequencies used in the fire analysis, and human actions, are developed and presented elsewhere in the TMI-1 PRA Environmental and External Hazards Report.

1.4.5 ENVIRONMENTAL AND EXTERNAL HAZARDS REPORT The Environmental and External Hazards Report presents a probabilistic evaluation of the impact of environmental and external hazards on TMI-1.

Environmental hazards are equipment failure causes whose sources are 1-5 0566G100287TSR

within the plant boundaries and through which environmental interactions may simultaneously affect several plant components; e.g.,

fire, internal flood, steam, etc.

External hazards, on the other hand, are causes of equipment failure that originate outside of the plant boundaries; e.g.,

earthquakes, external floods, aircraf t crashes, etc.

Section 1 lists all of the hazards considered and explains the reasons for either their inclusion in or exclusion from the analysis.

Section 2 addresses seismic analysis.

It describes the seismicity of the site and the fragility of key building and equipment during an earthquake.

The seismic analysis is then conducted on the basis of this information to determine the seismic contribution to plant damage state frequency.

I Section 3 describes the analysis of spatial interactions involving such

{

environmental hazards as fire, flood, and steam that can cause intersystem dependent f ailures.

Sections 4 through 8 treat external hazards exclusively, including flooding from external sources, extreme weather phenomena, turbine missiles, aircraft crashes, and hazardous chemicals, respectively.

1.4.6 HUMAN ACTIONS ANALYSIS REPORT The Human Actions Analysis Report evaluates operator performance as it relates to the frequency of accident scenarios, the object of the evaluation being a quantification of the frequency of selected human actions to delineate the human contribution to the plant damage state frequencies.

Section 1 categorizes dif ferer t types of human actions according to the timing of the action.

These include human actions termed routine, inadvertant, dynamic, and recovery.

Section 2 describes the methodology for the analysis and evaluation of these operator actions.

Section 3 presents the conduct of operations at TMI-1, particularly the relationship of available, qualified manpower to man plant control stations in the event of an emergency.

Finally, Section 4 documents the quantification of each identified human action.

1.5 TREATMENT OF CURRENT INDUSTRY ISSUES This section describes selected issues that are currently of concern to the nuclear community and describes where and how they are addressed in the TMI-1 PRA.

Table 1-1 lists these issues and identifies where in this section each is discussed.

Table 1-1 also serves to begin the process of putting these issues into a context by grouping similar ones together.

1.5.1 DEPENDENCE This section first defines dependence and describes various ways in which it is treated in the TMI-1 PRA (Section 1.5.1.1).

Next, it responds to each of four terms currently used, sometimes erroneously, to discuss dependence and tells how they fit in.

1.5.1.1 Treatment in D4I-1 PRA The concept of dependence is important to both probability theory and probabilistic risk assessment.

In fact, it is the modeling of the 1-6 0566G100287TSR

dependence among the large number of plant components in TMI-1 that makes the PRA' job complicated.

If every component failure were to affect only a single component at a time, the reactor core would probably never be seriously threatened. As a matter of fact, it would require the unfortuitous coincidence of several of these failures before an accident could produce serious consequences, and such "independent" coincidences are truly rare.

There would still be a need to model the logic of such a coincidence to account for its impact on the plant, but this effort would be relatively simple. Generally, no one component failure would, by itself, result in core damage. Typically, core damage involves the failure of multiple components, either if-one failure led to another or t

if one condition caused more than one failure.

l A dependent event is a system action or physical condition in an event f

sequence (scenario), the likelihood of which is changed by the events that precede it or by the conditions that exist when the event is expected to occur.

In general, the likelihood of each event in a j

scenario is conditioned by each event that has occurred previously.

As will be seen later, sometimes the impact of previous events is not i

significant.

In other cases, previous events may preclude the subsequent ones. Such events are cf particular concern.

The joint likelihood of two or more events occurring simultaneously but independently is usually so small that it is not important to risk.

For example, two independent events that each have a likelihood of I chance O.

in 1,000 of occurring, have a joint likelihood of I chance in 1,000,000 of occurring, a number probably too small to warrant further consideration. Therefore, the TMI-1 PRA focuses its attention more on dependent events, on cascades or clumps of events, and on multiple events that result from each other or from the same cause.

This cause can be a condition in the plant, such as from an initiating event, from environmental conditions, or from the state of plant parameters, or it can be a similar manufacturer for a component.

In the example cited above, a dependent failure would manifest itself in the likelihood of occurrence of one event being dependent on whether the ether event had occurred.

If the degree of coupling (dependence) between the failures is strong, then the joint likelihood of both events in the previous example occurring may be closer to 1 chance in 1,000. This report relies on the well established concepts and terminology of probability theory and logic modeling to deal with dependent events.

One exception is the term "common cause failure." This term is used to describe possibly unforeseen or deliberately unmodeled aspects of system design that ould lead to the joint failure of two components, which would more likely than the joint probability of their failing independently.

The systems analysis block diagrams (see System Analysis Report) include explicit "common cause failure" terms.

The concept of dependence is considered in many places and at many levels of the study, including:

e Initiating Events. Each initiating event is carefully examined to g

determine which of the alleviating systems needed may be disabled as a direct consequence of the initiating event itself. This dependence is modeled by grouping initiators demanding similar alleviating 1-7 0566G100287TSR

I systems (see Section 2 of the Plant Model Report), then defi ing the correct boundary conditions on each alleviating system to rake their analysis specific to this initiator group (see the "boundary condition" tables in Section 4 of the Plant Model Report).

Initiating events that create environmental conditions in TMI-1 that might impact more than one event in a scenario were considered.

If their likelihood and potential consequences were judged to be significant, they were modeled explicitly.

Some of these events include steam line breaks and loss of reactor coolant system inventory events, as described in Section 2 of the Plant Model Report, and "external events" such as earthquakes, fires, floods, missiles, and high winds, as discussed in the Environtrental and External Hazards Report.

e Top Events.

Each event in each scenario is examined to specify its correct boundary conditions, given the previous events in the scenario.

A branch may not appear in an event tree because the event whose failure would lead to it is not needed, is certain to be successful, cannot be successful, or is already failed because of events that have occurred previously in the scenario.

Previous events may only change the availability of a subsequent alleviating system without eliminating the branch.

Such a situation is indicated on the event tree and in the boundary condition table by a nurerical specification, such as HPA-2 when HPA-2 refers to the second boundary condition for the high pressure injection system train A (see Plant Model Report, Section 4).

g e

Support Systems.

Support systems that upon failure, impact frontline systems are modeled explicitly in the support system model, as described in Section 3 of the Plant Model Report.

The assumed impact of support system failures on each event of a scenario is specified in the boundary conditions table for each event tree (see Sections 3 and 4 of the Plant flodel Report).

e Human Actions. Human actions that might impact more than one event in a scenario are modeled explicitly as top events of the event trees. An example of this is Top Event TH, operator throttling HPI flow, which appears in many of the transient event trees.

H uma n actions that impact only one system, but more than one component in that system (for instance test or maintenance errors), are modeled y

explicitly in the systems analysis (see the Systems Analysis Report).

Most cases of dependence identified during the course of the study were modeled explicitly.

Allowance was made for real but undefinable dependencies by using "common cause" terms in the systems analyses.

Furthermore, certain dependencies acknowledged by the nuclear industry and specifically considered in the Tt11-1 plant design were judged to be insignificant contributors to risk and were therefore not explicitly modeled in the TMI-1 plant model.

These include the of feet of flooding resulting from high energy line breaks and the impact of seismic Class II components falling and striking seismic Class I components.

1-8 0566G101187TSR

1.5.1.2 Commonly Used Terms The following terms represent issues of concern with respect to the treatment of various types and aspects of dependence, o

Common Cause Failure.

A term used to cover various types of dependent-(usually failure) events that share a cause.

Operating history data have shown that such joint mechanisms exist.

Where they may be significant contributors to risk, they vare modeled as i

dependent failures.

In this study, the term "common cause failure" refers exclusively to cases of dependence that were left unmodeled either intentionally or unintentionally because their joint failure j

mechanisms were not well-enough understood.

)

e Common Mode Failure.

A term often misunderstood used either synonymously with the term "dependent failure" or as representative of the subset of dependent failures of two pieces of equipment failing in the same way or failing because they are in the same "mode."

This term is intentionally not used in this study.

e System Interactions.

Typically, this term refers to adverse or unrecognized dependencies among events in a scenario.

Used as an "NRC unresolved safety issue," this term refers to all such interactions regardless of their contribution to risk.

System interactions are generally subdivided into "functional" and "spatial" O

dependencies.

Both dependencies were modeled explicitly in the PRA:

functional interactions, as described above, in the Systems Analysis l

and Plant Model Reports and spatial interactions in the Environmental and External Hazards Report.

e Environmental Effects.

This term refers to dependence between events stemming from environmental conditions in the plant.

For instance, the impact of the failure of the control building ventilation system that cools the electronic equipment and electric switchgear in various rooms is modeled explicitly in the support system model, as described in Sections 3 and 4 of the Plant Model Report.

1.5.2 SPECIAL INITITATING EVENTS Numerous initiating events have received significant attention recently.

All such events are treated explicitly and in the appropriate context in this report.

Some scenarios that are sometimes incorrectly called initiating events, such as reactor coolant pump seal LOCA and failure to reclose a primary relief valve, are discussed in Section 1.5.3, Special Scenarios, since they are not initiating events but rather a result of another initiator and a subsequent failure (s).

Among the initiating events of ~special recent concern are:

e Steam Generator Tube Rupture. This event is complicated by the required operator actions.

It is discussed in detail in O

Section 4.2.8 of the Plant Model Report where it is treated explicitly in its own event tree.

1-9 0566G100287TSR

e Loss of River Water. This initiating event is analyzed explicitly in Section 4.2.19 of the PMR.

It is of particular interest because it might lead to both reactor coolant pump seal leakage and high pressure injection pump failure.

e External Events. All external events (that is, events originating outside of plant systems that create adverse conditions in TMI-1 while perturbing the RCS) are treated explicitly. The external events treated explicitly in this stud / were all treated in the EEHR.

Earthquakes Fires Internal Floods External Floods Wind and Tornadoes Aircraft Accidents Turbine Missiles Hazardous Chemicals Those judged to be significant to risk were analyzed in the same way as internal events both in the scenario defir.ition and quantification process.

Event trees were made for each important external event.

These trees were treated in the same way as the internal event trees in the identification of dominant scenarios.

e Events Initiated from Other Than Full Power.

In this study, as in most others performed to date, only events initiated from higher than approximately 15% reactor power were considered.

At lower power levels, the feedwater will be controlled manually with the main feedwater system.

All events considered in this study were initiated with the feedwater level control systen in automatic and the turbine generator on line.

It was assumed that at lower power levels the possible scenarios leading to core damage would be much less frequent than the comparable ones occurring fron full power.

There are several reasons for this assumption.

One is that the plant spends only a small fraction of the calendar year at power levels in which the feedwater control is in manual.

Second, events at these power levelt are ruch more likely to be alleviated by operator response because the operator is nanually controlling most plant functions. Most initiating events are not possible from other operating modes. For l

instance, loss of main feedwater or a reactor trip cannot happen in l

operating modes in which the reactor is already tripped and decay I

heat is being removed with the condensate booster pumps. Also, lower decay heat, stored energy levels, and fission product levels I

significantly reduce any consequences.

In addition, everything will happen more slowly, making it more likely that the operator will successfully alleviate the consequences of the evcnts.

These positive factors are somewhat balanced by the fact that as the plant is cooled down the engineered safety features no lenger needed are bypassed one by one as the pressure decreases. After being 1-10 0566G100287TSR

bypassed, they are ne longer available to automatically alleviate events but may be available for manual actuation.

In addition, the technical specifications on safety equipment are different and are usually less demanding than they would be at full power.

This means that a higher system unavailability is common during these periods.

On balance, however, the TMI-1 PRA team considered that the impact of events from less than 15% power would be insignificant.

e Check Valve "V" Sequence or "V"-Sequence.

This is an example of an initiating event that is usually called a scenario.

This is because in some plants this initiating event can cause core damage without any other system failures. No alleviating systems can help if the break occurs outside the reactor building and the release therefore bypasses the containment altogether.

In the TMI-1 PRA this initiator has been called by the name of the valves that in TMI-1 would have to open, inadvertently or due to a failure, to fail the lower pressure piping downstream of them to cause this initiating event.

(See Inadvertent DHR Isolation Yalve Opening, PMR Section 4.2.5.)

Since the frequency (see Data Analysis Report, Section 3.5.2.6) of this event is very low it was assumed (as a modeling simolification) that it goes directly to core damage and therefore it is not treated explicitly in its own event tree, o

Loss of ICS/ Instrumentation.

Integrated control system failure causeo specifically by loss of ICS power supply bus ATA was C

considered explicitly in this study.

PMR Section 4.2.15 describes the loss of bus ATA power event tree.

This initiating event results in main feedwater being ramped back to 50%, so that the RCS reacts to what appears to be a loss of feedwater.

After the resulting reactor trip, the main feedwater stays at 50% (when less than 10% is needed) resulting in an excessive cooldown.

At TMI-1, the failure modes of the power-operated relief valve, turbine bypass valves, and atmospheric dump valves minimize the effects of this event.

It was also found that none of the other instrumentation or control equipment needed to alleviate this scenario was lost.

1.5.3 SPECIAL SCENARIOS Certain scenarios are of special interest because they are NRC unresolved safety issues.

In addition, some have been shown in other PRAs to be significant risk contributors.

e Station Blackcut. This type of scenario can result from any of the initiating events defined in Section 2 of the PMR when power from the offsite grid (Top Event OP) and the diesel generators or onsite distribution system (Top Events GA and GB) fails completely.

All such scenarios were considered explicitly in the evaluation of the event trees. Those initiated by the loss of offsite power are considered in the loss of offsite power event tree (see PMR Section 4.2.17), and those occurring from reactor trip and other initiators wers treated in their own frontline, early response event trees (see PMR Section 4.2).

The loss of onsite and offsite electric power is treated in the support system model described in Section 3 of the PMR.

1-11 0566G100237TSR

i e

Anticipated Transients without Scram.

The possibility of the reactor Tailing to trip on demand was considered for every initiating event g

described in FMR Section 2 in which the trip actuation setpoints were reached and reactor trip was required for reactivity control.

The "without trip" scenarios are considered explicitly in each frontline event tree in the PMR except in the trees for "reactor trip" and for the large, medium, and small loss of RCS inventory initiating events, e

Reactor Coolant Pump Seal LOCAs.

Scenarios that lead to reactor coolant pump seal degradation are possible in any event tree in this report except in those for the loss of coolant accidents.

If both seal cooling and seal injection flow were lost, the seals were assumed to begin to degrade.

Such scenarios were treated exolicitly in all transient trees.

The important station blackout scenarios in the loss of offsite power event tree were time limited by either the batteries running down, causing the auxiliary feedwater to stop leading to the emptying of the steam generator and boiling off the l

RCS inventory, or by the loss of RCS inventory due to the seal l

failure.

In the case of the loss of river water initiating event, the time that it would take for the failed seals to cause the core to uncover should be adequate time to recover HPI flow to the RCS /f a recovery of river water.

Such recovery was incorporated into the scenarios in the loss of river water event tree.

e Primary Relief Valves Open and Fail to Reclose. Most event trees in the PMR except those for the LOCAs ask whether the pilot-operated relief valves or primary safety valves, open and whether if opened, they reclose.

This question is asked in two instances:

1.

If excessive cooldown takes place and the operator fails to throttle HPI flow prior to opening of the PORV.

2.

If there is a reactor trip failure.

Such reclosure failure can lead to rapid loss of RCS inventory as would occur following a pipe break.

It requires similar alleviation, e

Bleed and Feed Cooling (also known and referred to herein as "HPI Cooling".

In the event trees, for all transients and for the very small loss of RCS inventory, the possibility of heat removal from the RCS using the RCS relief valves and high pressure injection flew is considered.

In this study, this cooling mode is called "HPI cooling." HPI cooling was assured to be successful if one out of the three primary relief valves opened and one HPI pump was started either manually or automatically.

(Automatic start would occur only if the engineered safeguards actuation system was previously actuated for other reasons.) The viability of HPI cooling for removing decay heat has been confirmed by B&W transient analysis.

HPI cooling was not considered as a viable method for cooling the RCS to decay heat removal system entry conditions; i.e., as a way of removing both decay heat and latent heat (the heat stored in the RCS) due to the considerable period of time required for cooldown.

Of course, PSys would not work for removing latent heat because they cannot be held open.

1-12 0566G101187TSR

e Pressurized Thermal Shock.

If scenarios lead to high RCS pressure and relatively low Rcs temperatures, it is postulated that the possibility of crack propagation in the reactor vessel increases.

1 This is because exposure of the reactor vessel to neutron flux raises i

the ductility transition temperature; i.e., the temperature at which carbon steel suffers a step increase in brittleness.

This transition temperature has been well known for years.

It has been the cause of automobile axle failures in Alaska and "liberty" ship hull failures at low temperatures. Usually, the transition temperature is outside the normal operating range of nuclear power plants.

However, concerns with what the transition temperature might be after years of reactor operation has caused strict pressure-temperature limits to be established for operation of the reactor coolant system.

Recent events have occurred at nuclear power plants that have violated these limits and, for highly irradiated pressure vessels, could have caused concern for reactor vessel integrity.

These events have resulted from excessive cooldown of the RCS followed by repressurization via the high pressure injection system.

The transient event trees used in this study include a number of cooldown scenarios.

These scenarios result in excessive cooldowns (i.e., ones for which high pressuro injection will be actuated) if the initiating event plus one of the following combinations of additional events occurs:

Failure of the main feedwater to ramp back.

Failure of the emergency feedwater control system to limit the feedwater delivered.

Failure of all secondary system steam relief valves--turbine bypass valves, atmospheric dump valves, or main steam safety valves--to reclose.

Excessive main feedwater, steam line break, loss of bus ATA, and very small RCS pipe break initiating events would also cool down the RCS and actuate the high pressure injection.

For all scenarios in which such excessive cooldown events occur, the high pressure injection system is assumed to operate.

A question (top event) is then asked about whether or not the operator successfully throttles HPI flow prior to water being driven through the PORV.

Driving water through a PORY makes it less likely that it will reclose.

These scenarios were judged in this study to be more significant to risk because of their potential for leaving a primary relief valve open than because of the likelihood that the reactor vessel might fail.

Top Event RV was included in all event trt es where PTS might occur.

This top event represented the conditional likelihood of reactor O

vessel failure, given that an excessive cooldown has occurred.

GPUN has estimated (based on previous work by 83W) that the conditional failure frequency of the reactor vessel, given that an excessive 1-13 0566G100287TSR

cooldown scenario has occurred, is always less than 5 x 10-4 This averages the frequency over the remaining plant lifetime, and takes credit for a reactor vessel flux reduction program.

This range of values, when combined with the more frequent excessive cooldown scenarios (for instance, failure of MFW to ramp back and failure of the operator to throttle HPI flow), results in quite low scenario frequency.

In addition, even if the reactor vessel did fail, it is most likely that it would fail as a leak at the core midplane.

(This is the area of highest neutron fluen:e.)

Failure of the reactor vessel at the midplane would not necessarily preclude injection flow to tha core.

It may be no worse than a large loss of RCS inventory event, which is already evaluated in the Plant Model Report. The TMI-1 PRA does not, however, take credit for mitigating a reactor i

vessel rupture.

1 Cold Shutdown. Most events considered in this study were considered to have ended if 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at operating temperature and pressure with the reactor tripped had elapsed.

Reducing the RCS temperature and pressure to 275'F and 400 psi, respectively, and operating the decay heat removal system was considered to be necessary for steam generator tube rupture and for ccntinued small RCS inventory loss events wherein it was necessary to cool the RCS in order to fix the problem.

In the tube rupture case, recirculation via the containnent sump is made impossible by the initiator, yet continued RCS inventory control is required.

The alternatives to core uncovery are to replenish the borated water storage tank to provide for long term makeup or to get the RCS cooled to less than 212*F and arrest the inventory loss to the secondary system.

The continued small RCS inventory loss events are treated in the reactor trip event tree for cases in which RCS leakage is within the capabilities of normal makeup; i.e., less than 150 gallons per minute, but nore than technical specification allowable leakage.

1.5.4 HUMAN ERRORS Human errors are dealt with on two levels in this study.

If they affect more than one system or change the course of a scenario, they become event tree top events (see TH, failure to throttle HPI flow in the PMR).

If such errors only impact one system, they are then included in the unavailability evaluation of that particular system.

In either case, the evaluation of the likelihood of such events is discussed in the Systems Analysis Report.

Human errors involved with testing or maintaining the system are also described in the Systems Analysis Report.

Four types of human errors are possible.

Like other PRAs performed to date, this study addresses in detail only the first three of the following four types and provides some consideration of the fourth:

Testing and naintenance or other technical specification-related e

errors wherein a component is lef t in a state from which it cannot perform its alleviating action.

Such errors were considered for all g

systems; however, they did not prove to be important for all of them.

1-14 0566G100237TSR

o o

Procedural errors wherein the operator fails to perform actions required by the emergency or operating procedures for a particular scenario. The failure of the previously mentioned TH top event (HPI throttling) is an example of a procedural error, o

Errors in selecting the correct procedure.

In some cases, the identity of a specific scenario may be sufficently ambiguous that the operator could choose an incorrect emergency procedure to follow.

In such a case, all the operator's subsequent actions may be inappropriate to the situation at hand.

The only such error considered to be important in this study was ID (failure to identify correct procedure) in the steam generator tube rupture event tree s

(see PMR Section 4).

Failure of Top Event ID means that the operator has mistaken the SGTR for a very small loss of RCS inventory event.

Such errors will look, at first glance, like errors of commission.

Other errors of commission in which, for instance, the operator steps e

in and turns off a pump without being misled by having picked the wrong emergency procedure.

Such errors are extremely difficult to predict and have not been treated in detail in the TMI-1 PRA. One example of such an error, the inadvertent throttling of HPI flow, is considered in Top Event BW (split fractions BWE and BWF).

1.5.5 UNCERTAINTY O

Consideration of uncertainty is a very fundamental aspect of this study.

In fact, the study team considers uncertainty and risk to be inseparable.

If there were no uncertainty about what the risk from operating TMI-1 was going to be, there would be no reason to do a risk assessment.

Uncertainty in every important input value is propagated through to the final plant damage state and core damage frequency curves, which are presented in "probability of frequency format (see Section 5).

These express the study team's state of knowledge about how well the team was able to calculate the frequency of all important scenarios.

A two-step process (see Section 4) was used to first find the important scenarios, and then to prnpagate the uncertainty from component distributions to risk curves for those scenarios that were important

("dominated risk").

How the important scenarios were picked is described in Section 6 of the PMR.

How the uncertainties were propagated through these dominant scenarios is described in Section 4.4 of this report and in Section 6 of the PMR.

The first step was to allow a single characteristic of the distribution (usually the mean) to represent the top event likelihood of failure in the event trees.

These means came from conplete distributions that were the result of propagating component distributions through the systems analysis equations (see Systems Analysis Report).

All scenarios in the event trees were evaluated with these means; then, only those scenarios O

necessary to represent a large fraction of the frequency of each type of event tree consequence (plant damage state) were kept.

A logical, or Boolean, equation and its algebraic equivalent were written for each type 1-15 0566G101187TSR

of consequence category and then reduced.

This allowed all dependent events to be treated properly. Next, the probability of frequency distributions for the top and initiating events that had been represented by their mean were used in logical expressions to derive a distribution for the frequency of each plant damage state and for core damage.

1.5.6 PROBABILITY AND FREQUENCY Special language is used in this report to allow the study team to consistently describe its state of knowledge about each input or calculated value.

The probability of frequency format was used.

Frequency was used to describe a "hard," measurable number, which can be thought of as the outcome of a thought experiment or an experiment to be dor,a in the future.

Probability, on the other hand, is a different notion, which is introduced because rarely in life is anything known with complete certainty.

Probability is used as a way to communicate our state of confidence on any particular matter.

It is a numerical scale introduced to quantify states of confidence or states of kncwledge.

To make this notion useful, we must clearly define the connection between the numerical scale and the state of confidence.

This can be done in several ways. The most direct, however, is to use frequency in the following way.

Suppose a lottery basket contains coupons nunbered from 1 to 1,000.

Suppose the basket is thoroughly mixed and that a coupon is to be drawn blindfolded.

Will the coupon be nurbered 632 or less? With respect to this question, a certain state of confidence is experienced.

Similarly, others experience a state of confidence with respect to this same question.

This state of confidence is called, "probability 0.632," equal to the frequency of such draws in an infinitely repeated experiment.

In the same way, the entire probability scale can be calibrated, from zero to one, using frequency as a standard of reference.

)

This method of definition shows the intimate connection between probability and frequency.

This connection needs to be recognized always, but at the same time must not be allowed to obscure the furdamental difference. Frequency is used to calibrate the probability scale in a "bureau of standards" sense.

Once the calibration is established, probability..an be used to discuss a state of confidence in areas where one-time events are being addressed.

For each frequency used,

t. distribution of probability that the frequency has a particular value was established.

This distribution plots a range of frequency against the likelihood that each frequency value is the correct one.

All such values of probability that any particular frequency is the correct one represent a probability of frequency curve.

Such curves are used wherever uncertainty is represented in this study.

(See Section 4 for a description of how this is done.)

The methods used in this report for propagating uncertainties did not require that the probability of frequency curves have any particular shape.

1.5.7 SUCCESS CRITERIA Success criteria were established for the performance of each system in each top event in the event trees.

These criteria specify to what degree 1-16 0566G100237TSR

each system must perform to accomplish its action.

All such criteria are described in Section 4.1.4 of the PMR.

In general, the success criteria'used in this study were kept as realistic as possible.

Some exceptions may exist when realistic analyses for success criteria were unavailable, and could not be performed within the scope of the PRA. Realistic values were used for two reasons.

First, to use "conservative" success criteria, e.g., the ones in the Final Safety Analysis Report, would usually produce excessively high estimates of the risk from operating TMI-1.

Second, in some particular scenarios, combinations of conservative success criteria were found to not always result in conservative estimates of the scenario frequency and consequences. For both of these reasons, it would have been undesirable to use anything less than the most accurate possible success criteria.

1.5.8 CUALITY ASSURANCE OF THE TMI-1 PRA 1.5.8.1 General Quality Assurance Practices The essential differences between a rigorous scient'fic study and a nonscientific, intuitive evaluation are the use of appropriate and consistent methods, careful documentation, and peer review.

PRA is a highly scientitic undeavor requiring the highest levels of technical competence and integrity.

As with any scientific endeavor, the quality of a PRA study hinges on tne use and documentation of appropriate assumptions, methods, data, and analysis. The purpose of careful documentation is essentially twofold.

One major purpose is to aid the analysts in maintaining control over the process; i.e., it builds a "blueprint" of the progress, which permits tracing logical progressions from initial assumption to final results.

The second function of the documentation is to facilitate peer review, critiques, and reproducibility.

1 Given the requirements for a quality study, it is easy to see that the competence and integrity of the people involved are of paramount importance.

For a PRA to be successful, the study team must be made up of at least the following:

Experts in the analytical and probabilistic methods employed in the e

analysis.

Engineers who have hands-on knowledge of the workings of the e

engineered systems being analyzed.

Practitioners who can translate analytical methods and plant e

knowledge into meaningful models for quantifying risk.

Engineers and scientists eith concentrated knowledge of the behavior e

of systems under normal and abnormal conditions.

O Specialists in phenomena that are relevant to the study.

Such e

phenomena might include earthquakes, fires, floods, and extreme winds.

1-17 0566G100237TSR

e Authors who have special skills in communicating highly technical and scientific work.

The most important consideration for verifying the quality of a PRA is to perform the work correctly in the first place.

Quality assurance is enhanced by segmenting the study into stages so that the analyst has checkpoints on his progress.

Internal procedures require the analyst to present his work to his associates and defend the results.

This technique is very effective in creating a sense of responsibility and professionalism.

In addition, a different analyst checks the model and duplicates the key calculations.

The work is subject to detailed review by senior members of the study team and by a technical review board.

This review checks on the overall methods employed, makes spot checks of detailed models and calculations, questions all assumptions, carefully reviews all documentation, and identifies the weakest and strongest points in the analysis.

1.5.8.2 31-1 Specific Quality Assurance Procedures The objective of the TMI-1 PRA quality assurance program developed by PLG was to ensure that the services provided were reliable, traceable, and in full compliance with all applicable Federal regulations ard industry standards.

For this project, additional emphasis was placed on technical review.

A description of the technical review levels is provided in Table 1-2.

A brief description of the quality assurance procedures follows:

The document control system ;pecified procedures for identifying and e

logging documents transmitted and received and for storing and retrieving project files, Corrective action procedures established requirenents for controlling e

corrective actions for quality assurance program deficiencies discovered during technical analysis and reviews or quality assurance program audits.

The procedures addressed the responsibility for detection and cort ection of the deficiency, the filing of Corrective Action Reports, and the tracking of report status, Quality assurance program audit procedures established guidelines for e

the frequency, scope, and documentation of internal audits and the responsibilities of the company officers and managers.

The internal audits were made to ascertain that the specified quality assurance procedures were being followed and to uncover any deficiencies in the procedures, j

Independent technical review guidelines established the scope of the e

reviews and the responsibility of the project managers in these reviews.

1 The conputer code quality assurance program established the e

responsibilities of the project manager, computer coordinator, computer code author, and code verifier.

The program also set guidelines to ensure that the codes performed as intended and were properly documented.

1-18 0566G100237TSR

)

e The document change control defined procedures for processing and approving changes to project documents.

Project documents included the project plan, quality assurance manual, and any other decurents affecting control of the project.

e Subcontractor selection procedures set responsibilities and selection and documentation guidelines to ensure that subcontractors met the same technical and quality assurance standards set forth in the manual.

e Federal regulation compliance procedures set guidelines to ensure that the appropriate lawful actions would be taken should significant safety defects in the plant be revealed.

1.6 REFERENCE 1-1.

American Nuclear Society and Institute of Electrical and Electronics Engineers, "PRA Procedures Guide; A Guide to the Performance of Probabilistic Risk Assessments for Nuclear Power Plants," U.S. Nuclear Regulatory Commission, NUREG/CR-2300,1983.

/^'s V

7\\U 1-19 0566'3100237TSR

TABLE 1-1.

DISPOSITION OF ISSUES OF CURRENT CONCERN O

Issue Reference e Common Cause Failure e Common Mode Failure Section 1.5.1, Dependence e System Interactions e Environmental Effects e Steam Generator Tube Rupture 3 e Loss of River Water o "External Events" e Missiles y

Section 1.5.2, Special e Tornados e Earthquakes Initiating Events e Events from Other than Full Power e Check Ysive "Y" Sequence e Loss Of ICS/ Instrumentation e Anticipatect Transient Without' f

Scram e RCP Seal LOCA e PSVs/PORVs (Primary Valves)

Fail to Reclose Section 1.5.3, Special Scenarios e Bleed and Feed Cooling e Pressurized Thermal Shock e Station Blackout e Cold Shutdown d

e Huran Errors Section 1.5.4, Human Errors e Uncertainty Section 1.5.5, Uncertainty e Probability Versus Frequency Section 1.5.6, Probability and Frequency e Success Criteria Section 1.5.7, Success Criteris O

0567100287:1TSR

  1. 9 TABLE 1-2.

REVIEW RESPONSIBILITIES

\\ J Stage Review Objective Person Responsible 1

Check all calculations, computer Analyst / Author input and output; proofread documents prepared by publications department for technical accuracy.

2 Double-check all calculations; review Task Leader documentation for technical accuracy; ensure consistency of docurrentation within technical area (e.g., systems);

ensure that the right tools are used.

3 Review all deliverables; ensure Project Manager project objectives are met; ensure consistency among technical areas and documentation; be responsible for resolution of all review comments and assignment of work needed to resolve review issues.

4 Assure that all parts of the project Project Director team perform their assigned responsibilities; review results and conclusions of key deliverables.

5 Review all deliverables for correctness Client (GPUN) of interpretation of plant design and planned operation, documentation, safety analyses, and modeling of plant and site unique characteristics.

6 Perform quality assurance audits; PLG Quality conduct quality assurance training; Assurance maintain quality assurance records.

Manager 7

Perform overall independent review Technical Review of the report section deliverables Board in early draft form, particularly methods and results.

l l

b V

0567100237:2TSR 1-21

l h l

V 2.

HISTORICAL PERSPECTIVE l

l Nuclear safety has been a visible and fundamental concern in the development and commercialization of nuclear power. From the beginning of the nuclear industry, safety design philosophy has centered around the "defense in-depth" characterized by the multiple fission product barrier concept supported by upper bound, deterministic calculations. This i

approach has served the cause of nuclear safety well. Carried to an extreme, however, it can lead to the wasteful use of resources and the unnecessary introduction of equipment complexity, which can actually reduce safety. With the growth of experience of operating nuclear power plants, the upper bound calculations have been supplemented with an t

analytical approach that assesses nuclear power plant safety more realistically by putting such upper bound results into etntext.

PRA is the approach.

PRA is both a systematic identification of the levels of damage that could result from nuclear plant operation and a rigorous assessment of the likelihood of such occurrences.

The upper bound deterministic approach for assessing nuclear power plant safety is specified in the Code of Federal Regulations. The Code l

requires the analysis of a fixed set of predefined accidents for the l

reactor plant. Originally, the most severe of these accidents, the maximum hypothetical accidents, were selected to establish required i

distance factors from the plant (Reference 2-1).

The somewhat arbitrary t

O nature of these distance factors began to stir interest.

In the early 1960s, F. R. Farmer of the United Kingdom proposed a new approach to power plant safety based on the reliability of consequence limiting equipment (Reference 2-2).

At the time, the United Kingdom, facing a need to bring nuclear power plants closer to large populations, began to abandon the somewhat arbitrary notions of plant safety and espoused a more realistic and quantitative definition of risk to public health.

Meanwhile, in the United States, a series of studies sponsored by the

[

U.S. Atomic Energy Commission was undcrtaken in the early and mid-1960s to probe the merits of using reliability techniques in the safety analysis of American nuclear power plants. These studies (References 2-1 i

and 2-2) identified the need for special data and analytical tools, such as fault tree analysis, to perform meaningful quantitative risk analysis, j

Interest in probabilistic risk assessment continued to grow during the 1960s. Analysis techniques were borrowed from statisticians and reliability engineers (References 2-3 through 2-5) and were developed i

into tools suitable for predicting failure frequencies for large, complex l

nuclear power plant systems. The benefits in terms cf safety control and understanding were documented in Reference 2-3.

(This reference developed a methodology for attacking the problem of probabilistic risk assessment of complex plants.) With the evolution of reliability techniques, people began to believe that it was possible to estimate the Itkelihood of low frequency, high consequence accidents at nuclear l

plants.

In 1972, the U.S. Atomic Energy Commission undertook the Reactor Safety Study under the direction of Professor N. C. Rasmussen of the l

C Massachusetts Institute of Technology (Reference 2-6).

This project took 3 years to complete and marked a turning point in attitudes toward j

measuring nuclear safety.

It was the most thorough investigation of I

2-1 0568G100287TSR

reactor safety of its time and, as such, it set the stage for the understanding of safety for years to come.

It calculated the risk from the operation of 100 U.S. light water reactors of then current design operating at base power. The report showed the way to derive and present risk results meaningfully to technical specialists and policy makers alike. The finished document formed a basis for thorough discussion of risk methodology, thereby focusing criticism, review, and improvement.

Three important findings of the study were that:

(1) the risk associated with the operation of selected nuclear power plants was indeed small, (2) the dominant contributor to risk was not the large loss of coalant accident, as previously emphasized in the Code of Federal Regulations, but (3) it was the transients and the small LOCAs that often make up most of the contribution to risk.

Although seminal in nature, the Reactor Safety Study was criticized extensively.

Between release of the draft report in August 1974 and the final version in October 1975, comments were received from 87 organizations and individuals representing governnent, industry, environmental groups, and universities. Many of these comments had a significant impact on the final report.

For example, the American Physical Society Study Group on Reactor Safety pointed out serious omissions in the consequence calculations.

The Union of Concerned Scientists, released its review of the study in 1977 (Reference 2-7).

It criticized all aspects of the report--its objectivity, the accident analysis, and the consequence analysis.

The most complete and even-handed review of the WASH-1400 report was conducted by the Risk Assessment Review Group chaired by Professor H. W. Lewis of the University of California, Santa Barbara (Reference 2-8).

The group was organized by the U.S. Nuclear Regulatory Commission on July 1,1977, at the request of Congressman Morris K.

Udall, Chairman of the Committee on Interior and Insular Affairs, who had held hearings on the Reactor Safety Study.

Following the release of the Lewis Report, the NRC issued a press release (Reference 2-9) withdrawing its endorsement of the WASH-1400. This l

announcement has since caused great misunderstanding of the criticism offered by Lewis, et al., and of the validity of WASH-1400 itself.

It is important to note, however, that neither the Lewis Report nor the NRC press release disavowed the fault tree / event tree methodology.

The most astounding statement by the NRC was that "the Commission does not regard as reliable the Reactor Safety Study's numerical estimate of the overall risk of reactor accidents." This action was based upon the Lewis Report conclusion that "absolute values of the risks preserted by WASH-1400 should not be used uncritically." The leap from this cautious caveat to rejection was a large one indeed. The Lewis Report found that the RSS error bands were understated, thus misrepresenting the uncertainties associateo with a potentially inadequate data base with the occasional use of weak statistical methods and with some calculational inconsistencies.

In particular, the Lewis Report urged caution in the use of the numbers, but did not reject them completely.

In summary, the general methodology was strongly supported and recorrnended for future use. Care in stating the bounds of knowledge, however, is necessary.

2-2 0568G100237TSR

The accident that occurred at the Three Mile Island Nuclear Generating Station, Unit 2 in March 1979 (Reference 2-10) had a profound impact on the nuclear industry and on the concept of risk assessment.

Portions of the TMI-2 sequence of events were not included in detail in the RSS analysis, causing many to question the validity of the analyses.

In truth, the transient at TMI did fit the RSS sequences, albeit not exactly. The transient fit in the sense that a small LOCA with failure of high pressure injection was included as one of the RSS sequences.

However, it did not fit exactly because the numerical probabilities that the RSS placed on this scenario represented an accident. progression going all the way to core melt. What the RSS did not estimate was the likelihood that an operator would interrupt the core damage.

