Forwards Transcript of 841108 Feedback Interview W/Witness SRT-A-5 Re Comanche Peak Technical Review Team Investigation Into Concerns Raised by Witness During Special Review Team 840403-13 Insp.W/O Encl
ML20136B115
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/11/1985
From: Vietti A
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
To: Noonan V
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
Shared Package
ML20136A539 List: ... further results
References
FOIA-85-59 NUDOCS 8601020433
Download: ML20136B115 (2)


Text

{{#Wiki_filter:' [ g M /AFCd . g .J

  • E(

... *[o,, UNITED STATES g {c NUCLEAR REGULATORY COMMISSION ./ 3 j WASHINGTON. D. C. 20555 \\...../ FEB 111985 Docket No.: 50-455 and 50-446 MEMORANDUM FOR: Vincent S. Noonan, Project Director Comanche Peak Division of Licensing FROM: Annette Vietti, Project Manager Comanche Peak Technical Review Team (TRT) Division of Licensing

SUBJECT:

FEEDBACK INTERVIEW OF WITNESS SRT-A-5 On Thursday, November 8, 1984, Witness SRT-A-5 was interviewed in person by A. Vietti, J. Zudans, and J. Calvo of the Comanche Peak Technical Review Team (TRT) staff. This interview held Granbury, Texas, was to provide feedbcck from the TRT's investigation into the concerns raised by this witness during the Special Review Team inspection of April 3-13, 1984. This report was issued July 13, 1984. This feedback interview was transcribed and a copy of the transcript is attached. In addition, the TRT reviewed a deposition that was taken of the individual during discovery for the ASLB intimidation hearings and considered technical concerns raised in the deposition. During this interview J. Calvo presented th.e results of the TRT investigation into electrical and instrumentation concerns AQE-46, AQE-47, AQE-48, AQE-52 and AE-53. A. Vietti presented the results of the TRT investigation into a QA/QC concern AQE-41. The witness was satisfied with the results of the TRT's investigation into the concerns and provided us with no further information. During the interview the witness stated he did not desire confidentiality. The witness was informed that it was routine that the staff would limit the use of his name to a "need to know". basis. l uwm Annette Vietti, Project Manager Comanche Peak Technical Review Team Division of Licensing cc. See next page f rn a m f f h j"[0 0 8601020433 B51113 h PDR FOIA .V [ CARDEBS-59 PDR

- i Vincent S. Noonan 2 cc: D. Eisenhut B. Hayes S. Treby J. Youngblood J. Calvo J. Zudanz A. Vietti Docket File 50-445/446 4 se. =}}