Text

-

N.

5 w

w_

.h NCTIE: C04PIEIE REWRITE, m OWEE BARS.

ISSUE f

SROWN & RCOT, INC.

C?SE3 MtMBER REVISION CATE PAGE 1 f 2 I

CP-QAP-12.1 4

EB 021983 wN /MAM

/[7,./f'3 TITLE:

CRIGIMATOR:

/DATE INSPECTION CRITERIA m [J IUb AND DOCUMENTATION REVIE*iED SY:

(

CATE REQUIREMENTS ?RIOR TO SYSTEM N-5 CERTIFICATI0t

/ 57 7-8.5 APPROVED PY:

sita QA~ Manager CATE 1.0 REFTRENCES

\\

1-A QI-QAP-2.1-5, " Training and Certification of Mechanical s

'N Inspection Personnel" '

1-B QI-QAP-11.1-28, " Fabrication

Installation Inspection of ASME Component Supports, Class 1, 2, and 3" 1-C CP-QAP-16.1, " Control of Nonconfonning Items" r^

1-D CP-QAP-12.3, " Testing Phase Quality Assurance Functions

(

Prior to ASME Code Certificatiog and Stamping" 1-E CP-QAP-12.2, " Inspection Procedure and Acceptance Criteria for ASME Pressure Testing" 1-F QI-QAP-11.1-26, "ASME Pipe Fabrication and Installation Inspections" l

2'0 GENERAL E0R N 0RMA"LON 00.Y 2.1 PURPOSE The purpose of this p'rocedure.is to establish requirements j

)

for:

h,e/

a.

System / subsystem walkdown! by Quality Control (QC)

Systems Group prior to release / pressure test.

System /sdbsystem walkdown prior to release for b.

penetration sealing.

2.2 SCOPE The scope oh lthis proc

C

- u)

I 8601020254 851113

-P PDR DE 59 I

,\\

1

}'..;-

n p

Y BROWN & ROOT, INC.

ISSUE c

CPSES NUMBER REVISION DATE PAGE O

JoS '5-t2S5 CP-QAP-12.1 4

FEB 021983 2 of 12 2.3 RESPONSIBILITY The QC Group Supervisor shall be responsible for the overall implementation of this procedure.

All inspection personnel performing inspections required by l

this procedure shall be trained, qualified and certified in i'

accordance with Reference 1-A.

The Quality Engineering (QE) Completions / Start-up Group Supervisor shall be responsible for supplying Quality Control with all the documentation required to perform piping system status walkdowns and component support design verifications.

3.0 PROCEDURE 3.1 PRERELEASE WALXDOWN p

The QC Systems Leads shall be responsible for performing a sJ status walkdown of piping systems.

1 I

Walkdown statusing of piping systems / subsystems shall be perfonned using the "QC Prerelease Checklist" (Attachment l

1), BRP drawings, vendor supplied subassembly drawings, BRH/GHH and SRHL's, if available, at the time of release.

l and all CMC'sl that have not been incorporated into the latest drawings.

If all drawinos are not available at time T l

of walkdown, that portion of the system which is affected by the missingi drawings will be statused when the drawings are received, i L

I i

The following :information shall be recorded on the system l

BRP drawing during prerelease walkdown:

i a.

Manufacturers identification / serial number of all ASME I

stamped items (i.e. piping subassemblies, valves, pumps and vessels), within the boundries of the BRP.

I b.

Material identification (i.e., Heat numbers, heat code, material specification) for material supplied by B&R, l

if available.

c.

General h nger locations and hanger number for. permanent hangers arid attachments.to piping.

I O

I i

l e

1

3 se R-4 -Q'_._. : ~.' _ _ _... !3..

h lt Nibh' BROWN & ROOT, INC.

ISSUE

~f,p' CPSES NUMSER REVISION DATE PAGE 3 f 2 JOB 35-1195 CP-QAP-12.1 4

FEB 021983 6

3.2 RELEASE FOR PENETRATION SEALING The Area Management Penetrations Seals Supervisor shall notify QC Systems Superintendent of piping penetrations they want released for sealing.