The initial reaction to the TMI accident was negative with respect to the value and role of probabilistic risk assessment; on reflection, the attitude soon changed.

Two important post-TMI independent studies recomended greater use of probabilistic analysis techniques in assessing nuclear plant risks and in making decisions about nuclear safety.

They were the report of the President s Commission on the Three Mile Island accident (Reference 2-11) and the so-called Rogovin Report (Reference 2-12). Following the lead of the reports of these commissions, several post-TMI NRC reports also noted the value of quantitative risk analysis (References 2-13 through 2-16).

Evidently, the use of probabilistic methods in nuclear safety analysis received a singular boost from the RSS.

However, as a result of the many controversies surrounding the RSS and the TMI-2 accident, it became J

obvious that certain areas of the methodology used in the RSS would have to be enhanced for probabilistic risk assessment to be better understood; i.e., to be more scrutable.

In particular, it would be necessary to provide:

e A better executive sumary.

j I

e A quantitative expression of the uncertainty in the risk results and in all the input variables, data, etc., that are used.

e A full display of the events and hardware contributing to risk in such a way that the impact on risk of changes in design and i

operations could be easily seen.

e Documentation that allows all models, boundary conditions, accident

)

l scenarios, and supporting data to be easily traced.

1 i

e A full treatment of all accident initiators, including those due to earthquakes, fires, floods, and winds.

e Detailed analysis of accident phenomena, including in-vessel and ex-vessel degraded core behavior, transient analysis, containment j

response, and source term definition, e

Consequence analysis based on plant-specific / site-specific weather and evacuation models.

2-3 0568G100287TSR

The accident that occurred at the Three Mile Island Nuclear Generating Station, Unit 2 in March 1979 (Reference 2-10) had a profound impact on the nuclear industry and on the concept of risk assessment.

Portions of the TMI-2 sequence of events were not included in detail in the RSS analysis, causing many to question the validity of the analyses, q

In truth, the transient at TMI did fit the RSS sequences, albeit not i

exactly. The transient fit in the sense that a small 1.0CA with failure of high pressure injection was included as one of the RSS sequencas.

However, it did not fit exactly because the numerical probabiliti's that the RSS placed on this scenario represented an accident.progressico going all the way to core melt. What the RSS did not estimate was the likelihood that an operator would interrupt the core damage.

The initial reaction to the TMI accident was negative with respect to the value and role of probabilistic risk assessment; on reflection, the attitude soon changed. Two important post-TMI independent studies recommended greater use of probabilistic analysis techniques in assessing nuclear plant risks and in making decisions about nuclear safety.

They were the report of the President s Commission on the Three Mile Island accident (Reference 2-11) and the so-called Rogovin Report (Reference 2-12).

Following the lead of the reports :.f these commissions, several post-TMI NRC reports also noted the value of quantitative risk analysis (References 2-13 through 2-16),

i Evidently, the use of probabilistic methods in nuclear safety analysis received a singular boost from the RSS.

However, as a result of the many controversies surrounding the RSS and the TMI-2 accident, it became obvious that certain areas of the methodology used in the RSS would have j

j to be enhanced for probabilistic risk assessment to be better understood;

^

1.e., to be more scrutable.

In particular, it would be necessary to provide:

6 e

A better executive surmary.

r e

A quantitatiu er.pression of the uncertainty in the risk results and j

in all the input variables, data, etc., that are used.

J A full display of the events and hardware contributing to risk in s

such a way that the impact on risk of changes in design and operations could be easily seen, e

Documentation that allows all models, boundary conditions, accident scenarios, and supporting data to be easily traced.

e A full treatment of all accident initiators, including those due to l

earthquakes, fires, floods, and winds.

j e

Detailed analysis of accident phenomena, including in-vessel and ex-vessel degraded core behavior, transient analysis, containment response, and source term definition.

e Consequence analysis based on plant-specific / site-specific weather and evacuation models.

l 2-3 0568G100287TSR

The first study to be completed af ter the RSS to include many of these new reatures was the "0PSA, Oyster Creek Probabilistic Safety Analysis,"

a draft report which was completed in 1979 (Reference 2-17).

The Zion (Reference 2-18) and Indian Point PRAs (Reference 2-19) and others performed by PLG for various utilities built on the Oyster Creek PRA methods and added important improvements, including: expanded comon cause failure analysis, uncertainty quantification methods, methods for assembling and dissecting the results, analysis of dependent failures and human interactions, containment and core response analysis, modeling of external events (earthquakes, fires, floods, etc.) and incorporation of the site-specific topography, emergency preparedness plans, and changing weather patterns in the consequence model.

In this report, a PRA incorporating all these features is termed a "full-scope PRA."

One impact of the above advances has been a r ce accurate specification of the contributors to risk.

The methodology now allows us to identify the contributors to risk and to observe in increasing detail what is driving the risk level.

This is vital for making decisions on design modifications, procedural options, or any other risk management action on the part of the utility.

Knowledge of the risk and its structure enables effective risk management.

In addition to the advances made by these recent PRAs, a very significant sign of the developing maturity of risk assessment was the publication of a PRA Procedures Guide (Reference 2-20).

Developed by experienced practitioners in private industry and in national laboratories, this guide defines what is meant by a PRA and describes some of the alternative methods available for performing each of its aspects.

Another impact of these advances has been to enhance the usefulness of PRA in risk management and in the regulatory process.

The latter includes conformance with regulatory safety goals (Reference 2-21),

post-TMI-2 accident licensing requirements (Reference 2-22),

environmental impact reports, and emergency preparedness plans (Reference 2-23).

All of these impt. cts are precisely what is intended to be achieved by the TMI-1 PRA.

The risk profiles from other PRAs cannot be used for the TMI-1 Station.

Recent experience indicates that risk profiles are even more plant specific than was realized following the early PRAs. A striking example is the difference in risk levels and dominant contributors between the Indian Point Units 2 and 3, which are similar units located on the same site (Reference 2-24).

In conclusion, it is becoming clear that the ultimate reason for doing a risk assessment is that there is an underlying decision (or many decisions) to be made.

The risk assessment provides vital input to the decision-making process formalized by decision analysis.

In this section, we give a brief review of the well-known decision theory diagram (Figure 2-1) and therefore, of Qe context for using risk assessrent.

At the lef t in this diagram, the point of decision is represented with variots items of information as input. On the basis of this information, we need to choose between options A, B,... fl.

2-4 0568G100287TSR

O V

If we knew for certain what would be the outcome of each option, the d(cision, of course, would be easy. What makes the situation interesting is uncertainty.

The uncertainty is represented in the-diagram by showing a set of possible outcomes (e.g., A;, A...)

for each option. The 2

best we can do, standing at the dec'sion point, is to look ahead and assign a probability to each of the possible _ outcomes, assuming we choose the corresponding option. These probability values represent our state of knowledge at the point of decision, based upon all>the information available there.

Associated with each outcome is a set of "impacts," which we regard as listed in a linear array called the impact "vector" to denote the fact that, in general, there are many different impacts or categories of impact associated with a given outcome.

Next, we must feed into the decision process the notion of "preference";

that is, we must say which sets of impacts we prefer to which others and by how rmch. Analytically, this is done by establishing a "utility" function which makes each irrpact vector into a single scalar, an ordinary number that expresses our preference value for that set of impacts. This being done, we may now calculate the "expected utility" associated with each option as the sum, over the possible outcomes of that option, of the product of the probability of that outcome multiplied by its utility.

According to this model of the decision process, then, the optimum O

decision is that option having the largest expected utility. This is the fundamental model of a decision situation.

It is necessary to remark that in order for the model to represent a real-life decision situation, it must include all the options present in that situation, including, for example, the option of not deciding--which is itself a decision, although rarely the optimum one.

Similarly, it should include the option of delaying the decision while we gather further information. Both of these options have probabilities, outcomes, impacts, and utilities like any other option and should be included explicity in the decision diagram.

Figure 2-2 gives an alternate formulation of the decision diagram that is better suited to our needs here. For this purpose, we define impacts so that there are only three components in our impact vectors, namely, "cost," c. "benefit," b, and "damage," x.

We consider, noreover, the simplest case in which our uncertainties about the magnitude of cost, benefit, and damage are independent of each other. We may then draw the decision diagram in the form of Figure 2-2.

In this figure, we allow C, the cost of option A, to stand for the A

entire probability density function (pdf) P (c); similarly, we allow A

B, the benefit of A, to stand for the pdf P (b).

In the case of A

A damage (in keeping with current convention), we show the probability curve drawn in complementary cumulative form, and we denote this curve by R (x), the risk cf A.

A We now think of the triplet (C, B e R > as characterizing A

A A

O option A.

Similarly, <Cy, By, Rg> characterizes N etc. The utility function now becomes a mapping from such triplets to scalars.

2-5 0568G100287TSR

Thus, A = U (<C, B, R >)
  • UN " U (<Cg, By, R >)

U A

A A

N where the scalar UA now expresses our degree of preference for the triplet <CA B, R >, etc. The optimum decision is then that A

A option having the largest utility value.

The purpose of risk analysis, as shown in Figure 2-2, is to provide the curve R. For a valid decision analysis, similar curves, A

Rg,... Rn, should be calculated for each option. Only the risk assessment is addressed in this report.

A PRA can put a decision into perspective about whether to modify a plant or its procedures for operation and maintenance by comparison with other sources of risk and with various proposed safety goals or acceptable risk criteria.

Af ter the final results have been assembled, the methodology permits a clear examination of risk contributors from several different perspectives.

The structure of the risk model allcws us to determine risk contributors in successive levels of detail. With this detail, we are ir, a position to identify options that can be most ef fective in reducing risk.

Thus, quantified risk before and after any proposed change allows us to define the ef fectiveness of the change.

Risk reduction may result from changes in specific plant components, personnel training, procedures, safeguards, containment, or emergency plans. The plant and site-specific risk model developed in this project is designed to accommodate this level of decision analysis.

In constructing a plant-specific risk model for TMI-1, the risk assessment team has taken advantage of lessons learned from previous PRAs (Reference 2-24).

Some highlights of these lessons are:

Important scenarios, such as those that occurred at the Salem plant e

(automatic scram failure), can be identified and their likelihood anticipated in advance of their occurrences. This tends to validate the whole idea of deriving risk estimates from risk rodels.

Nuclear plants are much more able to cope with a damaged core or even e

a core meltdown than had been generally perceived in the past.

As a result, the likelihood of the owner / operator experiencing a loss associated with damage to the plant is much greater than the likelihood of experiencing damage to public health and property.

e Contributors to risk vary, depending on the type of consequence considered.

Hence, a risk management strategy that focuses on core melt frequency is not likely to result in the sane set of actions as a strategy that focuses on the risk of early fatalities or one that focuses on the risk of latent fatalities, o

Core melt progression studies done in support of PRAs have moved a long way toward dispelling certain perceptions regarding the "China Syndrone" scenario. The evidence is very strong that containment basemat melt-through is not an inevitable consequence of a core 2-6 0568G100237TSR

I meltdown accident.

Studies that have been made relative to liquid pathways for radioactive material have indicated little or no consequence with respect to health and safety even when basemat melt-through is postulated to occur.

e Full scope PRAs have indicated the importance of including the analysis of such external events as earthquakes, fires,' flood, and high intensity winds.

In a number of cases, the external events have 1

been shown to be the major contributors to risk.

i e

The emphasis in new plants on independence and separation of safety system equipment trains has not necessarily reduced risk. While such designs reduce the risk contributions from such rare events as pipe ruptures, large fires, and extensive flooding, they make it more difficult to protect the plant against frequently occurring failures.

That is, the absence of crossties between systems denies access, for example. to alternate supplies of cooling water.

Because of their higher frequency, such events as normal challenges to these systems often turn out to be more important contributors to risk than the less frequent energetic events.

REFERENCES 3

2-1.

DiNunno, J.', F. Anderson, R. Baker, and R. Waterfield, i

1 "Calculation of Distance Factors for Power and Test Reactor i

4 Sites," TID-14844, March 1962.

2-2.

Farmer, F. R., "The Growth of Reactor Safety Criteria in the 2

United Kingdom," Anglo-Spanish Nuclear Power Symposium, Madrid, November 1964 l

2-3.

Garrick, B.

J., and W. C. Gekler, "Reliability Analysis of Nuclear Power Plant Protective Systems," HN-190, U.S. Atomic Energy 4

Commission, May 1967, 2-4 Garrick, B.

J., "Principles of Unified Systems Safety Analysis,"

Nuclear Engineering and Design, Vol.13, No. 2,1970, pp. 245-321.

f 2-5.

Locke, J. H., et al., "Canvey:

An Investigation of Potential Hazards from Operations in the Canvey Island /Thurrock Area," U.K.

Health and Safety Executive, May 1978.

2-6.

U.S. Nuclear Regulatory Commission, "Reactor Safety Study: An j

Assessment of Accident Risks in U.S. Commercial Nuclear Power i

Plants," WASH-1400 (NUREG-75/014), October 1975.

a 2-7.

Union of Concerned Scientists, "The Risks of Nuclear Power

'I Reactors: A Review of the NRC Reactor Safety Study," WASH-1400 i

(NUREG-75/014), August 1977.

I 2-8.

Lewis, H.

W., et al., "Risk Assessment Review Group Report to the U.S. Nuclear Regulatory Commission," NUREG/CR-0400, Septenber 1978.

t 2-7 0568G100287TSR

....-.-.,--L

2-9.

"Nuclear Regulatory Commission Issues Policy Statement on Reactor Safety Study and Review by Lewis Panel," NRC Press Release, No. 79-19, January 19, 1979.

2-10.

Electric Power Research Institute, "Analysis of Three Mile Island--Unit 2 Accident," Nuclear Safety Analysis Center, NSAC-1, July 1979.

2-11.

"The President's Commission on the Three Mile Island Accident:

The Need for Change - The Legacy of TMI," October 1979, 2-12.

Rogovin, M., and G. T. Frampton, "Three Mile Island, A Report to the Commissioners and to the Public," Government Printing Office, January 1980.

2-13.

U.S. Nuclear Regulatory Commission, "TMI-2 Lessons Learned Task Force Status Report and Short-Term Recommendations," NUREG-0578, July 1979, 2-14.

U.S. Nuclear Regulatory Comnission, "TMI-2 Lessons Learned Task Force Final Report," NUREG-0585, October 1979.

2-15.

U.S. Nuclear Regulatory Commission, "Action Plans for Implementing Recommendations of the President's Con:nission and Other Studies of TMI-2 Accident," Draft Report, NUREG-0660, Decenter 1979.

2-16.

U.S. Nuclear Regulacory Commission, "Review of HRC Regulatory Processes and Functions," NUREG-0642, January 1980.

2-17.

Garrick, B.

J., et al., "0PSA, Oyster Creek Probabilistic Safety Analysis," draf t, prepared for Jersey Central Power and Light Company, PLG-0100, August 1979.

2-18.

Pickard, Lowe and Garrick, Inc., Westinghouse Electric l

Corporation, and Fauske & Associates, Inc., "Zion Probabilistic l

Safety Study," prepared for Commonwealth Edison Company, September 1981.

2-19.

Pickard, Lowe and Garrick, Inc., Westinghouse Electric Corporation, and Fauske & Associates, Inc., "Indian Point Probabilistic Safety Study," prepared for Consolidated Edison Company of New York, Inc., and the Power Authority of the State of New York, March 1982.

2-20.

American Nuclear Society and Institute of Electrical and Electronics Engineers, "PRA Procedures Guide; A Guide to the Performance of Probabilistic Risk Assessments for Nuclear Power Plants," U.S. Nuclear Regulatory Commission, NUREC/CR-2300,1983.

2-21.

U.S. Nuclear Regulatory Commission, "Safety Goals for Nuclear Power Plants," NUREG-0880, May 1982, 2-22.

U.S. Nuclear Regulatory Commission, "Licensing Requirements for Pending Applications for Construction Permits and Manufacturing License," NUREG-0718, March 1981.

2-8 0568G100237TSR 1

,. _ _ _ _ _ =

i,

.I I

t 2-23.

U.S. Nuclear Regulatory. Commission, "Criteria for Preparation' and ~

Evaluation and Radiological Emergency Response Plans and-Preparedness in Support of-Nuclear Power Plants," NUREG-0654, Revision 1, November 1980.

2-24.

Garrick, B. 'J., "Lessons Learned from First Generation Nuclear -

L Plant Probabilistic Risk Assessments," llorkshop on

.i Low-Probability /High-Consequence Risk Analysis, Arlington, l

Virginia, June 15-17, 1982.

i i

I O

I

-l l

j I

t t

i i

l l

i e

O i

2-9 0568G100237TSR

POSSIBLE OUTCOMES IMPACT UTILITY EXPECTED p( A )

EU j

p(A I

^1 V(A )

[

U(A )

2 j

=

j DECISION A

[- i 2

OPTIONS

_b OA V(A )

U(A )

U(A)

=

p(A ) U(A )

3 2

=

2 j

j

^4

(

}

~

I INDICATIONS

=

li y

~

s J

s O

I o

2 B

C C

l V(C )

U(C )

=

j 3

3 D

b 4

4 U(C) p(Cj) U(C )

=

j C

V(C )

3 2

j U(C I

=

2 C

~' "

4

/

~

DECISION: Max U(K)

K=A,B,C-FIGURE 2-1.

THE ANATOMY OF A DECISION O

O O

O

)g U

S I

I I

B SY U

A L

N A

R A

R U

N

(

A A

N X

B O

A K

,A S

N' M

C I

R C

=

N

(

O

{

U U

S I

L

=

I

=

C E

A

=

U N

E D

U D

OM LA N

O

)

I

)c b

S

(

(

I A

A C

P P

E b

D

/

/

b E

T c

E T

E H

I T

F G

T T

I F

G S

E A

S E

A F

O N

M O

N M

O

.C E

A C

O E

A N

B P

P P

D B

D O

P P

P I

T A

=

=

L A

A A

=

=

=

U C

M B

R N

N N

R C

B R

O F

ETANR ET LA 2

2 ERU

.9 G

B O

I F

N 4

O 0

O T

I PO

/ +

O

?:

l ll

,l:[

/D 3.

PLANT PERSPECTIVE V

This section describes the TMI-1 plant, its safety functions, and the relationship of the PRA model to the plant, as built.

3.1 DESCRIPTION

OF PLANT AND SITE The Three Mile Island Nuclear Station Unit 1 is located on Three Mile Island in the Susquehanna River, Londonderry Township, Dauphin County, about 10 miles south of Harrisburg, Pennsylvania. TMI-1 is rated at 871 MWe (gross), and is licensed for a core power of 2,535 MWt.

It went into commercial operation in September 1974.

The TMI-1 NSSS was supplied by Babcock & Wilcox Company, and the turbine generator was supplied by General Electric, Gilbert Associates, Inc.,

was the architect-engineer.

l TMI-1 is owned jointly by Jersey Central Power and Light Company, 25%;

l Metropolitan Edison Company, 50%; and Pennsylvania Electric Company, 25%;

all owners are operating companies of the General Public Utilities Corporation.

It is operated by GPU Nuclear, also a GPU subsidiary.

Three Mile Island is located approximately 2-1/2 miles south of Middletown, Pennsylvania, at longitude 76*F 43'-30"' west and at latitude 40*F 8' north.

It is one of the largest of a group of several islands in l

(

the Susquehanna River and is situated about 900 feet from the east bank.

It is elongated parallel to the flow of the river, with its longer axis oriented approximately due north and south.

The island is about 11,000 feet in length and 1,700 feet in width. This unit is located in the northern one-third of the island.

The exclusion area includes portions of Three Mile Island, the river i

surface around it, and a portion of Metropolitan Edison Company-owned Shelley Island. Metropolitan Edison Company directly owns the site and j

all but a small portion on the southern end of Shelley Island.

The remainder of Three Mile Island is held by a wholly owned subsidiary of Metropolitan Edison Company.

The following sections contain a brief description of the reactor, the

)

reactor coolant system, and the reactor building. All the individual systems analyzed in the PRA are described in Appendix A.

3.1.1 REACTOR AND REACTOR COOLANT SYSTEM The TMI-1 reactor is licensed for operation at 2,535 MWt.

(All ratings in this description are used for reference only, and may not be exact or up-to-date.) The core contains 177 fuel assemblies arranged in a square lattice approximating the shape of a cylinder with an equivalent diameter of 128.9 inches and an active fuel length of 142.25 inches.

q Each fuel assembly contains 208 fuel rods,16 control rod guide tubes, Q

and 1 central instrumentation tube arranged in ' 15' x 15' array.

3-1 0569G100287TSR

Power control is achieved with 61 control rod assemblies, 8 axial power shaping rod assemblies, and soluble poison.

Each assembly consists of 16 rods held by a spider and coupled to a sealed roller nut and leadscrew-type control rod drive. On a scram, the 61 control rod assemblies drop into the core by gravity when current is removed from the drives.

The reactor coolant sys;em consists of the reactor vessel, pressurizer, four reactor coolant pumps and two once-through steam generators. The reactor coolant system removes the heat generated in the reactor and delivers it to the steam generators.

The pressurizer provides an overpressure to ensure a subcooled condition in the reactor coolant system, a surge tank for volumetric changes, and pressure control flexibility for all combinations of reactor operations.

The system is arranged in two heat transport loops, as shown in Figure 3-1.

Each loop has one steam generator and two reactor coolant pumps. The reactor coolant is transported through piping connecting the reactor vessel to the steam generators and flows downward through the steam generator tubes, transferring heat to the steam and water on the shell side of the steam generator.

In each loop, the coolant is returned to the reactor vessel through two lines each containing a coolant pump.

The reactor vessel is carbon steel with stainless clad, 40 feet 8-3/4 inches high overall and 171 inches in diameter. All major penetrations are located above the level of the top of the core.

The four reactor coolant pumps are vertical single stage centrifugal-type pumps with controlled leakage seal assemblies. Seal water is provided by high pressure water from the makeup pumps.

Intermediate closed cooling water is supplied to the thermal barrier cooling coils.

Each reactor coolant pump is rated at 88,000 gpm.

The two steam generators are vertical, straight-tube, once-through shell and tube type, which produce superheated steam at constant pressure throughout the power range.

At full load, each generator produces 5.6 x 106 pounds of steam per hour at 910 psig and 570*F.

Emergency feedwater is provided to the generators through dedicated auxiliary feedwater rings at the cop of the generators.

The pressurizer is connected to the reactor coolant piping by a surge line and a spray line.

Two co9 safety valves and one pilot-operated relief valve connected to the pressurizer protect all reacter coolant system components from exceeding the design pressure.

The reactor coolant system pressure is maintained by a pressure control system that energizes the pressurizer heater banks in sequence as pressure decreases below normal and opens the spray valve and pilot actuated relief valve when the pressure increases above normal.

All the plant systems analyzed in detail for the PRA are described in Appendix A.

These are:

electric power (Section A.1), engineered i

safeguards actuation (Section A.2), nuclear services river and closed cooling water systems (Section A.3), deca) heat river and closed cooling 3-2 0569G100287TSR

fm()

water systems (Section A.4), control building ventilation system r

(Section A.5), reactor protection system (Section A.6), turbine trip (Section A.7), main steam system (Section A.8), main feedwater and ICS (Section A 9), emergency feedwater (Section A.10), pressure control (Section A.11), high pressure injection and makeup and purification (Section A.12), and low pressure injection and decay heat removal (Section A.13).

3.1.2 REACTOR BUILDING SYSTEM The reactor building is a reinforced concrete cylinder with a flat foundation and a shallow dome roof.

The inside diameter is 130 feet and the cylinder height is 157 feet. The wall is prestressed with a post-tensioning system in two directions, while the roof is prestressed in three directions. There is a 3/8-inch carbon steel liner on the wall and dome, and a 1/4-inch liner in the base. The cafety features systems designed to protect containment integrity and reduce the amount of radioactivity lost from the reactor building in case of the loss of its integrity are described in Appendix A, Section A.14 (Reactor Building Isolation), Section A.15 (Reactor Building Emergency Cooling System), and Section A.16 (Reactor Building Spray System).

3.2 SAFETY FUNCTIONS AND HAZARDS FOR THE TMI UNIT 1 PLANT Webster's dictionary defines risk as "the chance of injury, damage or loss." It defines hazard as "peril; danger." Hazard, therefore, can be (A

/

thought of as a source.

Risk is the likelihood that this source, or hazard, produces an injury or damage. This is the sense in which these words are used in this study.

This idea can be expressed in the form of a symbolic equation Hazard Risk = Safeguards This equation also incorporates the idea that risk can never be zero as I

long as a hazard is present, but it can be very small. The radioactive material produced at TMI-1 is the hazard; the likelihood of.oreading this radioactivity through the surrounding population is the risk.

Most of the radioactivity produced in the plant remains at its source, namely, the fuel pellets.

The largest quantity of radioactivity is located at the reactor core and the spent fuel storage pool.

Smaller sources of radioactivity are normally present at the plant in the waste gas and liquid waste streams.

i The reactor core, although a hazard, need not be a significant risk if the probability of a release of radioactivity into the environment is sufficiently small.

The potential for releases varies, depending on the degree of disturbance to the core and the subsequent operation of the systems that are designed to return the plant to a sr.fe condition. The largest risk presented by the TMI Unit 1 plant is from the release of q

large fractions of the radioactive material in the core. Large fractions Q

of the radioactive material in the reactor core can only be released as a l

result of extensive core damage.

In the absence of extensive core i

3-3 0569G100287TSR l

damage, the fission product release that takes place is associated with initial cladding rupture.

This release consists mostly of radioactivity that escaped from the fuel pellets to void spaces within the fuel rods during normal reactor operation. During the rapid depressurization of the contained gases in the void spaces following cladding rupture, additional radioactive fission products are driven from the fuel pellets to the void spaces.

The fractio.' of the core that is released in this manner is several orders of magnitude lower than that associated with extensive core damage.

Thus, extencive core damage is the central undesired event for this risk assessment.

For extensive core damage to occur, it is necessary to create a severe imbalance between the amount of energy generated by the fission process (or by residual heat from fission products) and the capacity of the plant to remove heat.

Explosions and other exothermic chemical reactions between the cladding and the steam may create sufficient energy to damage the cladding and release radioactivity.

The functions that must be performed in order to control the sources of energy in the nuclear power plant and the hazard embodied in the radioactive material in the core are called safety functions.

The concept of safety functions forms the basis for choosing scenario initiators and for delineating the actions either required or possible to alleviate the consequence of each initiator; i.e.,

for initial structuring of a list of core damage scenarios (see Sections 4.1 and 4.2 for more about structuring this list).

Safety functions are defined as groups of actions that prevent extensive core damage, prevent reactor building failure, or minimize direct radioactivity releases. Actions may result from the automatic or manual actuation of a system, from passive system performance, or from natural feedback inherent in the plant design.

There are 10 safety functions that must be maintained at all times to alleviate initiating events and thereby contain stored radioactivity.

These safety functions are listed with their purposes in Table 3-1.

These safety functions may be divided into three classes:

1.

Core protection safety functions.

2.

Containment integrity safety functions.

3.

Direct radioactive material release safety functions.

The relationship between these classes is shown on Figure 3-2.

The plus signs indicate that it is necessary to protect the core, maintain containment integrity, and control direct radioactivity releases in order to limit the release of radioactivity to the general public.

In all safety functions, the word control means accomplishment of the safety function so that extensive core damage is prevented or radioactive releases are kept within acceptable limits.

3.3 RELATIONSHIP OF THE PRA MODEL TO THE TMI-1 AS-BUILT PLANT During the course of the development of the TMI-1 PRA, the plant was been modified to comply with regulatory requirements and to increase the availability / maintainability of the unit.

Some of the modifications have been followed closely by the PRA team and incorporated into the plant 3-4 0569G100237TSR

_ _... ~. _. _ _... _

O model even before they have been installed.

For example, the PRA includes the emergency feedwater and heat sink protection systems modifications made during the 1986-1987 refueling outage.

In the early stages of the PRA, the instrument air dryer transfer valve was identified as a major contributor to the loss of instrument air. The complete air dryer assembly has since been replaced and includes a new type of transfer mechanism. This new mechanism has been included in the air system model but still remains as a single failure point for the instrument air system.

As described in Section 5.2.3. of.this summary, the loss of the control building ventilation system is the sequence tnat dominates the total frequency of core damage.

During the first phase of this PRA, a loss of control building ventilation was seen as a major contributor to core damage, and, as a result, a study was undertaken to better understand the time available to the operators if the loss occurred.

It was determined that a system of portable ventilation fans and ducts could be used if the normal system failed. This system of portable fans and a procedure for installing the fans is included in the PRA even though the system is not yet fully operational.

During the 1986-1987 refueling outage, major modifications occurred to upgrade the routing and protection of cables to comply with the requirements of 10CFR50, Appendix R.

Revision 7 of the GPUN Fire Hazards Analysis report was used as a basis for developing the fire scenarios in

{]fs the PRA. Other modifications that changed cable routing after this revision of the FHA report have not been incorporated in this revision of the PRA.

As the PRA project progressed toward completion, the TMI-1 operating procedures were being modified and upgraded to conform to the 83W Owners Group Abnormal Transient Operating Guidelines. The PRA team has monitored the evolution of these procedures closely and included their impact in the development of the human action failure probabilities, j

Each core protection safety function has a priority relative to the others, as shown in Figure 3-3.

In general, reactivity control is the foremost function because the amount of heat that must be removed from the core is determined by how well this function is performed. Next in precedence are those functions for appropriately maintaining a core cooling medium.

To achieve this, actions must be accomplished to maintain an adequate reactor coolant system inventory and an appropriate reactor coolant system state. Finally, if core heat removal is not carried out, reactor coolant system heat removal is irrelevant. Not only should this hierarchy be kept in mind, but the need for the vital support systems to carry out these safety functions should be recognized.

All safety functions must be accomplished to a degree commensurate with the extent to which they are challenged. Only Ly doing so can the risk from the hazards of direct or indirect radioactivity release be bv 3-5 0569G100287TSR

maintained at an acceptable level.

For this reason, safety functions were used in three ways in the probabilistic risk assessment process:

1.

To organize the process of determining those initiating events that could threaten the release, either directly or indirectly, of radioactivity as discussed in the Plant Model Report, Section 2.

2.

To organize the search for alleviating systems for each initiator, as shown in the event sequence diagrams described in the Plant Model Report, Section 4.

3.

To organize an initial set of event tree top events, as described in the Plant Model Report, Section 4 O

O 3-6 0569G101187TSR

O O

O TABLE 3-1.

DEFINITION OF SAFETY FUNCTIONS PURPOSES SAFETY FUNCTION PURPOSE REACTIVITY COIJTROL SituT REACTOR DOWN TO REDUCE HEAT PRODUCTION REACTOR COOLANT SYSTEM MAINTAIN A COOLANT MEDIUM AROUND CORE INVENTORY CONTROL REACTOR COOLANT SYSTEM MAINTAIN Tile COOLANT IN THE PROPER PRESSURE CONTROL STATE 2

CORE IIEAT REMOVAL TRANSFER HEAT FROM CORE TO A COOLANT REACTOR COOLANT SYSTEM TRANSFER HEAT FROM THE CORE COOLANT llEAT REMOVAL Y

CONTAINMENT ISOLATION CLOSE OPENINGS IN CONTAINMENT TO PREVENT RADIATION RELEASES CONTAINMENT TEMPERATURE KEEP FROM DAMAGING CONTAINMENT AND AND PRESSURE CONTROL EQUIPMENT COMBUSTIBLE GAS CONTROL REMOVE AND REDISTRIBUTE HYDP. OGEN TO PREVENT EXPLOSION INSIDE CONTAINMENT MAINTENANCE OF VITAL MAINTAIN OPER ABILITY OF SYSTEMS SUPPORT SYSTEMS NEEDED TO SUPPORT F RONT LINE SYSTEMS DIRECT HADIOACTIVITY CONTAIN MISCELLANEOUS STORED RADIO-RELEASE CONTROL ACTIVITY TO PROTECT PUBLIC AND AVOID DISTRACTING OPERATORS FHOM PROTECTION OF LARGER SOURCES k

,m,,,

m-

..~,,, _.., _.,, -. -,.,. _

-m.

O R ELIEF +-- -

1 REACTOR VESSEL CA AND,

1313 a 108 LS/H VENT OH T AVO $79F

~

CF m

j --+

+-- CF ANDLPINECTION E

VENT 4

603F 603F 555F.

., 55 5 F 555F.

,555F (h

(h STEAu STEAM GENERATOR A GENERATOR B STEAM e

  • STEAM a

STEA M +--

-+ STEAM SEAL VENT SEAL VENT SEAL CRAIN +

+-

--NSCC NSCC

-+

+ SEAL CRAN FEEDW ATER --+

+-- FEEDW ATER NSCC +

+---

--M A K EUP MAKEUP-

-+

+ NSCC

%j MAKEUP +

+ MAKEUP l

l J

l r

{

l I

<ii I

l r

RC PUMP RC PUMP 7

DRAIN ORAIN i,

CRA;N MAKEUP AND HPINJ ORA #N HPINJ SEAL VENT SEAL VENT SE AL ORAIN +

+- NSCC NSCC -*

+ SEAL CRAIN NSCC +

+- M A K EUP M AK E-e

+ NSCC VP MAKEUP +

+ MAKEVP 1

I 7

I 1.

I l

l l'

6 db 4

BC PVVP I

l RC PUMP t

CRAJN MPFNJ HP INJ RC LETOCWN AND CRAtN FIGURE 3-1.

REACTOR COOLANT SYSTEM ARRANGEMENT FLOW DIAGRAM O

3-8

O O

O i

CONTROL OF INDIRECT RADIOACTIVITY RELEASE CORE DAMAGE PREVENTION CONTAINMENT INTEGRITY

  • DIRE
  • R ADIOACTIVITY CONTROL RELEASE CONTROL
  • RCSINVENTORY CONTROL
  • ISOLATION
  • HCS PRESSURE CONTROL y

FUEL POOL COOLING

  • PRESSURE / TEMPERATURE
  • CORE IlEAT REMOVAL CONTilOL WASTE PROCESSING
  • RCS IIEAT REMOVAL
  • COMBUSTIBLE GAS SPRAY CliEMICAL CONTilOL ADDITIOt!

w J

  • MAINTENANCE OF VITAL SUPPORT SYSTEMS ULTIMATE IIEAT SINK ELECTalC POWER COMPOtJENT COOLING WATER ltJSTRUMENT AIR HABITABILITY FIGURE 3-2.

CLASSES OF SAFETY FUNCTIONS

i l

REACTIVITY CONTROL t1CS RCS IrJVEtJTORY PflESSURE COrJTROL y

COfJTflOL A

Y o

P.1AlfJTEflANCE OF VITAL SUPPORT CORE HEAT REMOVAL SYSTEr.tS F

flCS HEAT REMOVAL FIGURE 3-3.

HIERARCHY OF CORE DAMAGE PREVENTION SAFETY FUNCTIONS 1

O O

O

N 4.

PRA METHODOLOGY OVERVIEW The PRA methodology overview is presented in five sections.

In the first four, a presentation is made of the general PLG approach to PRA, highlighting certain aspects of the approach to which we refer in subsequent discussions. These sections are included to agree on terms and thus to facilitate understanding.

In general, the methodology described relates to the third level of the three levels of risk assessment defined in the NRC Procedures Guide (Reference 4-1) and presented below:

e Level 1.

Corresponds to developing and quantifying the plant systems model with or without considering external events.

e Level 2.

Includes both the plant and containment model with or without considering external events.

e Level 3.

Includes all three models (plant, containment, and weather-evacuation site) with or without external events.

Section 4.5 describes the PRA process used for TMI-1.

This process would be classified, according to the NRC Procedures Guide, as "Level 1, including external events."

4.1 GENERAL PRA PROCESS In assessing the risk from operating a nuclear power plant, we are attempting to predict the outcome of operating that plant in terms of several measures of damage.

Sources of possible damage are Niled "hazards." Thus, the radioactivity in a nuclear plant may be said to be a hazard to the public. It is not necessarily a "risk," however, since the idea of risk also involves the idea of the likelihood that the hazard will be converted into an actual delivery or realization of damage.

Thus, a "risk analysis" can be viewed as consisting of answering the i

following three questions:

I e

What can go wrong; i.e., by what scenarios or sequences of events might damage from the hazard be actualized?

e How likcly are these scenarios?

e What are the consequences of these scenarios; i.e., how severe is the damage?

To answer these three questions for a nuclear power plant, a structured thinking process was employed that begins with a systematic identification and categorization of all scenarios that might lead to significant damage to the plant or to the public health. Each scenario is then analyzed to determine its frequency of occurrence and magnitude of its consequent damage, as measured by several damage indices.

O v

4-1 0571G100587TSR

In calculating these frequencies and damage magnitudes, it is important to explicitly quantify the uncertainty, as any competent scientist does when presenting results.

In the case of risk assessment, it is l

especially important to quantify uncertainty since we are dealing with rare events and with a skeptical audience of regulators, intervenors, and the general public. Therefore, we incorporate uncertainty into the PRA from the beginning, from each piece of input data up to the final results.

The uncertainty in the risk comes from a lack of prior knowledge about exactly how frequently each scenario will occur and exactly what consequences it will produce. Both of these sources of uncertainty are carefully tracked throughout a PRA in order to specify, as accurately as possible, the risk from operating the plant.

Table 4-1 conceptualizes the results of a risk assessment in tabular form, including uncertainty. The likelihood or recurrence interval is expressed as a frequency, 6 Consequence magnitude is denoted by X.

Uncertainty about frequency and consequences will be expressed by a probability distribution, P(6,X). This probability distribution is a function where $ and X are the independent variables and P is the dependent variable.

The group of scenarios in Table 4-1 can be represented as a set denoted bybraces{}. Each scenario and its risk (i.e., each line in the table) can be put into brackets < >.

The total set of scenarios (the risk, R) can then be expressed as R = {< S,P j (6,X )> }, for i = 1,2,...,N (4.1) i where Sj

= a scenario identifier or description.

P(6j,Xj) = joint probability distribution on the frequency of occurrence, (64 ), and the consequences, Xj,

of scenario Sj.

The form typically used in presenting risk assessnent results today is the cumulative or frequency of exceedance form.

In the frequency of exceedance form, the frequencies of all scenarios exceeding a particular level of damage are summed. Curves that are the locus of all At points y

for a given damage type, t, and probability, P(6t risk curves in frequency of exceedance format fof,X ), are the family of that damage type (see Figures 4-la through 4-lg).

