l 1 INSTRUCMCN l REV151CN l ISSUE pggg 37g TEr.AS UT1.mES GENERAtNG CO. l NUMSER
}
CPSES i of 10 :
l Q I-QP-11.3-40 14 lg gg A
~
pREPAREa Sy:
/ e
/-9O#
g, g.3,g
- ,A g j
C:. ASS 1E ELECTRICAL e
POST CONSTRUCTION i
VERIFICATION APPROVED BY:
Y0
- .ATI
/ *- W
/
APPROVED SY:
O/
// h we 1.0 REFERE?CES 1-A C?-QP-11.3, " Electrical Inspection Activities" r
l 1-3 QI-QP-11.3-25
" Electrical Cable Installation. Inspections" i
(hh h 1-C CPM-9.1, " Control of Nonce mq 1-0 CP-QP-13.0, "Inspec: ton Report i
i 1-E CP-QP-16.0, "Nonconfomances" 2.0 GENERAL Tf O-hg h,
'a.g V s w.m w8qh
( 'g b&s l
2.1 P'JRPOSiE AND SCOPE i
i This Quality Instruction supplements Reference 1-A and is I
established to verify the adequacy of installed Class 12 j
equipment and systams at Comanche Peak Steam Electric Station.
j i'
3.0 IMSTRUCTION (1) The frequency of inspection efforts shall be as cirected j
within this instruction, unless directed in writing i
otherwise, by the Quality Assurance / Quality Concroi Supervi sor.
l (2) Post construction verification shall be per#omed upon e
I notification froar the Building Management Crgani::ations i
~
or the TUGC3 Site QA Supervisor or his designee.
(3) All Class 1E and non-Class 1E cable, raceway and equi pment installations within the scope of Reference 1-A shall be inspected and documented in accordance with this Instruction. (
k 8601020642 851113 DE 9
pyg
~
l a**
.,q
2
~
- : - :Q - -
ISSUE INSTRUCT!CN REVIS!CN pggg NUM85R CATE TEXAS UTILmES GENERATING CC.
N9E 2 of 10 QI-QP-11.3-40, 14 (4) A craft accompanied post construction veri fication walkdown shall be conducted by the Electrical QC i
Inspectors to determine the status of items.
l (5) Where cable tray, caole or other alectical ecuipment is covered or coated, the doctmentation initiated by the original inspections shall be sufficient.
(6) The Post Construct 1on VeM f1 cation ' inspections shal1
[
be performed according to the criteria defined in i
Paragraphs 3.1 and 3.1 of this Instruction. Ins pection results shall be documented on Class 1E Electrical Post Construction Verification Inspecticn Reoorts (Attach-ants 1 and/or 2).
(7) When unsatisfacor/ conditions are identi fi ed, the respective inspection attribute (s) on the IR shall be i
checked "Un-sat" and the deficient itans and concitions recorded on a Post conci sely( Attachment shall be clearly and List.
3).
The l
Construe:1on Deficiency Deficiency Lists shall be attached to.eaca respective
[
IR and the IR's shall be processed in accorcance witn Reference 1.-0.
(8) Open Post Construction Deficiency Reports that were prepared and issued in accordance with previous l
revisions to this instruction shall be processed-and closed out according to the following:
a.
Status logs shall be manually maintained under the direction of the cognizant QC Supervisor to status j
i and, control the open Deficiency Reports.
i l
b.
The Deficiency Reports shall be routed to the cognizant Construction Supervisor for correction /
resolution of the reported deficiencies. -
i c.
Following correction / resolution of :ne deficiencies i
reported on each Deficiency Report, the affected itses shall be re-inspected.
Inspection results shall be documented on Inspeciton Reports, Attach-ments 1 and/or 2.
The responsible QC Instector shall attach the applicacle Deficiency Report to each Inspection Report i
l d.
The Inspection Reports (Attachments 1 and 2) snall I
be processed and canpleted in accorcance wi ta Reference 1-0.
j moc= c4
~~
.: 3. :..,
m l
ISSUE INSTMUCTICN REVISIC N p4gg NUMSER CATE l
. TEXAS UTIUTIES GENERATING CO.
m E5 I-Q P-11.3-40 JAN g 34l 3 ofl0-
-l 14 i
l 3.1 POST CONSTRijCTION VERIFICATION j
3.1.1 Verify Cable Tray Tiie QC Inspector shall perfona a visual inspection to the i
maximim extent possible without disassemoly of all caole i
{
tray raceways, i.a., caele tray covers, firewrap, thennolag,
I to ensure that the trays are free of damage.
