Amends 78 & 70 to Licenses NPF-2 & NPF-8,respectively, Changing Tech Specs in Section 6, Administrative Controls, to Reflect Revised Corporate Mgt Position
ML20151D141
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/18/1988
From: Adensam E
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20151D144 List:
References
NUDOCS 8807220377
Download: ML20151D141 (20)


Text

-

p'# "*%

+

l UNITED STATES 3

h NUCLEAR REGULATORY COMMISSION j

j WASHINGTON, D. C. 20555

%,,,,e ALABAMA POWER COMPANY DOCKET N0. 50-348 JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 1 AMEN 0 MENT TO FACILITY OPERATING LICENSE Amendment No. 78 License No. NPF-2 1.

The Nuclear Regulatory Commission (the Cocmission) has found that:

A.

The application for amendment by Alabarra Power Company (the licensee), dated May 10 bCO, as superceded May 26, 1988, l

complies with the standards and requirements of tne Atomic Energy Act of 1954, as amended (the Act), and the Cornmission's rules and regulations set forth in 10 CFR Chapter I; i

B.

The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities wil!

conducted in compliance with the Commission's regulations; 0.

The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is arrended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph 2.C.(2) of Facility Operating License No. NPF-2 is hereby amended to read as follows:

8807220377 800710 PDR ADOCK 05000348 P

PNV

I 2

-(2) Technical Specifications.

-The Technical Specifications tantained in Appendices A'and 8, as revised through Amendment No. 13 are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

license amendment is effective as of its date of issuance and shall e implemented within 30 days of receipt of tne amendment.

FOR THE NUCLEAR REGULATORY COMMISSION t

Elinor G. Adensam, Director Project Directorate.Il-1 Division of Reactor Projects I/II

Attachment:

Changes to the Technical Specifications Date of Issuance: July 18, 1988 i

H A

n.c

.UFC :LA:

1 PR:PM:

2)

R:

OGC

0:P 21:0RPR :

NAME : PA n : ER

en :
EA sam DATE : 7/l{/88 7/\\t/88 7/ll/88 7/12/88 s

5 0FFICIAL RECORD COPY

ATTACHMENT TO LICENSE AMENDMENT NO. 78 TO FACILITY OPERATING LICENSE NO. NPF-2 DOCKET N0. 50-348 Replace the folicwing pages of the Appendix A Technical Specifications with-tne enclosed.pages.

The revised areas a're indicated by marginal lines.

Remove Pages Insert Pages 6-1 6-1 6-6 6-6 6-9 6-9 6-11 6-11 6-12 6-12 6-13 6-13 6-14 6-14 f

l

. _....... -.. -.,.,.,,.... -.... _ _. _ -...... _ _.,..,...., _.. ~,..,,.

.... _ -,,... _. _l

.. ~

ADMINISTRATIVE CONTROLS

...........................--.......--=====......--....--..-------...----

6.1 RESPONSIBILITY 6.1.1 The General Manager - Nuclear Plant shall be responsible for overall unit operation and shall delegate in vriting the succession to this responsibility during his absence.

6.1.2 The Shift Supervisor or during his absence from the Control Room a designated individual shall be responsible for the Control Room command function. A management directive to this effect, signed by the vice president responsible for Nuclear Generation, hereafter referred to as Vice President-Nuclear, shall be reissued on an annual basis.

6.2 ORGANIZATION I

5.2.1 0FFSITE AND ONSITE ORGANIZATIONS Onsite and offsite organizations shall be established for unit operation and corporate management, respectively.

The onsite and offsite organizations shall include the positions for activities affecting the safety of the nuclear power plant, a.

Lines of authority, responsibility, and communication shall be established and defined for the highest management levels through intermediate levels to and including all operating organization positions.

These relationships shall be documented and updated, as appropriate, in the form of organization charts, functional descriptions of departmental responsibilities and relationships, and job descriptions for key personnel positions, or in equivalent forms of documentation. These requirements shall be documented in j

the FSAR.

b.