4.2 QUALITATIVE DEFINITION OF SCENARIOS AND THEIR CONSEQUENCES Each scenario consists of an initiator or something that starts a sequence of events. This might be a system f ailing, a pipe breaking, a fire, or a human error (something that perturbs the reactor cooling system). The rest of the scenario consists of manually and automatically actuated actions or passive processes that determine the consequences of the scenario. These actions, or events, consist of systems, working or not; buildings and pipes, remaining intact or not; the direction and 4-2 0571G100787TSR

/~N speed of the wind when the scenario extends to a release; whether it d

rains during a release; how people move away from the plume, etc.

In the PRA, all scenarios were defined by a combination of deductive and inductive processes. First, a set of all possible initiating events was deduced. Then, the events that occur in each scenario subsequent to the initiator were characterized inductively, using event trees and a meteorological sampling process.

In principle, it is desirable to make this process as thorough as possible; i.e., to list in great detail all pos;ible scenarios and determine the consequences of each one individually.

In a plant such as TMI, however, this could make the list run into millions of scenarios.

Methods are used to group similar scenarios into a manageable number of scenario categories.

This grouping will be done by dividing each scenario into four parts:

1.

The initiating event.

2.

The subsequent events that are determined by the performance of the plant systems.

3.

The phenomenological events that occur in the core and containment after the initiation of core damage.

A 4.

The weather and evacuation-related events.

U Each of these types of events for each scenario becomes part of a plant or site performance model. All events in the scenario will be modeled either in the plant model, the containment model, or the site (really offsite) model. This means that each scenario when finally assembled consists of three scenario fragments, one from each of these three model s.

The events in each one of these fragments were defined as being conditional on a certain set of events having previously occurred.

Therefore, af ter a set of interfaces or "pinch points" between model>; has been agreed on, each model can be developed separately.

It also means that the scenarios have to exit each model in one of a certain predefined i

set of states. After being assigned to this pinch point state, the scenario lo longer has its own identity; it is just one member of a group and is treated in the same way as all other members of that group in the succeeding models. These pinch point states define the initiating events, or crucial conditions, for the succeeding model. Therefore, they will contain only the information that must be transferred from the preceding model to the next model because that information is important l

to what happens in the next model.

4.3 OUANTIFICATION OF SCENARIO FRE0VENCY 4.3.1 SCENARIO FRAGMENT FREQUENCIES Once the possible scenarios have been qualitatively defined, it becomes A

necessary to calculate the frequency with which they occur.

In the V

simplest terms, this process consists of combining the likelihood of the 4-3 0571G100587TSR

initiating event with the conditional likelihood that each successive event occurs, given all of the preceding events. The resultinc overall scenario frequency can be expressed by the equation 6

=6

. f(1lI). f(2l1,1). f(311,1,2)... f(Mll,1,2...,M-1)

(4.2) 4 where 6 I

= the initiating event frequency.

f(ll!)

= the conditional frequency of 'the first subsequent event in the scenario, given that the initiating event, I, has occurred.

f(Mll,1,2...,M-1)

= the conditional frequency of the last event, M, in the scenario, given that the initiating event and the first M-1 subsequent events have occurred.

The frequencies, f, are called conditional split fractions of top events because they represent the likelihood that a scenario branches one way or the other in an event tree, given that certain previous events have occurred. The events in event trees are described at the top; thus, they are called top events. A scenario splits and follows either a success or a failure branch. Depending on which branch it follows, a different scenario will evolve.

The conditional split fractions in Equation (4.2) come from the model in which the event is defined.

For instance, events 1 and 2 (with frequencies f(llI) and f(2lI,1)) might be quantified in the plant model, event 3 in the containment model, and event M in the site model. This leads to the establishment of a conditional frequency or split fraction for the whole scenario fragment corresponding to a particular model; e.g., f(PLANT MODEL FRAGMENTil) = f(lll) f(211,1). The concept of such scenario fragment frequencies is extremely useful because it allows the overall scenario likelihood to be calculated in three independent parts, which can then be assembled.

If one frequency changed, the others would not be affected; only the assembly would have to be redone. Most important, perhaps, is the ability to characterize the dependence of the total risk on interesting intermediate points in the scenario; for instance, to decompose the risk of early fatalities to show how it depends on the responses of the plant systems (the output of the plant model ).

4.3.2 THE MATRIX VIEW The process of decomposing the risk into its contributors is greatly aided by viewing the frequencies in each model in a matrix context. Thi s point of view is illustrated in Figure 4-2.

4-4 0571G100587TSR

I p

Each model in this figure may be regarded as a transition operator, or Q

matrix, which defines the likelihood that various entering scenarios will exit in p2f.icular states; that is, the likelihood that a given entering scenario will end up passing through a particular set of events in the model. The idea of such a transition matrix is that the identities of the exact events in the scenario are not as important as the condition of r

the plant when the scenario exits to the next model. This is saying that knowing whether system A or B failed is not as important to the containment model as knowing whether the RCS pressure was high when the plant model scenario resulted in core damage and whether _ the containment heat removal systems are still operating.

by a vector, 6, where each element 6;their frequencies can be represented If the initiatjng events are grouped, 1 is the total frequency of that group measured in occurrences per year.

For example, the scenarios enter the plant model af ter their initiating event, I, and exit in state j with conditional frequen:y Mij, w)hich is equal to the sum of the frequencies fj(PLANT MODEL FRAGMENT 11 3 fo r all plant model fragments going to exit state j from initiator 1.

The set of these M j may now be represented as a matrix, which will be i

called the plant matrix.

The frequencies of the individual scenarios that enter from initiator i t

and exit in state j are no longer distinct. The product 61 ij is j

M the total frequency of all such scenarios. However, the probTem hai been p) considerably simplified.

Instead of dealin) with hundreds of scenarios

(

that might make this transition, it is only necessary to deal with one group represented by one scenario. The initiating events that were used for TMl entering the plant model are listed in Table 4-2, and the exit states are the plant damage states listed in Table 4-3.

Plant damage states reflect the degree to which plant systems function properly in response to an initiating event.

If all systems necessary to prevent core damage during the scenario operate properly, the scenario does not 90 to a PDS but, rather, to a success state.

l The frequencies of the plant damage states have been computed. The next l

step in the risk assessment / scenario definition process is only performed for a level 2 or level 3 PRA. This step is to translate information on how well the alleviating systems work into information about how radioactive materials may be released. This release will come from the reactor core and go to the area surrounding the plant, depending on the plant system performance. A conditional containment and degraded core model or, simply, containment model will be used to perform this task.

l t

This model treats core damage progression phenomena and the physical processes that are involved. The analysis for the containment model reaches deep into the plant activities, particularly with respect to core behavior and the impact of the containment engineered safety systems following core damage. Many studies, experiments, and analyses are examined to provide a strong technical basis for quantifying containment O<

response. Central to the containment analysis is identifying the response of the containment to the progression of a degraded core 4-5 0571G100587TSR

accident. Supporting the model are the results of numerous analyses and studies of physical processes. For example, analyses of degraded core phenomena (including in-vessel effects, vessel f ailure, and ex-vessel effects) and experiments and studies on steam explosions and hydrogen generation and combustion were all used as input to the model.

The containment model can be represented as a containment matrix, C, where the elements, Cjk, would represent the conditional frequency of emerging from the containment model in release category k, given that we enter it in plant damage state j.

Typical release categories are listed in Table 4-4.

I't is expected that similar ones may be developed for TMI-1 if a level 2 or level 3 PRA is performed in the future. These release categories represent different characteristics of releases that impact the extent and kind of damage the releases will inflict on the surrounding population.

Among these characteristics are whether the release begins early or late, whether it leaves through the top or side of the containment building or through the basemat, and whether the sprays are operating to scrub radioactivity from the air when the release begins.

The site model estimates the potential for producing a particular level of damage among the surrounding population due to each of the containment release categories. The damage indices that are usually used in PRAs are listed in Table 4-5.

To determine the health effects from a release, a distribution of airborne and deposited radioactive material in the environment will be defined as a function of time.

There are many factors that datermine the nature and extent of health effects. The most important are the evacuation strategy and the weather conditions that exist during the release. The approach that is taken in a PRA is to study a large number of individual weather scenarios for each particular type of release. Any plume that is projected to leave the site area is assumed to be influenced according to weather data taken from the nearest measurement station; i.e., hourly data taken from multiple sites. The models employed permit the plume to vary in direction according to the wind direction. Other important factors are the population distribution and the evacuation conditions. A variable direction evacuation scheme is used to build into the analysis the ability to depict actual emergency planning.

As with the plant and containment, the site model can be represented by a site matrix, S, where the elements S,X represent the conditional k

t frequency of magnitude X of damage type t, given that a release in category k has occurred.

Using these three matrices (M C, and S), the risk calculation can be symbolically represented by combinations of matrix operations.

Starting at the lef t side of Figure 4-3, the assembly process then consists of the following steps. The product of the initiating event vector with the plant matrix, M, yields a new vector, 6Y:

I 6Y = 6 M 4-6 0571G100587TSR

I O

The elements of 6, are the unconditional frequency of occurrence of Y

d each plant damage state, yj (measured in occurrences per reactor year). 6Y is called the unconditional plant damage state frequency vec tor.

If this vector, in turn, is now multiplied by the containment matrix, C, the vector 60 is obtained.

Y 60 =6C The elements of 60 are the frequency-of occurrence of release category k (measured in occurrences per reactor year). so is referred to as the unconditional release category frequency vector.

Finally, multiplying 4P by the site matrix, S, yields 6t = 60 S The elements of 6 t are the frequency of occurr9nce of level X of damage type t (measured in occurrences per reactor year).

Substituting each previous vector equation into the next one, we obtain f

the relationship between 6t and 6 I, as follows:

Y I

6 = 6 S = (6 C)S = ((6 M)C)S = 6 MCS This equation shows how the results of the plant, containment, and site j

models are assembled with the initiating event frequencies to yield risk resul ts. The assembly process proposed for TM1-1 only goes through the unconditional plant damage state frequencies.

4.3.3 DECOMPOSING THE SCENARIO FREQUENCIES An important result of using the matrix formalism is the ability to decompose the final results through matrix manipulations to deteraine the contributions of each pinch point scenario group to the total risk. For instance, the dominant plant model scenarios contributing to public health risk could be determined by finding the dominant plant damage states contributing to a particular offsite consequence type (e.g., early fatalities) and then finding the highest frequency plant model scenarios going to these PDSs.

The key to this process is the formation of a square diagonal matrix from the frequency vectors for the pinch point groups, in the case of the i

dominant plant model scenario fragments, the vector 6Y is made into a i

square matrix 1 0..

0 6

6{

0 0

O sf = ??..?

b,y _

4-7 0571G100687TSR

which, if multiplied by the product of the containment and site matrices, C and S, yields 6 CS 0

a matrix whose elements are the contributions of each PDS to each camage level (e.g., the frequency with which PDS 3B produces 100 or more early fatalities).

Similarly, the contributions of initiating events to PDS:

Frequency (6hi)

Release Category Frequency (6 MC)

D and Of fsite Damage Frequency (6 MCS)

D may also be calculated in this way. Also PDS contributions to release category frequency (6fC) and release category contributions to offsite damage level exceedance frequency (thS) may be determined in the same manner. The results of the decomposition process performed in the TMI-1 PRA is described in Section 5 of this report and in even more depth in Section 6 of the Plant Model Report.

4.4 UtlCERTAINTY The process of identifying each member of the scenario list and quantifying its point estimate frequency has now been described.

It remains only to describe how to express our state of knowledge about these frequencies. Our state of knowledge about any frequency from that of a basic component on up to core damage frequency is expressed in "probability of trequency" format. This format is defined and described in Section 1.5.6.

The following process is used:

1.

All possible scenario initiators (initiating events) are identified, and their probability of frequency distributions, P(61), are calculated.

2.

A mode? of the response of the plant and site to each initiator is developed, and the conditional frequency with which the plant would respond in each specified way (given that the initiating event occurred) is characterized by using probability distributions.

3.

All the combinations of initiating event probability of frequency distributions and the conditional plant response probability distributions are then combined to first generate a probability curve characterizing the state of knowledge about the frequency of each scenario and then to find the probability of frequency distribution of the PDS; then, the PDS curves are combined to produce a core damage frequency curve.

5 4-8 0571G100687TSR

b)

Just as in the matrix theory formalism described in Section 4.3.2, the V

probability of frequency distributions can be combined or grouped to produce a single distribution to represent the frequency of each group at each pinch point. Figure 4-3 shows the. process and Figures 4-la through 4-19 show the probability of frequency curves produced at each pinch point and for each element in the plant, containment, and site matrices. The distributions corresponding to the elements in the plant, site, and containment matrices are progressively combined from initiating event probability of frequency distributions to final risk curves, just as was done with the matrices, but this time including the PRA team's uncertainty. From Equation (4.1), each discrete damage level, X, now t

represents a new subset of grouped scenarios or doublets.

The total scenario set of Equation (4.1) is thus represented by the bounding approximation R = { <S, P(6 4, Xi, t ) >}

(4.3) 9 for i = 1,2,...N '

where Nl is the total number of scenario groups contributing to y

damage type t.

The total range of damage considered is thus discretized into the interval s (X,X t + 4X ] for ease of computation, then t

t summed and smoothed out in the final risk curves.

(See Appendix B, Section 1, for a description of this smoothing process.)

O Figure 4-3 shows the probability of frequency curves produced at each pinch point and for each element in the plant, containment, and site matrices. These uncertainties in turn imply uncertainty in the final risk curves of Figure 4-3.

This uncertainty is displayed by giving a family of curves with probability or confidence level P as the parameter of the family. Thus, we obtain what we call a "risk curve in probability of frequency format," Figures 4-1c through 4-1g.

These curves are read in the following way. Let c1 be the ordinate over point x1 of the curve labeled P =.90 (the 90th percentile curve). Then, we would say that we are 90% confident that accidents resulting in damage x1 or greater occur with a frequency no greater than o1 One such risk diagram is prepared for each damage type; e.g., fatalities, injuries, population dose, etc. The set of these diagrams thus constitutes the quantification of the public health risk in graphical form.

In the case of the TMI-1 PRA, which was a Level 1 PRA including external events, tne risk assessment process consisted of the part shown in Figure 4-4 The output is a figure, such as Figure 4-la, showing what has been found out about the frequencies of the various plant damage states and their sum, the core damage frequency itself, and a core damage probability of frequency cumulative curve. The curves of this type produced during the TMI-1 PRA are shown in Section 5 in Figures 5-1 and 5-2.

p The following sections describe how the dirtributions corresponding to V

the elements in the plant are combined to progress from initiating event probability of frequency distributions to plant damage state probability 4-9 0571G100687TSR

of frequency curves, just as was done with the matrices, but this time representing the uncertainty with its whole curve instead of just with the mean value of the curve.

4.4.1 INITI ATING EVENTS As will be explained in Section 4.5.2.1, the initiating events are first defined and grouped by similar effects; then, a probability of frequency distribution P(6 )

4 is calculated for etc nitiator group i.* This type of distribution is represented by curve at pinch point I in Figure 4-4 and is given by N

4 P(6 ) = [ P(cfk) k=1 where Ni

= the number of initiating events producing effects to be represented by group i.

6lk = the frequency of the kth initiator in initiator group 1.

O The distribution P(df) can be calcylated from the probability distributions for the individual 6ik, given by P(61k), according to the instructions given in Appendix B, Section B.2.

4.4.2 PLANT SYSTEMS MODEL The plant model translates the probability of freq ancy distributiens for the initiating event groups given by P(6!) (curve A at pinch point I in Figure 4-4) into probability f frequenc distributions for the plant damage states given by P(6 ) (curve C at pinch point 11 in Figure 4-4).

This process is ac omplished using probability distributions for the conditional frequencies of transition from each initiating event group to each plant damage state. The probability

  • Throughout this discussion, notation of the form P(6) w;11 be used to denote the probability distribution of frequency 6.

P(6 7 ), for instance, refers to the probability of frequency distribution for initiating event group 1.

It does not refer to the function P evaluated at a specific numerical value of that frequency.

O 4-10 OS71G101187TSR

/~'s distribution for the frequency of transition from initiator group i

()

plant damage state j is represented by F(Mjj) and is shown as curve B in Figure 4-4.

Actually, the transition frequency from initiator group i to plant damage state j is calculated by combining the frequencies of all plant model scenarios making this transition. These individual scenarios can be thought of as the plant model doublets,

< S,,P (3,, PDS )>

4 j

where Sfg

= the mth plant model scenario in initiator group i.

P(51m,POS ) = the joint probability distribution for the frequency 3

and resulting plant damage state of that scenario.

1 Hundreds of such scenarios may originate from initiator group i, and their conditional frequencies must be combined to develcp the distribution, F(Mjj). These scenarios are identified on event trees.

The probability of frequency distribution for each scenario is developed by combining the distributions for each of the events in that scenario.

The probability of frequency distribution for plant damage state j is given by N

I P(6{ } =

P(6 ) F (Mg) j i=1 where Nj is the total number of initiating event groups that can result in plant damage state j. This distribution can be calculated from the individual probability of frequency distributions P(6 ) and F(Mjj) according to the procedures spelled out in Appendi B.

However, the process wjll be somewhap more complicated than the process for ggig(61) because P(6j) is a sum of products rather than a 4

The plant model was quantified in two steps. The first step was to identify the plant scenarios of highest frequency for each plant damage state. This was done using a single value, usually the mean, to characterize each distribution.

(The mean was chosen because it contains information about the high frequency tail of the probability di stribution. ) These mean values were then combined and propagated through the entire risk model, as described under the matrix formalism above. Based on these point estimate results, the risk dominant plant damage states and the highest frequency scenarios.in each were chosen.

In the second stage of the analysis, probability distributions were 3

propagated through the plant systems model for these dominant scenarios.

4-11 0571G100587TSR

This two-step process necessitated keeping track of all the high frequency scenarios leading to each plant damage state. The identity of these scenarios was maintained to be able to write logical expressions for the Arobability of frequency distributions of the plant damage states (curve UC in Figure 4-4) in terms of the probability of frequency distributions for the system failures and initiating events.

With risk defined fundamentally as a list of scenarios or event sequences, the key requirement of a risk assessment methodology is an orderly procedure for defining the scenarios. For this purpose, we use a number of logical methods, most notably the master logic diagram, event sequence diagrams, event trees, fault trees, cause tables, and environmental tables. These methods are described in the Plant Model f

Report, and their development is described in the tasks in Section 4.5 of this report. Underlying the logical methods used for organizing results are fundamental engineering analyses reflected in the Plant Model Report and in all the other TMI-l PRA reports.

4.5 TMI-1 PRA PROCESS Based on our PRA experience, the TMI-1 PRA was conducted in two phases which consist of a "mini" or "focusing" PRA prior to starting detailed work followed by a subsequent detailed risk assessment.

This two-phase approach allowed the early use of PRA results and facilitated the development of the detailed risk model.

During Phase I, those systems or initiating events likely to be important to the overall plant risk were identified, thus giving early warning of further required analysis and/or

. formation; the particularly troublesome physical processes that called for more detailed analysis in Phase 11 were revealed before development of final event trees. The approach adopted in Phase 11 was based on our findings during Phase 1.

The Phase I results were documented in a separate report, PLG-0354 (Reference 4-2).

The approach used during the development of the TMI-1 PRA is described in detail in the individual TMI-1 reports that make up the documentation of this PRA and whose tasks are summarized in the following sections.

4.5.1 PHASE I PROCESS 4.5.1.1 Plant Familiarization I

This task was conducted to identify information sources and to gather specific plant design and operation information specific to Three Mile Island Unit 1.

This information helped in the 2arly identification of major potential risk contributors, which led to the definition of a detailed project schedule and a rational allocation of project resources.

4.5.1.2 Initiating Event Identification A small set of initiating events was chosen to define scenarios representative of major risk contributors. This effort reduced the number of scenarios considered, while ensuring concentration on issues of 4-12 0571G100587TSR I

/

major relevance for Phase II. All possible initiating events were V]

included in one of six initiating event groups. The frequency of each group was calculated from the sum of all the initiating events. The initiating event groups used were:

1.

Turbine Trip. Used to represent transients with main feedwater available.

2.

Loss of Offsite Power.

3.

Loss of Main Feedwater.

4.

Medium Loss of RCS Inventory. Used to represent small as well as large loss of RC5 Inventory.

5.

Steam Generator Tube Rupture. Used to represent very small LOCAs al so.

6.

Loss of.:iver Water to the Pumphouse Intake Basin.

4.5.1.3 Preliminary Systems Analysis The preliminary systems analysis was conducted in two parts. _The first part was an initial screening that encompassed all TM1-1 systems. System summaries were developed to determine the normal and alleviating actions of each system. Alleviating actions are those performed to reduce the O

consequences of an initiating event.

Success requirements were identified for all alleviating actions, as discussed in the next section; i.e., the plant model. Each system was also classified as to whether further analysis was required. Those requiring no further analysis were so noted, and their system summaries were filed.

(It is important to understand that although systems analysis is discussed here first, tha t plant modeling and systems analysis are iterative tasks.)

The second part of the systems analysis task was an analysis of those systems that passed the initial screening and therefore needed to be analyzed in sufficient detail to estimate their availability and to develop event tree top events. The estimation was conducted in one of two ways, depending on the system involved:

1.

For those systems that are very similar to their Midland or Seabrook counterparts and whose models were not significantly different (i.e., similar logic, success criteria, and support systems states),

the conditional split fractions from the Midland or Seabrook PRA were used.

2.

When significant differences in system logic were noted, block diagram logic modeis were used that included independent hardware failure, maintenance, testing, human error, and common cause failure terms. Tha unavailability expressions were then quantified using data from JD>er the Midland or Seabrook PRA data bases.

O 4-13 0571G100587TSR

4.5.1.4 Phase 1 Plant Model A plant model was developed to represent the scenarios, progressing from the six initiating events through to the plant damage states. For calculational convenience, the plant model was split into three submodels; namely, a frontline systems model for early response, a frontline systems model for late response and for resporse of the containment safety features, and a support system model. These event trees represented all the important alleviating systems and dependencies between systems.

4.5.1.5 Phase I Analysis of External Events and Spatial Interactions The objective of this task was to identify externally initiated events (such as aircraf t crashes, floods, earthquakes, etc.) and spatial interactions that may result from internally initiated accidents, such as fires, pipe breaks, missiles, etc., that were most relevant to TMI-1 This preliminary study detennined the level of study effort in Phase 11.

4.5.1.6 Preliminary Plant Damage States A preliminary set of plant damage states was developed to estimate the severity of each scenario. A plant damage state defines the conditions in the RCS and the availability of the containment safety features at the time of core damage. Such PDSs were developed to perform a containment analysis on the core damage scenarios if it is desired in the future.

4.5.1.7 Assembly Process The objective of this task was to put together the requences from the three sets of event trees in the plant model and to estimate the frequencies of occurrence of the most important scenarios for the TMI-1 PRA. These frequencies determined the relative importance of scenarios for their contribution to severe core damage; these frequencies and the scenario PDSs determined their contribution to risk. To a large extent, this task relied on PLG's previous PRA experience.

4.5.2 PHASE 11 PP,0 CESS 4.5.2.1 Detailed Definition and Grouping of Initiating Events The dual objective of this task was to complete a list of all the initiating events for consideration in the TMI-1 PRA and, for calculational convenience, to group them into a reduced set according to plant impact.

A detailed definition of initiating events was then performed by means of a traster logic diagram, which enabled us to categorize initiating events accordirig to the safety functions threatened, the threatening effect, and the cause of threat. This resulted in identifying 46 initiators. We then further grouped these initiators into 18 groups when their impact on the plant initiated identical plant response sequences within the plant model event trees. The selection of initiating events was based on those 4-14 0571G100587TSR

(b initiating events having tt greatest number of top events envisioned in the course of developing the event tree for the initiating event in question. A complete treatment of the definition of initiating events may be found in Section 2 of the Plant Model Report, and the calculation of their frequency is found in the Data Analysis Report.

4.5.2.2 Development of Detailed List of Internally Initiated Accident Scenarios As in Phase I, the internally initiated scenarios were developed by means of three models:

the support system event tree model,. the frontline system early response models, and the frontline system late response event tree models. This task refined the Phase I plant model in which many issues concerning scenario development were intentionally left undetailed.

The many support system success and failure permutations (6,513) were i

reduced to a smaller number for calculational and modeling convenience.

The reduction was made on the basis of the impact that these sequences would have on the froritline systems. This process yielded 1,104 unique sets of event tree scenarios that produce identical frontline system 7

impacts called impact vectors. These impact vectors were grouped further by putting all very low frequency impact vectors into a single group with an enveloping impact. This effort produced 145 impact vectors.

In an effort to further redLce these vectors to a more manageable number of corresponding runs of tne frontline system event tree model, we further grouped these impact vectors according to similarity of impact and i

6\\

frequency into 39 common support system states with enveloping impacts.

Although grouping was done conservatively, care was taken to ensure that the degree of conservatism introduced was minimal. This was accomplished by ensuring that impact vectors with little impact on frontline systems, but with relatively high frequencies, were not combined with low frequency impact vectors having substantially more impact on the frontline systems. The support systems event tree and the combining according to impact a*e both described in Section 3 of the Plant Model Report.

Also, part of this task was the development of event trees for 20 additional initiating events. These event trees included recovery 1

actions and one set of split fractions for each support system state to properly account for the boundary conditions placed on the frontline systems by the support system availability. Fifty unique early and late j

response frontline event trees were produced. A detailed description of the development of the frontline event trees is contained in Section 4 of the Plant Model Report.

The Phase Il plant model consists of three segments, one for all the support systems and one each for the ear.y and late response frontline systems. The early response frontline event trees were called "main" trees, and the late res;onse frontline trees were called subtrees. The scenarios in the main trees resulted in either success or input to i

h subtrees; the end states of the subtrees were success or plant damage O

states. A version of each main and subtree was made for each support 4-15 0571G100587TSR

~

system state.

Each plant model scenario was then constructed by combining a scenario fragment from each of the three trees. A scenario fragment is a particular path or sequence in one of these three consecutive trees. The three types of trees are sequential and represent one large plant model event tree that would go from initiating event to plant damage state.

4.5.2.3 Data Analysis This task was performed to provide failure rates and component repair times required in the conduct of the systems analysis that follows and initiating event frequencies for the quantification of scenario frequencies in the event trees.

The data analysis consisted of the four major work elements described below-e Definition of Data Requirements. The first step was to ensure compatibility between the data analysis and the systems analysis tasks. Data requirements for each system model were reviewed.

A common level of detail was fixed and component failure modes were ser)ed for each model.

This intertask review served to focus both the data base development effort and the systems modeling tasks toward a level of detail commensurate with the available data, o

Generic Data Base Development.

PLG had developed a computerized generic data base for probabilistic risk assessments that they have performed in the past.

The information in this data base includes data collected for other plants for which PLG has performed PRAs, as well as data from WASH-1400 and other sources. This data base served as the starting point for the TMI-1 plant-specific data analysis.

The generic data base was reviewed to ensure applicability to TMI-1, and new failure and success information was incorporated to update the generic data base.

The failure rate estimates and the assigned weights were combined to obtain new generic state-of-knowledge distributions. The result was a probability distribution for each parameter that reflects the range of information embodied within the literature. The types of data included in the data base were:

Component Failure Rate Data. The available generic data were reviewed to ensure consistency witn the needs of the TMI-1 PRA.

Subjective weighting factors were assigned to each piece of data, based on the compatibility of the source with the way the data were used in the PRA.

In many cases the failure rate data obtained from power plants examined in previous PLG risk assessments provided important input to these relative weights.

Component Maintenance Data. Generic component maintenance data were accumulated f rom other power plants.

Information about both frequency and duration of maintenance is necessary to determine component unavailability.

The frequency of maintenance defines the rate that components are removed from service; the duration defines the time the components are out of service.

Separate distributions were developed to represent the uncertainty in the frequency and duration of maintenance.

4-16 0571G100687TSR

O Common Cause Failure Data PLG's data base includes beta factor k

distributions for several key components.

These distributions were based on review and classification of reported nuclear power plant dependent and independent failure incidents.

Human Error Rates. The chief sources of generic data on human error rates were the NRC Human Reliability Handbook (Raference 4-3).

Along with other sources, this document was used to provide human error rates in numerous situations. The uncertainty associated with these data was also represented as a distribution.

Initiating Event Frequency. The plants included in the generic initiating event data base were selected on the basis of.

similarity to the TMI-1 plant and on the data availability. The data in Reference 4-4 (EPRI NP-2230) were supplemented by data from monthly operating reports, the Nuclear Regulatory Commission's "Licensed Operating Reactors Status Summary Reports" (the "Grey Books," Reference 4-5), and Nuclear Power Experience reports.

e Plant-Soecific Data. Based on our Phase I site visit, a large volume of valuable information about TMI-1 equipment operating history was extracted from plant records. The amount of information available in TMI-1 control room operating logs, test reports, maintenance records, etc., about the number of equipment f ailures, operating hours, and component demands determined the degree of influence of V

plant-specific data. This required failure and success event data records.

Similarly, plant-specific component maintenance frequency and i

duration data were extracted by reviewing the history of repair and maintenance activities at TMI-1.

For initiating events, we sought the number of occurrences and the number of operating years.

e Bayesian Combination of Generic Data Base and Plant-Specific Data.

The plant-specific data were combined with generic information, using Bayes' theorem to provide a TMI-1-specific data base that includes all available data and their uncertainty.

The Data Analysis Report offers an in-depth description of all the data base development.

4.5.2.4 Systems Analyses A system analysis was performed for each of the 17 systems listed in Table 4-6.

The objective was to develop a model of system performance to be used for the quantification of each top event conditional frequency, i.e., split fraction. The analysis of each system split fractions is described in the Systems Analysis Report.

In each systems analysis, the first part consisted of a definition of the

,O analysis.

In this section, the functions being analyzed were described V

and a brief presentation was made of the top events and the split 4-17 0571G100587TSR

]

fractions pertaining to the analysis. Based on this information, the top events were defined in detail with the success criteria for each of the split fractions. As a final step, the boundaries of the equipment included in the system analysis were described.

The second part of the system analysis was a description of the logic models used for the quantification of top event split fractions. The logic model description consists of:

e Support Systems Needed e

Systems Supported e

Equipment Shared with Other Systems e

Automatic Actions e

Aanual Actions e

Operator Emergency / Recovery Actions e

Controlling Station Locations, Indications, and Alarms e

Testing and Maintenance Requirements e

Technical Specifications, Limiting Conditions for Operation, and Surveillance A block diagram model was constructed showing the success logic for the system in several alignments, including normal, test, maintenance, and misalignments.

Based on these block diagrams, fault trees were developed on the block level to convert the success logic of the block to failure logic and to include comon cause failures; the main function of the fault trees was to allow computerized sorting of the minimal cutsets to develop algebraic equations for calculation of split fraction frequencies.

Third, an algebraic equation was developed for each alignment, based on the minimal cutsets for that alignment. Each minimal cutset frequency was determined by algebraic equations that combine basic event frequencies; then, by combining the equations for each alignment, an equation for the split fraction frequency was produced.

Finally, each split fraction frequency equation was quantified using the computer code RISKMAN3.

4.5.2.5 Human Actions Reliability Analysis The objective of this task was to evaluate operator performance during accident scenarios. The scope of the analysis was to quantify the effectiveness of selected human actions to delineate the human contribution to the frequency of core damage and plant damage states.

O 4-18 0571G100587TSR

r

/

Only selected human actions were analyzed.

In the first part of the C

study, we separated human actions by type to include routine, inadvertent initiators, dynamic human actions, and recovery actions.

e Routine Actions.

These include those actions performed prior to the accident initiator, typically involving testing and~ maintenance, which may result in inadvertent system mi%11gnments. _ Routine actions may affect the operation of the system in question by way of either partial degradation or complete disablement.

In either case, however, the effect of routine actions was included in the system's performance as part of the systems analysis.

e Inadvertent Initiators. These include actions that inadvertently initiate plant events; e.g., cause a reactor trip. These events are an implicit part of the historical data base used for the estimation of initiating event frequencies.

Therefore, the quantification of

+

these human actions was not included here, i

e Dynamic Human Actions. These include (1) actions performed during a licenario to supplement the automatic response of plant systems to mitigate the event, (2) actions that may change cr detract from the automatic response of plant systems, and (3) specific actions that restore previously failed systems by realignment. Dynamic actions were identified when called out by the plant procedures, which were i

reviewed during the development of the event sequence diagrams.

e Recovery Actions. These refer to more complex activities to restore previously failed systems or to start systems where automatic actuation is not available.

Recovery actions were chosen to address f

accident sequences whose significance became clear only after i

preliminary rounds of quantification.

Recovery actions were evaluated by means of recovery models, which simulate situations of decision making under conditions of high stress and little time for detailed planning. The results from the recovery models were in the y

form of a frequency of recovery, given a particular set of boundary conditions. This frequency of recovery formed the split fraction of j

the top event "system recovery" that was incorporated into the system event tree.

e The Human Actions Analysis Report describes the methodology, the analysis, and the results of the evaluation for all the types of operator actions described in this section.

4.5.2.6 Environmental and External Hazards Analysis The objective of the environmental hazards analysis was to establish the risk from internally generated hazards, such as fire, internal flooding, j

steam, smoke, etc.

The objective of the external hazards analysis, on the other hand, was to determine the risk from external hazards, i

including external floods, tornadoes, aircraf t crashes, earthquakes, and the like.

)

The environmental hazards analysis was divided into two parts:

(1) the identification of environmental hazard scenarios in a process called v

l 1

4-19 l

0571G100687TSR

spatial interactions analysis and (2) the assessment of their importance compared to other contributors to risk by inclusion in the PRA assembly process.

To determine the significant spatial interactions, it was necessary to know the component inventory at each location in the plant.

The critical equipment, piping, and cables vital to alleviating accident scenarios in each of the "fire locations" from the GPUN analysis (Reference 4-6) for 10CFR50, Appendix R (Reference 4-7), and the possible propagation of hazards among these locations were identified.

Then, t.n exhaustive list was naJe of the sources of environmental hazards existing at each location.

In the second step, the spatial interaction scenarios were incorporated into the general PRA assembly process.

To do this, the spatial interaction scenarios were divided into three categories:

those giving rise to an initiating event, those disabling one system, and those giving rise to an initiating event and simultaneously disabling one or more sy s tems. The contribution to risk from the scenarios of the first two categories was accounted for in either the quantification of the initiating event frequency or in the analysis of the split fraction frequency for the particular system being disabled.

The scenarios giving rise to an initiating event, while also impacting one or more of the systems required to alleviate the impact of that initiator, were further subdivided into those leading directly to core damage and those not doing so.

For those that did not lead directly to core damage, we developed separate event trees to establish their importance.

The event tree for the one such scenario found, a fire, is presented in Section 4 of the Plant Model Report.

These spatial interaction scenarios that produced core damage without any other independent systems failure and therefore did not require an event tree for definition or quantification were included directly in the list of core damage scenarios discussed in Section 5 of this report.

The seismic analysis described in Section 2 of the Environmental and External Hazards Report comprised several steps. The objective of this task was to assess the seismicity of the site at Three Mile Island, the fragility of key buildings and equipment when exposed to earthquakes, and the possible consequences of damaging them.

First, we determined annual frequency of exceedance for peak ground accelerations at the site on the basis of site-specific seismicity data.

Second, for selected plant components particularly susceptible to earthquake damage, we assessed thsfr design and design criteria; i.e.,

their fragility.

Earthquakes can directly fail components by knocking their cabinets over, for instance, or indirectly by dropping block walls on the components.

Event trees j

were developed to describe seismically initiated accident sequences and to determine dominant plant damage states relative to the results of the event trees of other initiating events.

The seismic event trees are described in Section 4 of the Plant Model Report.

Winds can affect critical structures at the plant site in at least two ways and are discussed in Section 5 of the Environmental and External Hazards Report.

If wind forces exceed the load capacity of a building or 4-20 0571G100687TSR

another external facility, either the walls or framing might collapse or d

the structure overturn from the excessive loading.

If the wind is strong enough (such as in a tornado), it might be capable of lifting materials and thrusting them against some of these critical facilities. Critical components or other contents of facilities not designed to resist missile penetration might be damaged and lose their function.

The analysis of the risk from aircraf t crashes into the TMI-1 plant described in Section 7 was built on analysis previously performed for GPUN as reported in Reference 4-8.

The analysis of the risk from toxic chemical accidents at or near the TMI-1 plant described in Section 8 was built on analysis previously performed for GPUN as reported in Reference 4-9.

Missiles generated in the event of turbine failure can potentially damage safety-related systems. The analysis of turbine-generated missiles is described in Section 6.

Although highly unlikely, serious damage to a series of pieces of critical equipment in combination with a plant trip may lead to considerable consequences.

4.5.2.7 Plant Damage States The plant damage states developed and used in Phase 11 of the TM1-1 PRA are shown in Table 4-3 as a list. Although the TMI-1 PRA did not include a containment and degraded core analysis, PDSs were assigned to each scenario to make an estimate of the importance of the scenario to risk

. O and enable future use of these scenarios with a containment model. The plant model event tree structures are profoundly affected by inclusion of plant damage scenario end states.

If core damage were the only end state of importance, with no more information specified, the event tree structures would be much simpler; for instance, no containment safety features would need to appear. However, no information would be gained about the importance of the containment safety features or about the importance of any system to public health risk.

Furthermore, if POSs were not included but were needed later, the event trees would have to be drastically restructured.

As in previous PLG PRAs, the plant damage states were defined by considering the following six factors:

1.

Availability of containment heat removal for preventing long-term containment overpressure failure af ter core damage.

2.

Availability of fission product removal to reduce the containment atmosphere source term potentially available for release upon I

containment failure.

J 3.

Whether the BWST water is accumulated in the containment before or i

shortly after reactor vessel melt-through. This is to distinguish "wet" containment sequences in which the containment atmosphere is always saturated from "dry" containment sequences in which superheating of the atmosphere and higher temperatures are possible, g

i l

4-21 0571G100587TSR i

i

4.

Whether the vessel penetration takes place at high or low RCS pressure.

The pressure in the RCS dictates the distribution of core melt debris following vessel penetration.

5.

Whether the containment is isolated at the time of core damage.

If the containment is already bypassed by, for instance, a stuck-open containment isolation valve when core damage occurs, the source term cannot be contained and an early release will occur.

6.

Whether the opening in containment produces a large or a small leak path. For small leak paths, those of less than 15 square-inch equivalent orifice area, the release duration extends over several hours and would be treated as a continuous release in the offsite consequence model.

