Forwards SE Authorizing,With Exception of Relief Requests Q1P16-RR-V-3 & Q2P16-RR-V-3,on Basis That Util Proposed Alternatives Provide Reasonable Assurance of Operational Readiness for Affected Pumps & Valves
ML20155E019
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 10/29/1998
From: Berkow H
NRC (Affiliation Not Assigned)
To: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
Shared Package
ML20155E023 List:
References
GL-89-04, GL-89-4, TAC-M99186, TAC-M99187, NUDOCS 9811040137
Download: ML20155E019 (4)


Text

_ , _ . _ _ - - -

marg  !

k UNITED STATES y

j NUCLEAR REGULATORY COMMISSION I

WASHINGTON D.C. 30666 4001 j

\ . . . . . ,/g October 29, 1998 Mr. D. N. Morey Vice President - Farley Project Southern Nuclear Operating Company, Inc.

Post Office Box 1295 Birmingham, Alabama 35201-1295

SUBJECT:

RELIEF REQUEST FOR THE PUMP AND VALVE INSERVICE TESTING PROGRAM - JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 (TAC NOS. M99186 AND M99187)

Dear Mr. Morey:

This letter provides the results of the U.S. Nuclear Regulatory Commission (NRC) staff's review of the Joseph M. Farley Nuclear Plant (FNP), Unit 1 third 10-year interval inservice testing (IST) program for pumps and valves. The third interval covers the period from December 1,1997, to November 30,2007. For FNP Unit 2, the IST program covers the second 10-year interval from December 1,1997, to July 30,2001, and a portion of the third 10-year interval from August 1, 2001, to November 30,2007. In a letter dated March 20,1997, NRC approved the use of the American Society of Mechanical Engineers (ASME) Operations and Maintenance Committee of ASME (OM) Code-1990, Subsection ISTB for Pumps and Subsection ISTC for Valves to udpate the IST programs for FNP Units 1 and 2.

By letters dated July 3,1997, and January 22,1998, Southem Nuclear Operating Company, Inc. (SNC) submitted its third and second 120-month updates to its IST program (for the interval from December 1,1997, through November 30,2007) of pumps and valves for FNP, Units 1 and 2, respectively. In the updated program, SNC submitted five pump relief requests for both Units 1 and 2, five valve relief requests for Unit 1, and seven valve relief requests for Unit 2.

The staff and SNC discussed these relief requests on November 18,1997, and April 28,1998.

In response to the staff's questions and comments, SNC provided additional information by letter dated January 22,1998, and indicated that more information would be provided at a later date. In a subsequent letter dated April 6,1998, SNC withdrew certain relief requests, and

'/

revised certain other relief requests. However, in its April 6,1998, letter, SNC submitted three new valve relief requests for both Units 1 and 2. After review of these additional relief requests, '[

a conference call was held on April 28,1998, to discuss the NRC's concerns and comments. In a letter dated August 7,1998, SNC withdrew one of the three new relief requests and revised the other two relief aquests.

The staff has completed its review of all relief requests submitted in conjunction with the additional information provided in the previously discussed letters. The enclosed Safety Evaluation provides the staff's evaluation and conclusions. With the exception of relief requests Q1P16-RR-V-3 and Q2P16-RR-V-3, the proposed attematives described in the other remaining relief requests are authorized pursuant to 10 CFR 50.55a(a)(3)(ii), on the basis that t;ie SNC's proposed alternatives provide reasonable assurance of operational readiness for the affected pumps and valves and that imposition of the Code requirements would result in hardship 9811040137 98102' PDR ADOCK 05000348 J P PDR pO, 6 Ed

{ ([ $ q F.O

I . .

i 1

D. N. Morey without a compensating incre'ase in the level of quality and safety. With respect to relief requests Q1P16-RR-V-3 and Q2P16-RR-V-3, the use of grouping and sampling approach for Valve OV661 is denied, because it does not meet the size requirement of Generic Letter 89-04, Position 2. SNC should remove Valve QV661 from these relief requests.

The changes in the scope of the IST program, cold shutdown justifications, refueling outage justifications, and IST program commitments have not been reviewed in detail and are subject to NRC inspection.

If you have any questions regarding this response to your requests, please have your representative contact Jacob 1. Zimmerman at (301) 415-2426.

Sincerely, Herbert N. Berkow, Director Project Directorate 11-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364

Enclosure:

Safety Evaluation cc w/ encl: See next page

D. N. Morey October 29, 1998 without a compensating increase in the level of quality and safety. With respect to relief requests Q1P16-RR-V-3 and Q2P16-RR-V-3, the use of grouping and sampling approach for Valve QV661 is denied, because it does not meet the size requirement of Generic Letter 89-04, Position 2. SNC should remove Valve QV661 from these relief requests.

The changes in the scope of the IST program, cold shutdown justifications, refueling outage justifications, and IST program commitments have not been reviewed in detail and are subject to NRC inspection.

If you have any questions regarding this response to your requests, please have your representative contact Jacob 1. Zimmerman at (301) 415-2426.

Sincerely, ORIGINAL SIGNED BY D. JAFFE FOR:

Herbert N. Berkow, Director Project Directorate ll-2

, Division of Reactor Projects - 1/II Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364

Enclosure:

Safety Evaluation cc w/ encl: See next page Distribution: LBerry LPlisco, Ril Docket File JZimmerman PSkinner, Ril PUBLIC MTschiltz, EDO e-mail TLH3 - SE only PD 11-2 Rdg. OGC Y. Huang, EMEB JZwolinski GHill (2)

HBerkow ACRS 1-OFFICE PD k PDil-2/ , OGCfht PDJf-d NAME rmarten LBerry / y//muf, HBe DATE //8/98 @/ bl98 # / A /98 h/8/98 / /98 DOCUMENT NAME: G:tFARLEYtM99186.REL

n _ a -- + 1,.,v - - 4.-,m,,,, a,a 4 e a -- -- a e.-

Joseph M. Farley Nuclear Plant cc: l Mr. L. M. Stinson Rebecca V. Badham General Manager- SAER Supervisor Southern Nuclear Operating Company Southern Nuclear Operating Company Post Office Box 470 P. O. Br>x 470 Ashford, Alabama 36312 . Ashford, Alabama 36312 i Mr. Mark Ajtuni, Licensing Manager Southern Nuclear Operating Compar.y Post Office Box 1295 Birmingham, Alabama 35201-1295

, Mr. M. Stanford F"~ ton Balch and Bingham !?v ?irm 1 Post Office Box 'O 1710 Sixth Avenue M;io Birmingham, Alabama 35201 Mr. J. D. Woodard l Executive Vice President Southern Nuclear Operating Company Post Office Box 1295 Birmingham, Alabama 35201 State Health Officer Alabama Department of Public Health 434 Monroe Street Montgomery, Alabama 36130-1701 Chairman Houston County Commission Post Office Box 6406 Dothan, Alabama 36302 Regional Administrator, Region 11 U.S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, S.W., Suite 23T85 Atlanta, Georgia 30303 Resident inspector U.S. Nuclear Regulatory Commission 7388 N. State Highway 95 Columbia, Alabama 36319