a FEB 7 1973 I
f i
[
l hiles(DocketNo.50-231,SEPOR)
'IHRU:
R. J. Schem1, 011ef, OR-1, L BEVIEW ON OkN? NO.16, SEFOR l
l
% letter dat a January 24, 1973, GE pmposed a chany to the Teclnical l
Specificatiano to mmove the zwquimment forcintrusionslam sensors on l
the SEPOR perister fence while mtaining aquimments fbr intrusion alams at other locations at the facility. 'lhey want this abange i
because the fence alarm system has been experiencing a high false alarm me due to wind gusts. 'Ihe intmston alam system (Refbance Chang No.15 safety evaluation of December 8,1972) is utilised cnly as a backtp to the pomanent physical barriers that restrict mauthor-iaed access to radiation amas at the retimd facility. Missive shielding l
and welded steel enclosums am pmvided for all amas with radiation levels W11ch exceed " Guidelines for Dooantamination of Pheilities and Equipment Prior to Melease fbr Questricted Use or 'Ibmination of l
Licenses fbr Bypmduet, Soume, er Special Nuclear Material of April 22, l
1970". Adequate backup to t% physical barriers will be provided by the intrusion alanns installed <m ttas building 3within the theility.
1 l
Based on our review of the pmposed change, we haw concluded 12:at.
iglementation of the change will not pmaant significant hasards cen-j siderations not described or iglicit in the Safbty Analysis Report and that them is mascriable assuranee that the health and safbty of 1
i the pitlie will not be endangered. Aoeortlingly, Qiange No.16 to the l
'Dooknisal Specifications is being issued to 05.
i P. B. Erickson Op'::M ing Reactors Bmnah fl DLaomete of Licensing Distribution l
Applicant T. J. Carter Applicant's Legal Counsel R. J. Schemel i
i
@AECODR cket File P. B. Erickson S. A. Teets i
Local PDR R0 (3) l 10 Beadin6 File 000 Brunch Beading File N. Dube J. R. Buchanan, ORNL M, Jinks (2)
T. W. Laughlin,DI'I2 D. J. Skovholt OFFICE >
'a S488880AM >
f BATE >
a.s ABC-Ste (Rev.9 53) ASCM ON0
-