Fcr larger openings in containment like the 48-inch diameter purge valves, the relese would be treated as a "puff".

The distinction between early and late core damage has been found to not significantly impact offsite health consequences (Reference 4-10, Section 6).

4.5.2.8 Assembly of Results The objective of this task was to put together the scenarios from the three sets of event trees and calculate the frequencies of all the scenarios for the TMI-1 PRA.

By determining these frequencies, judgments were made about the relative importance of specific scenarios and systems for reducing the predicted core damage frequency.

The frequencies of all scenarios were calculated as follows.

The conditional probabilities of the top events (i.e., split fractions) that were defined and estimated iteratively by the systems analysis and plant modeling were input to the various event trees, which we evaluated numerically by use of the ETC9 computer program. Results from all event tree runs were input to the MAXIMA program. MAXIMA produced (1) a list of scenarios ordered by their core damage frequency and a separate list to each plant damage state, (2) the conditional probability of going from each initiator to each plant damage states, the plant matrix described in Section 4.2, (3) the total frequency of core damage, and (4) the contribution of particular systems and plant model segm*nts to overall core damage.

4.6 REFERENCES

4-1.

American Nuclear Society and IEEE, "PRA Procedures Guide; A Guide to the Performance of Probabilistic Risk Assessment for Nuclear Power Plants," U.S. Nuclear Regulatory Commission, NUREG/CR-2300, 1983.

4-2.

Pickard, Lowe and Garrick, Inc., "Three Mile Island Unit 1 Probabilistic Risk Assessment, Phase I Report," prepared for GPU Nuclear Corporation, PLG-0354, April 1984.

4-22 0571G100687TSR

-. ~ -

i h

4-3.

Swain, A.D., and H.E. Guttmann, "Handbook'of Human Reliability V

Analysis with Emphasis on Nuclear Power Plant Applications,"

Sandia National Laboratories, prepared for U.S. Nuclear Regulatory Commission, NUREG/CR-1278, SAND 80-0200, August 1983.

4-4.

Electric Power Research Institute, "ATWS: A Reappraftal, Part III, Frequency of Anticipated Transients," EPRI NP-2230, January 1982.

4-5.

U.S. Nuclear Regulatory Commission, "Licensed Operating Reactors, Status Summary Report," NUREG-0020, Grey Book, September 1974 to -

l February 1979.

4-6.

GPU Nuclear Corporation, "TMI-1 Fire Hazard Analysis Report for Appendix R Compliance," May 11, 1982.

4-7.

Code of Federal Regulations,10CFR Parts 0 to 199, Revision of January 1,1986, Office of the Federal Register, National Archives and Records Administration.

l I

4-8.

Pickard, Lowe and Garrick, Inc., "Updated Prediction of the Frequency of Aircraft Crashes at the Three Mile Island Unit I t

Site," PLG-0411, April 1985.

j 4-9.

Pickard, Lowe and Garrick, Inc., "Probabilistic Risk Assessment of Offsite Releases Initiated by a Toxic Chemical Releaso," PLG-0370, July 1984, i

O i

4-10.

Pickard, Lowe and Garrick, Inc., "Midland Probabilistic Risk l

Assessment," prepared for the Consumers Power Company, May 1984.

f i

I O

b 4-23 0571G100687TSR L'

... ~

~

TABLE 4-1.

SCENARIO TABLE IN ABSTRACT FORM at Ca" fg Frequency Consequences Uncertainty l

,9ng?

S og S,t P(e3,X3})

X i

t b

  • S 3,t

(* S ' S}

2 2

2 2

2 b

  • S
  • S,t P($3,X3)

N y

g NOTE: From this point forward, gS4 Sj,t will be expressed and X as $ $ and Xi,t*

O l

9 0572G100687TSR 1 4-24

- =.

-e t

r

-i; f

O

(

-TABLE 4-2.

PINCH POINT I - TMI-1 INITIATING EVENT GROUPS i

i Initiator !

Initiator Group f

i 1

Large LOCA i

(

-2 Medium LOCA r

3 Small LOCA l

1 4

Very Small LOCA 5

Inadvertent Opening of DHR Valves I

6 Steam Line Break in Intermediate Building I

l 7

Steam Line Break in Turbine Building

)

8 Steam Generator Tube Rupture

{

9 Excessive Feedwater Flow O

10 Total Loss of Main Feedwater-l 11 Reactor Trip j

12 Tu rbine -Tri p j

13 Loss of Air System l

l 14 Loss of Control Building Ventilation j

15 Loss of ATA Power (ICS) 16 Loss of DC Power Train A 17 Loss of Offsite Power 4

l 18 Loss of Nuclear Services Closed i

Cooling Water i

i' 19 Loss of River Water l

l O

i 4-25

l 0572G100687TSR:2

.. _ _. _. _ _ _ _.. _... - -, _ _ -,, _. ~. _ _, _ _ _.. _. _ _ _ _,... _,

TABLE 4-3, PINCH POINT II - TMI-1 PLANT DAMAGE STATES O

Description cf Conditions at Time of Core Damage Plant Re ac tor Reac tor Damace RWST Inhetion RCS Pressure Building Ruilding S ta te Pelative t 9

at Integri ty at Fission J

Reactor Vessel Het t Wel t-Through Core Melt Product Mel t-Through Pemoval ggg p

j 1

1A Never low Yes Yes Yes 2

1C Never Low Yes No No 3

10 Never Low Small Yes Yes 4

1F Never low Small No No 5

1H Never Low Large No A

2A Refore Low Yes Yes Yes 7

2B Before Low Yes Yes No R

2C Refere Low Yes No No 9

20 Refere Low Small Yes Yes 10 2E Refere Low Small Yes No 11 2F Refere Low small No No 12 2G Refere Low large Yes 13 2H n fore low large No e

14 3A Never High Yes Yes Yes 15 3C Never Hich Yes No No 16 30 Never High Small Yes Yes 17 3r Never High Small No No 18 3H Never Hich Lsroe No 19 4A A f ter High Yes Yes Yes 20 4B Af ter High Yes Yes No 21 4C A f te r High Yes No No 22 40 Af ter High Small Yes Yes 23 4E A f ter High Small Yes No 24 4F Af ter Hich Small No No 25 4G Af ter Hich Laroe Yes 16 4H Af ter High Large No 27 5A Refere Hich Yes Yes Yes 28 58 Refere Hich Yes Yes No 29 SC Refere High Yes No No 30 Sn Refere Hioh Small Yes Yes

~

31 SE Before High Small Yes No 32 SF Before Hich Small No No 33 SG Pefore Hich Larce Yes

^

34 SH Refere High Large No Lecend:

"--" indica tes that beat removal takes place through the large hole in the reactor building.

Hich DCt pressure at melt-throuch means > 400 esig; low oressure reans < 400 osig, "Larce" means hole of > 15 square-inch equivalent orifice area produced only by leaving the containment ource valve (s) ocen; "small" means a hole < 15 square inches produced by leaving any other eenetration or combination of penetrations unisolated; "yes" means the containment 15 in tac t.

O 4-26 0572G100687TSR:3

(v)

TABLE 4-4 PINCH POINT III - EXAMPLE RELEASE CATEGORIES Description of Release Conditions C

o X

1 Steam Explosion with Containment Spray 2

Steam Explosion without Containment Spray l

3 Early Overpressure with Containment Spray 4

Early Overpressure without Containment Spray 5

Delayed Overpressure with Containment Spray 6

Delayed Overpressure without Containment Spray 7

Basemat Melt-Through with Containment Spray 8

Basemat Melt-Through without Containment Spray i

9 Containment Intact with Containment Spray 10 Contair. ment Intact without Containment Spray r

k.

4'27 0572G100587 TSP:4

TABLE 4-5.

PINCH POINT IV - EXAMPLE DAMAGE TYPES a g Description L

1 Acute Fatalities 2

Injuries 3

Thyroid Cancer Cases 4

Cancer Fatalities (other than thyroid) 5 n' hole Body Man-Rem Exposure I

P 9:

4-28 0572G100687TSR:5

b TABLE 4-6.

SYSTEMS ANALYZED o

1.

Electric Power System 2.

Engineered Safeguards Actuation System 3.

Nuclear Services River Water and Closed Cooling Water Systems 4

Decay Heat River Water and Closed Cooling Water Systems 5.

Control Building Ventilation System 6.

Reactor Protection System 7.

Turbine Trip System 8.

Main Steam System i

9.

Main Feedwater and Integrated Control Systems 10.

Emergency Feedwater System 11.

Pressure Control System O

L 12.

High Pressure Injection System

13. Low Pressure Injection / Decay Heat Removal System l

14.

Reactor Building Isolation System

15. Reactor Building Emergency Cooling System 16.

Reactor Building Spray System 17.

Instrurrent Air System l

v i

0572G100587TSR:6 4-29

Oi TABLE 4-6.

SYSTEMS ANALYZED V

1.

Electric Power System 2.

Engineered Safeguards Actuation System 3.

Nuclear Services River Water and Closed Cooling Water Systems 4

Decay Heat River Water and Closed Cooling Water Systems 5.

Control Building Ventilation System 6.

Reactor Protet. tion System 7.

Turbine Trip Sys+em 8.

Main Steam System 9.

Main Feedwater and Integrated Control Systems 10.

Emergency Feedwater System

11. Pressure Control System 12.

High Pressure Injection System

13. Low Pressure Injection / Decay Heat Removal System 14 Reactor Building Isolation System
15. Reactor Building Emergency Cooling System 16.

Reactor Building Spray System 17.

Instrunent Air System O

0572G100587?SR:6 4-29

a' a

h h Coat I"

COR(sa(LT

[

' =,,

t 7

e i

i,e i

[

  • a j

_i

=

. s.

I 1

,e io t

\\

1

{

.-. s...a u

_a...,..m

. s.1,...,... a..

2, 2 d' s'.4.# iv* g) 4

_A_

.\\,. _

ii" s'2 4 " d . # iva

,e m...._.

._9.~'

1.

l. I t.#

5.

d gs 3.'*

-83 M

-M g

,g

,,4 B 0

1.

a t e(OU(NCV.OCCURREN({3 P(R R( ACIOn v( An f atoutNCV Of OCCupn{hc{ Fin na Acrose vi An E"

F PLANT DAMAGE FIGURE 4-lb.

FREQUENCY OF RELEASES

.g

,,2

,,2

,j

,,s II" NE #~IATES SI J

E

( art,Y F AT Attists a

FIGURE 4-lc.

PUBLIC HEALTH RISK -

7 ACUTE FATALITIES w

O s.-2 g7 so-

'g 3 e

s

=.-

! A I_-

i l.<m.:

!. t 5-

!N e

=,/

=

~4

3.4 5

f if

~

o a

> d' i.~

g ga 5,g.l o

e

.I "./

~"/.'

4 4

^

>?

s/

m'

.."./

a

./

2

,c

,/

MAN A(na INUNCANI AI CAseCE R p AT Ag gg31g g)"II 3fMG h IMAN IN V AO6. C ANC(R) e

.' i.' i.'

i.'

sa i.

FIGURE 4-1. PUBLIC HEALTH RISK -

emmts FIGURE 4-le PUBLIC HEALTH RISK -

FIGURE 4-If.

PUBLIC llEALTH RISK _

9 THYRblDCANCERCASES W10LE BODY P'AN-REM CANCER FATALITIES (Other than Thyroid Cancers)

FIGURE 4-Id.

PUBLIC HEALTH RISK -

INJURIES FIGURE 4-1.

REPRESEfiTATIVE fiUMERICAL RESULTS FROM A PRA S

9 9

t O

1_

)

R O

T E

+ C G

E T

jV A E M A

+

E

[

G TS A

S

- M T

A N

+

DE O

I P

S H

N

)

X C

L O

I N

I R

E T

I D

A T

O L

2 A

P T

M M

U 3

8 F

CC E

E t

RA i2 I

OS AL

.1 T

T E

S S

CC

(

SC PI I R

)

)

5 HT

_ R O

SA Y

j NM TC O

e.

w E R E

I N SO AG j V TO EE e E AI S

I A

LT LTEA E

EI RC L

RS

'e N

E

)

R IX GA

(

NR R

L I T T

E H

A W

D M

OD 4

O HN D

M T

N T

N SA 3

T A

N T

p i *,.-

E 3

E N

M N

SS S

M E

i' I

SR i

L N

M A

T EO E

I N

A I

)

N CT V

T AT O

s OC a

E N

T NE O

C C

RE R

L O

NEE C

OVR 1_

T C

M PV

(

C

'e CET

, E YY j V S

E S

LC e.

BN 2

TE j T E

L NT e A C

C s ME V

LT S

O M C EU m

E AA I

T V

SQ R

'e e

PS T

SE EL N

P

= -

AR Y

A Y. M F

  1. L C s E

l P

V #

B 'd M

e #

H,

(

TS

)

X E - - -

E I

s FE L

R E

T S Y #

0R D

A A #

  1. +

T O

3 T

ET 2

M W

i -.-

M 1

C' 7 L

T N

I N E

N A

VE

.8 i

V A

i2 L

RV PI EE E

L L

P V

O m

M TT e

NNE 1_

AEE 2

LVR PET j G 4

G e,

I

)

N NI l,

T R

E A

A TO R

=

T e

I T

NT U

E.

I N t

TEC G

T NI E I VE V

NI EV I

F I E l

(

e M :

7:

o, S T :

Ns T, E NS s, C E L ER I

ME Uo

,R D

QT m

G

.T O

EC E

R A SM RE Fv 1M m

?S m

{

l j:

1

]'

O I

E!

b "h

3h d

e

$$ \\

3*

W14Al lovvvv03 ed E

'N Me40s M8vid

.I " ^

g a+.

i si us 03 a$i n

.I ]

s g#

a 3

5 Iy gg I

a

=

. a

1 3

=

0k j

i,3 e

gig 2-b h

"*ES"O.".oli/"'

g h

e,!

o G #

I-

[. !. f, 8

=

6

.3 o

3 H

Z E

1 as I*h gg

,E, :

=

s w

u' f!!.

lb

!5@ I A) h i

sig i-

.s g

en g

o al

?.

il a

i a

..,,.,..v,o m ~

3 il

..o.

a gli G

w ors 2

si E

g.I 8

w

=

lg=

fis il Id 0

is se 5

lai s, !!

184 I,

=g gr 819 a-a 8

g

~

aa n'

syg m,..on,1,,,,,,,,,

i visoa ecme EIS G #

1 l"i le!

li e!

e 1

4-32

(NsCOesDaTIOsmat

,5 MTuh g

~,.

=r

,i-;

j co w a n =,

Damasa EsATE g

?

-a w

5-

-n W

p P' AF'esfTIGAfgess 5*

fj gi:

sure suoost Ja

<5 5

6 1--

AvtNTsesfMTO.rs.Our 80s0 Pt Asst OAmAct grAgg co r 46 EASI s.utaOmr5 j(lS M g. os, FIGURE 4-4.

RISK ASSE55 MENT PROCESS SPECIFIC TO THE TMI-1 PRA

5.

SUMMARY

OF RESULTS Section 4.1 described how the risk from operating TMI-1 could be _

characterized by a set of risk curves, as shown in Figures 4-1 and 4-4.

i The assembly process for TPRA consisted of using unconditional initiating event frequency curves like curve A in Figure 4-4 and combining them with conditional scenario frequency curves like curve B to produce unconditional plant damage state frequency curves like curve C.

?

This section summarizes the results of the PRA by first showing the core damage frequency curve and then working backward to unravel the-contributors to this curve (more detailed results are presented in Section 6 of the Plant Model Report). The contributors to be examined i

first will be the initiating event groups (Section 5.2), which are pinch point I in Figure 4-4.

Next, these results will be unraveled further in Section 5.3 to examine the scenarios contributing to core damage i

frequancy.

In Section 5.4, the scenarios will be summed down the event tree top events to find the most important systems. Finally, each of these important 3ystems will be further unraveled in Section 5.5 to identify the most important component failures contributing to the unavailability of each important system. Operator-initiated system actions are described in Section 5.6.

i All of the sequences described in this section contribute signficantly to the core damage frequency, but they would not all necessarily contribute significantly to the public health risk of operating TMI-1. All core

(

damage scenarios contribute to the economic risk to GPUN of operating TMI-1, but some do not contribute to the risk of offsite consequences.

Some information about the contribution of each scenario to public health r

risk may be gleaned from the plant damage state of the scenario. Plant damage states are discussed in Section 5 of the Plant Model Report.

l 5.1 CORE DAMAGE FREQUENCY f

i Figures 5-1 and 5-2 present the probability of frequency curve for core damage. This is one of the key results of the TPRA. The frequency of i

core damage represents the likelihood that some scenarios could get i

sufficiently out of control to damage the core.

I The core damage frequency curve is presented in probability of frequency i

fermat. This format was used to express our state of knowledge about this frequency. As explained m Section 4.4, each parameter involved in the calculation of the core damage frequency has uncertainty associated with it. All of the uncertainties that went into calculating the frequency of each scenario were combined to calculate a frequency distribution for the scenario. Then, the probability of frequency distribution for each scenario was combined to calculate the uncertainty associated with the core damage frequency.

Figures 5-1 and 5-2 divide the core damage frequency into broad c

categories according to the source of the initiating event. The "total O

externals" curve represents the contribution from all externally initiated scenarios and the "total internals" from all internally j

initiated scenarios. The "total" curves represent the sum of these two.

i 5-1 0573G100787TSR

The probability of core damage frequency curves in Figure 5-1 expresses uncertainty using the cumulative frequency format.

Figure 5-2 expresses the same information in the probability density format.

These figures both say that the TMI-1 PRA team is 95% confident that the total core damagefrequencyfromallsourcesjbothinternalandexternal;seenext section) is no more th greater than 2.6 x 10"gn 9.4 x 10-and 95% confident that it is really These figures also indicate that our best estimate of jhe core damage frequency, the median (or 50th percentile),

i s 4.5 x 10.

The mean distribution is 5.5 x 10"gf the total core damage frequency The greater range between the 5th and 95th percentile values "total external" curve in Figures 5-1 and 5-2 indicates the greater uncertainty in calculating the frequency of externally initiated scenarios compared to that involved with calculating the frequency of the internally initiated scenarios.

The span is about an order of magnitude for the externals as compared to about half that for the internals.

The point estimate mean value shown in Figure 5-1, 5.5 x 10-4, has a special significance to the results presentea for this study.

This mean value is the product of the means of the system reliability and initiating event frequencies used for choosing the most important scenarios. Most results presented in the first three volumes of this study are presented in terms of products of means, and their contribution or importance is compared to 5.5 x 10-4 The most important use of the product of the means was in determining which scenarios were suf ficiently important to have their own mean and distribution calculated.

The most important scenarios were chosen from the event tree calculations using taan values for the split fractions.

The split fraction mean values were used for screening because they are single values that characterize the shape of the probabil",y of frequency distribution and therefore help ensure that the correct "important" scenarios were chosen.

5.2 INITIATING EVENTS CONTRIBUTING TO CORE DAMAGE FRE0UENCY This section discusses the initiating events that contributed the highest frequency scenarios to the total probability of core damage frequency curve presented in Figures 5-1 and 5-2.

All of the initiating event groups used in the TPRA are shown in Table 5-1.

Table 5-2 shows the contribution of the initiating events in Table 5-1 grouped according to whether they originate within, internal, or outside the plant systems, external. All the internal initiating events contribute 81% of the core damage f requency, while the external contribute 19%. Most of the contributions (16%) from external events come from the six firec listed in Table 5-1.

The calculation of the fire and other external event frequencies is presented in the Environmental and External Hazards Report. One fire, F04, and the four carthquakes EIS, E25. E40, and E60, were analysed using event trees as described in the Plant Model Report.

As seen in Tabic 5-1, core damage results 36% of the time from scenarios initiated by loss of control building ventilation, 7% of the time from steam generator tube rupture, 6% of the time from fires in the auxiliary building MCC area ( AB-FZ-6) and 5% of the time from loss of offsite power, 4% of the time from reactor trip, fires in switchgear room 1S (C8-FA-2b), fires in the ESAS cabinet area (CB-FA-3c), loss of instrument 5-2 0573G102387TSR

air, medium LOCA, and excessive main feedwater and very small break LOCA. No other initiators contribute more than 3%.

The fire-initiating events listed in Table 5-1, except for the fire in the 10 switchgear room (CB-FA-3a, hazard scenario 2), lead directly to core damage because none of the alleviating systems that are still available after the fire can prevent core damage, in most of these fires, loss of the RCP seal cooling and unavailability of the high pressure injection pumps produces core damage.

The core uncovers because the RCP seals fail and water is then lost through the seals.

There is no way to replace the lost reactor coolant since the high pressure injection pumps do not work.

It will not happen right away, but core damage is inevitable unless either power is recovered to the HPI pumps or, in fact, the seals somehow remain intact.

In all of these fires, power or control cables are burnt in low probability fire 4 of higher intensity than those for which 10CFR50, Appendix R (Refe ence 5-1) protection was designed.

The frequency of such fires is very low, but the possible impact on the plant is so great that they became important risk contributors.

The fire in the control building 10 switchgear room (CB-FA-3a), hazard scenario 2 shown in Table 5-1 required an additional nonfire-related failure to produce core damage and did not produce any important scenarios.

Therefore, this initiating (event contributed relatively little to the total core damage frequency <1%).

4 5.3 SCENARIOS CONTRIBUTING TO CORE DAMAGE FREQUENCY This section discusses the plant model scenarios which dominate the total frequency of core damage curve presented in Figure 5-1.

As listed in Table 5-3, the core damage scenario with the highest frequency (33%) is one initiated by loss of control building ventilation.

The next three highest frequency scenarios at 6%, 4%, and 4%, respectively, are fires in j

three different areas of the plant. The first one is in the auxiliary building and the next two are in two different areas of the control j

building.

The next highest frequency scenario at 2.4% is a medium LOCA scenario in which the operator fails to establish recirculation flow from the reactor building sump. The next scenario at 2% is initiated by excessive main feedwater, which actuates high pressure injection. The operator fails to reestablish minimum-flow recirculation when he throttles the HPI flow, which fails the operating high pressure injection pumps. Then, the RCP seal cooling fails independently. Failure of seal injection from the HPI pumps and of seal cooling together result in i

extensive leakage from the RCP seals. The seventh scenario at 2L is another fire, this one in the IE switchgear room in the control l

building.

The next scenario at 1% also is a seal LOCA but initiated by a loss of air with subsequent failure of the seal injection valves and of l

seal cooling.

The eighth most frequent scenario is like the fifth, a i

failure of sump recirculation, but, in this case, following a large i

instead of a medium LOCA. The next 3 scenarios and the 14th, all at l

1 about 1% each, result in core damage because of failures of decay heat i

removal either by failing the OHR system itself or by failing the decay i

O heat cooling water system or combinations of one train of each. All i

V other scenarios contribute less than 1% each.

These scenarios are the

}

4 first of an almost continuous series of scenarios.

In fact, in this j

e q

5-3 0573G102387TSR it

,e-.

,n-

-a,-m,-,-.

--,,e

~, -,

continuum of scenarios closely spaced in frequency, the first 10 contain only 55% and the first 100 only 74% of the total likelihood of core damage.

Based on the scenarios shown in Table 5-3 with "*" and "**,"

approximately 54% of the core damage frequency involves scenarios in which reactor coolant is being lost through the reactor coolant pump seals because neither seal cooling from the intermediate closed cooling water system nor seal injection is available from the makeup system.

In addition, this loss of reactor coolant cannot be properly alleviated since high pressure injection is also unavailable.

In some of these cases, long-tern decay heat removal is also not available (those marked with "*").

The loss of inventory through the seals dictates the time available for recovering support systems that are lost.

If seal cooling and iniection failures did not lead to large losses of RCS coolant, as 4.5 x 10-g this PRA, then the Tg!-1 core damage frequency would be only assumed i instead of 5.5 x 10~

in the "**" cases and, in the "*"

cases, the likelihood of recovering DHR capability would be higher.

Another interesting conclusion from looking down the list of scenarios is that 42% of the core damage frequency comes from scenarios in which long-term core heat removal / inventory control is involved.

Failures in sump recirculation and decay heat removal are included in this group.

This means that core uncovery would take a relatively long time to occur; therefore, more time is available to fix damaged systems.

Some advantage has already been taken of these enhanced repair and recovery opportunities in this PRA.

LOCAs (other than seal LOCAs) with failure of the HPI are not important contributors in this plant.

5.4 PLANT SYSTEMS CONTRIBUTING TO CORE DAMAGE FREQUENCY This section discusses the plant systems that are most important to the total frequency of core damage curve presented in Figure 5-1.

The scenarios in Table 5-3 were further decomposed to find the system action failures that dominate the frequency of severe core damage; these syste.

action failures are shown in Table 5-4.

The systems in Table 5-4 are indicated by underlined uppercase letters that correspond to individual systems analyses in the Systems Analysis Report.

The appropriate section numbers are indicated in this table.

Under each systems analysis heading, the actions that each system performs are grouped by categories that correspond to the event tree top events.

Under each category title indicated by a bullet ("o") are specific system actions or events initiated by failures with the system.

(These specific system actions are raferred to above as split fractions in Section 4.)

The first numerical column to the right of the titles is the decomposition of the total core damage frequency into contributors. This decomposition is made by adding the frequency of all scenarios in which each system failure occurs. The total percentage of all contributing systems may exceed 100% because more than one system failure may occur in each core O

5-4 0573G102387TSR

t O5 darage scenario.* Such a "vertical cut" measures the cumulative effect of many low frequency scenarios that, due to their large number, would be prohibitive to examine individually.

{

The second column to the right in Table 5-4 represents the system contribution that comes from each system action category. The numbers in

-the second column in square brackets ("[ ]") indicate the contributions i

from split fractions other than 0.0 or 1.0.

The numbers in curly braces,

"{ }" indicate the contribution of scenarios that have both of two redundant trains failed (the so-called "cross terms"). The contribution i

from these two train failure cases have been subtracted from the total system contribution in the first numerical column because, otherwise, the

[

system actions would be double counted when compared to an action that contains both trains. The third column represents the fraction of the system action category contribution that comes from each specific action.

When failures that initiate events, as well as those that alleviate the consequences of initiating events, are considered, the control building i

ventilation system at 43% is seen to be very important. Most of the scenarios that lead to core damage and have CBVS failures (98%) are

[

initiated by loss of control building ventilation.

Failures of the decay heat removal system appears in scenarios sustaining 4

37% of the core damage frequency. Failure of this system is important j

because it is necessary for the long-term success of core heat removal O-through either open (sump) or closed loop recirculation.

Recirculation i

from the reactor building sump is an important part of this system, Thi s system also contains low pressure injection actions. The decay heat cooling water system that cools the DHR heat exchangers is also important e

figuring in 21% of the core damage scenarios.

l l

The high pressure injection system also figures in scenarios with 37% of the core damage frequency. As can be seen by the square bracket terms, however, the HPl system is usually important not because of failures within itself but because support system failures make it unavailable.

l The important exceptions to this are the throttling and minimum-flow i

recirculation system action categories.

l

  • The importance percentage calculated in this way usually indicates the percentage reduction in core damage frequency that would result if the i

system were made perfect; i.e., unable to fail. For instance, if system A (which contributes to 10% of the core damage frequency) were made perfect, the total core damage frequency would be reduced by 10..

An exception to this rule is for cases for which the system does not contribute to core damage but merely to the PDS damage state in which the scenario appears. Fixing a containment safety feature will not reduce core damage frequency; therefore, when such a system is made perfect, the frequency of one PDS is decreased, while that of another is increased by the same amount, leaving total core damage frequency unchanged. Another exception is when there are two systems failed in the scenario, eithe-O one of which would in itself lead to core damage. Fixing one such system would reduce the frequency of the scenario with the pair of failures and increase the frequency of the scenario containing failure of the unfixed system.

5-5 0573G100787TSR

Electric power systems failures account for 24% of the core damage frequency. These include all of the AC and DC power and offsite power systems that are important to accident initiation or alleviation.

Main steam and feedwater system failures, although they do not lead directly to core damage, occur in scenarios that have 23% of the core damage frequency.

RCS pressure control system failures appear in about 22% of the core damage frequency. These are system actions to open and close RCS relief valves and to use the RCS sprays to depressurize the RCS during cooldown. Again, only failure of the cooldown actions would lead directly to core damage, but the other pressure control system failures, if eliminated, would reduce the core damage frequency.

No other systems contribute to in more than 10% of the core damage frequency.

5.5 SYSTEM COMPONENT FAILURES CONTRIBUTING TO CORE DAMAGE FREQUENCY The most important of the system action categories in Table 5-4 were further decomposed to show the most important specific system actions that contributed to each category and the system component failures that contribute to the failure of each specific action. This further decomposition is shown in Table 5-5.

Each page of Table 5-5 contains the most important of the action categories as they appeared in Table 5-4 for a particular system. Use Table 5-4 as a guide for plowing tnrough the more extensive and complicated Table 5-5.

The lef t-hand three columns in Table 5-5 are the same as those in Table 5-4.

The three right-hand numerical columns are different. The first numerical column in Table 5-5 is the same as the second one in Table 5-4.

It is the system action category (top event) contribution to core damaae frequency. The second column in Table 5-5 is the same as the third in Table 5-4, it is the fraction of the total contribution to the category from eacn specific system action (split fraction). The third right-hand column in Table E-5 is the fraction of each system action failure that is caused by a particular component or set of components (blocks in the reliability block diagram for the system). Only the most important component failures are shown not all of them. Extreme caution should be used if one is tempted to multiply these three columns together, but they do give some idea of which components to work on to reduce the core damage frequency.

This table also indicates the contribution from initiating events and the cases in which the system unavailability was dictated by dependence on support system or other preceding failures instead of failures within the system itself. Such cases are indicated by specific system actions that are labeled "guaranteed failure." An example of this is DHR system specific action SA-1.0 (SAE). The number in the second column to the right of SA-1.0, 8%, indicates that 8% of the 15% contribution to the SA system action category or about 1% of the 15% is not due to failure of the sump or operator, but due to dependence on the failure of some preceding system, 5-6 0573G100787TSR

t n

I No attempt has been made to sum across components of a particular type except for operator actions. The operator actions extracted from l

Table 5-5 are discussed in the next section.

i 5.6 OPERATOR ACTIONS CONTRIBUTING TO CORE DAMAGE FREQUENCY i

1 Many operator actions are important in the THI-1 PRA, and contribute f

significantly to reducing the calculated core damage frequency. However, the failure of the operators to successfully perform certain actions contributes to core damage in some of the scenarios. Table 5-6 summarizes the contribution of the most important of the operator actions to core damage frequency. The actions in Table 5-6 are grouped into i

three categories:

l e

Operator Restoration and Recovery Actions

[

e Manual Actions To Actuate Systems e

Manual Backups To Automatic Actions Inclusion in these categories is somewhat arbitrary; some actions might logically fit into two categories, but have only been put into one. All of the operator actions in Table 5-5 were put into one of these three categories. These actions included those from recovery (RE) top events.

[

from initiating events that had operator actions to prevent the plant tripping, and from systems analyses, but no maintenance contribution was included. The numbers in the second right-hand column have had the 4

specific system action contribution to core damage frequency multiplied i

i by the fraction of that failure that was estimated to be attributable to the operator. All such products were sumed to get the number in the first right-hand column; then, the first right-hand column was divided into each specific action contribution to get the fractions in the second

[

]

column. Table 5-6 had to be prepared at the level of specific operator l

actions because only at this level could the operator's contribution be t

calculated. No generalities could be made tbout his contribution across all operator actions in any particular action category.

l The most important category of operator actions were those classified as l

l restoration and recovery (38%). By far the most important action of l

these was what the operator did after losing the control building fans or l

chillers to restore ventilation before plant trip (58% of the 38%).

I

)

The next most important category comprised the manual actions to actuate j

systems (12%).

In this category, the operator was almost equally important to reestablishing minimum-flow recirculation after throttling i

HP! flow (47% of 12%) and switching low pressure pump suction from the BWST to the sump following a large LOCA (39% of 12%).

l t

The last category, manual backup to automatic actuations, was less j

important at 8% and contained no single important action that contributed j

more than 25% of this 8%.

5.7.

REFERENCES 5-1.

Code of Federal Regulations,10CFR Parts 0 to 199, Revision of 4

j January 1,1986, Office of the Federal Register, National Archives and Records Administration.

e 0573G100787TSR

TABLE 5-1.

INITIATIfiG EVEf4T C0fliRIBUTI0f4S TO CORE DAMAGE FREQUEfiCY O

Sheet 1 of 2 l

l Contribution tie an Oescrip tion Co e 0 m e t n Frequency, Percen t g7 of 5.5 x 10-4 LC Loss of Lor. trol Building Ventilation 36.4 2.00 1 10-4 TR Steam Generator Tube Pupture 7.0 3.84 x 10-5 F01 Fire in Auxiliary Bui1*g MCC Ares 5.5 3.00 x 10-5

( AB FZ 6 hazard ?

1)

AC Loss of Of fsite Power 5.3 2.90 x 10-5 RT Deactor Trip 3.8 2.10 x 10-5 F02 Fire in Control Building Switchgear 3.6 2.00 x 10-5 Room 15 (CB FA-2b; hazard scenario la)

F06 Fire in Control Building ESAS Cabinet 3.6 2.00 x 10-5 Area (CB FA-3c; hazard scenario 1)

LA Loss of Instrurent Air 3.6

1. 98 x 10- 5 fiL Medium LOCA 3.6 1.97 x 10-5 EXC Excessive Main Feed ater 3.1 1.80 x 10-5 V5B Yery small LOCA 3.2 1,74 x 10-5 LR Loss of River Vater to the Putnp House 2.9 1.58 x 10-5 TT Turbine Trip 2.4 1.28 x 10* 5 ATA Loss of ATA Power 2.3 1.22 x 10-5 F C5 Fire in Control Pu11 ding Switchgear 1.8 1.00 i 10 5 Poem 1E (CB-FA-3b; hazard scenario 1)

All Other Fires and Floods

< 2.0

< 1. 00 x 10- 5 60 Loss of One Train of DC Power 1.8 9.80 x 10-6 LL Large LOCA 1.6 8.84 x 10-6 Small LOCA 1.4 7.27 x 10-6 Large External Floods

1. 4 7.50 x 10-6 SLI Steam or Feedwater Line Breaks in the 1.1 6.32 x 10-6 Turbine or Interrediate Bu11 dins 1.0 5.00 x 10-6 F03 Fire in Control Building Batterfo 1)

Room B (CB FA-?d; hazard scenar LNS Loss of Nuclear Services Cooling Water 0.7

3. 5 4 x 10- 6 F04 Fire in Control Building Switchgear 0.3 1.36 x 10-6 Room 10 (CB FA-3a; tazard scenario 2)

FW f otal Loss of Main Feedwater 0.6 3.1 E x 10-6 E60 0.69 Earthouake 0.5 2.48 x 10-6 0574 *,101287T 5 R: 1 5-8 j

TABLE 5-1 (continued)

[

Sheet 2 of 2

\\-

I Contribution to Severe Description Core Damage Frequency, Percent pe eac tor Year of 5.5 x 10-4

, l_

E25

,qua ke

< 0.1 1.22 x 10-7 i

VS Opening of the DHR solation Yalves

< 0.1 1.00 x 10-7

.n qu ak e

< 0.1 7.52 x 10-8 E40 v

EIS 0.15g Earthquake

< 0.1 2.76 x 10-8 t

t i

i i

t I

l v

0574G101287TSR:2 5-9 j

TABLE 5-2.

INITIATING EVENT CATEGORIES CONTRIBUTING SIGNIFICANTLY TO CORE DAMAGE FREQUENCY

"'#U Contribution, F

Description Percent of pe act r 5.5 x 10-4 Year INTERNAL 80.6 4.43 x 10-4 Loss of Support Systems:

52.8 Loss of CBV 36.4 2.00 x 10-4 Others 8.2 4.53 x 10-5 Loss of Of fsite Power

  • 5.3 2.90 x 10-5 Loss of River Water to Pumphouse 2.9 1.58 x 10-5 All Other Transients 11.1 6.09 x 10-5 Very Small LOCAs (including steam generator tube rupture) 10.1 5.58 x 10-5 All Larger LOCAs 6.5 3.58 x 10-5 LOCA outside Containment

< 0.1

' 00 x 10-7 EXTERNAL 19.4 1.07 x 10-4 Fires Explicitly Modeled**

15.7 8.64 x 10-5 All Other Fires and All Internal Floods

<2

< 1.00 x 10-5 Earthquakes 0.5 2.70 x 10-6 External Flood 1.4 7.5 x 10-6 Tornado

<< 0.1 1.2 x 10-8 Turbine Missile

< 0.1 2.3 x 10-7 Aircraf t Crash

< 0.1 1.0 x 10-7 Toxic Chemical

< 0.1 2.6 x 10-7

  • Loss of of fsite power could also be included in the external category.
    • Fires, though internal to the plant, are usually categorized as external events.

O 5-10 0574G102987TSR:3

O O

O

~

TABLE 5-3.

SCENARIOS CONTRIBUTING SIGNIFICANTLY TO CORE DAMAGE FREQUENCY i

i Sheet 1 of 4 Contribution RCP to Severe Mean Order eal re m ge re uency Description Number Fail-Frequency, per Reactor ure Percent of Year 5.5 x 10-4 1

Loss of control building ventilation and failure 33.3 1.83 x 10-4 to establish alternate room cooling.

2 Fire in auxiliary building MCC area (AB-FZ-6; 5.5 3.00 x 10-5 1

hazard scenario 1).

i 3

Fire in control building switchgear room IS 3.6 2.00 x 10-5 (CB-FA-2b; hazard scenario la).

u, 4

Fire in control building ESAS cabinet area 3.6 2.00 x 10-5 (CB-FA-3c; hazard scenario 1), and the operator fails to use the citernative shutdown system correctly.

5 Medium LOCA and failure to establish sump 2.4 1.30 x 10-5 recirculation.

6 Excessive main feedwater, leading to HPI actuation; 1.9 1.02 x 10-5 failure to provide HPI minimum-flow recirculation after H?I flow throttling, leading to HPI pump failure; and failure of RCP seal cooling leading to seal LOCA with no HPI available.

7 Fire in control building IE switchgear room (CB-FA-3b; 1.8 1.00 x 10-5 hazard scenario 1).

i

  • Long-term DHR hart re' eval is also unavailable.
    • Seal cooling and injection ara both failed.