Damage i
inspections 'shall consist of, but are not limited to, the l
- following:
i i
{
a.
Cable tray shall be free of burrs, rough edges, or i
foreign material, i
i b.
Damage to Galvanized surface; is to be repaired by i
l application of Galvanox or sicilar approved prcduct.
j i
c.
Proper wortunanship has prevatied to e'nsure over-all
[
quality product free of surface damage, warpage,
bent sidt rails,. etc.
r i
d.
All cable pulling aids have been removed (i.e., rollers i
fish tape, tape rope, etc.).
I i
i 3.1.2.
Verify Conduit
~
l The QC Inspector shall perTorm a vi sual inspection, to the maxirmas extent possible without disassemely, of conduit i
raceways to ensure condui t is free fran damage.
This i
inspection shall consist of, but is not limitec to, the following:
a.
Conduit shall be free from burrs, rougn edges or j
foreign materials.
6
.t b.
Conduit bends shall not shcw excessive flattaning or
[
Interruption of the smooth bore of the conduit.
1 r
NOTE:
Excessive flattening is defined as that anount of flattening whicn reduces the conduit outside di ameter by 257,.
~
c.
Damage to Galvanized surfaces shall be recaired wi th :
Galvanox or an engineering approvec equal.
I t
i.
(
l Puur see6 :
WQCO G
.7,.-..
- m a v?4%e.,,--
t
. _........ ~...._.
q l
I83UI Im@CN REVISICN PAGE NUM88R CAra TEXAS UTi!.mES GENERATING CC.
~
CPSES f
M 9 S 4l 4 of 10 l
QI-QP-11.3-40 g
I I
i l
d.
Bushings, fittings, and hardware shai1 be in place and secure.
e.
All cable pulling aids have been renoved (i.e. fish tape, tape rope, etc.).
i f.
Conduit cover, junction box, pull box and tennination box coven and gaskets have been installed.
3.1.3 Verify Caole Installation The QC Inspector shall perform a visual inspection of cable installations to ensure cables are free of damage.
This l
inspection shall consist of, but is not limited to, the following:
i a.
Cables shall be free fras damage and debris.-
b.
Cable bend radii have n6t been violated.
c.
Cables are trained and properly secured with cable ties.
d.
Power cable spacing has been maintained in accordance with Reference 1-B.
I, Cable slack of 2' inch minimum is provided at transition e.
l points between cable tray sections at cifferent elevations and at conduit entries to cable trays and between category I structures.
f.
Cable installed in trays shall be below side rails.
i 3.1.4 Verifv Ecuiement Installation l
The QC Inspector shall perfonn a visual inspection to ensure I
i that the installed equipment has not sustained damage and that good and procer wortmanship has prevailed. This inspection l
shall consist of, but is not li:rited to, the following:
i l
i 1
a.
Equipment has sustained no visible physical damage.
i 8
b.
Covers shall be installed and conditions of gasket
- sterials have not deteriorated or sustained damage.
I c.
Cables shall be properly trained, bundled and tied with l
ty-raps in a nect and onderly manner.
d.
Conductor insulation free from damage.
I TUGCC CA
,,7...
9-.,w gy-.
y--w.-
p.ww
,pw
-,m-
- -+--
=_.
=
i S.
._ s....
= _. -
INSTRUCT!CN IO3UI REVISICN PAGE TEXA8 UT!UTIEF GENERATING CC.
M9E 5 of to QI-QP-11.3-40 14 e.
Tenninal lugs at tennination points tight and secure.
f.
Iquipannt is clean and free from debris.
I I
g.
Equipment filtars installed in vent openings wnere required by drawing.
I h.
Non pennanent conditions have been clearly arked in accordance with Reference 1-C.
i.
Verify electrical equipment has been grounded.
NOTE:
Step (i) is for personnel safety. Reference to drawings or specifications is not necessary l
or required.
- 3. 7.
INTERNAL WIRING SEPARATION Separation between field run redundant Class IE cables and Class. 1E/Non-Class IE cables within equipment shall be l
saintained in accordance with the equipaent speci11 cation.
If the specification gives no separation requirements, the sinimum separation distance between redundant Class 1E and Class IE/Non-Class IE cacies shall be greater than or equal to 6 incnes.