The General Manager-Nuclear Plant shall be responsible for overall unit safe operation and shall have control over those onsite activities necessary for safe operation and maintenance of the plant.

The Vice President-Nuclear shall have corporate responsibility for l

c.

overall plant nuclear safety and shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining, and providing technical support to the plant to ensure nuclear safety.

d.

The individuals who train the operating staff and those who carry out health physics and quality assurance functions may report to the appropriate onsite manager; however, they shall have sufficient organizational freedom to ensure theit independence from operating pressures.

FARLEY-UNIT 1 6-1 AMENDMENT NO. $0, 77, 78

_ - ~ _ - _. - _, -

l ADMINISTRATIVE CONTROLS 6.2.3 SAFETY AUDIT AND ENGINEERING REVIEV GROUP (SAERG)

FUNCTION 6.2.3.1 The SAERG shall function to conduct operational evaluations, engineering reviews, and audits for the purpose of improving safety.

COMPOSITION 6.2.3.2 The SAERG shall be composed of multi-disciplined dedicated onsite group with a minimum assigned complement of five engineers or appropriate specialists.

RESPONSIBILITIES 6.2.3.3 The SAERG shall be responsible for the following:

a. Participating in operational evaluations for improvement of safety I

wherein such evaluations and recommendations therefrom are not limited to the fulfillment of existing programs, policies, procedures, or capabilitiec of existing equipment and inctallatienc.

j

b. Systematic engineering reviews of plant performance and activities with results reported independently of onsite operational management to offsite upper management.
c. Comprehensive plant audits in accordance with audit requirements set forth in quality assurance programs, licensing documents, and other policies and procedures.

i AUTHORITY 6.2.3.4 The onsite SAERG shall carry out its function reporting offsite directly to the Manager-Safety Audit and Engineering Review who in turn reports directly to the Vice President-Nuclear.

6.2.4 SHIFT TECHNICAL ADVISOR 6.2.4.1 The Shift Technical Advisor shall serve in an advisory capacity to the Shift Supervisor primarily in the assessment of accident and transient occurrences.

5.3 FACILITY STAFF QUALIFICATIONS 6.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971 for comparable positions and the supplemental requirements specified in Sections A and C of Enclosure 1 of the Mareb 28, 1980 NRC letter to all licensees, except for (1) the Health Physics Supervisor who shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975.

FARLEY-UNIT 1 6-6 AMENDHENT NO. 5), 78

L I 1

ADMINISTRATIVE CONTROLS AUTHORITY-6.5.1.7 The PORC shall:

a.

Recommend to the General Manager - Nuclear Plant in writing, approval or disapproval of items considered under 6.5.1.6(a) through (e) and (j) and (k) above.

b.

Rende'r determinations in writing with regard to whether or not each item considered under 6.5.1.6(a), (c) and (d) above constitutes an unreviewed safety question.

c.

Make recommendations to the General Manager - Nuclear Plant in writing that actions reviewed under 6.5.1.6(b) above did not constitute an unreviewed safety question.

RECORDS 6.5.1.8 The PORC shall maintain written minutes of each meeting and copies j

shall be provided to the Chairman of the Nuclear Operations Review Board.

l 6.5.2 NUCLEAR OPERATIONS REVIEW BOARD (NORB)

FUNCTION 6.5.2.1 The NORB shall function to provide independent review and audit of designated activities in the areas of:

a.

Nuclear power plant operations i

b.

Nuclear engineering

)

c.

Chemistry and radiochemistry d.

Metallurgy j

e.

Instrumentation and control i

f.

Radiological safety j

g.

Mechanical and electrical engineering h.

Quality assurance practices COMPOSITION 6.5.2.2 The NORB shall be composed of at least four persons including:

Chairman:

Vice President-Nuclear l

Vice Chairman:

General Manager - Nuclear Support Secretary:

Manager-Safety Audit and Engineering Review Member:

General Manager - Nuclear Plant and other appointed personnel having an academic degree in an engineering or physical science field and a minimum of five years technical experience, of which a minimum of three years shall be in one or more of the areas given in 6.5.2.1.