0574G102687TSR:4

TABLE 5-3 (continued)

Sheet 2 of 4 Contribution RCP to Severe Mean Order Seal Core Damag',e Frequency Number Description Fail-Frecuency per Reactor ure Percent of Year 5.5 x 10-4 8

Loss of air; failure of RCP seal injection and 1.1 6.26 x 10-6 cooling.

9 Large LOCA and failure to establish sump 1.1 5.95 x 10-6 recirculation.

10 Steam generator tube rupture and failure of 1.1 5.88 x 10-6 one train of decay heat removal and the opposite train of decay heat cooling water, leading to u,

g loss of long-term decay heat removal capability.

11 Very small LOCA and failure of both trains of 1.1 5.78 x 10-6 decay heat cooling water, leading to loss of long-term decay heat removal capability.

12 Steam generator tube rupture and one train of 1.0 5.36 x 10-6 electric power leading to failure to cool down RCS and stop RCS inventory loss so that recirculation is not needed.

13 Fire in contral building battery room B 1.0 5.00 x 10-6 (CB-FA-2d; hazard scenario 1), leading to seal LOCA with no HPI.

  • Long-term DHR heat removal is also unavailable.
    • Seal cooling and injection are both failed.

05 2687TSR:5

O O

O TABLE 5-3 (continued)

Sheet 3 of 4 Contribution RCP to Severe Mean Order Seal Core Damage Frequency Number Description Fail-Frequency, per Reactor ure Percent of Year 5.5 x 10-4 14 Very small continued loss of RCS inventory, 0.7 3.90 x 10-6 failure of one train of decay heat cooling, and failure to align other train of decay heat removal.

15 Loss of river water; loss of EFW, thus reducing 0.7 3.90 x 10-6 available recovery tirae; and failure to recover river water prior to core damage.

v.i 16 Loss of river water with EFN available and 0.6 3.51 x 10-6 failure to recover river water, even with more time available.

j.

17 Steam generator tube rupture and failure of 0.6 3.21 x 10-6 i

decay heat removal.

18 Steam generator tube rupture and failure of the 0.6 3.12 x 10-6 necessary closed-loop recirculation because there is no water in the sump.

0.5 2.77 x 10-6 19 Station blackout; failure of EFW, thus reducing available recovery time; and failure to recover AC power prior to core damage.

20 Small LOCA and failure of both trains of decay 0.5 2.70 x 10-6 heat cooling water.

l

  • Long-term DifR heat removal is also unavailable-l-
    • Seal cooling and injection are both failed.

I.

(

0574G102687TSR:6

TABLE 5-3 (continued)

Sheet 4 of 4 Contribution RCP to Severe Mean Order Seal Core Damace Frequency Number

.,es cri pti on Fail-Frequency [

per Reactor ure Percent of Year 5.5 x 10-4 21 Steam generator tube rupture and failure to 0.4 2.44 x 10-6 cool down prior to BWST exhaustion, leading to continuing inventory loss with no makeup available.

22 Loss of one train of DC power, failure of EFW, 0.4 2.09 x 10-6 and failure of operator to start HPI cooling.

23 Reactor trip, continued small RCS inventory loss.

0.4 1.88 x 10-6 failure of both trains of decay heat cooling m

h water, and failure of the operator to get decay heat removal back prior to core damage.

24 Loss of one train of DC power, failure of EFW, 0.4 1.88 x 10-6 failure of the opposite train of decay heat ceoling water, leading to unavailability of high pressure recirculation.

25 Very small break and failure to establish high 0.4 1.86 x 10-6 pressure sump recirculation.

05 2687TSR:7

l

(

)

(

)

(

w/

w/

</

l TABLE 5-4.

SYSTEMS AND ACTIONS CONTRIBUTING SIGNIFICANTLY TO THE FREQUENCY OF CORE DAMAGE Shee t 1 of 5 Sys tem

  • Spectfic To ul Specific Split Ac tion SS System (SAR Section; System Sys tem SYs Y

Fraction /

Ca tegory Component Table Number)

Con tribu tion j

Ini tia ting Contribution Ca tegory

[ split fraction /

System Action Category to Core Con ibution Event to Core (top event) ini tia ting e Specific System Action Danage Abbrevia tion Damage event (I.E.)]

Frequency Frequency Control Building 43%

Ventilation (6; 5-5A)

CV Control Building Ventilation 43% [1%)

I.E.

LC e Loss of CBV Initiating Event 98%

CV-1(NS)

CVD e Control Building Ventilation 2%

Failure Decay Heat Removal (6; 5-78) 37%

SA Decay Heat Removal - Reactor 15% [5%]

m Building Sump Train A 4

SB Decay Heat Removal - Reactor 12% [5%] (5%)

m Building Sump Train 8 DH Decay Heat Removal - Pumps 8% [8%]

and Heat Exchangers HL Decay Heat Removal - High Pressure Recirculation 4% [2%]

LP Low Pressure Injection Mode 2% [.25]

- BW Borated Water Storage Tank 11 High Pressure Injection 37%

(13; 5-5C)

HPB High Pressure injection 16% [.3%] (0%)

Train B - Pump C HPA High Pressure Injection Train A - Pumps A and B 9% [1%]

TH Throttle High Pressure 8% [5%]

Injection Flow MR Minimum-Flow Recirrulation 7% [61]

HI High Pressure Injection Valves 2% [.21]

INJ RCP Seal Injection Valves 2%

  • These are percentages of the total core damage frequency calculated from the internal events plus one fire contained in the event tree results assembled with MAXIMA (see PMR, Section 1). Contributors to other results were not included.

0574G100987TSR:8

TABLE 5-4 (continued)

Sheet 2 of 5 Sys tem

  • Specific To tal Specific Spli t Ac tion Sys tem Sys tem System (SAR Section; Sys tem Frac tion /

Ca tegory Ac tion Component Table Number)

Con tribu tion At Ini tia ting Contribution Ca tegory

[ split fraction /

System Action Category to Core Con tribu tion Even t to Core

( top event) ini tia ting e Specific System Ac tion Damage Abbrevia tion Damage event (1.E.)]

Frequency E en t Frequency Elec tric Power (2; 5-5E) 24%

OP Of fsite Power 6% [.2%]

I.E.

AC e Loss of Offsi te Power 96%

Initiating Event from Operating History Data OP-1 OPA e loss of Offsite Power af ter 41 Plant Trip GA Emergency AC Power - Train A 5%

GB Emergency AC Power - Train B 4% (11) 1C 480V AC Motor Control 3%

Center-lC ESV (nL DB Emergency DC Power - Train B 3%

cn AA ATA bus 2% [.11]

DA Emergency DC Power - Train A 2%

Main Steam and Feedwater 23%

(8, 9,10; none)

MF-Main Feedwa ter - Enough 14% [.1%]

TC Main Steam Safety Valves Reclose 8% [6%]

MF&

Main Feedwater - Too Much 1%

TT Turbine Trip

<.02%

SD Secondary System Relief

<.02%

Valves Open SL Steam Line Rupture Detection

<.02%

Sys tem St Main Steam Isolation valves

<.02%

Close

  • These are percentages of the total core damage frequency calculated from the internal events plus one fire contained in the event tree results assembled with MAXIMA (see PMR, Section 1).

Contributors to other results were not included.

4G100787TSR:9

%)

s i

TABLE 5-4 (continued)

Sheet 3 of 5 Sys tem

  • Specific To tal Specific Split Action Sys tem Sys tem System (SAR Section; SYS D" System Fraction /

Category Ac tion Ac tion Action Component Table Number)

Con tribution Ir;i tia ting Contribution

~

Ca tegory

[ split fraction /

System Action Category to Core Con tribution Event to Core (top event) ini tia ting e Specific System Action Damage to Top Abbrevia tion Damage even t (I.E.)]

Frequency Even t Frequency RCS Pressure Control (12; none) 22%

PD POR7 Opens 11% [.2%]

RC Primary Relief Valves Reclose 8%

CE Cooldown during an SGTR 3% [1%]

CD Cooldown af ter a small Leak 21 PY Primary Relief Valves Open

<.02%

Decay Heat Cooling 21%

Water (5; 5-58) m HA Decay Heat Cooling Water -

12% [9%]

/

Train A N

HB Decay Heat Cooling Wa ter -

11% [8%J { 2%)

Train B Intermediate Closed Cooling 9%

Water (13; 5-5D)

SE Intermediate Closed Cooling 9% [5%]

Wa ter Emergency Feedwater (11; 5-5F) 6%

EF-Emergency Feedwater - Not.

6%

Enough EF+

Emergency Feedwater - Too

<.02%

Much

  • These are percentages of the total core damage frequency calculated from the internal events plus one fire contained in the event tree results assembled with MAXIMA (see PMR, Section 1). Contributors to other results were not included.

l 0574G100787TSR:10

TABLE 5-4 (continued)

Sheet 4 of 5 Sys tem

  • Spec i fic Toul Specific Splgt Ac tion Sys tem Sys tem System (SAR Section; Sys tem System Frac tion /

Category Ac tion Action Component Table Nuinber)

Con tribu tion Ini tia ting Contribution Category

[ split fraction /

o Core Con tribu tion r' vent

( top event) ini tia tlng e Specific System Action Damage to Top Abbrevia tion Damage event (I.E.)]

Frequency Even t Frequency Instrument Air (18; 5-5G) 4%

AN Instrument Air 4% [.2%3 I.E.

LA e Loss of Instrument Air 95%

Inf tiating Event - From Operating History Data AM-1 (OP.CA/GB )

AMD e Given Emergency AC 4%

Train A or B and Offsite Power Unavailable Nuclear Services Cooling 4%

y' Wa ter (4; 5-SH)

NS Nuclear Services Cooling Wa ter 4% [.2%)

I.E.

LR e Loss of River Water 76%

Initiating Event From Operating History Data I.E.

LNS e Loss of Nuclear Services 17%

Cooling Water Initiating Even t NS-1 NSA e One Train Operates for 4%

24 Hours N S-1.0 NSG e Guaranteed Failure Cooli1g 2%

Water Initiating Event

  • These are percentages of the total core damage frequency calculated from the internal events plus one fire contained in the event tree results assembled with MAXIMA (see PMR, Section 1).

Contributors to other results were not included.

4G100787TSR:ll

O h

(D

\\

( /

TABLE 5-4 (continued)

Sheet 5 of 5 Sys tem

  • Specific To tal Specific Split Ac tion System Sys tem System (SAR Section; Sys tem System Frac tion /

Ca tegory Ac tion Component Table Number)

Con tribu tion Action Ini tia ting Contribution Category

[ split fraction /

System Action Category to Core Contribu tion Event to Core (top event) initia ting

, Specific Sys tem Action Damage Abbrevia tion Damage event (I.E.)]

Frequency E

t Frequency i-Engineered Safeguards 2%

Actuation (3; none) i EA ESAS - Train A 11 EB ESAS - Train B 1%

Reactor Protection (7; none) 1%

RT Reactor Trip 1%

  • These are percentages of the total core damage frequency calculated from the internal events plus one fire contained in the m

I L

event tree results assembled with MAXIMA (see PMR, Section 1). Contributors to other results were not included.

e I

I i

i i

i i

e 1

0574G100787TSR:12 4

_-----__----+--._----.+.----.: - - ~ ~,,. -

TABLE 5-5a.

SYSTEMS ACTIONS CONTR!80 TING SIGNIFICANTLY TO THE FREQUENCY OF CORE DAMAGE FROM THE CONTROL BUILDING VENTILATION SYSTEM Sheet 1 of 2 Specific Coamonen t/

5 P

Sys tem Split Description of:

Ac tion Sys tem Action Frac tion /

System ActidCategory ( top event)

Ca tegory Ac tion Ca tegory Ini tia ting e Spect fic System Action (top event)

Sp1i t Fraction /

j

( top Event (initia ting event / split fraction)

Con tribution Initiating Event

,g Fm h/

even t)

Abbrevia tion

- Component or Operator Ac tion to Core Damage Con tribu tion Frequency to Top Event g

CV Control Building Ventilation 43% [1%]

I.E.

LC e Loss of CBV Initiating Event 98%

- CCF of Chillers or Chilled 44%

Water Pumps and Outside Air Temperature > 95*F

- CCF of Ventilation Booster 19%

or Exhaust Fans and Failure of Operator To Establish Al ternate Cooling (n

- Chilled Water Train d3 Maintenance and Failure of 10%

O Operator To Establish Al ternate Cooling

- Failure of Both Trains of Chilled Wa ter and 8%

Outside Air Temperature

> 95'F

- Failure Closed of 1 of 19 Fire Dampers and of 47, Operator To Establish Al ternate Cooling Key: CCF = common cause failure.

[ ] = contribution from failures wi thin the system i tself.

  • These are percentages of the total core damage frequency calculated from the internal events plus one fire contained in the event tree resul ts assembled with MAXIMA (see D1R Section 1). Contributors to other results were not included.

74G100787TSR:13

O O

J TABLE 5-Sa (continued)

Sheet 2 of 2 omp%e d Specific Sys tem

  • Specific Opera tor Sys tem Spli t Description of:

Ac tion Sys tem Ac tion Frac tion /

System Action Category (top event)

Ca tegory Action

  • E' Ca tegory Ini tia ting e Specific System Action (tap event)

Split Fraction /

to Spli t

( top Event (initiating event / split fraction)

Con tribu tion Initiating Event 9

event)

Abbrevia tion

- Component or Operator Action to Core Damage Contribution "9

Frequency to Top Event

- Failure of Both Ventilation Booster or Exhaust Fans and 3%

Failure of Operator To Establish Al ternate Cooling

- Exhaust Fan Maintenance and Failure of Operator To 3%

Establish Alternate Cooling

- Booster Fan Maintenance and Failure of Operator To 3%

Establish Alternate Cooling T

CV-1(NS)

CVD e Control Building Ventilation Failure, Given Failure of 2%

ro Nuclear Services Water

~

- Outside Air Temperature

> 95*F 94%

- Operator Fails To Realign Once-Through Cooling or 3%

Establish Alternate Ventilation

- Maintenance 2%

Key: CCF = common cause failure.

[ ] = contribution from failures within the system itself.

  • These are percentages of the total core damage frequency calculated from the internal events plus one fire contained in the event tree results assembled with MAXIMA (see PMR, Section 1). Contributors to other resul ts were not included.

0574G100787TSR:14

TABLE S-Sb.

SYSTEMS ACTIONS CONTRIBUTING SIGNIFICANTLY TO THE FREQUENCY OF CORE DAMAGE FROM THE DECAY HEAT REMOVAL SYSTEM Sheet I of 3 P""

Specific Sys tem

  • Specific
  1. 5
  • E Sys tem Split Description of:

Ac tion Sys tem

^

Ac tion Frac tion /

System Action Category ( top event)

Ca tegory Ac tion SE Ca tegory Ini tia ting e Specific System Action

( top event)

Spli t Fraction /

ac don /

to Spli t

( top Event (initiating event / split fraction)

Con tribu tion Initiating Event "9

event)

Abbrevia tion

- Component or Operator Action to Ccre Damge Con tribu tion "9

F requency to Top Event SA Decay Heat Removal - Reactor 15% [61]

Building Sump Train A SA-1(GA)=1 SAB e Guaranteed Failure due to Failure of Electric Power 53%

Train A SA-1 SAA e Recirculation Available and Initiated within 1 Minute 32%

during a large LOCA

- Operator Fails To Initiate 93%

T

- Sump Clogs or DH-V6 Fails N

To Open 6%

N SA-1.0 SAE e Guaranteed Failure 8%

SA-2 SAC e Recirculation Available and Initiated wi thin 10 Minutes 7%

during a Small or Very Small LOCA

- DH-V6 Fails To Open 82%

- CCF Failure 7%

- Sump Clogs 3%

- Operator Fails To Initiate 3%

DH Decay Heat Removal - Pumps and 8% [8%]

Heat Exchangers DH-1 DHA e At least One Train Starts and Runs 20%

- CCF of Both Pumps To Start 77%

- Pump Maintenance 8%

- Piggy-Back Strainer Maintenaxe 41

- Pump Operability Testing 3%

Key: (CF = common cause failure.

L ] = contribution from f ailures within the system itself.

  • These are percentages of the total core damage frequency calculated from the internal events plus one fire contained in the event tree results assembled with MAXIMA (see PMR, Section 1). Contributors to other resul ts were not included.

.G100787TSR:15

O C

O TABLE 5-Sb (continued)

Sheet 2 of 3 Spectfic Sys tem

  • Spectfic O erator P

System Split Description of:

Ac tion Sys tem

^#

Ac tion Frac tion /

System Action Category (top event)

Ca tegory Ac tf on

  • EIII Ca tegory Initiating e Specific System Action

( top event)

Split Fraction /

( top Event (initiating event / split fraction)

Contribution Initiating Event ac don /

"9 event)

Abbrevia tion

- Component or Operator Action to Core Damage Con tribu tion "9

Frequency to Top Event E

DH-1 ( HA.HB )

DHF e At least One Train Starts and Runs, and One Train of Decay 14%

Heat Cooling is Recovered in 6 Hours DH-1(GA)

DtE o At least One Train Starts and Runs, and One Train of Onsite 14%

AC Power is Recovered in 6 Hours HL Decay Heat Removal - High Pressure m

Recirculation 4% [2%]

E HL-1.0 HLC e Guaranteed Failure 42%

W HL-1 HLA e Align Closed Loop 20%

- Maintenance on DH-V3 35%

- Operator Fails To Open Valves 29%

- Misalignment af ter Testing 26%

HL-2(SA)

HLE e Align from Reactor Building Sump, Given Sump Suction Train A Failed 20%

- Failure of DH-V78 To Open and Remain Open 901

- CCF of Two Motor-Operated Valves 8%

- Failure of Y-Strainer 2%

Align from Reactor Building Sump 18%

HL-2 HLB e

- CCF of DH-V7A and DH-V78 96%

- Failure of Y-Strainer and Opposite DH-V7 Valve 2%

Key: CCF = common cause failure.

[ ] = contribution from failures within the system itself.

  • %,1ese are percentages of the total core damage frequency calculated from the internal evente plus one fire contained in the event tree results assembled with MAXIMA (see PMR. Section 1).

Contributors to other results were not included.

0574G100787TSR:16

.,-...- - - -.-~--.,--.

TABLE 5-Sb (continued)

Sheet 3 of 3 Specific

  • E "*"

System

  • Specific Sys tem Split Description of:

Ac tion Sys tem Ac tion Frac tion /

System Action Ca tegory (top event)

Ca tegory Ac tion Con i tion Ca Mgory Initiating e Specific System Action (top event)

Split Fraction /

j to Spli t

( top Event (initiating event / split fraction)

Con tribu tion Initiating Event Fem /

event)

Abbrevia tion

- Component or Opera tor Action to Core Damage Con tribu tion F requency to Top Event g

HA Decay Heat Cooling Wa ter - Train A 12% [9%)

e Available to Decay Heat 74%

Exchange

- Maintenance of Decay Heat 48%

River Water Pump

- Failure of Standby River 13%

Water Pump To Start and Run

- Failure of Motor-0pera ted 9%

Water Pump Discharge Valve

- Maintenance of Decay Heat 8%

m Closed Cooling Wa ter Pump ru

- flaintenance of River Wa ter 6%

S trainer

- Maintenance of Decay Heat 4%

Service Cooler Key: CCF = common cause failur.,

[ ] = con tri bu tion f rom f a ' '<c s wi thi n the sys tem i tsel f.

  • These are percentages of the total core damage frequency calculated from the internal events pitas one fire contained in the event tree results assembled with MAXIMA (see PMR, Section 1).

Contributors to other results were not included.

G100787TSR:17

(

b O

(

U V

TABLE 5-5c.

SYSTEMS AND ACTIONS CONTRIBUTING SIGNIFICANTLY TO THE FREQUENCY OF CORE DAMAGE FROM HIGH PRESSURE INJECTION SYSTEM Sheet 1 of 2 Specific Component /

E System Split Description of:

Ac tion System Ac tion Frac tion /

System Action Cc agory (top event)

Ca tegory Ac tion

[ split Ca tegory Ini tia ting e Specific System Action (top event)

Split Fraction /

acdon/

( top Event (initiating event / split fraction)

Contribu tion Initiating Event 9

event)

Abbreviation

- Component or Operator Action to Core Damage Contribution "9

Frequency to Top Event g

y HPA High Pressure Injection Train A -

Pump. A and B 9% [1%)

HP-1.0 HPI e Guaranteed failure 84%

H9-1(OP/NS)

HPK e One of Two Pumps Work af ter Offsite Power or Nuclear 10%

Services Fall

- Unscheduled Maintenance of Both Pumps 49%

- Failure of Pump C To Start 19%

r llure of Pump C To Run m

a no for 24 Hours 13%

m

- Failure of One of Seven Isolation Check Valves To Open 10%

- CCF of Pump C To Start and 4%

F - for 24 Hours

- raslure of Dischtrge Check 3%

Valve MU-V74C To Open HP-1 HPA e One of Two Pumps Work To Provide Flow 3%

- Failure of Suction Valve 54%

MU-V14 A

- Unscheduled Maintenance of Both Pumps 38%

- CCF of Both Motor-Opera ted Suction Valves (MU-V14s) 51

- CCF of Both M keup Pumps 61

  • These are percentages of the total core damage frequency calculated from the internal events plus one fire contained in the event tree results assembled with MAXIMA (see PMR, Section 1). Contributors to other results were not included.

0574G100787TSR.18

TABLt 5-Sc (continued)

Sheet 2 of 2 l

Specific Sys tem

  • Specific Sys tem Opera tor Sys tem Split Description of:

Ac tion Sys tem Action Ac tion Frac tion /

System Action Category (top event)

Ca tegory Ac tion Con tribu tion Ca tegory Ini tia ting e Specific System Action

( top e';ent)

Split Fraction /

j 3

( top Event (initiating event / split fraction)

Con tribu tion Initiating Event FMW event)

Abbrevia tion

- Component or Operator Action to Core Damage Con tribu tion g

F requency to Top Event (I.E.)]

MR High Pressure Injection 7% [6%J MR-1 MRA e Minimum-Flow Recirculation Is Established af ter Successful 81%

Thro ttl ing

- Failure of Operator 981

- Failure of Either Motor-Opera ted Valwe To Open 2%

MR-1.0 MRB e Guaranteed Failure 1 91 T

  • These are percentages of the total core damage frequency calculated from the internal events plus one fire contained in the ro event tree results assembled with MAXIMA (see PMR, Section 1). Contributors to other results were not included.

74G100787TSR:19

)

OQ)

TABLE S-5d.

SYSTEMS AND ACTIONS CONTRIBUTING SIGNIFICANTLY TO THE FREQUENCY OF CORE DAMAGE FROM INTERMEDIATE CLOSED COOLING WATER SYSTEM Specific Sys tem

  • Specific P

Sys tem Split Description of:

Ac tion Sys tem

^

^

Ac tion Frac tion /

System Action Category (top event)

Ca tegory Ac tion esp 11t C@n Ini tia ting e Specific System Action (top event)

Split Fraction /

( top Event (initiating event / split fraction)

Contribution Initiating Event j

event)

Abbrevia tion

- Component or Operator Action to Core Damage Contribution Frequency to Top Event Even t SE Intermediate Closed Cooling Water 9% [5%]

SE-1 SEA e Seal Cooling Is Maintained to all Four RCPs 341

- Failure of Ei ther Air-Operated Valve 44%

4

- Failure of Seal Cooling Heat Exchanger 311

- Failure of Both ICCW Pumps 111

- Unscheduled Pump Maintenance 8%

m

- Failure of One of Five Motor-4 Operated Valves 3%

N SE-1.0 SEC e Guaranteed Failure 41%

SE-1(OP.

SEE e Seal Cooling Is Maintained to AM.GA)

All Four RCPs, Given Offsite 21%

Power and Diesel A Failure and Instrument Air Success

- Reverse Leakage of Check Valve 44%

4

- Unscaeduled Pump Maintenance 2 71

- Failure of Pumps To Start 18%

s

- Failure of Check Valves To Open 5%

- Failure of RCP Seal Cooler 3%

SE-1 SEB e 'aal Cooling Is Maintained to j

(GA/GB)

All Four RCPs, Given One Train 4%

of AC Power Is Failed

- Reverse Leakage of Check Valve 44%

- Unscheduled Pump Maintenance 27%

- Failure of Pumps To Start 181

- Failure of Check Valves To Open 55

- Failure of RCP Seal Cooler 3%

  • These are percentages of the total core damage frequency calculated from the internal events plus one fire contained in the i

event tree results assembled with MAXIMA (see PMR, Section 1). Contributors to other resul ts were not included.

i i;

i 0574G100987TSR:20

TABLE S-Se.

SYSTEMS AND ACTIONS CONTRIBUTING SIGNIFICANTLY 10 THE FREQUENCY OF CORE DAMAGE FROM THE ELECTRIC POWER SYSTEM Sheet 1 of 2 Specific Componen t/

Sys tem P* #

System Split Description of:

Ac tion Sys tem

^

Ac tion Frac tion /

System Action Category ( top event)

Ca tegory Ac tion

[spl i t Ca tegory Ini tia ting e Spect fic System Action (top event)

Split Fraction /

( top Event (initiating event / split fraction)

Con tribu tion Initiating Event "9

even t)

Abbrevia tion

- Component cr Operator Action to Core Damage Con tribu tion Frequency to Top Event OP Of fsf te Power 67 [.2%)

I.E.

AC e Loss of Offsite Power Initiating Event - From Opera ting 96%

History Data OP -1 OPA e Loss of Offsite Power af ter Plant Trip 4%

- Failure of Off site Grid on Demand 46%

- Failure of Of fsite Grid during T

24-Hour Mission Time 33%

to

- Failure of Either of Two 10%

Au 111ary Power Transformers

- Failu 2 of Either of Two Circui t Breakers 7%

- Failure of Either of Two Buses 4%

during Operation GA Emergency AC Power - Train A 51 [ %]

GA-l(0P)

GAB s Provide AC Power from Diesel Generator A for 6 Hours 57%

- Unscheduled Maintenance of Diesel Generator Set 47%

- Failure of Diesel To Start on Demand 21%

- Failure of Diesel Generator To 17%

Continte To Run Af ter First Hour

- Failure of Diesel Generator To 9%

Run for the First Hour

- Diesel Generator Breaker Failure 4%

  • These are percentages of the total core damage frequency calculated from the internal events plus one fire contained in the event tree results assembled with MAXIMA (see PMR, Section 1). Contributors to other resul ts were not included.

374G100787TSR:21

s TABLE S-Se (continued)

Sheet 2 of 2 Specific Component /

3 f,

3,,

Syste Spli t Description of:

Ac tion System 99 Actica Frac tion /

System Action Category (top event)

Ca tegory Action Contribution Ca tegory Ini tia ting e Specific System Action

( top event)

Split Fraction /

fraction /

3

( top Event (initiating event / split fraction)

Contribution Initiating Event g

F d od event)

Abbrevia tion

- Component or Operator Action to Core Damage.

Con tribution Initiating

'"C#

P 1

(I.E.)]

Even t GA-1 GAA e Provide AC Power From Diesel Generator A or From Offsite 38%

- One of Nine Circuit Breakers Transfers Open 57%

- Failure of One of Seven Electric Buses 27%

- Failure of One of Three Transformers during Operation 10%

- Circui t Breaker ISB-D2 Transfers Open 6%

T GA-1.0 GAC e Guaranteed failure 5%

I

  • These are percentages of the total core damage frequency calculated from the internal events plus one fire contained in the event tree results assembled with MAXfMA (see PMR, Section 1). Contributors to other results were not included.

I i

1 4

5 0574G100787TSR:22

TABLE 5-5f.

SYSTEMS AND ACTIONS CONTRIBUTING SIGNIFICANTLY TO T11E FREQUENCY OF CORE DAMAGE FROM Tile EMERGENCY FEEDWATER SYSTEM Sheet 1 of 2 Componen t/

Specific g

g Opera tor Sys tem Spli t Description of:

Action Sys tem Ac tion Frac tion /

System Action Category ( top event)

Ca tegory Ac tion Con tri fon Ca tegory I ni tia ting e Specific System Action (tcp event)

Split Fraction /

j

( top Event (initiating event / split fraction)

Con tribu tion Initiating Event g

7 7

even t)

Abbrevia tion

- Component or Opera tor Ac tior-to Core Damage Contribution E

(I.E.)]

Even t EF-Emergency Feedwater - Not Enough 6%

EF-1(OP.

EFE e At least One Pump Started, Given 41%

AM.GA/GB)

No Of fsite Power, No Instrument Air, and Only One Train of Emergency AC Power Available

- Failure of Opera tor To Replenish the 2-Hour Air 63%

Bottles and To Locally Control the EFW Flow y

- Failure of the 2-ilour Air w

and of the Operator To 18%

O Locolly Control The EFW Flow

- Failure of the Turbine-Driven Pump and of the Remaining 9%

Motor-Driven Pump To Start or Run

- Failure of the Turbine-Oriven Pump, while the Remaining 8%

Motor-Driven Pump Is in Mai n tenance EF-l(OP.

EFF e At least One Pump Started, Given 33%

GA/GB)

No Offsite Power, and Only One Train of Emergency AC Power Available

  • These are percentages of the total core damage frequency calculated from the internal events plus one fire contained in the event tree results assembled with MAXIMA (see PMR. Section 1).

Contributors to other results were not included.

74G100987TSR:23

O O

O TABLE 5-5f (continued)

Sheet 2 of 2 Specific Sys tem

  • SpectfIc Sys tem Opera tor Sys tem Split Description of:

Action Sys tem Ac tion Action Frac tion /

System Action Category ( top event)

Ca tegory Ac tion 9

4 Ca tegory Ini tia ting e Spect fic System Action (top event)

Split Fraction /

7 (top Event (initiating event / split fraction)

Contribution Initiating Event hida %

p gg event)

Abbrevia tion

- Component or Operator Action to Core Damage Con tribu tion F requency to Top Event (I.E.)]

Even t EF-1(OP EFD e At least One Pump Started, Given

.AM)

No Offsite Power and No 20%

Instrument air

- Failure of Operator To l

Replenish the 2-Hour Air 96%

Bottles and To Locally Control the EFW Flow

- Failure of the Turbine-Driven Pump and CCF of the Two 1%

Motor-Driven Pumps or CCF (n

of All Three O

EF-1(OP.

EFH e At least One Pump Started, Given 6%

AM.VA/VB)

No Offsite Power, No Instrument

~

Air, and Only One Train of Vital Instrument AC Power Available

- Failure of Operator To Replenish the 2-Hour Air 75%

Bottles and To Locally Con trol the EFW Flow

- Failure of the 2-Hour Air and of the Operator To Locally 22%

i Control the EFW Flow

- Failure of the Turbine-Driven Pump and CCF of the Two 1%

Motor-Driven Pumps

  • These are percentages of the total core damage frequency calculated from the internal events plus one fire contained in the event tree resul ts assembled with MAXIMA (see PMR, Section 1). Contributors to other results were not included.

4 I

0574G100987TSR:24 4

TABLE 5-59 SYSTEMS AND ACTIONS CONTRIBUTING SIGNIFICANTLY TO Tile FREQUcNCY OF CORE DAMAGE FROM Tile INSTRUMENT AIR SYSTEM Component /

Specific 5

Operator

  1. 5 "

Sys tem Spli t Description of:

Ac tion Sys tem Ac tion Fraction /

System Action Category (top event)

Ca tegory Ac tion spli t Ca tegory Ini tia ting e Specific System Action

( top event)

Split Fraction /

t Spli t

( top Event (ini tiating event /spli t fraction)

Con tribu tion Initiating Event ac don /

9 event)

Abbrevia tion

- Component or Operator Action to Core Damage Con tribu tion "9

Fre@ency to Top Event E )]

AM Instrument Air 4% [.2%]

I.E.

LA e Loss of Instrument Air Initiating Event - From 95%

Operating History Data AM-l(OP.

AMD e Given Emergency AC Train A or B 45 GA/GB) and Offsite Power Unavailable:

- Failure of Operator To Restart Air Compressors 84%

af ter Loss of Of fsite Power T

- Failure of Air Compressors w

To Start and Run 8%

- CCF of Air Compressors To N

Surt and Run 4%

- Maintenance on The Air Compressors 4%

  • These are percentages of the total core damage frequency calculated from the internal events plus one fire contained in the event tree results assembled with MAXIMA (see PMR, Section 1). Contributors to other resul ts were not included.

G100787TSR:25

1 G

%./

TABLE 5-Sh.

SYSTEMS AND ACTIONS CONTRIBUTING SIGNIFICANTLY TO THE FREQUENCY OF CORE DAMAGE FROM THE NUCLEAR SERVICES COOLING WATER SYSTEM Spectfic Component /

y5 em Pec W c Systen Operator System Spli t Description of:

Ac tion System Ac tion Ac tion 1

Ac tion Fraction /

System Action Category (top event)

Ca tegory Ac tion 9

Ca tegory Ini tia ting e Specific System Action (top event)

Split Fraction /

7

( top Event (initiating event / split fraction)

Contribu tion Initiating Event Ndadg 7

j event)

Abbrevia tion

- Component or Operator Action to Core Damage Contribution Frequency to Top Event (I.E.)]

NS Nuclear Services Cooling Water 4% [.2%]

!. E.

LR e Loss of River Water Initi& ting Event - From Operating 76%

History Data I. E.

e Loss of Nuclear Services 17%

i Cooling Water Initiating Event NS-1 NSA e One Train Operates for 24 Hours 4%

- Rupture of iieat Exchanger, and Operator Falls To Isolate 56%

?

- Failure of Closed Cooling 6

Water Pump To Operate 8%

W and Its Discharge Check Valve To Reseat

- Maintenance on One River Water Pump and Other Two 7%

River Water Pumps Fail

- River Water Header Isolation Yalve Transfers Closed 6%

- CCF of All Three River Water Pumps 5%

- Maintenance on One Closed Pump and Other Two 5%

Closed Pumps Fail MS-1.0 NSG e Guaranteed f ailure Cooling Water Initiating Event 21

- Maintenance on DH-V3 35%

  • These are percentages of the total core damage frequency calculated from the internal events plus one fire contained in the event tree results assembled with MAXIMA (see PMR, Section 1). Contributors to other results were n t included.

I i

0574G100787TSR:26 4

TABLE 5-6.

OPERATOR ACTION FAILURES CONTRIBUTING SIGNIFICANTLY TO Tile FREQUENCY OF CORE DAMAGE Sheet 1 of 3 Specific Specific Operator Action Opera %r Opera tor S lit Ca tegory Ac tion Ac tion Operator Action Category g

Con tri bu tion Con tribu tion

[ spilt e Spect ic Operator Action

  • Abbrevia tion to Core Damage to Total f rac tion

_ Frequency Con tribu tion (I.E.)3 of Category Operator Restoration and Recovery:

30%

Loss of CBV Initiating Event 42%

I.E.

LC e

(includes operator failure to establish alternate cooling)

D H-1 (GA)

DHK e At least One Train of DHR Starts 181 and Runs, and One Train of Onst te AC Power Is Recovered in 6 Hours I.E.

LR e Loss of River Water Initiating 10%

Event - From Operator History Data (includes operator failure to clear the screen before plant trip) un RE-2 REB e Recover River Water 5%

RE-2(EF )

REF e Recover River Water with Steam-4%

Driven EFW Punp Failed RE-1 (E F )

REC e Recover Onsite or Of fsite Power 3%

during a Station Blackout with Steam-Driven EFW Pump Failed RE-3 REG e Recover Single Train of Onsite 3%

Power or Of fsite Power CV-1(NS)

CVD e Provide Alternate Ventilation

.31 af ter Control Building Ventisation Failure, Given Failure of Nuclear Services Water RE-3(EF)

REH e Recover Single Train of Onsite

.1%

Power or Of fsite Power With Steam-Driven EFW Pump F.11ed RE-1 REA e Recover Onsite or Of fsite Power

.1%

during a Station Blackout Manual Actions To Actuate Systems 13%

MR-1 HRA e Minimum-Flow Recirculation Is 471 Established af ter Successfully Throttling HPI

  • Indicates failure of the action described.

0574G100787TSR:27

T

)

l

)

TABLE 5-6 (continued)

SMet 2 of 3 Spect fic Operator Action Operator Opera tor Ac tion Operator Action Category p

Contribu tion Con tribu tion

[spli t e Specific Operator Action

  • to Core Damage to Total 1

Frequency Con tribu tion I*

  • of Category SA-1 SAA e Recirculation Available and 39%

Initiated within 1 Minute of BWST Low Level Alare during a large or Medium LOCA RW-2 BWR e Operator Initiates HPI Cooling 6%

TH-2(GA)

THG e Throttle Makeup Flow Using MU-V165 6%

befom Diesel Generator Train A Fails l

ID-1 I'm e Operator Identifies SGTR 2%

TH-2 TM e Throttle Makeup Flow Using MU-V16s 2%

C D-1 CDA e Operator Cools Down To Repair

,6%

m Small Leak L

TH-1 THA e Throttle Makeup Flow Using MU-V217 4%

m SA-2 SAC e Recirculation Available and

.3% -

Initiated within 10 Minutes of BWST Low Level Alare during a Small or Very Small LOCA l

TH-1(OP)

THF e Throttle Makeup Flow Using

.06%

MU-V217. Given that Offsite Power Is Lost after Plant Trip CE-1 CEG e Operator Cools Down during

.06%

an SGTR Leak in RCS -

Manual Backun To Automatic Actuations 8%

EF-1(OP.AM.

EFE e At least Dne Pump Started Given 23%

i GA/GB)

No Offsite Power, No Instrument Air, and Only One Train of Emergency AC Power Available RC-3 RCC e Primary Safety Valves Reclose 19%

af ter Passing Wa ter and l

Operator Throttles HPI Flow l

E F-l(OP.

EFF e At least One Pump Started Given 18%

GA/GB)

No Offsite Power and Only One Train of Emergency AC Fower Available EF-1(OP.AM)

EFD e At least One Pump Started, Given 13%

No Offsite Power and No Instrument Air

  • Indicates failure of the action described.

OS74G100987TSR:28 l

TABLE 5-6 (continued)

Sheet 3 of 3 Specific Specific Opera tor Action Opera tor Operator Spilt Ca tegory Ac tion Ac tion 0 erator Action Category FM6 Con tribu tion Con tribu tion

[ split e Specific Operator Action

  • Abbreviation to Core Danuge to Total frac tion Frequency Con tribution (I.E.)]

of Category RC-6 RCF e PORY Recloses af ter Passing 9%

Water, and Operator Throttles

!!PI Flow AM-1 (OP.