The QC Systems Lead shall verify the penetration meets the following acceptance requirements:

a.

All welds inside penetrations are completed, pressure tested and acceptable.

b.

No base material defects.

c.

Free of foreign material, d.

Hangers and permanent attachments required are installed and comply with design specifications, e.

Pipe clearance and gradient.

g The Completions / Start-up QC Group will notify Area Management of penetrations acceptable for sealing.

Prior to releasing a penetration for sealing, the Penetration Seal Release Form (Attachment 2) shall be completed and submitted to the ANI for his concurrence.

Completed Penetration Seal Release Forms shall be forwarded to Quality Engineering Systems (QES) for filing in the applicable line file (s).

3.3 COMPONENT SUPPORT DESIGN VERIFICATION The QC Systems Leads shall be. responsible for performing an inspection of all ASME Component Supports to verify they are in compliance with the Vendor Certified (Large Bore) or Design Reviewed (Small Bore) drawings.

Inspections of component supports shall be performed using the "QC Caponent Support Checklist" (Attachment 3).

Any welds on component supports that are not required by the Vendor Certified (VCD) or Design Reviewed Drawing shall be inspected in accordance with Reference 1-B.

The QC Inspector shall indicate on the VCD or Design Reviewed Drawing the actual weld size and its location..

i 3.4 SYSTEM / SUBSYSTEM DEFICIENCIES'

,g All items defined on the "QC Prerelease Checklist" or "QC l Caponent Support Checklist" as unsatisfactor shall be !

documented on the "QC Punchlist" (Attachment 4) y z

y l

~O

,l

. - - -. ~ -. - - -. -

-,.,------y..y.. -

~

T - --..

r iM BROWN & ROOT, INC.

ISSUE 3

CPSES NUMBER REVISION DATE pAGE OB 35-1195 CP-QAp-12.1 4

FEB 021983 4 of 12 i

Base material defects and arc strikes shall be identified and resolved per Reference 1-C,*

in addition to being recorded on the "QC Punchlist".

When the prerelease walkdown is completed, the QC Systems clerks shall return all walkdown documentation and a copy of the QC Punchlist to the QE Completions / Start-up Group for coordinating resolution of punchlist. Items (Reference 1-0).

The QE Completions / Start-up Group shall notify the responsible QC Systems Leads when the QC Punchlist items have been corrected by returning their copy of the Punchlist and supporting documentation to the QC Systems clerks. The corrected items will be reinspected to verify acceptability per "QC Prerelease Checklist" or "QC Component Support Checklist" and a copy forwarded to QE Completions / Start-up Group.

Any unsatisfactory items that require an Engineering O

evaluatioa or re ork wiii be ideatified oa hca's ia accordance with Reference 1-C.

A system or portion of a system shall not be considered completed until Quality Assurance has verified through_ the above mentioned QC walkdown and QE Systems documentation review that all permanent piping, valves, pumps and hangers are comp 1'te and intact and have been installed in accordance e

with current installation documentation (i.e., BRP drawings, BRHL's,BRH's,GHH's, CMC's,etc.). Also the pressure! test shall have been completed and accepted by the ANI and the Owner in accordance with Reference 1-E.

l i

i 9

8 e

O

'? t:

e O.'

~

'l _

-- - -(

w-v i-BROWN & ROOT, INC.

ISSUE

,I4.;[1{.

CPSES NUMBER REVISION DATE PAGE

(]~

JOB 35-1195 CP-QAP-12.1 4

5 r 12 FEB 021983 ATTACHMENT 1 QC PRERELEASE CHECKLIST System Numoer Hydro NumDer ITEMS INSPECTION CRITERIA QCI/DATE SAT /UNSAT 1.

All items within the ten boundary are canplete and readily accessible.

2.

All welds, joints and base metal repairs which require welding and areas of high stress are accessible n

and clear of insulation and properly documented on the applicable : drawings v

to be used during test walkdown and included in the Pressure Test Package (applies pr,ior to pressure test only).