FARLEY-UNIT 1 6-0 AMENDMENT NO. 00 78

ADMINISTRATIVE CONTROLS g.

Reports and meetings minutes of the PORC.

h.

Proposed changes to Technical Specifications or this Operating License.

i.

The safety evaluations for proposed 1) procedures 2) changes to procedures, equipment or systems and 3) test or experiments

. completed under the provision of Section 50.59 10 CFR, to verify that such actions did not constitute an unreviewed safety question.

AUDITS 6.5.2.8 The following audits shall be conducted under the direction of APC0's Manager - Safety Audit and Engineering Review:

a.

The conformanco of facility operation to. provisions contairred within the Technical-Specifications and applicable license conditions at least once per 12 months.

(

b.

The performi.nce, training and qualifications of the entire facility staff at least once per 12 months.

1 c.

The results of actions taken to correct deficiencies occurring in facility equipment, structures, systems or method of operation that affect nuclear safety at least once per 6 months.

d.

The performance of activities required by the Operational Quality Assurance Program to meet the criteria of Appendix "B",

10 CFR 50, at least once per 24 months.

The Facility Emergency Program at least once per 12 months.

e.

f.

Tne Facility Security Plan at least once per 12 months.

g.

Any other area of facility operation considered appropriate by the NORB or the Vice President-Nuclear.

l h.

The Facility Fire Protection Ecogram and implementing procedures at least once per 24 months.

i.

An independent fire protection and loss prevention program inspection and audit of the unit at least once per 12 months utilizing either qualified offsite licensee personnel or an outside fire protection firm.

j.

An inspection and audit of the unit fire protection and loss prevention program by a qualified outside fire consultant at least once per 36 months.

k.

The radiological effluent and environmental monitoring programs and the results thereof at least once per 12 months.

FARLEY-UNIT 1 6-11 AMENDHENT NO. 39, 78

' ADMINISTRATIVE CONTROLS 1.

The OFFSITE DOSE CALCULATION MANUAL and implementing procedures at least once per 24 months.

m.

The PROCESS CONTP.0L PROGPAM and implementing procedures for solidification of radicactive vastes at least once per 24. months.

n.

At each scheduled NORB meeting, the Manager-Safety Audit and Engineering Reviev shall make a summary report of the above audits.

AUTHORITY 6.5.2.9 The NORB shall report to and advise the Vice President-Nuclear on l

those areas of responsibility specified in Sections 6.5.2.7 and 6.5.2.8.

RECORDS 6.5.2.10 Records of NORB activities shall be prepared, approved and distributed as indicated below:

1 a.

Minutes of each NORB meeting shall be prepared, appreved and forwarded to the Vice President-Nuclear within 14 da/s following l

each meeting.

b.

Reports of reviews encompassed by Section 6.5.2.7 above, shall be prepared, approved and forwarded to the Vice President-Nuclear l

vithin 14 days following completion of the reviev.

c.

Audit reports encompassed by Section 6.5.2.8 above, shall be forwarded to the Vice President-Nuclear and to the management j

positions responsible for the areas audited within 30 days after completion of the audit.

6.5.3 TECHNICAL REVIEV AND CONTROL ACTIVITIES 6.5.3.1 Activities which affect nuclear safety shall be conducted as follows:

a.

Procedures required by Technical Specification 6.8 and other procedures which affect plant nuclear safety, and changes j

(other than editorial or typographical changes) thereto, shall 1

be prepared, reviewed and approved.

Each such procedure or procedure change shall be reviewed by an individual / group other than the individual / group which prepared the procedure or procedure change, but who may be from the same organization as the individual / group which prepared the procedure or procedure change.