AMD e Given Emergency AC Train A or B 2%

GA/CB) and Of fsite Power Not Available Total Contribution of All Manual Actions to Core Damage Frequency 50%

m

  • Indicates failure of the action described.

c OS74G100787TSR:29

O O

O 1.0 f[

95 %

TYPE 5%

50 %

95 %

MEAN TOTAL 2.0x10-4 3.5x10-4 7.7x10-4 4.4x10-4 y

INT RNAL 0.8 -

TOTAL +

INTERNAL t-d TOTAL 3.2x10-5 6.5x10-5 2.6x10-4 1.1x10-4 E

EXTERNAL suo 0.6 -

a (Il til MEDIAN h

2 TOTAL 2.6x10-4 4.5x10-4 9.4x10-4 5.5x10-4 0.4 -

5 f

J O.2 -

TOTAL EXTERNAL 5%

/

/ J o

10-6 10-5 10 4 10-3 10-2 l

j FREQUENCY OF CORE DAMAGE (EVENTS PER REACTOR YEAR) i FIGURE 5-1.

TMI-1 PRA PROBABILITY OF CORE DAMAGE FREQUENCY DISTRIBUTIONS l

(CUMULATIVE PROB ~iBILITY FORMAT)

TOTAL INTERNALS N

Cmzy TOTAL EXTERNALS 3

TOTAL a

s e

n.

I I

i 10-s 10-4 10-2 10-2 FREQUENJY OF CORE DAMAGE (EVENTS PER REACTOR YEAR)

FIGURE 5-2.

THI-1 PRA PROBABILITY OF CORE DAMAGE FREQUENCY DISTRIBUTIONS (PROBABILITY DENSITY FORMAT)

~

9 9

9

APPENDIX A SYSTEMS DESCRIPTION This section provides a summary description of the 17 systems that were analyzed and included in the TMI-1 PRA plant model. More details of each system can be found in each. system's section of the Systems Analysis Report.

A.1 ELECTRIC POWER SYSTEM The primary function of the electric power system is to provide a source of motive, control, and instrument power to various. plant equipment.

This function is normally accomplished by supplying power from the offsite network to the 230-kV electrical substation, which in turn supplies power to plant loads through two auxiliary transformers.

All plant loads are normally supplied from offsite power through the auxiliary transformers and not directly from the Unit 1 main L

turbine generator and transformers. Therefore, when a plant trip occurs due to an initiating event other than c loss of offsite power, a fast transfer from the main generator output to offsite power is not required.

If that power is lost from the output of an auxiliary transformer, the nonengineered safeguards loads being supplied from that i

auxiliary transformer will automatically transfer to the other auxiliary Q(,/

transformer if power is available from it. At the same time, a diesel generator will start and supply power to the train of engineered safeguards loads that lost power.

If offsite power is lost, power will be supplied from two automatic, fast-surtup diesel engine generators. These are sized sc that either one can carry the required engineered safeguards load. The ratings of each emergency generator vary between 2,600 and 3,300 kW at 0.8 power factor, depending on the annual maintenance period and the load

{

duration. Each emergency generator will feed one of the 4,160V i

engineered safeguards buses. Each generator is capable of feeding the safeguards loads of one 4,160V bus following required loss of coolant accident as well as selected nonemergency loads.

The analysis of the electric power system is described in detail in Section 2 of the Systems Analysis Report.

A.2 ENGINEERED SAFEGUARDS ACTUATION SYSTEMS The engineered safeguards actuation systems monitors parameters to detect loss of integrity in the reactor coolant system pressure boundary and initiates operation of the high and low pressure injection systems, the reactor building isolation, the reactor building cooling, and the reactor building spray systems.

In addition, the signal is used to start the emergency diesel generators and to control load sequencing.

O The reactor coolant pressure and reactor builaing pressure have been selected as parameters to initiate engineered safeguards action.

Pressure of 1,600 psig or 500 psig in the reactor coolant system W.

A-1 0570G100587TSR

4 psig or 30 psig in the reactor builung are the levels at which injection and other engineered safety features are actuated.

Each of these actuation parameters is measured by three sensors.

The output signal of each sensor is monitored for each level by a bistable that has two output relays, one for each of two channels.

The analysis of the engineered safeguards actuation system is described in detail in Section 3 of the Systems Analysis Report.

A.3 NUCLEAR SERVICES RIVER AND CLOSED COOLING WATER SYSTEMS The nuclear services closed cooling water system consists of four 33%-capacity nuclear services coolers and three 50%-capacity nuclear services closed cooling water pumps. This system, along with the intermediate cooling system, satisfies the cooling requirements of all nuclear-oriented services other than decay heat and reactor building emergency cooling.

In the event of a LOCA,1007 redundancy of all nuclear services equipment is obtained by isolating nonessential items so that flow requirements are reduced to approximately half that of normal operation.

An elevated surge tank of 1,470-gallon liquid capacity (1,600-gallon total capacity) provides storage of water for the nuclear services closed cooling system. Makeup is added from the demineralized water storage tank by remote manual actinn taken in the control room.

The nuclear services river water system, while having redundancy in itself, can also be supplemented by secondary services river water pumps, by valving if required.

The nuclear services river water pumps are sized to cool the nuclear services coolers and also the intermediate service coolers. They are located in the intake screen and pump house.

Each pump is eqLipped with a booster pump, which supplies pressurized filtered water to the pump shaf t and the bearings.

River water is circulated through the tubes of the nuclear services coolers located in the cooler vault.

Closed cooling water is circulated on the shell side. After passing through the coolers, the river water can be used for emergency deicing purposes or diverted to the cooling tower collecting sump or rei:urned to the river. Radioactive fluid leakage will not be returned to the river from these systems unless a tube leak occurs simultaneously in a nuclear services cooler and in a cooler served by the closed system.

The analysis of the nuclear services river and closed cooling water systems are described in detail in Section 4 of the Systems Analysis Report.

A.4 DECAY HEAT RIVER AND CLOSED COOLING WATER SYSTEMS Decay heat removal cooling water is provided by two separate 100%-capacity trains from the decay heat removal coolers back to the ultimate heat sink (Susquehanna River).

Each of these trains consists of two separate loops, one closed and one river water.

Each decay heat river water train consists of a 100%-capacity decay heat river water pump, which cools a 100%-capacity decay heat services cooler.

Each closed cooling water ain consists of a 100%-capacity decay heat closed i

A-2 057OG100287TSR

O cooling water pump, which circulates cooling water through a 100%-capacity decay heat removal cooler and through those pumps and motors associated with the decay heat removal ~ system that require cooling.

The 100% capacity referred to above is 100% of the cooling required during a 10CFR50 LOCA scenario.

Either of the two decay heat trains will permit cooling down the plant under normal shutdown;.

operating both will provide a faster cooldown.

The analysis of the decay heat river and closed cooling water systems are described in detail in Section 5 of the Systems Analysis Report.

A.5 CONTROL BUILDING VENTILATION SYSTEM The control building ventilation system is designed to continuously maintain the conditions in the control building within limits of 4

temperature, humidity, and radiation so that engineered safety features will continue to function and to provide a ventilation rate sufficient for healthful human occupancy.

The basic function of this system is to maintain 75'F dry bulb /50%

relative humidity inside when it is 95'F dry bulb /75% relative humidity outside and all the engineered safety features required for a LOCA are 1

operating. The system is designed for automatic use of outside air for i

cooling whenever the outside air temperature is suitable for this purpose, f

The control building ventilation system has also been designed to O

function after a significant radiation release to place selected areas in a recirculation mode and to place the chemical hood in the nuclear sample room and radiochemistry laboratory in a recirculating mode.

The control building ventilation system is a central system employing electric reheat for zone temperature regulation.

The supply duct carries air from the conditioning equipment to the rooms on all four floors of the building.

The following major components are employed in the control building ventilation system:

e Two normal-duty supply fans, each sized to handle 100% of the required air supply, e

Two emergency-duty supply fans, each sized to handle 100% of the required air supply, i

e Two cooling coil banks, each sized for 100% of the design load.

Coils are of a standard finned-tube type. They are cooled by chilled water from mechanical water chillers. The coils are balanced to remove heat to keep the building temperature and relative humidity in the desired range.

i e

Two mechanical water chillers, each sized for 100% of the design load.

Each chiller is a factory-assembled unit complete with all l

major components mounted on a base structure. Chiller compressors A-3 0570G100287TSR

are of centrifugal design, and chiller condensers are of the water-cooled type. These are supplied with cooling water from the nuclear service closed water system, e

Two chilled-water pumps, each sized for 100% of the design water flow. These pumps are of the close-coupled, centrifugal type with mechanical seal.

The emergency recirculation system for Elevation 306' 0" is designed to recirculate, cool, and filter air through selected areas during emergencies that produce high radiation levels outside the control building. The system goes into its emergency mode on a signal from the engineered safeguard system of a design basis accident in the reactor building or on a signal from one or more of the monitoring devices protecting the system from the influx of contaminants carried by the outside and/or the return air.

The analysis of the control building ventilation system is described in detail in Section 6 of the Systems Analysis Report.

A.6 REACTOR PROTECTION SYSTEM The reactor protection system monitors parameters related to safe operation and trips the reactor to protect the reactor core against fuel rod cladding damage.

It also assists in protecting against reactor coolant system damage caused by high system pressure by limiting energy input to the system through reactor trip action.

The system consists of four identical protection channels, each terminating in a trip relay within a reactor trip (RT) module.

In the normal untripped state, each protection channel functions as an AND gate, passing current to the terminating relay and holding it energized as long as all inputs are in the normal energized (untripped) state.

Should any one or more inputs become deenergized (tripped), the terminating relay in that protective channel deenergizes (trips).

Thus, for the trip signals, each protective channel becomes an OR gate.

Each of the four protection channels terminates in a channel trip relay within a reactor trip module.

There are four such modules.

Each protective channel trip relay has four logic-contrelling contacts, each controlling a logic relay in one reactor trip module. Therefore, each reactor trip module has four logic relays controlled by the four protection channels.

The four logic relays combine to form a two out of four coincidence network in each reactor trip module.

The coincidence logics in all reactor trip modules trip whenever any two of the four protection channels trip.

The four RPS protective channels are identical in their functions.

They are all combined in the system logic to trip the reactor automatically and protect the reactor core for the following conditions:

1.

When the rear or power, as neasured by neutron flux, exceeds a fixed maximum limit.

A-4 0570G100587TSR

2.

When the reactor power, as measured by neutron flux, exceeds the 1imit set by the reactor coolant flow and power imbalance.

3.

When the reactor power exceeds the limit set by the number and combination of reactor coolant pumps in operation.

4.

When the reactor outlet temperature exceeds a fixed maximum limit.

5.

When a specified reactor pressure-outlet temperature relationship is wceeded.

6.

When the reactor pressure falls below a fixed minimum limit or exceeds a fixed maximum limit.

7.

When reactor building pressure exceeds a fixed maximum limit.

In addition to the above protective trips, an anticipatory trip has been added to the RPS to trip the reactor on loss of both main feedwater pumps or a main steam turbine trip.

The analysis of the reactor protection system is described in detail in Section 9 of the Systems Analysis Report.

A.7 TURBINE TRIP The turbine receives steam from two steam generators (thermal energy) and Ot converts the thermal energy to mechanical energy through rotation of the turbine shaf'. The turbine, in turn, is directly connected to an electric generator that produces electrical energy on rotation of an excited field.

Turbine trip is actuated by four main stop valves, which quickly shut off steam to the turbine under emergency conditions. These stop valves are located one each in the four main steam lines upstream from the control valves to which they are welded. One of the main stop valves is provided with an internal bypass valve capable of passing approximately twice the no-load flow for slow warming of the stop valves, control valves, high pressure shell, and for decreasing the pressure differential across the main stop valves until the hydraulic cylinder can open the valves. The remaining three stop valves have ro bypass and are either fully open or fully closed.

i The turbine has an electrohydraulic control system that controls acceleration, load, speed and overspeed by positioning of the steam j

valves (stop valves, control valves, and combined intermediate valves),

i Prior to turbine trip, the emergency trip system oil pressure is supplied 1

to the disc dump valves of the hydraulic actuators on each steam valve.

This oil pressure allows the steam valves to stay open. Under emergency l

conditions, sudden relieving of the oil pressure will result in rapid closure of all steam valves to prevent overspeed.

If all four of either the stop or control valves are closed the turbine is said to be in a q

tripped condition.

O The analysis of the turbine trip system is described in detail in Section 8 of the Systems Analysis Report.

A-5 0570G100237TSR

A.8 MAIN STEAM SYSTEM The main steam system delivers steam from the steam generators to the high-pressure turbine and the main feedwater pump turbines during startup, power operation, and when shutting down the unit. Under conditions in which both main feedwater pumps are unavailable, the steam generators deliver steam to the emergency feedwater pump turbine.

Also, af ter turbine trip, the main steam system dissipates all the energy produced in the reactor coolant system through the turbine bypass system to the condenser and to the atmosphere via the main steam safety valves.

The 28.9% step load rejection capability of the turbine bypa:s valves and atmospheric dump valve requires that the main steam safety valves open on turbine trip.

The main steam system consists of two main steam lines from each CTSG to the high-pressure turbine for a total of four lines.

The only cross-connection between the lines is in the turbine steam chest between the turbine stop valves and control valves.

Each of the main steam lines is furnished with a main steam isolation stop check valve and branch lines that supply steam to the main feedwater pump turbines and to the emergency feedwater pump turbine.

The motor-operated main steam isolation stop check valves are located in the concrete portions of the intermediate building.

They are remotely and ranually operated from the control room to close in less than 2 minutes.

The main steam safety valves are located upstream of the main steam isolation stop check valves.

The emergency feed pump turbine supply is upstream of the main steam isolation valves and also connects to the turbine bypass valves and the atnospheric dump valves.

Downstream of the main steam isolation stop check valves are the main steam stop/ control valve assemblies.

The analysis of the main steam system is described in detail in Section 9 of the Systems Analysis Report.

A.9 MAIN FEEDWATER AND INTEGRATED CONTROL SYSTEMS The main feedwater system, in conjunction with the condensate and heater drains, is designed to supply water at a rate required by the steam generators during full power operation.

The integrated control system provides the proper coordination of the reactor, steam generator feedwater, and turbine control under all operating conditions.

The main feedwater system maintains level in the OTSG throughout all modes of normal plant operation.

It consists of two 60% capacity turbine-driven feedwater pumps that take suction from the low-pressure heater outlet header and discharge into a common header that supplies two trains of two high-pressure heaters each.

Each pump is provided with a recirculation line to the main condenser.

Feedwater from the high-pressure heater flows through a temperature mixing header and then enters the steam generator via separate feed lines each provided with main feedwater regulating valves.

A-6 0570G100287TSR

The feedwater regulating valves are positioned by the integrated control system; differential pressure across the valve sets feed pump turbine governor speed. For startup or low-load operation, a smaller regulating valve is provided in parallel with the main regulating valve. Also, for startup and hot standby operations, a small bypass line and valve are installed around each of the main feedwater valves to supply a continuous low flow rate to the steam generator feedwater nozzles.

The turbines driving the main feedwater pumps are supplied steam from the main steam system and discharge to the condenser.

Without the circulating water system and condenser vacuum available, the main feedwater pumpt will not operate.

1 The integrated control system properly coordinates the reactor, steam generator feedwater, and turbine control under all operating conditions.

Proper coordination by the ICS consists of producing the best load response to the unit load demand, while recognizing the capabilities and limitations of the reactor, steam generator feedwater system, and i

turbine. When any single portion of the plant is at an operating limit i

or control section is on manual, the ICS design uses the limited or manual section as a load reference.

The ICS maintains constant average reactor coolant temperature between 15 and 100% rated power and constant steam pressure at all loads.

Optimum unit performance is maintained by limiting steam pressure variations; by limitira the unbalance between the steam generator, o

turbine, and the reactor; and by limiting the total unit load demand on f

Q loss of capability of the steam generator feed system, the reactor, or the turbine generator. The ICS provides limiting actions to ensure i

proper relationships among the generated load, turbine valves, feedwater flow, and reactor power.

The ICS includes four independent subsystems including the unit load i

demand, the integrated master control, the steam generator control, and the reactor control. The system philosophy is that control of the plant is achieved through feed-forward control from the unit load demand. The i

ULO produces demands for parallel control of the turbine, reactor, and steam generator feedwater system through respective subsystems, i

The steam generator control is capable of automatic or manual feedwater control from startup to full output. The integrated master control is capable of automatic or manual turbine valve control from minimum turbine load to full output and or manual control below minimum turbine load.

I The reactor control is designed for automatic or manual operation above

(

about 15% output and for manual operation below 15' i

The analysis of the main feedwater and integrated control systems are I

described in detail in Section 10 of the Systems Analysis Report.

l A.10 EMERGENCY FEEDWATER SYSTEM l

The emergency feedwater system delivers water to the steam generators on

(

low level in the steam generator for the purpose of removing decay heat.

l

\\

i l

l A-7 i

0570G100237TSR l

The emergency feedwater system is divided into train A and train B, both of which are actuated simultaneously on loss of all four reactor coolant pumps, on less of both main feedwater pumps, on low steam generator level, or on a 4 psig reactor building pressure signal.

The emergency feedwater system consists of two motor-driven pumps powered from recundant Class 1E 4,160V buses and one 100% capacity turbine-driven pump, which receives steam from the main steam lines. The motor-driven emergency feedwater pumps are automatically loaded on the diesel generator during loss of offsite power with or without simultaneous existence of an ESAS actuation. The three pumps are located in the intermediate building.

The turbine-driven pump is physically separated from the motor-driven units.

The emergency feedwater pumps normally take suction through separate lines from the two condensate storage tanks.

They may also be manually aligned to take suction from the condenser hot well or demineralized water storage tank. As a further backup source of last resort, river water can ce used via the reactor building emergency cooling water pumps.

The three cinergency feedwater pumps discharge into a common header from dich separate 6-inch lines deliver water to each steam generator.

Each of the 6-inch supply lines contains a flow-limiting venturi and two parallel air-operated control valves controlled by the heat sink protection system.

The HSPS controls emergency feedwater flow af ter the emergency feedwater pumps have been activated.

The analysis of the energency feedwater system is described in detail in Section 11 of the Systems Analysis Report.

A.11 PRESSURE CONTROL SYSTEM tlormal RCS pressure control is by the pressurizer steam cushion in conjunction with the pressurizer spray, pilot (electromagnetic) operated relief valve, and heaters. The system is protected against overpressure by reactor protective system circuits, such as the high pressure trip, and by pressurizer relief and safety valves located on the top head of the pressurizer.

Since all sources of heat in the system (i.e., core, reactor coolant pumps, and pressurizer heaters) are interconnected by the reactor coolant piping with no intervening isolation valves, all relie' valves are located on the pressurizer.

The pressurizer spray line originates at the discharge of a reactor coolant pump in the same heat transport loop that contains the pressurizer.

Pressurizer spray flow is controlled by an electric motor-operated valve using on-off control in response to the opening and closing pressure setpoints. An electric motor-operated valve in series with the s;' ray valve provides a backup means of securing flow if the spray valve should stick open.

The PORY is mounted on the top head of the pressurizer.

The main valve operation is controlled by the opening or closing of a pilot valve, which causes unbalanced forces to exist on the main valve disc. The pilot A-8 0570G100587TSR

t valve is opened or closed by a solenoid in response to the opening and 1

closing signals from the pressurizer pressure instrumentation at pressure setpoints.

The pressurizer heaters replace heat lost during ncrmal steady state operation, raise the pressure to normal operation pressure during RCS heatup from a cooled down condition, and restore system pressure following transients. The heaters are arranged in 13 groups and are controlled by the pressure controller.

The first six groups use modulating control and will normally operate at partial capacity to replace heat lost, thus maintaining pressure at setpoint within a reasonable margin of difference. A basic on or off control is used for the remaining seven groups. A low-level interlock prevents the heaters from being energized with the heaters uncovered.

The analysis of the pressure control system is descrihed in detail in Section 12 of the Systems Analysis Report.

A.12 HIGH PRESSURE INJECTION / MAKEUP AND PURIFICATION SYSTEM The makeup and purification system serves to control the reactor coolant inventory and the boric acid concentration in the reactor coolant syster through the processes of letdown and makeup and to remove impurities in the water.

There are three pumps that serve both a makeup and purification function O

and a high pressure injection function. Normally, one is operating and two are in standby. The operating pump. takes suction from the makeup tank and discharges to the normal makeup and the seal injection lines.

Makeup flow to the reactor coolant system is regulated by the reactor coolant volume control valve, which operates on signals from the prescurizer level controller.

If greater than normal makeup is required, a manual motor-operated valve allows the operator to provide increased makeup to the reactor coolant system without initiating HPI.

Upon engineered safeguards initiation, the pumps on engineered safeguards standby are activated.

(The the already operating pumps.) pumps on ESF standby may or may not include l

Suction is taken from the borated water storage tank, discharging into each of the high pressure injection lines that discharge into the RCS downstream of the reactor coolant pumps.

The analysis of the high pres;ure injection / makeup and purification system is described in detail in Section 13 of the Systems Analysis Report.

A.13 LOW PRESSURE INJECTION / DECAY HEAT REMOVAL SYSTEM The decay heat removal system removes decay heat from the core and sensible heat from the reactor coolant system in four distinct modes:

Following certain LOCAs in the low pressure coolant injection mode, e

e Ouring the latter stages of cooldown in the closed loop recirculation t

mode.

3 i

a i

j A-9 OS70G100237TSR

e Following certain LOCAs in the low pressure, open loop recirculation

mode, o

Following other smaller LOCAs in the high pressure or "piggy-back" recirculation mode, with the high pressure injection system.

The system also provides auxiliary spray to the pressurizer for complete depressurization, maintains the reactor coolant temperature during refueling, and provides a means for filling and draining the fuel transfer canal.

In the closed loop, decay heat removal mode, this system takes suction from an reactor coolant system hot leg outlet line and delivers the water back to the reactor through the core flooding nozzles after passing through the decay heat removal pumps and coolers.

The decay heat removal system may be lined up in this mode when the reactor pressure is below the DHR system suction piping design pressure and temperature for cooldcun of the system to refueling temperatures. The coolers remove the decay heat from the reactor coolant passing through them. With both coolers in operation, the decay heat removal system is designed to cool the reactor coolant system from 250*F to 140*F in 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br />.

Decay heat is transferred to the decay heat closed cooling water system through the decay heat removal cooler.

The major system components consist of two redundant trains, each consisting of a DHR pump and a cooler, as well as various pipes and valves, depending on the lineup. The decay heat removal pumps are arranged in parallel and are designed for continuous operation during the period required for removal of decay heat during a routine shutdown and refueling.

Each pump is provided with an integral motor lube oil system.

Remotely operated vent valves provide for venting of air and noncondensibles from the pump casings under normal conditions and after the accident when decay heat removal vaults are not accessible.

The borated water storage tank is located outside the reactor building and the auxiliary building.

It contains a minirum of 2,270 ppm boron in solution and is used for RCS inventory control.

The berated water storage tank provides a suction source for the reactor building spray system, the decay heat removal system in the low pressure injection mode, and the makeup and purification system in the high pressure injection mode. Redundant high, low, and low-low level indication and alarrs are provided on the main control console.

During a LOCA, the borated water storage tank water is delivered to the RCS via the emergency core cooling system injection pumps. When the BWST level drops to the low-low level alarm point of 3 feet, the operators switch the LPI pump suction to the reactor building surp by opening DH-V-6A and 6B, then shutting DH-V-SA and 58.

If the RCS pressure is greater than the shutof f head for the LPI pumps, the LPI system is aligned to inject water to the suction of the HPI pumps by opening DH-V-7A and 78.

Af ter proper flow is verified, the operator then isolates the BWST from the injection purps.

This LPI to HP! injection lineup is referred to as the "piggyback" mode of operation and is also used in the HPI cooling mode upon low-low level in the BWST.

A-10 0570G100587TSR

OQ Whenever the LPI pumps are aligned to the reactor building sump as a i

suction source, the decay heat removal coolers are used to cool the sump i

water and reject the heat to the decay heat closed cooling water system.

The analysis of the low pressure injection / decay heat removal system is described in detail in Section 14 of the Systems Analysis Report.

A.14 REACTOR BUILDIf1G ISOLATI0t1 SYSTEM I

The reactor building isolation system closes containment penetrations not l

required for operation of the engineered safeguards to prevent leakage of i

radioactive materials to the environment from inside the reactor building or RCS. Leakage through penetra+f ons is minimized by a double barrier so that no single, credible failure on malfunction of an active or passive component can result in intolerable leakage. The installed double barriers take the form of closed piping systems, both inside and outside the reactor building, and various types of isolation valves.

Four types of isolation valve layouts exist, depending on what type of line is being isolated i

e Each line connecting directly to the reactor coolant system has two reactor building isolation valves. One valve is external and the other is internal to the reactor building.

These valves may be l

either a check valve and a remotely operated valve or two remotely operated valves, depending on the direction of normal flow.

e Each line connccting directly to the reactor building atmosphere has two isolation valves. At least one valve is external and the other may be internal or external to the reactor building. These valves i

may be either a check valve and a remotely operated valve or two remotely operated valves, depending on the direction of normal flow.

Each line not directly connected to the reactor coolant system or not e

open to the reactor building atmosphere has at least one valve l

either a check valve or a remotely operated valve. This valve is located externally to the reactor building.

Lir.es that penetrate the reactor building and are connected to either e

the building or the reactor coolant system, but that are never opened

[

during reactor operation, have two normally closed barriers; e.g.,

blind flange and closed valve.

All lines open to the containment atmosphere or connected directly to the RCS (either normally or intermittently that can result in transfer of radioactivity out of containment) that are neither part of the emergency core cooling systems nor support for RCP operation are isolated on i

reactor trip. Reactor building partial isolation occurs on a signal of j

approximately 4 psig in the reactor building. A 30-psig signal provides j

isolation for certain lines not isolated by the 4-psig signal. There are j

additional containment isolation signals, such as the reactor trip, hiah radiation,1,600-psig RCS pressure, and pipeline break signals, j

The analysis of the reactor building isolation system is described in detail in Section 15 of the Systems Analysis Report.

A-11 0570G100297TSR

A.15 REACTOR BUILDING EMERGENCY COOLING SYSTEM Reactor building emergency cooling is provided to remove heat from the containment atmosphere to limit stress on the reactor building structure.

Reactor building air recirculati<n and cooling units work in conjunction with the reactor building spray 5ystem acring periods when decay heat is being deposited to the containment atmosph!re. The systems are designed so that the heat removal capability required during the post-accident period can be attained by operating spray systems and cooling units in the emergency mode in various combinations.

(See success criteria discussion in Plant Model Report, Section 4.1.4.)

Long-term reactor building heat removal depends on the operation of the reactor building emergency cooling units or the decay heat removal system since the reactor building spray system cannot remove heat from the reactor building.

Erergency and normal cooling is performed with the same basic units that are components of the reactor building ventilation system.

Each unit contains an emergency cooling coil, a normal cooling coil, and a two-speed fan.

For emergency cooling, the units will operate at a reduced speed under post-accident conditions, with the heat being rejected to river water.

The back-pressure regulating valve on the emergency cooling coil discharge line maintains emergency system pressure above maximum containment design pressure and prevents leakage out of the contairment through a damaged system.

Receipt of the reactor buildina isolation signal (4-psig reactor building pressure or a low reactor pre,3ure of either less than 1,600 psig or less than 500-psig backup signal) automatically switches the reactor building emergency cooling system to the emergency mode.

This includes:

1.

Energizing the three recirculating air handling units.

2.

Operating the three units at the lower speed.

3.

Starting the reactor building emergency cooling purps.

4.

Opening the emergency cooling coii isolation valve on the outlet side of the coil.

Inlet valves are normally open for leak monitoring purposes.

5.

Closing the normal cooling coil isolation valve.

The analysis of the reactur building emergency cooling system is described in detail in Section 16 of the Systems Analysis Report.

A.16 REACTOR BUILDING SPitAY SYSTEM The reactor building spray system is designed to furnish building atmosphere cooling 1n conjunction with decay heat removal system operating in the open loop recirculation mode to limit post-accident building pressure and to remove airborne fission products from tne A-12 0570G100287TSR

i reactor building atmosphere, thus reducing the inventory of airborne fission products available for leakage to the environment if the containment should not be isolated or should fail due to overstress. The reactor building emergency cooling system described in Section A.15 above also has containment atmosphere heat removal capability.

(See success criteria discussion in Section 4.1.4 of the Plant Model Report.)

[

f The system consists of two pumps, two reactor building spray headers, and i

the necessary piping, valves, instrumentation, and controls. The pumps and remotely operated valves can be operated from the control room.

The reactor building spray system is designed in two trains.

Both trains operate independently.

A crossover is provided between the two spray train suction lines and contains double manual valves, with a test line for recirculation of borated water from the buildi.1g spray pumps.

Each pump starts, initially taking suction from the borated water storage tank through the interface with the decay heat removal system.

The spray is injected into the building atmosphere through a set of spray headers and nozzles for each train.

The analysis of the reactor building spray system is described in detail

[

in Section 17 of the Systems Analysis Report.

A.17 INSTRUltENT AIR SYSTEM The instrument air system supplies clean, dry, oil-free air at 100 psig

),

throughout the plant for motive control of valves and instrumentation.

The instrument air compressors, receivers, and dryer are located in the seismically hardened portion of the intermediate building. One instrument air compressor can supply all the air needed for normal plant i

operation.

l The two instrument air compressors are supplied power from separate class f

lE busses; however, the instrument air system is not safety related and, after s loss of offsite power, the compressors have to be manually 6

restarted. When offsite power is available, two service air compressors also supply air to the instrument air system if air pressure drops to 80 psig.

A steam or feed line break in the intermediate building is assumed to cause failure of the instrument a'r system.

I An automatic, heat reactivated air dryer in series with prefilters and

[

afterfilters removes dirt particles and moisture from the air prior to i

distribution to system loads.

If a failure were to occur in the air dryer (plugging or transfer failure), a complete loss of the instrument air system would result unless an operator locally bypasse., the dryer using the manual bypass valve.

l The 2-hour backup instrument air system has becn analyzed separately and included in the analysis *or the emergency feedwater system (Section 11 of the Systems Analysis Report); however, the backup instrument air p

supplied from compressors I A-P-2A and I A-P-2B was not included in the PRA

(

V due to the low capacity of these compressors.

The analysis of the instrument air system is described in detail in Section 18 of the Systems Analysis Report.

A-13 0570G100237TSR

APPENDIX B PRA METHODOLOGY This appendix describes the concept of probability and the probability of frequency framework used throughout this study in Section B.1.

Section B.2 introduces some basic concepts and definitions associated with probability distributions. The methods for propagation of the uncertainties represented by the probability distributions in the failure rate data r.nd in the split fraction distributions are discussed in Section B.3.

The methodology details for each part of the PRA model construction process are contained in the corresponding sections of the full report; e.g. the methods followed for incorporating plant-specific data with generic failure rate distributions are described in the Data Analysis Report. Similarly, the methods and conventions followed to build the systems analysis models are described in Section 1 of the Systems Analysis Report, and so on for the other parts of the analysis.

Section B.4 of this appendix describes the quantification process that links together the different parts of the PRA model to determine the accident sequences that contribute most to risk. Section B.5 discusses the importance measures used to evaluate the results.

B.1 PROBABILITY

  • People have been arguing about the meaning of probability for at least 200 years, since the time of Laplace and Bayes. The major polarization of the argument is between the objectivist or frequentist schools that view probability as something external, the result of repetitive experiments, and the subjectivists who view probability as an expression of an internal state--a state of knowledge or a state of confidence.

In this study, we adopt the point of view that both schools are right; they are just talking about two different ideas. Unfortunately, they both use the same word--wnich seems to be the source of most of the confusion. We need, therefore, to give each idea the dignity of its own name. We do this by calling one idea frequency and the other p robabil i ty.

In the next section, we shall carefully explain the distinction we make in this study between these two words.

B.1.1 THE DEFINITION OF PROBABILITY AND THE DISTINCTION BETWEEN PROBABILITY AND FREQUENCY What the objectivists are talking about we shall call frequency. What the subjectivists are talking about we shall call probability. Thus, "probability" as we shall use it is a numerical measure of state of knowledge, a degree of belief, a state of confidence.

"Frequency," on the otner hand, refers to the outcome of an experiment of some kind O

  • This section derives, in part, from Reference B-1.

B-1 0575G100287TSR

involving repeated trials. Thus, frequency is a "hard" measurable number. This is so even if the experiment is only a thought experiment or an experiment to be done in the future. At least in concept, then, a frequency is a well-defined, objective, measurable number.

Probability, on the other hand, is a notion of a different kind. Defined as a number used to communicate a state of mind, it is thus inherently subjective and changeable as new information arrives. To make this notion useful, we must clearly define the correlation between the numbers and the state of mind.

This can be done in several ways. The most direct, however, is to u3e frequency in the following way.

Suppose we have a lottery basket containing coupons numbered from 1 to 1,000.

Suppose the basket is thoroughly mixed and that you are about to draw a coupon blindfolded.

We ask, "Will you draw a coupon numbered 632 or less?" With respect to this question you experience a certain state of confidence.

Similarly, I experience a state of confidence with respect to this same question. Let us agree to call this state of confidence, "probability 0.632," equal to the frequency of such draws in an infinitely repeated experiment.

Now, we both know exactly what we mean by p = 0.632.

Therefore, if you now say that the probability of your latest business venture succeeding is 0.632, I know exactly what your experiential state of confidence is. We have communicated!

In the same way, we define or "calibrate" the entire probability scale, from zero to one, using frequency as a standard of reference. Note th.it the process used here is entirely parallel to the way by which we define "red," 'chai r," "seventeen," and all other words or symbol s.

This method of definition shows the intimate connection between probability and frequency. This connection needs to be recognized always and at the same time not allowed to obscure the fundamental difference.

Frequency is used to calibrate the probability scale in a "bureau of standards" sense.

Once the calibration is established, we then use probability to discuss our state of confidence in areas in which we are dealing with one-time events and have no frequency information at all.

In this way, we liberate ourselves from the restrictions of the relative frequency school of thought (e.g., that only mass repetitive phenomena i

can be analyzed probabilistically) and instead create for ourselves a systematic, disciplined theory and language for dealing with rare events, for quantifying risks, for making decisions in the face of the uncertainties that are inevitably present in decision situations, and for taking the consequent actions with the knowledge that these are the best decisions and actions possible in lioht of all the information available to us.

el B-2 j

0575G100587TSR

This then is the definition adopted in this report. For a'dditional insight, we quote the following paragraph from unpublished notes by E. T. Jaynes:

Probability theory is an extension of logic, which describes the inductive reasoning of an idealized being who represents degrees of plausibility by real numbers. The numerical value of any probability ( A/B) will in general depend not only on A and B, but al:,o on the entire background of other propositions that this being is taking into account. A probability assignment is "subjective" in the sense that it describes a state of knowledge rather than any property of the "real" world; but it is completely "objective" in the sense that it is independent of the personality of the user; two beings faced with the same total background of knowledge must assign the same probabilities.

As further elaboration, we cite the following paragraph by A. DeMorgan.*

We have lower grades of knowledge, which we usually call degrees of belief, but they are really degrees of k nowl edge....

It may seem a strange thing to treat knowledge as a O

magnitude, in the same manner as length, or weight, or surface. This is what all writers do who treat of probability, and what all their readers have done, long before they ever saw a book on the subject.... By degree of probability we really mean, or ought to mean, degree of bel i e f.... Probability then, refers to and implies belief, l

more or less, and belief is but another name for imperfect knowledge, or it may be, expresses the mind in a state of imperfect knowledge.

B.1.2 THE DISTINCTION BETWEEN PROBABILITY AND STATISTICS Corresponding to the above definitions of frequency and probability as numbers, we may say that statistics, as a subject, is the study of frequency-type information. That is, it is the science cf handling experimental data. On the other hand, probability as a subject, we might say, is the science of handling the lack of experimental data.

Probability is married to risk assessment in PRA, because, without uncertainty, there would be no risk.

Thus, one often hears it said that we cannot use probability because we I

have insufficient data.

In light of our current definitions, we see that I

this is a misunderstanding. When one has insufficient data, there is I

nothing else one can do but use probability.

q

~

y

  • Further discussion of the foundations of the subjectivistic theory can be found in References B-2 through 8-6.

B-3 0575G100287TSR

B.1.3 COMMENTARY ON THE DEFINITIONS OF FREQUENCY AND PROBABILITY -

AN EXAMPLE We shall give a simple, tutorial example to further clarify the concept of probability and to indicate how we make the distinction between probability and frequency.

If I tossed a coin and asked you for the probability of it coming up heads, you will of course say.5.

If I tell you that I have just tossed the coin 10 times and the frequency of heads was.7 and now ask for the probability of a head on the next toss, you will still very likely say.5.

If, however, I tell you that I have tossed it a hundred times and the frequency was.7, 70 heads, you will now begin to suspect that the coin is not equally balanced, and the probability you give for heads on the next toss may move up--say to

.6.

If I tell you the frequency has been.7 in 10,000 trials, you will be convinced and will assign a probability of.7 to the next toss.

This example helps bring out the distinction between probability and frequency. The coin has not changed during this example, but your state of knowledge about the coin has--and this is reflected in your changing probabilities from.5 to.6 to.7.

On the other hand, I knew the coin was unbalanced to begin with--and my probability was.7 all along.

Which of us was right? Both of us were right.

Your probability reflected your state of knowledge and mine reflected mine. As such reflections, both were 100% accurate.

B.1.4 THE MEANING OF "THE" PROBABILITY - RELATION TO THE PHILOSOPHICAL BASIS OF RISK ASSESSMENT However, what about "the" probability.

Here our language plays tricks on us. There is no such thing as "the" probability--as if it were something external--there is only "your" probability, based on the evidence you have and "my" probability based on the evidence I have.

But, you say, suppose we toss the coin N times and plot the frequency of heads, 6(N), as a function of N.

As N gets larger and larger, f(N) will approach a limiting valJe. That value is "the" probability. Well, you could define it so. We find it more useful to call that limiting value "the" frequency--the frequency in an infinite experiment--and reserve the word probability to refer to the state of confidence at any moment. There is another sense, however, in which it can be said that there is a "the" probability. This is in the sense of the last sentence of Jaynes' definition. Any two idealized beings, "rational" beings, given the same total background of evidence and experience must assign the same numerical value of probability to a given proposition. That value could be said to be "the" probability.

It is independent of the personality of the user; hence, "objective."