3.

Adequate lighting is available.

I 4.

The size of all pipe socket welds shall be checked to the requirements of Reference 1-F.

l S.

Thetenperatureandpressurel indicated on the Code Data Plate for valves and equipment-is in compliance with the piping design requirements indicated on BRP drawings.

6.

Valve loca$ ion and orientation is in accordance :with the design documents.

7.

Valves are ' properly identified.

I Itemssho'fnovisiblesignofdamage.

8.

w Bolting material shall be verlified by 9.

n heat number, color code or documentation U

traceable: 1!o material.

\\

-C

b ' ~"

-..Q _

l 1

BROWN & ROOT, INC.

ISSUE CPSES NUMBER REVISION DATE PAGE O

a0s 3s-119s CP-QAP-12.1 4

FEB 021983 6 of 12 l

ATTACINENT 1 (con't)

ITEMS INSPECTION CRITERIA OCI/DATE SAT /UNSAT

10. All items in the pressure test boundary are free from arc strikes and base metal defects, if identified, they shall be handled in accordance with Reference 1-C.

NOTE:

Piping shall be installed within the following tolerances of items 11 thru 17.

11. Gradient (Unit 1 and common only):

3/16" per foot maximum (this applies to horizontal lines deviating from level only).

Deviations from plumbness of vertical lines and horizontal departure from design will be controlled by the two-inch tolerance on O

iocation.

12. Gradient (Unit 2):

1/16" horizontal)per foot maximum (vertical and

13. Slope - Minimum slope shall be *as desig-nated on the drawings.
14. Location - The following tolerances are L

pemitted:

a)

Unit 1 and Comon buildings - t 2 inches.

b)

Unit 2 Reactor Containment, Safeguard, Turbine buildings and Unit 2 yard piping - t 1/2".

15. Clearance - A minimum of two inches of clearance shall be maintained, including pipe insulation.with respect to other piping when one or both lines have an operating temperature of 200'F or greater.

All other lines may be installed with a minimum of one-inch clearance, with respect to other piping.

.O i

.?

y l

.x

+

)

,q

%/

BROWN & ROOT, INC.

f ISStJE CPSES NUMBER REVISION DATE PAGE O

a08 as-tiss 7 f 2 cp.q,p.12.t 4

res 021983 I

ATTAC}f4ENT 1 (con't.)

-ITEMS

~ INSPECTION CRITERIA OCI/DATE SAT /UNSAT

16. For clearance of pipe (with an operating temperature of 200*F or greater) from hangers, walls, ceiling, hand rails, etc.,

other than pipe to pipe, a minimum of one inch shall be maintained, including pipe insulation. All other lines may be installed with a clecrance only for insulation; however, on a case by case basis it might be necessary to notch insulation to establish clearance which will require engineering approval.

17. When installed in bicckouts, sleeves shall be installed so that, for lines with

-O operating' temperatures at or above 200*F.

their centerlines are within 1/4 inch of piping centerlines. For lines with operating temperatures of less than 200*F, the sleeve inside diameter must be no less than 1/2 inch from pipe outside diameter.

18. All bolts installed in flanged connections.
19. For liquid service, stops are removed fra support spring cans.
20. For steam, gas or air service the stops are installed in support spring cans.
21. Pipe is supported in compliance with the' below tables for straight runs of water filled or heavier wall pipe.

Nominal Pipe Size (in.)

1 1h 2

2h 3

3h 4

5 6

8 10 12 Water Service Span 7

9 10 11 12 13 14 ~16 17 19 22 23 O-Steam, Gas, i

or Air Service Span-9 11 13.

14 15 16 17 19 21 24 27 30 g l

.;.n.

+

i BROWN & ROOT, INC. f ISSUE 3

CPSES NUMBER REVISION DATE PAGE O

aos 35-1t95 FEB 021983 8 of 12 CP-QAP-12.1 4

l ATTAC}f4ENT 1 (con't.)