Procedures other than Administrative Procedures _ vill be approved by either the Technical Manager, the Operations Hanager, the Maintenance Manager, the Performance and Planning l

i FARLEY-UNIT 1 6-12 AMENDMENT NO. $9, 78 l

ADMINISTRATIVE CONTROLS

-o Manager, Plant Modifications Manager, the Administrative Manager, or an Assistant General Manager as applicable. The General Manager - Nuclear Plant vill approve administrative procedures, security implementing procedures, emergency plan implementing procedures and contingency implementing procedures.

Temporary changes to procedures which clearly do not change the intent of the approved procedures vill be approved by two members of the plant staff, at least one of whom holds a-Senior Reactor Operator's License.

For changes to procedures which may involve a change in intent of the approved procedures, the person authorized above to approve the procedure shall approve the change.

b.

Proposed changes or modifications to plant nuclear safety-related structures, systems and components shall be reviewed as designated by the General Manager - Nuclear Plant.

Each such modification shall be reviewed by an individual / group other than the individual / group which designed the modification, but who may be from the same organization as the individual / group which designed the modification.

Proposed modifications to plant nuclear safety-related structures, systems and components shall be approved prior to implementation by the General Manager - Nuclear Plant.

Proposed tests and experiments which affect plant nuclear c.

safety and are not addressed in the Final Safety Analysis Report shall be prepared, reviewed, and approved.

Each such test or experiment shall be reviewed by an individual / group other than the individual / group which prepared the proposed test or experiment.

Proposed tests and experiments shall be approved before implementation by the General Manager - Nuclear.

Plant.

d.

Occurrences reportable pursuant to the Technical Specification 6.0 and violations of Technical Specifications shall be investigated and a report prepared which evaluates the occurrence and which provides recommendations to prevent recurrence.

Such reports shall be approved by the General Manager - Nuclear Plant and forwarded to the Chairman of the Nuclear Operations Review Board.

Individuals responsible for reviews performed in accordance e.

with 6.5.3.1.a, 6.5.3.1.b, 6.5.3.1.c, and 6.5.3.1.d shall be members of the plant supervisory staff previously designated by the General Manager - Nuclear Plant.

Each such review shall include a determination of whether or not additional, cross-disciplinary, reviev is necessary.

If deemed necessary, such review shall be performed by the review personnel of the appropriate discipline.

f.

Each reviev vill include a determination of whether or not an unreviewed safety question is involved.

Pursuant to 10CFR50.59 NRC approval of items involving unrevieved safety question vill be obtained prior to General Manager - Nuclear Plant approval for implementation.

FARLEY-UNIT 1 6-13 AMENDHENT NO. f@, 78

\\

ADMINISTRATIVE CONTROLS

..................................................c,u......................

RECORDS 6.5.3.2 Records of the above activities shall be provided to the General Manager - Nuclear Plant, PORC and/or NORB as necessary for required reviews.

6.6 REPORTABLE EVENT ACTION 6.6.1 The following actions shall be taken for REPORTABLE EVENTS:

a.

The Commission shall be notified and a report-submitted pursuant to the requirements of Section 50.73 to 10CFR Part 50, and b.

Each REPORTABLS EVENT shall be reviewed by the PORC, and the results of this review shall be submitted to the NORB and the Vice President-Nuclear.

l 6.7 SAFETY LIMIT VIOLATION _

6.7.1 The following actions shall be taken in the event a Safety Limit is violated:

a.

The facility shall be placed in at least HOT STANDBY vithin one hour.

b.

The NRC Operations Center shall be notified by telephone as soon as possible and all cases within one hour.

The Vice President-Nuclear shall be notified within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

c.

A Safety Limit Violation Report shall be prepared. The report shall be reviewed by the PORC.

This report shall describe (1) applicable circumstances preceding the violation, (2) effects of the violation upon facility components, systems or structures, and (3) corrective action taken to prevent recurrence, d.

The Safety Limit Violation Report shall be submitted to the Commission, and the Vice President-Nuclear for NORB reviev l

vithin 14 days of the violation.

6.8 PROCEDURES AND PROGRAMS 6.8.1 Vritten procedures shall be established, implemented and maintained covering the activities referenced belov:

a.

The applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, Revision 2, 1978.

b.

Refueling operations.

c.

Surveillance and test activities of safety related equipment.

d.

Security Plan implementation.

e.

Emergency Plan implementation.

FARLEY-UNIT 1 6-14 AMENDMENT NO. 57, 78

l j

c 1

  1. pa ct%q'o UNITED STATES

'g NUCLEAR REGULATORY COMMISSION o

j WASHING TON, D. C. 20655 3

(

%...../

ALABAMA POWER COMPANY-00CKET N0. 50-364 JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2 AMENDMENT TO FACILITY 0PERATING LICENSE

~

Amendment No. 70 License No. NPF-8 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Alabama Power Company-(the licensee), dated May 10, 1988, as superceded May 26, 1988, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (tne Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; 8.

The facility will operate in conformity with the application the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with tne Commission's-regulations; 0.

The issuance of this license amendment will not be inimical to' the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragrapn 2.C.(2) of Facility Operating License No. NPF-8 is hereby-amended to read as follows:

l i

-2 (2) Technical Specifications The Technical Specifications contained in Appendices-A'and 8, as revised through Amendment No. 70, are hereby incorporated in the license. Alabama Power Company shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 30 days of receipt of the-amendment.

FOR THE NUCLEAR REGULATORY COMMISSION

\\6\\

Elinor G. Adensam, Director Project Directorate II.1' Division of Reactor Projects I/II

Attachment:

Changes to the Technical Specifications Date of issuance:

July 18, 1988

^

7 0FC

LA:

1 RPR:PM: D 1 DRPR:

OGC.... 4 y.'...............................:...........

0:JU7l:DRPR :

&.:.. p

.....:............:...........:..{.

NAME : P/ n n : E s:ch :

EAdensam

.....:.... 7f...............................:...........

7/Il/88 7//Y/88 DATE : 7//l /8 7/\\ 8 l

0FFICIAL RECORD COPY

i

<c ATTACHMENT TO LICENSE AMENDMENT NO. 70 TO FACILITY'0PERATING LICENSE NO. NPF-8 DOCKET NO. 50-364 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages.

The revised areas are indicated by marginal-lines.,

t Remove Pages Insert Pages 6-1 6-1 6-6 6-6 i

6-9 6-9 6-11 6-11 6-12 6-12 6-13 6-13' 6-14 6-14 j

1 l

l

__.-,-......,,__._,,,~..r.-,_.

~ _. - - _.

ADMINISTRATIVE CONTROLS

===============================================================

6.1 RESPONSIBILITY 6.1.1 The General Manager - Nuclear Plant shall be responsible for overall unit operation and shall delegate in writing the succession to this responsibility during his absence.

6.1.2 The Shift Supervisor or during his absence from the Control Room a designated individual shall be responsible for the Control Room command function. A management directive to this effect, signed by the vice president responsible'for Nuclear Generation, hereafter referred to as Vice President-Nuclear, shall be reissued on r.n annual basis.

6.2 ORGANIZATION 6.2.1 0FFSITE AND ONSITE ORGANIZATIONS Onsite and offsite organizations shall be established for unit operation and corporate management, respectively.

The onsite and offsite organizations shall include the positions for activities affecting the safety of the nuclear power plant.

a.

Lines of authority, responsibility, and communication shall be established and defined for the highest management levels through intermediate levelt, to and including all operating organization positions. These relationships shall be documented and updated, as appropriate, in the form of organization charts, functional descriptions of departmental responsibilities and relationships, and jcb descriptions for key personnel positions, or in equivalent forms of documentation. These requirements shall be documented in the FSAR.

b.

The General Manager-Nuclear Plant shall be responsible for overall unit safe operation and shall have control over those onsite activities necessary for safe operation and maintenance of the plant.

c.

The Vice President-Nuclear shall have corporate responsibility for l

1 overall plant nuclear safety and shall take any measures needed to ensure acceptable performance of the staf f in operating, r

maintaining, and providing technical support to the plant to ensure nuclear safety.

d.