Thus, if you and I are both ideal beings, with the same knowledge, each of us is acting rationally, coherently or objectively (to the extent that our probability assignments follow the formalized rules of the theory of B-4 0575G100287TSR

i OQ probability), then we will both assign the same probabilities.

If we do not assign the same probabilities, then either one or both of us is not coherent, or we do not have the same total background of evidence and t

information.

This idea of rationality or coherence is the philosophical cornerstone of I

our approach to risk assessment. For, if two rational beings, oi <en the same body of information, will evaluate probabilities the m*:.ie way, then by our definition, they will also evaluate risk the same way. Thus, a given specific body of information will imply and require a specific quantitative value of risk, and this value is objective and independent of who evaluates it.

B.1.5 TWO METHODS FOR DISCUSSING UNCERTAINTY: THE "PROBABILITY l

OF FREQUENCY" FRAMEWORK p

There are two basic methods for quantifying uncertainty, corresponling to two different questions. We illustrate these in the context of another coin flipping example.

In "Method 1" we ask, "What is the probability of a head on the next toss, P(heads)?" Alternately, in "Method 2" we say, "I am going to toss the coin 10,000 times. What is the frequency (i.e., the percentage of heads, 6) going to be?"

In Method 1, we answer simply with a number, P(heads), our state of confidence on the prospect of a head on the next toss, as reflected for example in the odds we would take in a bet.

O.

In Method 2, we are asked to predict the outcome, 4, of an experiment to be done in the future.

Since we do not know this outcome, we express our prediction in the form of a probability curve against frequency; e.g.,

Ca l

@D 8$

fo li:

i r

I t

0 5

1 l

9 FREQUENCY OF HEADS Thus, in the second method, we are led to the notion of a probability curve against frequency as a way of, or a framework for, expressing our state of knowledge about this as yet unperformed experiment.

This notion of probability of frequency and this distinction between Method 1 and Method 2 are central to the understanding of this study, Both methods will be usea as appropriate. They are dii. cussed further in later sections and will be of use to us in the ney' :ectior,in extending the definition of risk. We therefore expand c r:nti on. The v

B B-5 0575G100287TSR w

C ry-9=t=t*

W T#"i

=--7I F

P

Method 1 result can be derived from the Method 2 probability of frequency cu rve. The Method 2 probability of frequency curve p(6) can be used to express our Method 1 probability of heads on the next try as 1.0 p(head) =

ep(6)dt We see thus that the second method includes or encompasses the first.

The reverse cannot be said. Thus, Method 2 is a fuller, more complete way of talking about uncertainty.

Once a probability has been calculated, people inevitably ask, "How accurate is that prob. oility?" "How confident are you in that number?"

In response to such questions, authors of probabilist'.c risk assessments have been led to introduce such notions as confidence bounds on the probability and probability of probability, etc.

In the context of our definition, such phrases as "probability of probability" or confidence in confidence make no sense.

in view of our usage of the term probability, the probability of frequency curves expresses our state of confidence.

It thus appears as if the question is asking, "How confident are you in your state of confidence?"

In this form, the question seems undefined and unanswerable. However, there is a valid thought behind it. What we need to do, therefore, is to expand our framework somehow in such a way that, wite.in the enlarged framework, the question can be given a precise meaning and then be answered.

For this purpose, we make use of the probability of frequency idea in the following way. We imagine a thought experiment in which we undertake the proposed course of action, or inaction, many, many times.

At the end of this experiment, we will be able to look back at the records and ask, "How frequently did scenario sj occur?" This frequency will then be an experimentally measured number. Let us denote it by $j.

Its units are occurrences per trial.

Imagine now, that the scenarios have been arranged in order of increasing severity of damage. That is to say, the damages Xi obey the ordering relationship Xi X2 X3...Xn If we now plot the points <xj,Pp we obtain the staircase function shown as a dashed line, in Figure B-1.

If we draw in the smoothed curve, R(x), through the staircase, we can regard that curve as representing the actual risk.

Hence we call it the risk curve.

Probably, the best known examples of such curves were published in the Reactor Safety Study, WASH-1400 (Reference B-2).

Figure B-2 is an example taken from that study. Note in this example that the c.urves ar9 plotted on log-log scale, which results in the characteristic concave B-6 0575G100287TSR

i downward shape.

In this case, the asymptotes, as shown in Figure B-3, have the interpretation of maximum possible damage and probability of any damage at all.

We could then compute the cumulative frequency o= [64

  • $
  • i (where the sum is over all scenarios having damage equal to or greater than xi). We could now plot o versus x, obtaining Figure B-4, which we refer to as a risk curve in frequency format. This whole curve may De regarded as the outcome of our thought experiment.

The scenario frequencies and the damage associated with each scenario are constructed by combining probability of frequency distributions for each event in the scenario. The propagation of uncertainty precess described in Section 4 of the this report (TSR) and Section B.3 result in p(4j) and p(Xj)1, respectively. distributions for the frequency and consequences of each scenario Therefore, the cumulative frequency oj of all scenarios having damage Xi or greater has associated with it a p(o ) also. This means we ar6 producing a family of curves p(o,xj), represented pictorially by a "risk" curve in probability

(

of requency format. At each damage level on such a risk curve a l

vertical cut through the family looks like a probability of frequency curve.

i I

Pictorially, this is represented by a diagram of the form of Figure B-5.

l This figure is what we call a risk curve in probability of frequency t

format.

It consists of a family of curves, op(diagram, we would, for x), with the parameter being the cumulative probability.

To use this example, enter with a specific x value and choose, say, the curve

[

P = 0.90.

The ordinate of this curve, 00.90(x), is then the l

90th percentile frequency of x.

That is to say, we are 90% confident i

that the frequency with which damage level x or greater occurs is not larger than 00.90(XI-B.1.6 THE DISTINCTION BETWEEN FREQUENCY DISTRIBUTIONS AND PROBABILITY I

DISTRIBUTIONS i

l l

We now use our definitions to distinguish two further situations that are l

4 often badly confused.

a i

Let x denote the height of an individual person selected at random from a I

population.

If we now measure the height of each person, we can draw a frequency distribution showing what fraction of the population falls in each height increment.

If the population is large, we can, by a limiting process, express this distribution as a continuous curve, a frequency j

density distribution 4x(x), as shown in Figure B-6.

i The units of the 6x(x) are thus frequency per unit x, or fraction of O

population per unit height. This curve is an experimental quantity.

It l

portrays the variability of the population--a measurable quantity. The 1

l value of x therefore varies with the individual selected.

it is a truly fluctuating or random variable, j

i B-7 0575G100287TSR l

Now, contrast the situation for which we pick a specific individual (say, is.

Since we do Joe) in the population and ask what his height, xJoe, knowledge about i t not know his height for sure, we express our state of in the form of a probability density function, as in Figure B-7.

The units here are probability per unit height.

In this case, xjon is is a definite number.

It not a random or fluctuating variable.

is just that we do not know what it is.xgNis is a very different situation from the situation shown on the population variability curve.

Thus, 6x is the frequency distribution of a random, or fluctuating, nonfluctuating,0E) is the probability distribution for' a fixed, variable. P(xJ but unknown quantity.

This distinction between population variability curves and state-of-knowledge curves must be made when we analyze data on f ailure rates and initiating event frequencies from our specific plant and from other plants and other industries.

B.2 PROBABILITY DISTRIBUTIONS - BASIC CONCEPTS Probability distributions are, of course, fundamental to any discussion of risk and are used extensively throughout this study. For convenience, therefore, this section collects and reviews some of the basic ideas and standard language relating to such distributions.

B.2.1 DISTRIBUTION FUNCTIONS Given an uncertain variable X and a number x, the not:Aion X < x represents the hypothesis that X has a value less than or equal to X.

The (cumulative) probability distribution function, P(x), of the variable X is now defined as P(x) I probability (X < x)

(B.1)

This definition applies to both discrete variables (i.e., variables that take on a countable number of values) and continuous variables.

Frequently, we wish to have more detailed information than that provided by Equation (8.1),

in particular, for a discrete variable, we may wish to know the probability that X = x and, for a continuous variable, the probability that X falls between x and x + dx.

Thus, we define the probability function for a discrete variable, p(xj) = probability (X = xj' and the probability density function for a continuous variable dP(x) p(x) I ex The density function satisfies

=

p(x)dx = P(=) - P( =) = 1-0 = 1 (B.2)

B-8 0575G100587TSR

Ob and the cumulative probability u

.su n :

anction is calculated from P(x) =

p(s)ds (B.3)

(The integrals in Equations (B.2) and (B.3) are replaced by sums when X is discrete. )

As an example of the above, let T be the time at which a particular piece of equipment first fails and let P(t) = probability that T < t

Then, R(t) = 1-P(t) known as the "reliability," is the probability that the equipment has not failed by time t.

The probability density function p(t) = dP(t)

(B.4) is the probability of failure, per unit time, at t.

The "failure rate,"

or "hazard function," X(t) is defined as p

1

'dP(t)'

1(t) = g(t) =

3,ggg) og The interpretation of the failure rate is that 1(t)dt is the i

conditional probability that the equipment will fail in dt about t, given l

that it has not failed up until time t.

We now examine briefly several widely used standard distributions of l

discrete and continuous types, which are frequently encountered in risk analysis work. First, however, we will define some characteristics that all distributions have.

B.2.2 MEASURES OF CENTRAL TENDENCY AND DISPERSION We have suggested that a convenient way to express our state of knowledge about a random variable is to use a probability distribution. While a

[

distribution gives in detail all that we know about the variable, it may be convenient to characterize the distribution by using one or more values that reflect its central tendency and its dispersion. Combining such values instead of the actual curve may also be useful as a first approximation method of combining distributions.

O B-9 0575G100287TSR

The most widely used measure of central tendency is the expected value (or mean), which is defined as xp(x)dx a E E(X) E

< or (B.5)

Exj g p

i

(

according to whether x is continuous or discrete.

If the density function is interpreted as a mass distribution, then the expected value corresponds to the center of gravity. Besides the mean, there are two other measuras of central tendency, the mode, and median.

The mode (or most likely value) is defined for a discrete variable as the value for which pi is greatest and for a continuous variable as the value at which the density p(x) is maximum.

The median is defined as that point x50 for which P(x50) = 0.50 (B.6)

Thus, X 50 p(x)dx = 0.50 (B.7) or for a discrete variable Ep = 0.50 (B.8) q
  • C*50 The percentile n is defined as P ( xy ) = y (B.9)

From Equation (B.7), we see that the median is the 50th percentile. Two i

percentiles that are of ten used to indicate how broad the distribution is are the 5th and 95th percentiles, which are determined by Equation (B.8),

with y = 5 and 95, respectively.

O B-10 0575G100587TSR

i A measure of dispersion is the variance (and its square root, the standard deviation).

It is defined to be the second moment about the meant that is, i

f e

I (x-a ) p(x)dx i

SR E E(X a) 5 or (B.10)

E (x m)2pj j

1 i

t

(

The variance is related to the mean and the second moment about zero by 82 = E CX ),,2 (B.11) i 2

hence,

[

E(X ),,2 g 2 (B.12) 2 This equation states that the mean of the square of a random variable is equal to the square of the mean of the variable plus its variance. Thi s e

observation will be useful later in the quantification of fault trees.

l B.2.3 OlSCRETE DISTRIBUTIONS B.2.3.1 Binomial j

The binomi'ai di.tribution is applicable when an experiment can have only I

two outcomes; e.g., success or failure, such as in the case of a diesel i

generator either starting or not. Let us say the frequency of failure is f and of success,1 - f, and that an experiment is repeated n times.

i f

The following function p(r), then, gives the probability of exactly r failures in n trials, i.e.,

l f"(1-f)n-r,

f gy,f)n-r (B.13) r p(r) = H

-r)!

B.2.3.2 Poisson j

ltems of equipment that operate continuously, pumps for example, are usually modeled as having a failure rate X, that is constant in time.

In this case, the probability of having exactly k failures in t operating i

hours is given by t

p(k) =

e (B.14)

Viewed as a function of k, this expression is known as the Poisson distribution.

B-11 0575G100687TSR

B.2.4 CONTINU0US DISTRIBUTIONS B.2.4.1 Normal (Gaussian)

The Gaussian distribution, or normal curve of error, is fundamental in probability work.

The density function of this distribution is I

I * ~"

(B.15) p(x)

' -= < x < =

exp 2

=

nna 2a To get the standardized (tabulated) normal distribution, define the new variable z5 (B.16) in which case, Equation (B.7) becomes 2 ~

L (B.17) p(z) =

exp 2

,' Tid'~

Tables for the standardized distribution can be found in many textbooks (References B-7 and B-8).

B.2.4.2 Exponential Referring back to the Poisson (or constant failure rate) process, set k = 0.

Then, the probability of zero failures up to time t is

-A t R(t) = e (B.18)

The density function is

-X t p(t) = AR(t) = le (B.19) which, we notice, has units of probability per unit time.

The cumulative distribution is P(t) = 1 - e-\\t $1 t (B.20) where the approximation holds for it < 0.10 The implications of this approximation when uncertainties ~are propagated will be discussed in later sections.

B.2.4.3 Lognormal The lognormal distribution is used extensively in risk and reliability work and is relevant in more physical processes where the underlying variable is restricted to positive values; i.e., O to =.

In the present study, as in past safety studies, the lognormal is used to B-12 0575CiOO587TSR

O represent our state of knowledge of component failure rates and also to represent the variability, or frequency distributions, of populations of components.

The density function for the lognormal is IE " * -u _) b, 0 < x < =

I (B.21)

[

p(x) =

up 2

E 2a Comparison of Equations (B.15) and (B.21) reveals that if x is-lognormally distributed, then in x is normally distributed.

Very often in risk analysis, the primary variables are assumed to be

[

lognormally distributed.

It is of interest, then, to investigate some

[

useful properties of that distribution in-the present context.-

I The lognormal density was given in Equation (B.21). Note that this form contains two parameters, u and o.

We sometimes write x = A (u.o )

1 to mean that x is lognormally distributed with parameters u and o.

j Several characteristic values of the distribution are as follows:

2 i

f Mean:

a

= exp u+

(B.22)

I 2-2 2

~

2 Variance: 62,,2u + c

,o. 1

,3 e

-1 (B.23)

Mode:

X, = exp (u Inverting Equations (B.22) and (B.23), we get the parameters u and o as functions of the mean and variance; i.e.,

l o

= tn

+1 (B.24)

.a j

e 2

i

. gm.y (B.25) l Useful percentiles of the lognormai are:

5th Percentile:

x05 = exp (u - 1.64b)

(B.26) 50th Percentile:

x50

  • e" * /x05x95 (B.27)

(median) i B-13 0575G100587TSR

95th Percentile:

x95 = exp (p + 1.64b )

(8.28) y Percentile:

x

= exp (p + k o)

(B.29) y y

where ky is the appropriate coefficient found in tables of the standard normal distribution. The error factor (EF) is defined as EF=\\!*05 l

=e'47 (B.30) 9 V

It follows immediately that x95 = x50EF (B.31) and X50 x05

  • T B.32)

Since tn x is normally distribt.ed, the most convenient way to look at a lognormal distribution is to write x = mF Z (B.33)

When z in Equation (B.33) is a standard normal variate, then x is lognormally distributed; m 4 5 the median value of x and o is called the lognormal standard deviation, or the "multiplicative' standard deviation. The reason for the latter term is seen in Equation (B.33) from the fact that if we increase z by the additive amount,1.0, then x increases by the multiplicative factor 9.

Thus, the multiplier eo plays the same role in a lognormal curve as the additive quantity a plays in a normal curve. That is, when x changes by the factor ce, the cumulative probability changes by one standard deviation worth.

Two important properties of the lognormal distribution are (see Reference B-8):

o Property 1.

If X = 4(ux, Ox) and Y=CXy where C and C are constants, then 1

2 Y = A (u, c )

(B.34) y y

B-14 0575G100587TSR

~..

.l where (B.35) p

=Cu2 x + tn C1 y

c

=C (B.36) y 2x_

This property simply states that if a lognormal variable is multiplied by a constant and raised to a power, the resulting i

variable will also be lognormal with parameters given by.-

Equations (B.35) and (B.36).

We can easily prove this property by using Equation (B.33) to get C

C z

2 2x Y=Cm e

(B.37) 1x Equation (B.37) states that Y is also lognormal with median

{

i C2 j

Cimx and lognormal standard deviation C c. From Equation (B.27),

2x we then get Y

Cm

=e (B.38) y and Equation (B.35) follows immediately.

e Property 2.

If

]

X = A (u, o )

)

x x

and Y = A (py, oy) are independent, lognormally distributed variables, and V=X.Y (8.39)

then, 2

,,2 (B.40)

V=A p

+y o

Using Equation (B.33), we grt V = m my exp (o zx x + cyzy)

(B.41) x A

Since the sum of two normal curves is a normal curve, we have V

ozx x + cyzy = oyzy (B.42)

)

B-15 0575G100687TSR

where

=d2,g2 (B.43) o o y y

Thus, from Equation (B.41) we see that V is a lognormal variate with median m my and lognomal standard deviation, Equation (B.43).

x Therefore, Equation (B.40) is proved.

These properties of the lognormal distribution will be used later in tha cuantification of system unavailabilities.

B.2.5 DISCRETE APPR0XIMATIONS TO CONTINUOUS DISTRIBUTIONS Continuous distributions are, of course, the tools that we use to express our state of knowledge about continuous variables. For purposes of numerical calculation, however, it is convenient to approximate these continuous models by discrete distributions.

This discretization is, of course, similar to the procedures used in evaluating integrals by numerical quadrature.

Consider the following distribution, p(x), of the continuous variable x.

O lf

\\

x at a2 a3 an X

If we wish now to get a discrete approximation to p(x), we can do this simply by carving x up into intervals as shown in the figure. The idea is to assign the probability that x will fall in an interval (at_1, at) to a single point xj inside that interval. Thi s probability, say pj, is simply rag p (x)dx (B.44) pg=

g x

a _1 j

We can determine the points xj in various ways. For example, xi can be the mean value of the points in each interval. Thus, with the understanding a0 = - m,

aN + 1 = + m.

(B.45)

B-16 0575G100587TSR

s.

(V we determine xp (x)dx.

(B.46) x =

4 p

x 1-1 A second method is to simply take xj as the midpoint of the interval, i.e.;

a4 + ag.1 (8.47) x4 =

2 or 4 = /a a,1 (B.48) x gj In this case, we cannot use Equation (B.45). However, it will be satisfactory to choose a0 and aN+1 appropriately so that the probability that x falls outside the interval (a0, a +1) will be n

negligibly small. With these finite values of a0 and a

+1, n

Equation (B.47) or (B.48) can be applied to all int (rvals.

The points xi may also be determined using any other reasonable method that facilitates the calculations (since this is the major reason for the di sc reti zation). For example, if the lognormal distribution, Equation (B.21), is to be discretized, it will be convenient.to take advantage of its relation to the normal distribution and the fact that the normal is tabulated. Thus, we work with the logarithm of x, and we discretize the nonnal distribution and then switch back to the lognormal by taking exponentials.

The accuracy of the discretization increases as-the number of intervals increases; i.e., for N large. The intervals do not have to be of equal length.

The above discussion has shown how to develop a discrete distribution from a continuous one. The reverse of this process, obtaining a continuous distribution from a discrete one, is simply a matter of "fitting" or "smoothing." A convenient way to do this is to plot the discrete distribution, in cumulative form, as a step function and then smooth in a sigmoid shape as shown below. This smoothed shape can then be differentiated graphically to obtain a density function.

1.0

/

O

, s.,

B-17 0575G100587TSR

B.3 PROPAGATION OF UNCERTAINTIES, THE METHOD OF MOMENTS, AND THE METHOD OF DISCRETE PROBABILITY DISTRIBUTIONS The probability of frequency, P(61), of each scenario, Sj, is calculated by combining probability of frequency aistributions for each of the number of individual events (usually system failures) that define (make up) the scenario.

P(6 ) = f[P(6e, P(6e),

. P (6

)3 (8.49) 1 e

2 where Nj is the number of events in scenario i.

Having determined the function f (i.e., the events and the way they are combined) from the plant model, the next step is to combine the distributions, P(&k), to get the distribution P(61).

This step is known as the "propagation of uncertainties" for the frequency of scenario i.

For any arbitrary function f, a simple analytical form for the distribution P(6 j), of course, does not exist. However, simplifying numerical methods do exist.

Among these are the Monte Carlo method (Reference B-9), the method of moments (Reference B-10) and the method of discrete probability distributions (Reference B-11). The method most widely used in this study is the Monte Carlo method.

As background for the discussion of this method, we first review the analytical expressions for combining two continuous and independent probabilistic variables and the method of discrete probability distributions.

Propagation of uncert:inties using discrete probability distribution arithmetic becomes cumbersome when the number of equations and variables is large. This complexity stems from two sources. The first source of complication is that probabilistic operations are nondistributive for the multiplication operation over addition.

This means that the order in which multiplication and addition are performed can affect the final results. A second cource of complexity is the manner in which the resultant discrete distribution tends to have many more points than either of the two distributions involved in the operation. This complication can be resolved by condensation of the resultant distribution into a smaller number of discrete points although this condensation process can introduce some additional approximations, it is the first source of complexity, the requirement for correctly sequencing the arithemetic operations, that is the greatest limitation.

B.3.1 COMBINING PROBABIL ITY DISTRIBUTIONS, ANALYTIC, OR CONTINU0US VARIABLE CASE Let x and y be independent variables having the probability density functions px(x), p (y).

If z = x + y, then the density function for y

z is expressed by the convolution integral p (z) =

p (x)p (z-x)dx (8.50) y x

y B-18 0575G100587TSR

i

(~')

V Similarly, if i

z=xy (B.51) then p (z) =

pnp (#)fdx (B.52) z x

y (with any ambiguity at x = 0 handled by limit operatio'ns from both sides in the obvious way).

More generally, let z = f(x, y)

(B.53) f where, for any specific values of z and x, y has a specific value denoted by

,l y = f-1(z, x);

(B.54) that is z5 f[(x,f-l(z,x)]

(B.55)

Then t

(~'\\

i p (z) =

p (x)p [f-1(z,x)] g f-1(z, x)dx (B.56) 3 2

x y

which may be thought of as a more general form of convolution. Again, there are obvious further generalizations possible, but this is sufficient for our purposes.

f In real-life applied work, we rarely have the luxury-of dealing with l

analytic forms and even in those rare cases may be unable to parform the integrations [ Equation (B.56)] analytically. We are therefore led to seek approximate procedures.

i B.3.2 THE METHOD OF DISCRETE PROBABILITY DISTRIBUT!0 tis I

The method of discrete probability distributions is used extensively in this study. We therefore give a fairly complete exposition as follows.

B.3.2.1 Discrete Probability Distributions Let x be an ordinary scalar variable and let x1, x2

> Xn denote particular discrete values of x.

Let pi, p2'

' Pn be associated probability values so that n

p

=1 (B.57) g U

B-19 0575G100687TSR l

. _ ~

_ _,, a

Then, the set of doublets,

< p, x ) >, < p '

  • 2' ' ' ' ' # P '
  • n' " ( < P '
  • i> }

(B.58) y 2

n i

may be called a OPD and may be thought of as a discrete approximation to a continuous probability density function p(x).

More fundamentally, we need not introduce p(x) and may instead rega'rd the DPD directly as an expression of our state of knowledge with respect to variable x.

This is the point of view we shall take from here on.

We shall sometimes also refer to a set of doublets, Equation (B.58), as a probability "histogram." This usage, however, is explicitly no', intended to suggest that the xj should be regularly spaced.

On the contrary, coming from the point of view of the previous paragraph, we allow ourselves total freedom to select the xi and pi any way at all, save only that the set {<pj, xj>} adequately represents our state of knowledge and that it is suited to the numerical procedures we have in mind.

Thus, for example, suppose we were particularly interested in low values of x; i.e., in the icw-side tail of the distribution. We would then place several of the xj within this low-side tail, even though the corresponding pq was small.

In this way, we would ensure that the low values of x would be appropriately represented in our subsequent calculations.

B.3.2.2 Probabilistic Addition Suppose the variables x, y, z are related by z=x+y (B.59) and suppose our state of knowledge with respect to x and y is expressed by the UPDs x = { < pi, xj>), y = { < qj, yj> }

(B.60)

Moreover, suppose these states of knowledge are independent in the sense that, if we found out the true value of y, this would not affect our DPD for x, and vice versa.

For this situation, we cnay now define the operation of addition of two OPDs as follows

{ < p $, x > } + { < q), y3> ) = ( < p 4, x4 + yf)

(B.61) 4 43 We now regard the set of doublets on the right as a DPD representing our state of knowledge of the variable z.

z = { < rij, z j j>)

O C-20 0575G100687TSR

where rij = pj qj, zj j = xj + yj Equation (B 61) then is our algorithm for probabilistic addition.

It may be regarded as a discrete analog to the convolution operation, Equation (B.50). As an example of this algorithm, if x = { <.1, -l > <. 5, l > <. 4, 2> )

y = { <. 2, 5> <. 8, 10> }

the'-

z = { <. 02, 4> <.1, 6> <. 08, 7> <. 08, 92 <. 4, 11> <. 32, 12> }

B.3.2.3 Probabilistic Multiplication Similarly, we define multiplication of OPDs as

{<p, X >} {<q, y >) = {<p g X yf }

(B.62) j j

j j

jj j

Thus, if z = xy

then, z = {< rij, zij>)

(B.63) with rij = pigj, zij = xjyj (B.64)

As ari example, let us take the x and y of the previous paragraph. Then, z is the set of doublets, z = { <. 0 2, -5> <.1, 5> <. 08, 10, <. 08, - 10, <. 4, 10> <. 32, 2 0, }

Equation (B.64) is the discrete analog of Equation (B.52).

In a similar way, we can write the discrete version of Equation (B.56). We summarize all this in the following section.

B. 3. 2. 4 General Rule of Probability Arithmetic for Binary Operations If z = f(x, y)

(B.65) where x, y are the independent DPDs, x = {< pj, xj>}, y = {< qj, yj>)

(B.66)

B-21 0575G100587 TSP.

then z is the DPD, z = {< rij, zij>)

(B.67) where rij = pjgj, zjj = f(xj, yj )

(B.68)

We note in passing that b rjj = 1.0 ij so that Equation (B.67) is a bona fide DPD. We also note that obtaining the DPD for z is a simple matter of two nested "do loops" on a computing machine. We finally note the straightforward generalization to the case of more than two arguments in f.

That is, if 1 2 M

z = f(x,x,... x )

(B.69) where each xm is a DPD

  • = { < pf, xy >),

(B.70) x m

m then z is the DPD j >}

(8.71) z = {< rj..

4, zj

... z 1

M 1

M where M

=[Ipf (B.72) r,

.. j

'l M

m=1 m

2 M

z

=fx',x

,...x4 (B.73) j

..4 j

4 1

M i

2 M

If the ranber of variables here, M, is large, and f is complicated, then the DPD approcch, Equation (8.73), becomes computationally burdensome.

At this point, the Monte Carlo approach becomes more feasible.

B. 3. 3 MONTE CARLO ERROR PROPAGATION Monte Carlo error propagation is used in this study to quantify all system and plant model equations. Monte Carlo error propagation does not require that the arithmetic operations be carefully sequenced to avoid introducing dependencies between distributions, and the number of variables, which can be easily combined, is very large.

O B-22 0575G100587TSR 1

The Monte Carlo technique of simulating probability distributions is based on mapping uniform, random deviates through a continuous cumulative distribution function [CDF(x)], normalized to 1.0, as illustrated in Figure 8-8.

For every random value of y on the interval [0,1], there corresponds a value of x on the interval [a, b]. Assuming a uniform density of random deviates on the ly-axis, n, the total number of random deviates on any interval dy, is simply ndy. The corresponding interval on the x-axis then has density ndy/dx.

Since the probability density function of a random variable is proportional to the derivative of the corresponding C0F, this method of mapping uniform deviates through the CDF in effect simulates the PDF of the random variable ~.

After obtaining a raridom sample for each input variable according to its pecified PDF, these samples can then be combined according to the equations that describe the output function to obtain a random sample from the output distribution. This process is then repeated many times as part of the Monte Carlo sampling process. These samples can then be sorted and evaluated statistically to determine the parameters of the resultant distribution and its CDF. The PDF of the resultant distribution is also provided, usually in histogram form.

The Monte Carlo sampling process does introduce slight errors in the computation of the output distribution. With a suitable number of samples, however, this error can be limited to very manageable levels.

Estimates of the error in the sample output distribution percentiles and s

in the first and second moments can be evaluated statistically to ensure

\\

that the error is not significant.

For this study, the continuous input variable distributions are first approximated by discrete probability distributions tjat preserve the means of the original, continuous distributions. Consequently, all failure rate data are approximated by discrete distributions when propagating the uncertainties in the system models for each of the split fractions. The split fraction probability of frequency distributions are then also approximated by discrete distributions when compu ting the probability of frequency distributions for each plant damage state and for the total core melt frequency.

B.4 QUANTIFICATION OF THE PRA MODELS The results from the quantification of the TMI-1 PRA models are the core damage frequency, the plant damage state probability of frequency curves and the dominant contributors to the magnitude of the core damage frequency. The magnitude of the risk is determined by several analyses that are combined using a variety of special purpose computer programs.

Figures B-9 through B-12 show the different computer programs and how they interact to complete the quantification process. Tne number in the upper left corner of each box in the figures will be referenced in the following text to orient the reader to the overall process. The quantification process is divided into five analysis areas:

system (O

analysis, support system event sequence analysis, frontline system event V

sequence analysis, seismic analysis, and the analysis of fires, floods and external events. This breakdown of the analysis activities is not a B-23 0575G100587TSR

distinct separation of effort and work functions, but rather is a general division of activities in which there is some degree of interaction in working toward a comon goal.

This breakdown of the total analysis effort is consistent with the work breakdown structure followed in the creation of the PRA models.

B.4.1 SYSTEM ANALYSIS QUANTIFICATION The many system analysis models are documented in the System Analysis Report. Results from the quantification of these models are also provided in that report. These results were generated using the RISKMAN3 computer program; i.e., Reference B-12.

Once the system algebraic equations (data base S2) and component f ailure rates data base (i.e.,

block S1 in Figure B-9) have been prepared for the RISKMAN3 program, the system analysis models can be easily quantified.

e Data Base S1. The failure rate data base, 51, consists of the distributions issociated with maintenance frequencies and durations, human error rates, and all initiating event frequencies that are derived directly from experience data and comon cause failure model parameters.

e Computer Code 53.

The RISKMAN3 program can compute the split fractions for the systems analyses models. Both a point estimate and a Monte Carlo quantification option are provided. The point estimate quantification uses the mean values from the data base variable distributions. The resulting split fraction values are approximations to the mean value of the split fraction distributions. The accuracy of the point estimate approximation to the mean is dependent on the form of the split fraction equations.

The point estimate quantification is a fairly close approximation of the mean, provided the equations do not contain variable squared or cubed terms. The Monte Carlo calculation also updates the CSF.RM3 file, which contains the distributions for each split fraction.

Since the system equations generally do contain such terms, the final mean values of the split fraction distributions are computed using the RM3 Monte Carlo quantification option. The point estimate quantification is used only for debugging the split fraction equations. The results presented in the Systems Analysis Report for each system are the mean values computed using the Monte Carlo option of RISKMAN3.

e Data Base S4.

The mean values for each split fraction are stored in a file known as the master frequency file (MFF.RM3). The master frequency file is used when quantifying the accident sequence frequencies, which are discussed in the next section.

e Data Base SS. When the Monte Carlo option of RM3 is used, the complete distribution for the split fractions is also computed in addition to the mean value. The complete probability of frequency distributions for these split fractions are also stored in a file (CSF.RM3) for subsequent propagation of uncertainties through the most dominant scenarios (100 for TMl-1 PRA) of data base E14, using RMS.

B-24 0575G100587TSR

6 e

ob) 8.4.2 SUPPORT SYSTEM EVENT SEQUENCE ANALYSIS This section and the following ones discuss how the system split fractions described in the previous section are used as input in the quantification of the plant model event trees and in the propagation of uncertainties for the key accident sequences. The first stage of the plant model, the support model event tree, is discussed here and displayed in Figure B-10.

e Data Base Pl. The construction of the support system model begins with the preparation of intersystem dependency tables. Both the support-to-support system dependency table and the support-to-frontline system dependency table are used as input.

These tables are provided in Section 3 of the Plant Model Report.

e Computer Code P2. The support model event tree structure is prepared, based on the input from P1 and other knowledge of the operation of the support systems. The ETC9 program (See Reference B-13) can be used in the event tree drawing mode to help in this process. The event tree structure input consists of top event definitions, the top event number at each branch, the end state for each branch, and the branches involved in each instance of repeated tree structure logic; i.e., transfers. The support tree structure is then printed out for analyst review. The analyst reviews the tree structure and modifies it if necessary. After the tree structure is (V^)

finalized, the appropriate split fractions are assigned to each branch point in the tree for the case in which the initiating event does not disable a support system for the turbine trip initiating event.

e Data Base P3. A support system ETC9 input file is prepared for the turbine trip initiating event.

The tree structure and assignment of split fractions from the master frequency file (data base S4) is prepared. The analyst is also required to prepare a table that defines the impacts on frontline systems of different support system top event failures using data base Pl.

e Computer Code P4.

The ETC9 program is next used to help the analyst determine the end states for the support tree using the turbine trip input file (P3). This is an important part of the overall accident sequence model construction because the number of final support states for which all of the frontline event trees are quantified, with the number of initiating events analyzed, determines the size

)

and computational complexity of the overall model. The ETC9 code identifies the impacts of each sequence through the support tree, groups sequences with the same impacts into impact vectors, and then collects all impact vectors with very low frequency into a common state to reduce the total number of unique end states with appreciable frequency. This determination of significant and unique impact vectors is repeated for each quantification of the support tree. Separate quantifications of the support tree _are only required 3

for those initiating event groups that differ in their impacts on the

[V support system top events. Although the unique impact vectors computed for the support tree structure are the same for all B-25 0575G100587TSR

initiating events (i.e., they are not dependent on the quantification), those impact vectors that are grouped together by frequency binning do differ from one quantification run to the next.

The union of all the significant impact vectors for all support tree quantifications are candidates for support tree end states. For the TMI-1 PRA, this list of candidate support states was reviewed manually and selected states were judgmentally combined to limit the total number.

e Data Base PS. The final list of support system states and the definitions of these states in terms of their impa' cts on the frontline systems are saved for the generation of data base P8.

e Data Base P6. The end states of the support system event tree are assigned to specific support system states. A second version of the turbine trip ETC9 input file is then produced using these designations. Then, appropriate split fractions are made to produce a stacked ETC9 input file with one run per initiator group. The dependency table is removed, e

Computer Code P7.

ETC9 is run to requantify the support tree for each of the initiating event groups of interest using data base P6.

e Data Base P8. One output from ETC9 is a description of the support tree scenario fragments and a sequence of successes and failures of top events and split fractions through the support tree for each quantification. This list of split fractions for each scenario fragment is ordered by their end state and frequency. This file will be input to the MAXIMA program (E12) (commonly referred to as the

". MAX" file).

e Data Base P9. Another output file produced by CTC9 contains an ordered list of the dominant scenario fragments with the f ailed and successful split f ractions by name for each one. This file is to be used by MAXNAIL to produce the RMS equation file.

s Data Base P10. The list of support states and their definitions (i.e., data base PS) is used along with the master frequency file (i.e., S4) to prepare a split fraction translation table. This table was preparad manually, The tab',e describes how the assignment of split fractions to the frontline trees is to be changed as a function nf the support state.

The analyst first prepares a set of rules that document how the split fraction assigninent is to be changed as a function of the related frontline impacts. The frontline impacts of each support state are then compared with these rules to identify the split fraction assignment changes. The results are then summarized in table form for subsequent use in the quantification of the frontline event trees.

u.4.3 FRONTLINE SYSTEM EVENT SEQUENCE ANALYSIS T'

r sequence analysis provides scenario frequency results from all

- calculations to produce curves for core damage and plant damage state fiequencies. The dominant contributors to each category are also tabulated and ranked.

B-26 0575G100587TSR

(3

(,I The analysis is performed in two stages. First, the event sequence quantification is performed using the mean values from the initiating event frequencies and from the split fraction results; i.e., using the master frequency file. The results from this full quantification of the plant model event trees identifies the most important scenarios. The frequencies for these important scenarios are then reevaluated to quantify the uncertainty by propagating probability of frequency distributions for the split fractions and. initiating events through the scenario equations to produce such distributions for the plant damage states and the total core melt frequency. Further explanation of this process is provided in the form of a description of the corresponding blocks in Figure B-11.

e Data Base El. The data necessary for the event secuence analysis is provided by the restilts from each of the previously described analysis areas. The initiating events to be evaluated must be provided, along with a description of the potential frontline system plant response to each of these initiators in the form of an event sequence diagram. From this information, plant event tree models must be created.

e Computer Code E2. Event tree structures are prepared, based on the event sequence diagrams provided as input. The ETC9 program can be used in the event tree drawing mode to help in this process. The event tree structure input consists of top event definitions, the top f

event number at each branch, the end state for each branch, and the branches involved in each instance of repeated tree structure logic; s

i.e., transfers. These tree structures were then printed out for analyst review. Af ter the tree structures were finalized, the appropriate split fractions were assigned to each branch point in the tree for the case in which all support systems are assumed available. The analyst also specifies the end states for the main line trees or for the subtrees if they are used.

If one or more subtrees are required, the analyst must also specify the end states of the main line tree, which then determine which of the subtrees are transferred to from the main line tree. This step then provides all of the input necessary to evaluate the frontline event trees, assuming the boundary condition all of the support systems are available.

e Data ;ase E3. The input file for the case in which all support systens are assumed available is provided for all the frontline event trees. Such a frontline event tree input file is produced for each initiating event. Separate main line and subtree input files may be produced for each initiating event, depending on the number of top i

events required to model the plant response.

e Computer Code E4. The all support available ETC9 input files are i

then used as one of the input files to the ETCIN program. The ETCIN program takes the split fraction translation file as input from the support system analysis and the event tree code input files for the all support available boundary condition to produce a boundary s

condition table for each frontline event tree.

B-27 0575G100587TSR l

e Data Base E5. The boundary condition table produced by ETCIN indicates how to change the ETC9 input files from the all support available boundary condition to produce stacked input for to all other support system states. Run numbers and the unique runs for each event tree are also identified.

e Computer Code E6. The user then examines the boundary condition tables to determine if modifications need to be made. Run numbers may also be modified if necessary. The TABLE computer program thea uses these final boundary condition tables with the ETC9 input files for all support available run to prepare the ETC9 input files for all support system states other than the all support available case.