1 ITEMS INSPECTION CRITERIA QCI/0 ATE SAT /UNSAT Nominal Pipe Size (in.)

14 16 18 20 24 26 28 30 32 34 Water Service Span 25 27 28 30 32 33 33 34 34 35 Steam, Gas, or Air Service Span 33 35 37 39 42 44 44 46 46 48 O

Nominal Pipe Size (in.)

36 42 Water Service Span 35 36

{

Steam, Gas, or Air Service Span 48 50 l

l

22. When piping makes a change in direction, j

the total length of piping between j

existing pipe supports should not exceed-three-fourths the recommended straight run spans.

23. All supports should'be properly adjusted so as to provide full bearing surface or support full load, t
24. For in-line concentrated loads or equipment.

tie-ins, a support (permanent or temporary); '

should be located as close as possible.

25. Temporary supports shall be ",hard supports"

- V,n.

which are rigidly attached to the pipe.

such as. structured support secured to the pipe with all-thread rod, a. pipe clamp

~.

suspended by rod. clamped-bushing, etc.

9 L

S m

,'.:7

  • I,'

~~

4

n-

... Q 0

BROWN & ROOT, INC.

ISSUE CPSES NUMBER REVISION DATE PAGE O

aos35-119s CP-QAP-12.1 4

FEB 021983

~ 9 of 12 1

ATTAClEENT 1 (con't).

ITEMS INSPECTION CRITERIA OCI/0 ATE SAT /UNSAT,

26. Any temporary supports should have adequate bearing surfaces so as not to impose any localized pipe stresses.

s

27. ASME Code Name Plates are attached to "N" stamped items.

O i

l i

l f

t 8

i All checklist items have been satisfied Q.

QCI DATE i

1 e

e

.m m

t

~.

y m

.no tw d.

a BROWN & ROOT, INC.

ISS'JE CPSES NUMBER REVISION DATE PAGE O

a0B 2s-119s 10 f 12

P-QAP-12.1 4
EB 021983 I

i ATTACHMENT 2 s

RELEASE FOR HIGH OENSITY PENETRATION SEALS PENETRATION SEAL BELEASE FORM Report i Date Room #

BLDG. #

Sched. Sealing Bisco Dwg.

Applicable BRP d's Released for sealing by:

QC

-.Q i

ANI l

Exceptions - Holds i I

I I

8 g

I i

9 t

l.

l 8 b a:

N

,. J *.9 ee:: -

g E'.T 3 l 1'

6

!n... 0;,

^...

BROWN & ROOT, INC.

ISSUE E

CPSES NUM8ER REVISION DATE PAGE O

a08 as-119s CP-QAP-12.1 4

FEB 021983 11 of 12 i

ATTAChNENT 3 QUALITY CONTROL COMPONENT SUPPORT CHECXLIST HANGER NUMBER ITEMS INSPECTION CRITERIA OCI/DATE SAT /UNSAT 1.

Suppert configuration emplies with vendor (Large Bore) or Design certified drawing (Small Bore).

Reviewed Drawing 2.

All parts are installed (i.e., t,olts, nuts, "U" clamps,etc.)

'3.

Skewed weld sizes are in empliance with Reference 1-B of CP-QAP-12.1.

O 4.

All changes identified by Engineering j

on the Vendor Certified Drawing or Design Reviewed Drawing have been reinspected and emply with the above design documentation.

5.

Support empleted.

6.

Cements:

I All checklist items have been satisfied.

QCI DATE c.

s

~;;g l-5,$...-

m...e

~.

,s

)
c ' ; ;,,'/ *,

~.. _ _ _.

g;, ~

R

I SROWN & ROOT, INC.

[

ISSUE CgSES NUMBER REVISION DATE PAGE O

Cg.aAg-12.1 4

FEB 021983 12 of 12 JoS 35-2 SS 1

ATTACHMENT 4

4..

i i

tem a swisses, ensresens n.

0

.'y

~

1u4 3-e il M

i Ir y

1 9

i 4

.