The individuals who train the operating staff and those who carry out health physics and quality assurance functions may report to the appropriate onsite manager; however, they shall have sufficient organizational freedom to ensure their independence from operating pressures.

FARLEY-UNIT 2 6-1 AMENDMENT NO.

EJ, 69, 70

l ADMINISTRATIVE CONTROLS 6.2.3 SAFETY AUDIT AND ENGINEERING REVIEV GROUP (SAERG)

FUNCTION 6.2.3.1 The SAERG shall function to conduct operational evaluations, engineering reviews, and audits for the purpose of improving safety.

C_O_MPOSITION 6.2.3.2 The SAERG shall be composed of multi-disciplined dedicated onsite group with a minimum assigned complement of five engineers or appropriate j

specialists.

RESPONSIBILITIES 6.2.3.3 The SAERG shall be responsible for the following:

a. Participating in operational evaluations for improvement of safety wherein such evaluations and recommendations therefrom are not limited to the fulfillment of existing programs, policies, procedures, or capabilities of existing equipment and installations.
b. Systematic engineering reviews of plant performance and activities i

with results reported independently of onsite operational management to offsite upper management.

c. Comprehensive plant audits in accordance with audit requirements set forth in quality assurance programs, licensing documents, and other policies and procedures.

AUTHORITY 6.2.3.4 The onsite SAERG shall carry out its function reporting offsite directly to the Manager-Safety Audit and Engineering Reviev vho in turn reports directly to the Vice President-Nuclear.

l 6.2.4 SHIFT TECHNICAL ADVISOR 6.2.4.1 The Shift Technical Advisor shall serve in an advisory capacity to the Shift Supervisor primarily in the assessment of accident and transient occurrences.

6.3 FACILITY STAFF QUALIFICATIONS 6.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971 for comparable positions and the supplemental requirements specified in Sections A and C of Enclosure 1 of the March 28, 1980 NRC letter to all licensees, except for (1) the Health Physics Supervisor who shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975.

FARLEY-UNIT 2 6-6 AMENDHENT N0. ff, 70

ADMINISTRATIVE CONTROLS

==============================================================

AUTHORITY 6.5.1.7-The PORC shalls' a.

Recommend to the General Manager - Nuclear Plant in writing, approval or disapproval of items considered under 6.5.1.6(a) through (e) and (j) and (k) above, b.

Render determinations-in writing with regard to whether or not each item considered under 6.5.1.6(a), (c) and (d) above constitutes an unreviewed safety question.

c.

Make recommendations to the General Manager - Nuclear Plant in writing that actions reviewed under 6.5.1,6(b) above did not constitute an unreviewed safety question.

RECORDS 6.5.1.8 The PORC shall maintain written minutes of each meeting and copies shall be provided to the Chairman of the Nuclear Operations Review Board.

6.5.2 NUCLEAR OPERATIONS REVIEW BOARD (NORB)

FUNCTION 6.5.2.1 The NORB shall function to provide independent review and audit of designated activities in the areas of a.

Nuclear pover plant operations b.

Nuclear engineering c.

Chemistry and radiochemistry d.

Metallurgy e.

Instrumentation and control f.

Radiological safety g.

Mechanical and electrical engineering h.

Quality assurance practices COMPOSITION 6.5.2.2 The NORB shall be composed of at least four persons including:

Chairman:

Vice President-Nuclear l

Vice Chairman:

General Manager - Nuclear Support Secretary:

Manager-Safety Audit and Engineering Review Member:

General Manager - Nuclear Plant and other appointed personnel having an academic degree in an engineering or physical science field and a minimum of five years technical experience, of which a minimum of three years shall be in one or more of the areas given in 6.5.2.1.

FARLEY-UNIT 2 6-9 AMENDMENI No. EI, 70

ADMINISTRATIVE CONTROLS g.

Reports and meetings minutes of the PORC.

h.

