ML20136B227

From kanterella
Jump to navigation Jump to search
Designates Qa/Qc Reviewers Assigned to Each Comanche Peak Technical Review Team,Per 850315 Request.Individuals Will Be Responsible for QA Aspects of All Ssers & Future Allegations Addressed by Each Comanche Peak Technical Review Team Group
ML20136B227
Person / Time
Site: Comanche Peak  
Issue date: 03/20/1985
From: Livermore H
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
To: Noonan V
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
Shared Package
ML20136A539 List: ... further results
References
FOIA-85-59 NUDOCS 8601020481
Download: ML20136B227 (2)


Text

  • Fr

[. #e<> %

, [3. n tn.,9(8, UNITED STATES

-['g,,

i N'!C:.EA?, RIGULATORY CO?.*M;SSION l

wasm37CN, D. C. :C555

%,,.. /

mar _. 2 01985

    • =**

MEMORANDUM FOR:

V. Noonan, Director Comanche Peak Project FROM:

H. H. Livermore QA/QC Group Leader

SUBJECT:

DESIGNATED QA/QC REVIEWERS Your letter of March 15, 1985 recuestad designated QA/QC reviewers be assigned to each TRT group.

In response, the following members of the QA/QC group are assigned:

i Electrical

- Tom Curry Piping / Mechanical

- Itudy Bonnenburg

- Jim Malonson.

Civil / Structural

- Mark Eli Test Miscellaneous

- Vern Watson

- Vic Wenczel

  • In addition, all QC qualification issues will be addressed by Mr. Vern Watson.

The ' assigned individuals will become familiar with the SSERs of each assigned TRT group as soon as possible. They will be responsible for the Quality Assurance aspects of all SSERs and future allegations addressed by each and every TRT group. The original TRT group reviewers, (Piping / Mechanical, Electrical, etc.) will remain responsible for follow-up plans and related ASLB proceedings. The designated QA/QC individuals will remain responsible for all original QA/QC SSERs and related proccedings.

I request that the individual members of Piping / Mechanical, Electrical.

Test, Civil / Structural, Misc., and Coatings groups extend aid in the form of a crash familiarity work session in order that the subject designees

~

become familiar with the SSERs as soon as possible.

I also request that the designees accompany the TRT group members to all work sessions, site interviews and inspections, and alleger interviews in order that they will be able to extract and address all quality assurance problems in a real-time frame.

3 pg P 3 va,

~

8601020481 BD1113 PDR FOIA 1

GARDE 8 5-59 PDR

.[

~,- es o e

MAR 2 01985 2-In order to assure that the subject designees will be available (from a contract standpoint) to carry out their functions, I contacted Mr. Chet Poslusny as directed. Since the designees are now assigned as members of the other TRT groups and thereby dependent on their continuing services, it is necessary that the Group Leaders include the desigr.:.es in their contractural requirements at this time.

I have taken the liberty to instruct Mr. Poslusny that the designees' services will be required through July 1985. This, of course, should be reassessed by the respective group leaders.

As you are aware, with the assignment of the designees to other TRT groups, the TRT QA/QC group no longer exists.

Mr. C. Hale and I remain, but with no clear cut lines of authority or responsibility once the QA/QC SSERs are signed.

I expect you will advise us, with specificity, of our future function in the TRT.

i 1

Y FA4K012 H. H. Livermore QA/QC Group Leader cc:

D. Wessman A. Vietti J. Calvo.

R. Keinig C. McCracken C. Poslusny L. Shao R. Bangart (Region IV)

R. Tang J. Scinto, OELD i

a 4

l 1

i

-