In cases dere the above separation criteria j
cannot be maintained, barMers shall be installed between the cables.
l Barriers used for separation will be as follows (See Attacament 4 for typical examples):
1.
Metallic conduit; including Servicair Canpany FC 33 I
flexible conduit.
2.
Two sheets of fire retardant material separated by a sinimum o of air space or thennal insulating I
material. f Is" 4
i 3.
A single barrier wtth a 1" maintained air space or i
thernal insulating material between the components or l
i I
devices and the barrier.
l I
I Redundant Class 1E circuits shall enter in sepa rate.
l apertures and terminate on separate terminal blocks or I
connectors as shown on G&H design drawings, i-t Power supply feeds to. instrument and control room distribu-l N ShNn"*on M*Nskn MaNg's** (ISaM).N INdgg raceways j
e
.,)*
8..
9 w
I
_,_.p
,..,,-,,v.,
,y-
...s INSTRUCTiCN 383UI PAGE REVISICN NUM8ER CATE TEXAS UT!UT!ES GENERATING CC.
CPSES e
g 9 BB4 6 of 10 QI-QP-11.3-40 I4 4
The following cabinets have been analyzed and are exenpt from the separation requirements; however, equipment that provides for channel or train separation shall be utilized when available.
Note:
TBX for Unit I and TCX for Unit 2.
MIS Cabinets T-X-MIELCA-01 (4 Cabinets)
Solid State Protection Systan T-X-ESELSP -01 (Logic & Output i Caninets only)
Solid State Protection System T-X-ESELTC-01 (Test Cabinets)
Upgrade Protection 1 Surveillance T-X-XIELSS-50 I
Process Racks T-X-XIELRK-01 r
j l
T-X-XIELRK-02 T-X-XIELRK-03 l
T-X-XIELRK-04 l
Protection channel wiri ng, safety-train wiri ng, and Non-safety train wiring within panels IPC1, IPC2, IPC3, l
IPC4 will be in different wire bundles. These bundles will be separated to the maximum extent practicable.
~
3.3 00CUMENTATION f
Inspection Reports shall be processed in accordance with Reference 1-0.
}
i i
3.4 NONCONFORMANCES l
?
Nonconformances shall be doc:mented and identified in accordance with Reference 1-E.
I i
1 i
i
~ ~ ~ ~ - _:
_. _, =...,
3
+
- - ~ -
m
_... -.m i
4 I83UI
)
INSTRUCT:CN REWSICN PM*af NuussR CATE i
TEXA8 UTft mES GENWtATNECC.
1 CP888 JAN 9 54 OI-CP-11.3-40 14 7 of 10 i
l ATTACF. MENT 1.
i ll I
.-.a..
INSPECTION REPCRT ja E.
rres asseurrum c, ass tg gtgc age;gaux-nom.
J..dn ur.m, :
Tuusr.,= - rr.m s e _.m n
J.-mmvrererira.
e,
g u.
.. v.. -.
- r.,mm.
., or v..ua e.<
CGipilf.
CP&"f.'N."" C N :"i G r"3.e CP"'I 6 M 44RAJ3 l
C assomme omsures, au. aamusaan.s etums sarurastone
'"****7'"
j C==arres consi.stes. umssm== crone irene ustus name o
iras a 18eRCT!010 aTTRtaATES
- j de, gagg i
s
- S e
I wrotre esa, r nave 1 ii 1,
evi
- Ia corearataer inn arente I II Ie a.21 enar-en e erim senerne, senarsen i l i i
8-senere.anse,.ammere i i i I
I m rFV PSNDufT l l l.
l (vt,
I a.
rttr y maar.r ano trnais al 1 i
]
le avre er ;u 4;i, ev.sf=nts i lI i
Ie *atvant7re tiaracn senpenty trparern I i I I a.
atmetus sam -ar ere ar i
I i
)
I r.
esar e site _ eut ar tr temove i ei i
I Ie e me um a.nevrvt '.te se e en i i i I
i varFV c,18LII l l l l
(v),
I a.
Mtf 7 *Eqnct anc ttters i I i i
l
~.
I t.
tre tactf 107 vtaLAftn i I !
8 i
i c.
variere aan tre:ne I f a l
ie tese*w ann trstaatven.urmrwn I i !
l
{
4 ie vrein rianr eiser i I !