Proposed changes to Technical Specifications'or this Operating License.

1.

The safety evaluations for proposed 1) procedures 2) changes to procedures, equipment or systems and 3) test or experiments completed under the provision of Section 50.59.10 CFR, to verify that such actions did not constitute an unreviewed safety question.

AUDITS 6.5.2.8 The following audits shall be conducted under the direction of APCO's Manager - Safety Audit and Engineering Review:

a.

The conformance of facility operation to provisions contained within the Technical Specifications and applicable license conditions at least once per 12 months.

b.

The performance, training and qualifications of the entire facility staff at least once per 12 months.

The results of actions taken to correct deficiencies occurring in c.

facility equipment, structures, systems or method of operation that affect nuclear safety at least once per 6 months.

d.

The performance of activities required by the Operational Quality Assurance Program to meet the criteria of Appendix "B",

10 CFR 50, at least once per 24 months.

The Facility Emergency Program at least once per 12 moi.ths.

e.

f.

The Facility Security Plan at least once per 12 months.

g.

Any other area of facility operation considered appropriate by the-NORB or the Vice President-Nuclear.

l h.

The Facility Fire Protection Program and implementing procedures at least once per 24 months.

i.

An independent fire protection and loss prevention program inspection and audit of the unit at least once per 12 months utilizing either qualified offsite licensee personnel or an outside fire protection firm.

j.

An inspection and audit of the unit fire protection-and. loss prevention program by a qualified outside fire consultant at least once per 36 months.

k.

The radiological effluent and environmental monitoring programs and the results thereof at least once per 12 months.

FARLEY-UNIT 2 6-11 AMENDMENT NO. 29, 70

l l

ADMINISTRATIVE CONTROLS 1

1.

The 0FFSITE DOSE CALCULATION MANUAL and implementing procedures at least once per 24 months.

m.

The PROCESS CONTROL PROGRAM and implementing procedures for solidification of radioactive vastes at least once per 24 months.

n.

At each scheduled NORB meeting, the Manager-Safety Audit and Er.gineering Review shall make a summary report of the above' audits.

AUTHORITY 6.5.2.9 The NORB shall report to and advise the Vice President-Nuclear on l

those areas of responsibility specified in Sections 6.5.2.7 and 6.5.2.8.

RECORDS 6.5.2.10 Records of NORB activities shall be prepared, approved and distributed as indicated below:

a.

Minutes of each NORB meeting shall be prepared, approved and forwarded to the Vice President-Nuclear within 14 days following l

each meeting.

b.

Reports of reviews encompassed by Section 6.5.2.7 above, shall be prepared, approved and forwarded to the Vice President-Nuclear l.

q vithin 14 days following completion of the review.

l c.

Audit reports encompassed by Section 6.5.2.8 above, shall be g

forwarded to the Vice President-Nuclear and to the management l

f positions responsible for the areas audited within 30 days after completion of the audit.

6.5.3 TECHNICAL REVIEV AND CONTROL ACTIVITIES 6.5.3.1 Activities which affect nuclear safety shall be conducted as follows:

i a.

Procedures required by Technical Specification 6.8 and other procedures which affect plant nuclear safety, and changes (other than editorial or typographical changes) thereto, shall be prepared, reviewed and approved.

Each such procedure or o

procedure change shall be revieved by an individual / group other than the individual / group which prepared the procedure or procedure change, but who may be from the same organization as the individual / group which prepared the procedure or procedure change.

Procedures other than Administrative Procedures vill be approved by either the Technical Manager, the Operations Manager, the Maintenance Manager, the Performance and Planning FARLEY-UNIT 2 6-12 AMENDMENT NO. EI, 70

ADMINISTRATIVE CONTROLS Manager, Plant Modifications Manager, the Administrative Manager, or an Assistant General Manager as applicable. The General Manager - Nuclear Plant vill approve-administrative procedures, security implementing procedures, emergency plan implementing procedures and contingency implementing procedures. Temporary changes to procedures which clearly do not change the intent of the approved procedures vill be approved by two members of the plant staff, at least one of whom holds a Senior Reactor Operator's License.

