Text
,
.,an l" " **
VM V l
- TEXA3 UT1UTIES GENERATING CO. ;lNSTRUCTION i.AEVISION j
ISSUE l
PAGE NUMBER CATE j
lQI-QP-11.14-12j 1
l 1 of 4 l
l l
l ii,1AY 0 G 1983 i
~
! PREPARED BY://Nd,,b
' 4 ex, i '- '?
VERIFICATION OF SEISMIC ELECTRICAL EQUIPMENT
. APPROVED BY: %'d i u a f
3-MOUNTING DETATILS l
09 e i
I APPROVED BY:
{f DATE I
FOR IU0RVIAT0X ON_Y l
1.0 REFERENCES
l 1-A CP-QP-18.0, " Inspection Reports" ~
i 4
1-B QI-QP-11.2-3, " Torquing of Cor.: rete Anchor Bolts" l
l 1-C QI-QP-11.21-1, " Weld Inspectic 1" j
1-0 CP-QP-16.0, "Nonconformnces" l
i' EC HISTORICAL FILE !
l The purpose of this instruction is to delineate for the QC Inspector t-attributes which shall be used in the reverification (
mounting details of previously accepted seismic electrica, equipment.
2.2 SCOPE This instruction is applicable to all Seismic Category I and II Electrical and HVAC Equipment.
3.0 INSTRUCTION 5
3.1 REVERIFICATION The QC Inspect shall reverify Site fabricated equipment supports to ens e confonnance to the design document. The following crite:.a shall be used for acceptance, j
3.1.1 Anchor Bolt Inspection
(
The QC Inspector shall verify that all Hilti Expansion Anchor Bolts meet spacing and embeunent requirements of Reference 1-B and that all accessible torqued bolts have been sealed with Inspector's lacquer.
Bol ts requiring torquing shall be documented for Reference 1-B.
TUGCC oA -
0601020490 851113 PDR FOIA PDR GARDEB S-59
(
L l
INSTRUCTION REVISION ISSUE l
TEXAS UTIUTIES GENERATING CO.
pggg
\\
CNG QI-QP-11.14-12 1
MAY 0 6 1983 2 of 4 j
3.1.2 Weld Inspection a
The QC Inspector shall verify that all Site fabricated weldsents indicated on the design document meet requirements for size, profile, length, number, and configuration per Paragraphs 3.3.1.1 and 3.3.1.3 of Reference 1-C.
NOTE:
Snen the QC Inspector deems the coating renders accurate weld inspection indeterminate, paint removal shall be required.
This applies to reverification purpose only.
IRN's need not be issued for paint removal.
l 3.1.3 Equipment M unting Details Inspection The QC Inspector shall verify that all Site fabricated mounting details confom to the design document for size of material,
dimensional tolerances, orientation, and
-(.
configuration. Additionally, the QC Inspector shall verify that hardware (washers, shims, brackets, A325 nuts, etc.)
delineated on the design documents are installed and acceptable.
3.1. 4 Inaccessible Items i
It is the responsibility of the QC Inspector to ensure the installed condition conforms to the design drawing.
Items inaccessible for reverification per this instruction shall be documented per Paragraph 4>0 for future resolu tion.
4.0 00CIMENTATION 4.1 SITE FABRICATED ITEMS t
I i
All inspection of site fabricated items shall be documented,
{
3 as applicable, in accordance with Reference 1-A and
.i Attachment 1.
All unsatisfactory conditions shall be documented on an IR.
When necessary, unsatisfactory conditions may be described in detail on an attached sheet I
i to the unsatisfactory IR as per Attachment 2.
Inspection l
Reports shall be completed and. transmitted to the CPSES Permanent Plant Records Vault in accordance with Reference 1-A.
4.2 SUB-CONTRACTOR / VENDOR ITEMS 1
(
All unsatisfactory inspections of sub-contracter and/or vendor installations shall be documented on a Nonconfomance t
Report per Reference 1-D.
t I
r i
perm see, t
t INSTRUCTION ISSUE REVISION f
NUM8ER CATE PAGE TEXAS UTluTIES GENERATING CO.
CPSES QI-QP-11.14-12 1
EOOE 3 of 4 l
l ATTACHMENT 1
- 3asaseCME POW STEAas L. E TAsc S TATiCas g
g mem-se INSPECTION REPORT at i
- Tus - - i=== ELEGIRIGAL gamerm a
.m sas/ puussi amm EfD!tpasFM7 pe9tintiinf: MFT A f f M If 9
e i
artr,.ma gam.
gasF. M. act. e agv. a cpassag me.
am Laaunt a its ta.or.og.5r. ya, E5-100 si e10!-0P 11.14-12. Rev.
4 e
CP M CM"" OMn"on O Npac os UTMrion a
as r.
O mesen===was. au. =ucams n== narwastow 0 = w um. -._ c.=.m= ueras eaa.
.o tres am
,,e c, W.itas ATTR8WTES garg a
a e a
1.
HILTI EXPANSION ANCHOR BOLT (PfR PARA. 3.1.11
{
All snacine accentable I
a h.
H11tf riL..i r
' e.
Tercue verification 2.
WT O fNtPEETffW (PFW PARA 1 1 21 j
a Wold tire. nrefits and teneth h.
Dh of welds and confieuration 1
Fnilipnerut periorarTf tst: nrTg ft fpre para 1i 11
)
E Mfte nf nestesfal and effmeneinn h.
Mnnatine orientatinn and ennfieuratinn e.
Ha rdina re. wa t hert. eftes11an n : earts installed I
t 1
I l
l I
li I
f I l I
i l l l
I i 6
l 1 I i
i
- -- (8mus. specs CMJ.
s t
[
?
i s'=naw
.n. ct.asco O
e e
oc. m crea I
plume sem t l
?
k
-.~
l I
[
.n.
(
i' INSTRUCTION ISSUE REVISION PAGE i
NUMSER DAM TEXAS UTIUTIES GENERATING CO.
CPSES i
ll-QP-11.14.12 1
MAY 0 61983 4 of 4 ATTACHMENT 2
=cadancas Peas STEAM aticTasc sTanose I
I
- mer, w
INTECTION JtEPORT at ATM hT=,,
EIMpNTien JEL AT5 TEM / 3T1BWETum L mTEst PNmf f f RAf*WAV TffpM97 4
ar%JedL 8Ev.
sanF. 4LE GOC. 4 mEV. & GmanE NO, h EA3Wut M IL3T E p.0 CIT. 8 E5-100
,lQI.QP.11.14-12.Rev.
OP %rs C M M '*' C Ta$ din"om O N.aspecm.
OTMr==
ee asen stan.ra C meegTISB CDs%4TES, aLI. aMLJCam.E ITang SafWACTest, On-eevi une.
r, = usviseaa.
.a ersis sal 8
aftSPECTOs ATTRIGUTES
=
gatt 1
m.
fDFMTTFfEATION OF INftATISFACTORY ffWnfTfdes(t).
1 u
l l
i l
l l
8 l
l l
l' I
maanas meus, specs, ETcJ t ** M
!siem4 w a -t.R. ct,cau O
?
e oc srterca puun sem6 M
- - - - - - - - -