Informs NRC That Millstone Unit 1 Has Made Determination to Revise Content of Both Licensed & non-licensed Operator Training Programs.Summary of Changes Listed
ML20151X767
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/09/1998
From: Brothers M
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
B17434, NUDOCS 9809170244
Download: ML20151X767 (4)


Text

.. - - - . . - - ~ - - . - - .. - - - _ . - - -. -. . - ~ ~ . - . - - - ._

Northeast R Pe Ferry Rd. (Route 156), Waterford, CT 06385 '

Nucircr Energy sato. :uacar comr siation Northe6 % tear Energy Company P.O. Box .

Waterford, CT 06385 0128 (860) 447-1791 Fax (860) 444-4277 He Northeast Utilities System SEP 9 1998 Docket No. 50-245 B17434 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washingtor, DC 20555 Millstone Nuclear Power Station, Unit No.1 Licensed and Non-Licensed Operator Trainina On July 21,1998 W Northeast Nuclear Energy Company (NNECO) certified pursuant to 10CFR50.82 that it had permanently ceased power operations at Millstone Unit No.1.

j As a result, the 10 CFR Part 50 license no longer authorizes operation of the reactor or emplacement or retention of fuel into the reactor vessel and the operating mode is limited to fuelin the fuel pool only.

As a result of this decision to decommission Millstone Unit No.1, the determination has been made to revise the content of both licensed and non-licensed operator training programs. The training programs affected are the Licensed Operator Requalification Training (LORT) program and the Non-Licensed Continuing Training (NLCT) program, which are derived using a Systems Approach to Training (SAT) in accordance with the requirements of 10CFR50.120 and 10CFR55.4.

Specifically, the task lists for LORT and NLCT have been revised in accordance with Nuclear Training Procedures and the SAT process. The revision involved deselecting tasks, such as startups, shutdowns and Emergency Operating Procedures, which will no longer be performed by licensed and non-licensed operators under current or future plant conditions.

o As a consequence of the revision in the LORT task list, the number of tasks / objectives

.that will be evaluated during future annual operating tests and comprehensive written

- examinations will be reduced. The annual operating tests and written examinations are

. required pursuant to 10CFR55.59 to sample the items specified in 10CFR55.41 and

' 9809170244 990909 "

PDR ADOCK 05000245 V PDR I Bruce Kedyon to the NRC," Certification of Permanent Cessation of Power Operations and that Fuel j

' Has Been Permanently Removed from the Reactor,"(B17388), dated July 21,1998.

- omus aty,12 9sL .

'q hO - O

U.S. Nucirr Regulatory Commission B17434 \ Page 2 10CFR55.43 "to the extent applicable to the facility." Tasks and objectives applicable to power operations (such as the turbine generator, the isolation condenser and feedwater coolant injection system) will not be evaluated since they are no longer " applicable to the facility." The specific tasks / systems to be trained and evaluated on (such as spent fuel pool cooling, shutdown cooling and reactor building closed cooling water) remain selected in accordance with the SAT process.

If you have any questions concerning this submittal, please contact Mr. R. W. Flanagan at (860) 437-5817.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY MAN M. H. Brothars 'l N Vice President - Operations Attachments (1) cc: H. J. Miller, Region i Administrator R. J. Conte, Chief of Operator Licensing, NRC Region i S. Dembek, NRC Project Manager, Millstone Unit No.1 T. A. Easlick, Senior Resident inspector, Millstone Unit No.1 L. L. Wheeler, Senior Project Manager i

l l

l \

l

.. =

l i Docket No. 50-245 B17434 0

l i

l

, l l

l l Attachment 1 l Millstone Nuclear Power Station, Unit No.1 1 Licensed and Non-Licensed Operator Training l

l Regulatory Commitments l I

l e ,

September 1998 l

t-

7.

U.S. Nuclear Regulatory Commission B17434 \ Attachment 1 \ Page 1 Attachment 1 Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.

Please notify the Director, Regulatory Affairs at the Millstone Nuclear Power Station of any questions regarding this document or any associated regulatory commitments.

Number l Commitment Due N/A l None N/A I

l l

l s

.,