These other support system state quantification runs are then stacked behind the all support available case in a single input file for each event t ee.

e Data Base E7. The full ETC9 data file contains a set of stacked runs for each event tree. The first run is the all support available case and subsequent runs consist of default and conditional split fractions that are specific to each support system state.

The event tree end states and structures do not change with support state and therefore only appear once in the data file with the first run.

e Computer Code E8. ETC9 is used to quantify the frequency of scenarios through the frontline event trees, based on the assignment of split fractions documented in the E7 data base. The full ETC9 input files are quantified, including those from the fire and seismic analysis. The numerical values for each split fraction in the data files are extracted ' rom the master frequency file that is produced by the systems analysis; i.e., S4.

Each such stacked run of ETC9 produces an input file for MAXIMA (data base E9) and one for MAXNAll (data base E10).

e Data Base E9. One output from the ETC9 runs is a file containing information about each event tree branch or scenario fragment in the frontline event trees. This information includes the conditional frequency of the sequence fragment, the failed split fraction names, and the end state to which the sequence fragment is assigned. The total frequency of each end state of the tree is also provided. T hi s information is procuced for each quantification of the frontline event trees; i.e., one such listing for each support state quantified. Only the scenarios above a user-specified cutoff appear in this data base, e

Data Base E10. A second output from ETC9 is a description of the scenario fragments, a sequence of successes and failures of top events and split fractions through the tree in question.

This list of split fractions for each scenario fragment is ordered by their end state and frequency.

e Data Base Ell. A third output file is provided by ETC9.

The combination of all such files produced by ETC9 contains information about all the end states, support system states, frontline main W

trees, subtree names, and run numbers of each event tree used in quanti fying the plant model.

B-28 0575G100587TSR

t Computer Code E12. The MAXIMA 7 (Reference B-14) code makes use of two of the output files from ETC9 to link together the scenario fragments and determine the dominant scenarios to each plant damage state and to the total core damage frequency. MAXIMA uses the direction data file (Ell) and the scenario frequency data set (E9).

It also uses a list of the E0 file names (data base E21).

e Data Base E13. One utput of MAXIMA 7 is a file containing a complete I

list of all scenarios going to core damage and to each plant damage state. These scenarios are ordered by frequency. The scenario frequency, the run number for the scenario fragment used in each segment, and the name of the end states in each segment through which the scenario passes are all provided. This file then becomes input to the MAXNAIL code.

e Data Base E14. MAXIMA 7 also produces a file containing the initiating event frequencies and the matrix of total conditional frequencies of going from each initiating event to each plant damage state. These conditional frequencies are the sum of the frequencies of all scenarios going from the initiating event to one plant damage state divided by the initiating event frequency. This matrix of conditional frequencies is referred to as the M-matrix.

If a level 2 or 3 PRA is performed, the plant M-matrix will be subsequently processed by the CROSS (Reference B-15) program to combine it with the containment and the site matrices. Up to this point, the f's sequence frequency quantification is based on point values.

L./

Uncertainty propagation is accomplished on just the important sequences, as described in the following steps.

e Computer Code E15. The computer code MAXNAll uses the scenario tragment descriptions contained in data base E10 and the scenario list data base E13 to produce end-to-end scenario algebraic equations in tems of the success and failures of system split fractions for input into RMS (computer code E17).

e Data Base E16. The MAXNAll code produces a file that contains one equation each for the total core damage frequency and for all important plant damage states. Each equation consists of an algebraic sum of the frequencies for each scenario that contributes to the total. Each scenario frequency is expressed as the product of the success or failures of the split fraction applicable for that scenario.

e Computer Code E17.

RISKMANS is used to propagate all of the initiating event and split fraction distributions thru the scenario equations provided in data bases S1 and S3. RISKMANS reads the scenario equations (i.e., E16 and Q12) and the associated quantification data (i.e., S1, S3, and 04) for the split fractions and the initiating event frequencies.

It produces the probability of frequency distributions for total core damage and for inidividual plant damage states in data base E18.

B-29 0575G100587TSR

e Data Base E18. The data base file produced by RISKMANS contains the probability of frequency distribution for total core damage frequency and for the frequency of each plant damage state.

These distributions are stored in cumulative form.

e Computer Code E19. Program OPLOT reads the core damage and plant damage state frequency distributions from the E18 data base and plots either the cumulative or probability distribution functions for each.

e Output E20. The plots of the cumulative distribution functions and the probability distribution functions represent summary level results of the quantification process.

The list of dominant sequences determined by MAXIMA 7 (i.e., E13) and the point estimate contributions of each initiating event (i.e., E14) provide just a few of the many ways that the results can be further evaluated for risk management purposes.

B.4.4 SEISMIC ANALYSIS The methods used for the assessment of seismic events are documented in Section 2 of the External Events and Environmental Hazards Report.

The quantification of the seismic scenario frequencies requires input from other tasks, as indicated in Figure B-9.

e Data Base 01. This data base contains the frequencies of ground motions of various sizes at the plant. This provides the initiating event frequencies for the seismic events.

The continuous range of seismic event magnitudes is discretized into four levels for purposes of the quantification, e

Data Base 02. A second data base provides the structural analysts' estimates of the seismically initiated ground accelerations at which plant structures and components are predicted to fail; i.e., the fragility curves. These estimates are provided in the form of parameters of lognormal distributions. Then, for each of the four seismic intervals, a probability of frequency distribution can be constructed for the seismic failure frequency of each structure and component. The mean values of these distributions are stored in a failure rate data base file for seismic events. The fragility analysis also identifies the failure modes for the equipment or structures on which the fragility curves are based.

e Computer Code 03. The RISKMAN3 computer code is used to quantify the systems models, accounting for both the seismic and nonseismic failure causes. The systems analysts use the failure modes determined by the fragility analysts to decide how the seismic impacts are to be incorporated into the models. Once the system equations are modified accordingly, RISKMAN3 is used to quantify the system models. A separate quantification is required for each seismic level.

O B-30 0575G100587TSR

e Data Base 04. The seismic system quantification results are stored in four different master frequency files; i.e., one for each seismic l evel. The point estimate results, which approximate the mean values for these system results, are then ready for quantification of the seismic event trees. The split fraction distributions are generated only for those split fractions in scenarios found to be important to I

ri sk.

e Data Base 05. The seismic support model and frontline event trees are the same as those used for the turbine trip initiating event.

However, the assignment of split fractions to these trees is somewhat modified to account for the additional dependencies introduced by the seismic initiator. The names of all the system split fractions are kept the same as in the quantification for the turbine trip initiator. However, the numerical values change as a function of seismic level, as documented in data base Q4.

e Computer Code 06. ETC9 is used to quantify the frequency of scenarios thru the seismic support and frontline event trees, based on the assignment of split fractions documented in the QS data base.

The full ETC9 input files are quantified, including those for all four seismic levels. The numerical values for each split fraction in the data files are extracted from the master frequency files, which are produced by the systems analysis; i.e., Q3. Each such stacked run of ETC9 produces an input file for MAXIMA.

O

(/

e Data Base 07_.

One output from the ETC9 runs is a file containing information about each event tree branch or scenario fragment in the frontline event trees. This information includes the conditional frequency of the sequence fragment, the failed split fraction names, and the end state to which the sequence fragment is assigned. The total frequency of each end state of the tree is clso provided. Thi s information is produced for each quantification of the seismic event trees. Only the scenarios above a user-specified cutoff appear in the data base.

o Data Base 08. A second output from ETC9 is a description of the scenario fragments; i.e., a sequence of successes and failures of top events and split fractions through the tree in question. This list of split fractions for each scenario fragment is ordered by their end state and frequency.

o Computer Code 09. The MAXIMA 7 (Reference B-14) : ode makes use of two of the output files from ETC9 to link together the scenario fragments and determine the dominant scenarios to each plant damage state and to the total core damage frequency. MAXIMA 7, as applied to seismic events, uses the same direction data file (Ell) as the nonseismic MAXIMA 7 run; i.e., as E12. The scenario fragment frequency data base i

for the seismic events (i.e., data base Q7) is also used by MAXIMA 7.

e Data Base 010. One output of MAXIMA 7 is a file containing a complete list of all the seismic scenarios going to core damage and to each

(])

plant damage state. These scenarios are ordered by f requency. The scenario frequency, the run number for the scenario fragment used in i

i B-31 0575G100587TSR j

each segment, and the name of the end states in each segment through which the scenario passes are all provided.

e Data Base 011. MAXIMA 7 also produces a file containing the initiating event frequencies and the matrix of total conditional frequencies of going from each seismic initiating event to each plant damage state. These conditional frequencies are the sum of the frequencies of all scenarios going from the initiating event to one plant damage state divided by the initiating event frequency. Thi s matrix of conditional frequencies is referred to as the M-matrix.

If a level 2 or 3 PRA is performed, the plant M-matrix will be subsequently processed by the CROSS (Reference B-15) program to combine it with the containment and the site matrices.

e Data Base 012. Up to this point, the sequence frequency quantification for seismic events is based on point values.

Uncertainty propagation is accomplished on just the important sequences. Review of the completed seismic M-matrix quickly reveals that the contribution from seismic events is very small relative to all other events. Consequently, the steps in the nonseismic quantification process to identify the key scenarios for uncertainty analysis, which are very few, and to write them in equation form for uncertainty propagation were easily accomplished manually.

These equations were transferred over to the RISKMANS set of equations for all other initiating events (i.e., see the description for E17) for propagation of uncertainties.

B.4.5 FIRE, FLOOD, AND EXTERNAL EVENTS ANALYSIS The assessment of fires, floods, and external events is event specific.

Generally, the quantification of such events is done without the aid of the computer. The number of sequences is generally very few, and use can of ten be made of previous, detailed calculations done for other plants, but for which the overall conclusions are generically applicable to simplify the analysis.

This was found to be the case in the TMI-1 PRA.

For the TMI-1 PRA, the important sequences for such events were identified using hand calculations. When additional failures, independent of the initiator, were found to be important, use is made of the results from the systems analysis models (i.e., the master f requency file, S4) to quantify these additional f ailures. The key scenarios based on the point estimate results are then loaded into RISKMAN6 for uncertainty propagation.

In Figure B-9 this data base file is referred to as F1.

B.5 CALCULATION OF SYSTEM IMPORTANCE The contribution to risk of each scenario and system was reported in Section 5 of this report. These contributions were calculated using the point estimate plant model (M) matrix for this level 1 PRA, computed by combining the mean values of the split fraction distributions and combining them with the mean value initiating event frequency vector, O.

This section describes how this "disassembly" process can be generalized to identify risk contributions from a level 2 or 3 PRA that generates the B-32 0575G100587TSR

"h d

containment (C) and. site (S) matrices as well; i.e., presents the results in terms of release category frequencies and frequencies of exceeding specified damage indices (e.g., number of early fatalities) in addition

'I to the frequencies of each plant damage state, as computed in the currer t study.

It runs this assembly process backward to disassemble or "decompose" the risk into its important pinch point contributors, then to "unsum" at each pinch point to get individual contributors. Diagonal matrices can be developed from the M, C, and S-matrices to quantify the contribution of each state at each pinch point to the other states at other pinch points, including to risk. For instance. -the plant damage state diagonal matrix, y

6 0 can be combined with the site and containment matrices to determine the importance of each plant damage state to each type of offsite health effect. The diagonal matrix 6 0 I M (6 I = initiating for the plant damage states consists of the vector 6 events vector; M = plant model matrix) arranged diagonally into a square matrix in which both dimensions are the number of plant damage states.

p To further decompose the results requires going to the event trees and system models to identify specific event sequences and systems contributing to each plant damage state. From there, it is possible to dig still deeper by consulting the appropriate cause tables for the system alignments and individual components contributing to each system.

For instance, to find the important plant damage states with respect to risk, the example plant damage state vector 6 0 shown in Table B-1 is made into a square matrix 6{ 0.. 0 6{

0 0

60=

0 0..0

.y

...6 g

with N diagonal entries, one for each PDS, which, if multiplied by the product of containment matrix C and site matrix S, yields the matrix, O

Y 6 CS IV 0

B-33 0575G100587TSR

An example consisting of one row of this matrix for one damage index is shown in Table B-2.

This matrix is the frequency of exceedance for early fatalities calculated for each PDS. One row on this table shows one contribution of the plant damagt state to early fatalities. One major contributor, PDS VE, is indicated by the line surrounding the points on its column. This table entry is the risk curve 1abeled "VE" shown graphically with the total risk curve from all PDSs for early fatalities in Figure B-13.

After the plant darr. age states that are the major contributors to risk have been identified, the microscope can be turned up to find the scenarios that contribute most of the frequency of each plant damage state. The plant damage state frequencies presented in Section 5 were calculated by summing the frequency of all scenarios leading to it.

Similarly, the early fatalities that are caused (for example, plant damage state VE) are caused mostly by the specific scenario that leads to most of the frequency of PDS VE.

This is true because each scenario goes to only one PDS. Thus, the risk that is attributable to each scenario can be calculated by taking a ratio of frequencies.

Since

.11 scenarios to PDS VE 6

$,VE = the total frequency of plant damage state VE

=

yg i

and t

6

=6 CS xVE VE where t

6 x VE is the frequency of exceeding level 1 of damage indice x due to scenarios in plant damage state VE, then by substitution all VE scenarios t

E 6

CS i,VE 6

=

x I"I VE The risk associated with each scenario can be calculated from the PDS risk using the scenario frequency 61,VE 6

t t

1,VE

, 6(E.

i,VE

. VE where the term in braces is the fraction of the total PDS VE frequency from each scenario. This equation means that any number in Table B-2 can be multiplied by the frequency fraction for each scenario to get a scenario-specific risk curve, which would be similar to that for the total damage state risk curve.

B-34 0575G100587TSR

l p

V Knowing the risk attributable to each scenario is interesting but not as interesting _ as knowing the risk associated with each system. The microscope can be turned up even further to find the contribution of each system to risk. This is done by using the risk for each scenario to find the risk for each system (event tree top event). Each scenario consists of an initiating event and the fsilure of one or more responding systems.

The frequency of a scenario is calculated by multiplying the initiating event frequency by the conditional split fraction of each (failure) event in the scenario. Most scenarios that lead to core damage consist of at least one top event failure.

(An exception to this are V-sequences in which core damage is a direct result of the initiating event.) The risk associated with each system that fails in a scenario is all of the risk associated with that scenario. This concept can be appreciated by considering what it would mean to make a system perfect.

If a system were made perfect, its failure frequency (conditional split fraction) t becomes zero.

If any top event in a scenario has a frequency of zero, the scenario has a frequency of zero. For a scenario to have a frequency of zero means the scenario cannot happen.

If it cannot happen, it does not exist. Therefore, making any top e"ent in a scenario perfect makes the scenario and its contribution to risk disappear; hence, one less way of getting severe core damage and, thus, af getting risk to tne public.

To find the risk associated with each system, the total risk associated with all scenarios containing the failure of a particular system, j, can

(")

be summed:

%)

all POSs contributing all scenarios to damage type, t to PDS t with system j at level x E

E.t

( B. 5.1 )

l t

6 6

=

X. j g=1 j ol

. X. i i

The sum is over all scenarios in each POS containing the failure of system j and contributing to the damage type, early fatalities. Then, the contributions from all POSs are also summed. Unlike a scenario, a system failure may occur in many scenarios in many different plant damage states.

System contributions to risk calculated in this way mean that if the system were fixed so that its failure could not appear in any scenario (i.e., if it were made perfect), the total frequenc early fatalities would be reduced by the amount [6)y of exceedance of

]j. They would no longer contribute to risk.

Some scenarios may contain more than one system (top event) failure.

If one system in a scenario is fixed, then the scenario will disappear.

Therefore, the risk associated with other systems appearing in the scenario will also be reduced.

[6}]j for other systems will have to be recalculated af ter each system is fixed. Said another way, [613j represents the reduction in risk attributable to each system only if they are fixed one at a time.

j LJ B-35 0575G100587TSR

If only one system failed in each scenario, the percentage contribution, of, say, HPI would remain constant af ter EFW was fixed.

If all scenarios contained both AFW and HPI failures, fixing either system would eliminate the risk entirely.

The next step in unraveling the risk is to turn up the microscope still further and find the important system failure causes that contribute to risk. To do this, we must go to the cause table for each system and find the fraction of the system split fraction associated with each cause, k, of system failure:

-k f

t k,j

~ t'

~ t' 6

=f 6

. x_j k, j.6x,j

=

. x, all causes in s stem j fk,j The denominator in this equation is just the total split fraction for system, j, which, if the f,j terms are percentages, is just 1001,.

k Further, if the contribution to risk of all operator errors, for instance, is sought, then

[6 f xj must be summed over all systems with operator errors as a cause:

operator all operators with errors operator errors I

0 g

j, operator error x

3 Results of the TMI-1 PRA are presented in Section 5 of this report in terms of the percentage contribution of a particular system to risk.

This percentage is the measure of "importance" used.

Each of the frequencies discussed above can be converted to importance by dividing t

6 x Important systems are those that appear in scenarios, the sum of whose frequency dominates the plant damage states important to risk.

The process described above was run through for all PDSs in the computer code MAXIMA.

The ways to reduce the frequency of severe core damage ca1 also be calculated using this same logical procedure. The importance of a scenario,1, with respect to core damage frequency is just A i,PDS 6 total O

B-36 0575G100587TSR

h where the denominator is the total core damage frequency. The importance

\\d of a system, i, is to reducing core damage frequency is like Equation (B.74).

all scenarios Iall in PDS P with i

1

'PDSs system j 6 total E

[ 6 4'p

,P=1

, i=1 In a similar fashion, the importance of a system failure cause, k, is just

[all scenarios

~

~

all systems in PDS P witb with failure all 1

< cause k PDSs system j b

( i=1b6

)

total E

I 6

j,k

_P=l

\\

j 'p /,,

j=1 where fj,k is the importence of cause k to the failure system J.

B.6 REFERENCES B-1.

Kaplan, S., and B. J. Caref::k, "On the Quantitative Definition of Risk," Risk Analysis, Vol.1, No.1, March 1981.

O B-2.

U.S. Nuclear Regulatory Comission, "Reactor Safety Study: An V

Assessment of Accident Risks in U.S. Comercial Nuclear Power Plants," WASH-1400 (NUREG-75/014), October 1975.

B-3.

de Finetti, B., Theory of Probability, Vols.1 and 2, John Wiley

& Sor:s, New York,19/4.

B-4.

Savage, l..

J., The Foundation of Statistics, 2nd Ed., Dover Publications, New York,1972.

B-5.

Lindley, D.

V., Introduction to Probability and Statistics from a_

Bayesian Viewpoint, Cambridge University Press,1970.

B-6.

Apostolakis, G., "Probability and Risk Assessment: The Subjectivistic Viewpoint and Some Suggestions," Nuclear Safety, Vol.19, No. 3, pp. 305-315, May-June 1978.

B-7.

Green, A. E., and A. J. Bourne, Reliability Technology Wiley Interscience, New York, 1972.

B-8.

Aitchison, J., and J. A. C. Brown, The Lognormal Distribution, Cambridge University Press,1963.

B-9.

Hammersley and Handscomb, Monte Carlo Methods, Methuen, London, 1964.

B-10.

Apostolakis, G., and Y. T. Lee, "Methods for the Estimation of py Confidence Bounds for the Top-Event Unavailability of Fault j

Trees," Nuclear Engineering and Design, Vol. 41, pp. 411-419,1977.

B-37 0575G100587TSR

B-11.

Kaplan, S., "On the Method of Discrete Probability Distributions in Risk and Reliability Calculations--Application to Seismic Risk Assessment," Risk Analysis, Vol.1, No. 3, September 1981.

B-12.

Simpson, D. B., et al., "RISKMAH3 User Manual," PLG-0455, May 1986.

B-13.

Buttemer, D. R., et al., "ETC9 (Event Tree Code 9), Computer Code User Manual," PLG-0466, April 1986.

B-14.

Mikschl, T.

J., et al., "MAXIMA 7 Computer Program User Manaul,"

PLG-0514, October 1986.

B-15.

Wheeler, D. M., and D. C. Bley, "CROSS computer Code," PLG-0219, February 1982.

O O

B-38 0575G100587TSR

()

TABLE B-1.

VALUES AT SECOND PINCH POINT -

l PLANT DAMAGE STATE FREQUENCIES (& M)

Plant Damage Frequency State SEFC 7.41-6 i

SEF 1.28-9 '

SEC 1.76-8 SE 6.53-10 SLFC 1.91-5 SLF 4.76-9 SLC 1.93-6 SL 1.25-8 TEFC 8.43-7 TEF-1.61-9 TEC 9.32-7 TE 2.27-7 AEFC 1.75-6 AEF 1.87-10 AEC 8.23-9 AE 1.05-11 ALFC 9.76-6 O

ALF 7.27-10 ALC 3.98-10 AL 2.52-13 Y

1.05-7 Total (Core Melt) 4.21-5 NOTE:

Exponential notation is indicated in abbreviated form; i.e., 7.41-6 = 7.41 x 10-6, I

4 O

0576G100687TSR B-39

.i

m

~_m m.

~.._ -.

  • O
  • 0 "O

'C

  • e
  • e
  • e "O
  • e
  • e "O
  • 0 6C*)CCo*d
  • 0
  • 0
  • 0
  • C
  • e
  • O
  • O

'S

  • 9
  • S
  • O
  • S 60*l0CO*6
  • 0
  • 0
  • e
  • 0
  • C
  • e
  • 0
  • 0
  • 0
  • 0 0

9 6C= 30CO*(

  • th
  • 0 "O
  • C "C
  • e
  • 0
  • 9
  • e
  • e
  • O
  • O 40*t9CO*F
  • O
  • 0
  • 0
  • C
  • e
  • e
  • 4
  • 0

'O "O

  • 8
  • 9 6C*ReCO*t

'O

  • o
  • O
  • O
  • O
  • O
  • O
  • O
  • e "O
  • S
  • S e ta lee 0*4
  • G "O

"9

  • C "O
  • O
  • G "9
  • 0 "O
  • O
  • 0 OC*Dete*6
  • 0
  • 8

'O

  • e
  • 0
  • O
  • O
  • e
  • G

'O

  • O
  • O eC*BOCS*(
  • 0
  • 0
  • 0
  • C
  • O
  • O
  • G
  • O "4
  • D
  • 8 "O BC*BOCO*F
  • O
  • C

'O

  • C

=0

  • 0
  • C "O
  • e
  • e

'O

  • O 90*BOCO*t
  • O
  • O
  • O
  • e
  • 0
  • 0
  • 0
  • 8
  • e
  • 0

'O "B A C* BOCO*d

  • 0
  • 0

'O

  • e
  • e
  • O
  • O
  • S
  • e
  • e "9 ac=Bote*4
  • O-

"O

'S

  • C
  • e
  • e
  • C
  • e
  • e "O
  • O
  • O #C*BCCo*f
  • O
  • O
  • O
  • C
  • C
  • 0
  • G

'O

  • O
  • 0
  • e
  • e stelete*F
  • 0
  • O
  • 0
  • C
  • e
  • e
  • 0
  • e
  • e
  • o
  • e
  • 0 #Ce30CO*t "O
  • C
  • e
  • C
  • C
  • e
  • e
  • e "O
  • e
  • e
  • e 9C+30C0*d
  • 0

'O

  • O
  • C
  • O
  • O "O
  • 9 "O
  • e
  • 8
  • 0 90 30CO*t 2*

"O

  • O
  • O
  • C
  • O
  • e
  • e
  • O
  • e
  • e
  • e
  • e 9C*BOCO*t C::
  • O
  • O "O
  • C
  • e
  • 0
  • C
  • e
  • e "O
  • e
  • e SC*tCCO*F b'C
  • O "O
  • G

'C

  • O
  • O
  • 8 "O
  • e "O
  • O
  • O #C*DOCO*t
  • O
  • O
  • 9
  • G
  • e
  • e "O
  • O
  • e
  • O
  • e
  • O 45*70CO*f I'I
  • e
  • C "O
  • e "O
  • O
  • O
  • O
  • e
  • e "O
  • e E C* 30Co *4 N
  • 9
  • 0
  • O "C
  • O "O
  • O
  • e
  • e
  • 0 SC*D
  • .0
  • .e 0 u..ete*(

g

  • O
  • O 0
  • O "O
  • O "O

DCO*F

'O

'C

  • O
  • e
  • 8
  • t
  • 6
  • e "O
  • O 49*f8CO*t 0 3-IFed *E 01-3999"i
  • 0 91-M e(*1 91-M25*2 F1-3*e(*t
  • O E l-3950 *F 31-M as ** E l-3t 90*9 (1-M 95 *t (1-it(F*( *C*DOCO*d gy1 60-341t*t 01-M *9 *(
  • e 91-M et=1 gt-!s*O*t 21-3*st*t
  • 0 41-19 50
  • F
  • t-M it
  • t ( E-pt e0*9 OI-3016*i ti-Ittt*( *C*DOCo*t p

c) 4 60-Joll'I 01-19 99 *t * ?- 3t 1(

  • t 91-M st *3 91-I+4d *C F1-3*e t *t ( 9-16 9* *5 S t-1948 'l 91-351 e
  • t f 1-3( 80** S t-D0le *i (1-ME F *(
  • Ca t0CO*(

70 et 6 0- 3 %*(

  • 1-M tt
  • t 91-715 6 *5 51-19 E ( "I 11-Is tt *1 (3-le9**4 *t-Bl*I*t 9 t
  • B* *d *( 7 8-34t * *2 01-3416 *A F1-3939*t *(*)DCO*F F

e 60-tett*6 6 C-10* A **

  • 1-M 9( *f S t-34 t #
  • 3 61-to f t ** 31-M 1* ** (1-ti es *e
  • I-t(1 A *( t t-M9( *1 F1-9606*f #C-39te*f 21-3*it** *C*BOCO*E C13 40-3596*6 60-9042**

+I-3429*F (1-3Atf*t sta!t*6** 15-38t*** 28-76e0*I *1-M ld *(

$3-349**t 71-30 0e *d 40-32*d** $3-f476** EC*BOCe*4 00-let**1 6 C-M S E *9 +1-7699*f 41-?ts**2 51-19de*9 tt-? cit ** ft-?tCF*t *t-II+1*5 51-34 90 *7 f t-Mt0 *t t C-Erf t *f FI-Bi*t** (C*30Co*6 71

, 30-3128*1

  1. C-36 t * *t *1-3919*( 5t=3tC9*( 51-35,3*e 14 39*g*3 tt-Pat %"I
  • t M ** *a LI: His *# I t-Stet

>j ec-IttF*F SC-9*t0*1 *t-30*S*t 51-359t** *t-fic1*: et-M FO*1 33-344t*3

  • t-st e9
  • e E 1* M d F *(

11* Mf9*t et-3670*1 11-Brit ** E0*fc(0*F ee-30Fa*F GC-76*E*1

  • 1-M Cl *
  • 5 4-3 3
  • t *5 + 1-721* *1 01-U 9 F *1 21-ti ti
  • t El-BFt0*1 LI-Eitf** 11-Il9f*F PC-B*F**t II-I*F**I (0*70(0*t g_

0 0- 35t F *(

8C-F$st*t +1-3424** 51-3987*t *1-70*S*1 OT-M42*t it-Mit*t (5-30t0*3 51-3dit** II-Blit*F GC-31*A*1 Il-3755'I P C

  • 10 C e *4 et-3tle E 90-8774*1
  • 1-1915 *$ (1-39 t * *t + 1-Id *g
  • I 01-30(( *1 #1-398t *F ( 3-16 t I* t 11-M C * *4 Il-M9(*7 SC-35tF*2 11-3819*t Fe*30CO*5 g

sc-ip*t**

80-940t*1 *t-1060*9 51-3*7 t ** S t-f ree t 0 5-l* 0$ *t 21-3555 *t E l-559F*( 51-199t *t 13-3569*f S C-3 tit *f 11-59*e

  • t FC* BOCO *(

SC-19tt**

ec-30*9*I *t=3(0(*9 51-3CET*4 *1-is te

  • t 01-34 8 5 *1 ft-tit 9't II-Ita7*t El-t*(e*5 tt-3*ts*2 90-Btit*2 tt-390&*1 2C'30Co*7 rry 4 0- 3* % **

SC-3099*1

  • I-Dale *9 51-7et1*4 41-preC*f 01-3544*1 ft-iSte*2 tt-399t*I SI-Ittt** 31-3221*( 90-35dt*F 11-700F*F #C*70C9*t

(/B It*S**

SC-17tt*t

  • 1=fdF9*9 St-ftst*2 +1-It t 1 *F 01-It t s 't 21-P*te F E l-ptit *
  • S t-3(94 *9 t t-Be *F *t eC-Itit F 11-P*9f*F 10*t0CO*f 99-1199**

80=tsiC*2

+1-pile *9 (1-)**e*f 41-f* el*f C 1-1056 *1 21-19 59 *2 E l-1149't $1*B514*9 11-75 6 * *t eC-prit*F 15-f*4(*F 1Cet0CO'6 te-3v0?*6 00-FAC**2 +1-5760*1 6 5-fea t *e $1 7(1t *2 01-395t *F F T-It9t *2 (1-19 et

  • 3 S t-t*0t *2 14-3*
  • 9 ** GC-3FES*2 II-tett*F TC*3WCO*(

se-ited*t ~

GC-Ind**r *l-3*st*d 5 3-34 t * *4

  • t-3595 *F 01-3d F( *2 # 1-35 4 0 *' El-Dete*t 51-8419*i 11-30f f ** D C-Bitt *F 11-3* f 9 *F S t a toCo *F 9 0- 317t *5 e6-39tt*f

$1-tott*4 51-3419*e +1-tCeS*F et-ftst*r 21-It#C*4 El-3986*t St-ited*g Il-Blit** eC-3rit *F 11-It t4*f IC+ 30Co*t 90-Dett-t 90-3355*2

  • t 39 39'd 61-316 8 *6 + 1-37*9 *f 01-lel* *2 21-19 81 i El-F(te*F St-ISE9"i 15-125(** 90-BFit*F tt-39fa*7 00*BOCO*i 30-lit **5 eC*lef5*2 91-3959*4 51-7109*6 +1-!i99*F OI-leF**F 21-3*S**( El-M*C*F SI-Istt's 11-375t** et-lit 9'T 11-3926*F OC*leCo*C eC-36ts*$

9 0- 35 79 't s t-3919 *d

  • 1-7t CO *1 *1-it e9 *F 01-Pi t* *l i t" P.e d 'E (1-IFf0*F st-RCee's II-Itt*** sc-3219 F SI-lee 0*( Oce30f0*(

9 0- pt t t

  • 5 eO-P,$F9 F CC
  • DOC.o*2 LF9*F
  • t-3919't 91-M cC
  • I
  • 1-M e 9 "! O T-pt 9*
  • F 21-s* d t *( t i-IFI C
  • F $ 1-70CC *e i t-Dt 1* ** G C-3F t9 *F t i-te 00*t 90,9 C.

g i-M CO,i ti-u t 9 1 Si-M 94,m. ei a*st E FS*5 eC-

  • i->9i9 i in-edC F si->CcC 8 ii-itit

.St.

w 39 c.

n 3,9

.n w

n m

s w-SMat teits elect 15 A33dd3 S31VIS 39VWVO INVId 4

31VIS 39VWVO INV7d A8 S3III7VIVJ A78V3 39 33NV0333X3 30 A3N30D3BJ 7VN0IIIONO3N0

  • 2-8 318V1

. ~ _ _ _. _ _. _. _ _ _ _ _ _ _ _ _ _ _ _. _ _ _. _ _ _ _ _.. _... - _ _.., _ _ _ _ _

l i -

i LC-i

.i l

'. l l

l i

STAIRCASE FUNCTION 4

1 I

i L._

7 l

l-I 1

l SMOOTHED RISK CURVE l-i t_

i

_q 1

l l

l l

/ at.,

l j

i L

i

)

I I

i L

i l

i 1,

l L

L i

i 8 1 at...........

....su d

4 FIGURE B-1.

RISK CURVE 2

4 I

s 4

l 1

i i

4 1

5

?,

B-41

', ~ ;. we - - -

~ ~ - - -- - -.

e TOTAL wam CAvsI0 Asa C AA$m83 f 0f A4 f i All I aptossoeit

.n.

DAM f astWall sna 5

i s g g a

I 1:swe

\\

E v

N.

O I

Cas40R*ht AELE A581 l are Co alatt Pt A50arl On suo+o

.n...

100 =vCLI A A PO48 A esAset3 1/1013 30

,l, i.' =0 O

,o W

FIGURE B-2.

FREQUENCY OF FATALITIES DUE TO MAN-CAUSED L,ENTS LOC R PMAX aMAX LOC a l

FIGURE B-3.

RISK CURVE ON A LOG-LOG SCALE B-42

{

tog +

1 l

I o

i l

i 1

b W

5 g

r l

LOG a LtytL07CAMAct FIGURE B-4.

RISK CURVE IN FREQUENCY FORMAT l

I LOG 'D P e,9 i

P s

S I

..i 1

/

O Ltvf LOF DAMAGE J

FIGURE B-5.

RISK CURVE IN PROBABILITY OF FREQUENCY FORMAT 1

B-43 l

4

O 4x X

FIGURE B-6.

POPULATION VARIABILITY CURVE O

a 5

O

$ P(X I

JOE e

E 8

E XJOE FIGURE B-7.

STATE-0F-KNOWLEDGE CURVE O

B-44

= _ _ _

m 1.0 i.

M.

r.

ndy 3

u.

o u

s

=

O.-

ndy/dx x

b s

u, a

g

  • 0 8

. g a

x b

FIGURE B-8.

MONTE CARLO SIMULATION TECHNIQUE i

i B-45 J

O O

?

08F,RM3 Failure Rate Srs.EOS, Sys. CTS, Sys.CRT i

DPD.PM3

& Initiating System Models SYS.RM3 Event Data ir ir S3 RISKMAN3 (System Quantification) l Updates Numbers In. CTS Files (Monte Carlo e, Only)

(Monte Carlo or Point

[,,,,-

Estimate Modes)

/ S5 Spilt Fraction CSF. RM3 Olstributions (CSF. ORA)

D

- - - - + Manual Data Transfer Electronic Data Transfer o * '%

I i

Data Base Produced in Another Figure Split Fraction 1 MFF.RM3 g */

Means l

I s sta Base Produced in This Figure j

l FIGURE B-9 QUANTIFICATION PROCESS FLOW CHART--SYSTEMS ANALYSIS O

B-46

P1 Intersystem F!

Dependencies Tables

(

l I

l I

i

+

ETC9 l

(Tree Drawing l

Mode) l l

1 u

g l

SSGT.lNP I

Turbine Trip l

Support Tree F~l

[

Input I

l 3

I I

-~~,

l I

N I

MFF.RM3 h 8

I rk*P4 ETC9 8

Split (End State l

i f* - - -1 Fraction Determination l

\\

Means

/

Mode) l g

,a I

l p------

l O

l A

l P, Support g

i f

Stacked I

l System State 43 1

Support Tree dd l

Definitions

& Frontline input (With SS End I

impacts States, Without

]

I Dependency I

Table) 1 l

u P8 i

Split i

P7 ETC9 Fraction N" j (Scenario l

Translation Frequency Table Mode) y 1

Pio SS

--- - --> Manual Data Transfer I

see,. trio Sequence SSS. MAX 1 Condith,nal l

l l SSS. SEQ Description

Electronic Data Transfer Frequencies

,e*~m 0

t

{

Data Base Produ*ed in Another Figure

\\

  • en w #

f Data Base Produced in This Figure O

FIGURE B-10.

SUPPORT SYSTEM ANALYSIS B-47

F50 s ri i.

r.

.,..., -. = >

..,1.. ;

,,s

.w eM*

g~

I i

l F

3 i

uw a,***.~.

I t

i ft

.;~2 w

t

.+

t.at t h

( ?C9 t

- g. E MS t

. - ~.

i

+

m...

,1

.m-Oe.sw C.+ w I

U

..s e.

I

..I l

... u o w*

l t

e It

{

.m

~~

Ee g

,.;J"

,cs.->

j 2

. ~ -.

s.

.s=,

m..

_J me, im t

-.. ~..,

C., O n.

D S

e e th.

1w.

1 FIGURE B-11.

EVEiiT SEQUENCE ANALYSIS i

i B-48 i

7 l

t l

1 Seismicity j

Analysis

, - ~ ~ ~

\\

s r Failure Rate g I

Fragility lt

& Instiatmg ;

i i Analysis i

Event i

\\

Data

%.,,.* *, /

---a-

,,-==g I

y 1

\\

l (System Quantification) l System g

RISKMAN3 i

Models I

l l

l 4

Seismic 7

Seismic Split Fraction Master Frequen l

l l

pii.,

Distnbution File u

,, = ~ ~

r l

/ E7 g

OS r

Full

\\

A,,,gnment of f ETC9 input i Split Fractions 1

I N'3

,/

for Seismic g

_,o' E C9 v

(Scenano Frequency Mode) i I

MAXIMA Scenario Scenano g

l l

g Direction Fragment l

Fragment l

g Frequency Desenption 1

g j

/

% f.* *

' P MAXIMA 1

  • * - - - + Manual Data Transfer T

' Electron.c Data Transfer N

7 Full Plant j

Seismic l

Seismic l

8 Data Base Produced en Another Figure Scenano g,

Data Base Produced in TNs Figure Seismic Scenano Equations 4

FIGURE B-12.

SEISMIC ANALYSIS B-49 i

10' r

~

N i

~

- ~~~~~.--.,

4,

.s s

10'8

~.,

s

~,*s 2

's

  • s

\\

e

\\

l

\\

l

\\

w 10-9

\\

\\

cc O

.7 U

=

TOTAL t

w i

VE cc cc t

E l

U 10-10 l

=

l t

I O

I

/

W W

l

.4 o

I X

l w

1 u.

I O

I D 10'll p l

N

~

0 0

i w

e ALFC E

i E

I 4

I i

10'l2 I

I

~.

I I

~

t 1

~

l l TE I

i!

l

'd 10-13 J

+

1 4!

i't, i

2 3

4 5

1 10' 10 10 10 10 dCUTE FATALITIES FIGURE B-13.

UNCONDITIONAL FREQUENCY OF EXCEEDANCE OF EARLY FATALITIES BY' PLANT DAMAGE STATE B-50