I I r.
cAsLE !s TaAYS IS SELoni SIDE 2 AILS 8 i i I
i l
I I
i I
I I i i
l i i i l
l i l l
t i l l
l ll l
1 l
rannans (air,s., sPtc.. ETc.)
i
\\
.i w
M4 aC2 4
]'
8ggfg 15BeneftafG LM. C,OSED
[
8 8
4C mWECf34 g
'1 1
4 M
1 Atum sank 1 n-
.... ~
--,---L",?--
r S
c !$ ?N *
=A~*m**r~'*~"*A~"
- ~+r
,-.4
2.
EI M*TMUCT!CN REVISICN PAGE NunesER CATE Texas uT!L.' TIES GENERATING CC.
CPSE3 I
JM 9 E64, 8 ofl0 QI-0P-11.3-40 l 14 f
4 ATTACtf9ENT 2 l
.Casasecast 8086 ST&nas M*M
$7a C38 e
INSTCTION N 6* r.
r --- 'un n = - - c pcn vr?frietre w ns t g Ew. m ctu.= = = = =
,i.- ammw n
7 m,
pMT C,. iTiec*
sama, a r.as y.as.sur a auv.a :
p - -_ a a.as
- - -.es sman m
esOf-M.tt.1 40. eev.
CP M C7'W gid== C783 Wig Ch C P7,;ge.,,,,
l
-e C supunnes casums,au.muusans rrens sarupearser as.mapegan
- ara C sugBWTIWP 6 trS W W ISJHP f
se I
-erme se. >l ampaction ATTmeurss dmars ammarums 4
., a st i
i ei l
1.
lver4 N raui a I I I I
14.
race of 4^- --
6 I e i
i le einta.. _- _- e.,., 4 w aw e_
l' l 3 I
I It.
C m enet aattet gater4 aft O
f 99t ! _. 7 *IS4 M %M EN if dM T 17 ran t imanne as e 841 *e, 4 =t en t i ed 8,, vene seen4aes
! I I I
I n.
__ -- _,,_ r -- w * *4see have %.en. _ _ _;
I I i i
I le e
I*
- 3nduc*se insulatten 8=ge of 4--
l i I I
I IW Tem 4aal ti.mns at *sewination saf sts eient i tsare i 3 8 I
i 8 I I I
l 4.
flecT* cal eeu4ement has
- Jean weesneed le-u cument inte-at smearat<an as see 1.2. af.M-11.14c l I i i
l e
i I
I I
I f
l I I l 4
i
(
I l l !
I l
~.
i I ei i
i i ! I i
l j -
I i ! l l
l l
4 1 ! e l
}
t I i i l
4 6 6 e a
e i
l l l t l
l I I t
t i
l l }
l l
anname mares, m.a 5
(k h*M 4
en.
D
=
I e
- * " ~
~~ ~
l
'a-~
j
,,..s_'_
4 A,1
ISSUE PRCCEDURE REVISICN PAGE NUMSER CATE TEXAS UTIUTIES GENERATING CC.
C" iJAN g m.$
9 of 10 0I-0P-11.3-40 14 i
ATTAC. 4ENT 3 9
i m
as l
l l
l I
w
. s I
s_ 5 a
i
=
.im M*
d s
=
d 5
w 2
2 E
=
i l
l l
l E
4 z
1E i
1 5
I i
.-=a=-
e e-
.4
(
L a
.r L.
-~
I hI$.;*
ins Jm.
CN MASCM
[
PAGE
. _ am..ma e=.
CN3 I4
! JAN 9 E8-.
~
01-0P-11.3-40 10 er 10 a
ATTACfE!!T"4
'intarmaT' thoat stf ons
- f. GEZ-GE2 Al N AIX
- 4) 'd!"MI3 !#MC'fC. stag g J MATERIAL, I-I
=
g I.
G E r-48RRIER (DIR E f SAERTER T.4 RATED 37 t/4* AZ2 spent 3 ApMONE 3EML CISA.AT35 FATIRIJ4
,o
~
n,
,4 t,,:
a
.-41-. y L N r naam+wn (g:33,g sagg;gg}
>a
~*
k V
3
%s
!* MDIDtst AIX Dact 3 scout, i
NT3R MTERIA 3 3E 1:3.
'I C&K. llPP2 tert. E7.*.. 5r :::::s
-"i 8 e :lppasrr :::r
- a. aar.w::st.::::cucurr a-I W,l _
r
- t..'ca.L:: cucurr.g ::.:.::. czen-(including Sarsicasir flex conduit) c!ntRr:7.v? ?:txa l
4 fuocl: cA m,
s l
L
.