NOTE TO:
V. Noonan, Director, CP, TRT THRU:
J. Calvo, E&I, TRT dd FROM:
E. Marinos, E&l, TR
SUBJECT:
SOME SIGNIFICANT FINDINGS REGARDING E&l INSTALLATIONS AT CP Per your request, communveteo by R. C. Tang, enclosed is a sunnary of some of the more significant findings we have made as a result of our review of various allegations.
The sumaries in the enclosure are listed according to the preliminary significance we have placed on each finding, and with the first item representing the most significant finding.
0 Evange os Marinos E&I TRT cc:
R. C. Tang 4
e v4 J_
~ ;V V i
g D601020376 851113 J
PDR FOIA PDR GARDE 85-59 1 3B3
~ ~ ~
~ '
l c
.A llB 5%
I e
ENCLOSURE E&I, TRT SIGNIFICANT FINDINGS 1.
The QC inspector training appears to lack progrannatic controls and may have resulted in inadequate qualification training for some electrical QC inspectors. (E&I Category 6.)
2.
The adequacy of seismic supports for suspending ceiling and lighting in the control room could not be determined.
(E&I Category 4.)
3.
Cable Butt splices in cable trays and panels may not meet acceptable installation criteria.
(E&I Category 1.)
4.
Cable and conduit separation not maintained in accordance with established separation criteria.
(E&I Category 3.)