For changes to procedures which may involve a change in intent of the approved procedures, the person authorized above to approve the procedure shall approve the change.

b.

Proposed changes or modifications to plant nuclear safety-related structures, systems and components shall be reviewed as designated by the General Manager - Nuclear Plant.

Each such modification shall be reviewed by an individual / group other than the individual / group which designed the modification, but who may be from the same organization as the individual / group which designed the modification.

Proposed modifications to plant nuclear safety-related structures, systems and. components shall be approved prior to implementation by the General Manager - Nuclear Plant.

c.

Proposed tests and experiments which affect plant nuclear safety and are not addressed in the Final Safety Analysis Report shall be prepared, revieved, and approved.

Each such test or experiment shall be reviewed by an individual / group other than the individual / group which prepe. red the proposed test or experiment.

Proposed tests and experiments shall be approved before implementation by the General lanager - Nuclear Plant.

d.

Occurrences reportable pursuant to the Technical Specification 6.0 and violations of Technical Specifications shall be investigated and a report prepared which-evaluates the occurrence and which provides recommendations to prevent recurrence.

Such reports shall be approved by the General Manager - Nuclear Plant and forwarded to the Chairman of the Nuclear Operations Reviev Board.

e.

Individuals responsible for reviews performed in accordance with 6.5.3.1.a 6.5.3.1.b, 6.5.3.1.c, and 6.5.3.1.d shall be members of the plant supervisory staff previously designated by the General Manager - Nuclear Plant.

Each such review shall include a determination of whether or not additional, cross-disciplinary, review is necessary.

If deemed necessary, such review shall be performed by the review personnel of the appropriate discipline.

f.

Each reviev vill include a determination of whether or not an unreviewed safety question is involved.

Pursuant to 10CFR50.59 NRC approval of items involving unreviewed safety question vill be obtained prior to General Manager - Nuclear Plant approval for implementation.

FARLEY-UNIT 2 6-13 AMENDMENT NO. EZ, 70

J ADMINISTRATIVE CONTROLS

.....s.....................................................................

RECORDS 6.5.3.2 Records of the above activities shall be provided to the General Manager - Nuclear Plant, PORC and/or NORB as necessary for required revievs.

6.6 REPORTABLE EVENT ACTION 6.6.1 The following actions shall be taken for REPORTABLE EVENTS:

3 a.

The Commission shall be notified and a report submitted pursuant te the requirements of Section 50.73 to 10CFR Part 50, and b.

Each REPORTABLE EVENT shall be reviewed by the PORC, and the results of this review shall be submitted to the NORB and the Vice President-Nuclear.

6.7 SAFETY LIMIT VIOLATION 6.7.1 The following actions shall be taken in the event a Safety Limit is violated:

a.

The facility shall be placed in at least HOT STANDBY vithin one hour.

b.

The NRC Opbrations Center shall be notified by telephone as soon as possible and all cases within one hour. The Vice President-Nuclear shall be notified within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

c.

A Safety Limit Violation Report shall be prepared. The report shall be reviewed by.the PORC. This report shall describe (1) applicable circumstances preceding the violation, (2) effects of the violation upon facility components, systems or structures, and (3) corrective action taken to prevent recurrence.

d.

The Safety Limit Violation Report shall be submitted to the Commission, and the Vice President-Nuclear for NORB reviev l

sithin 14 days of the violation.

J 6.8 PROCEDURES AND PROGRAMS 6.8.1 Vritten procedures shall be established, implemented and maintained covering the activities referenced below:

a.

The applicable procedures recommended in Appendix "A" of a

Regulatory Guide 1.33, Revision 2, 1978.

l b.

Refueling operations.

1 c.

Surveillance and test activities of safety related equipment, l

d.

Security Plan implementation.

e.

Emergency Plan implementation.

1 FARLEY-UNIT 2 6-14 AMENDMENT NO. A9, 70

,