$ $/J/ W
. s "' '
u*.1TED STATES I
REGULATORY CCMMISS ON
\\.j,9
- i. AF.HINGTON. O C. 20555
)
, >= ;.g "j i
....~
MAR 15 %
MEMORANDU.'! FOR:
T. R. Workinger, TRT FROM:
J. C. Jen:. Civil / Structural Subgroup 2.w.:ne Peak TRT
SUBJECT:
SUPPLEMENT NO. 8 REFERENCES TO QA/QC SSER 4
REFERENCE:
March 8,1985 Memo from T. R. Workinger to H. Livermore, QA/QC Group Leader The Civil / Structural Staff has reviewed the list of issues requiring further QA/QC review as identified by you from the Civi.1/ Structural SSERs in Supplement No. 8 (Attachment 1 to the reference). We believe that this list should be expanded to include the five additional issues provided in the enclosure to this memoranaum.
If you have any questions, please contact T. Langowski at 443-7956 or D. Jeng at 443-7974.
2t c l
- 0. C. Jeng, Ci-ructural j
Subgroup, TRT
Enclosure:
As stated cc: w/ encl.
V. Noonan J. Calvo L. Shao R. C. Tang R. Keimig i
H. Live o I
D. Hunter R. Philleo
{
C. Hofmeyer J. Devers T. Langowski l
7" N,3 j1 o g K O 0
ivb. gyva
~
8601020479 B51113 PDR FogA l
l j
l OARDEBS-39 pop
4,..
g Y.AR 1513c5 i
ENCLOSURE ppK-291/Theresultsoftheevaluationpertainingtolackoflaboratory
. signatures on batch tickets will be further assessed as part of the overall programmatic review concerning procedures under QA/QC Category 6 "QC Inspection."
ppK-42f/Theresultsoftheevaluationpertainingtoinadequateconsoli-dation of concrete will be further assessed as part of the over-all programmatic review concerning procedures under QA/QC Category 6 "QC Inspection."
ppK-64f/TheresultsoftheseevaluationspertainingtoQCinspection procedures (falsification) will be further assessed as a part of the overall programmatic review concerning procedures addressed under QA/QC Category 3 " Records".
pp K-84 This (control room ceiling design) would indicate failure of the quality assurance program to ensure that applicable provisions of Regulatory Guide 1.29 were fully met.
ppK-961/TheresultsofthisevaluationpertainingtoQCcontrolsatthe batch plant will be further assessed as part of the overall i
programmatic review concernirc :recedures adcressed under QA/QC Category 6 "QC Inspection."
f/CommitsNRCtoprepareasupplementtothisSSER; based,inpart,upon the findings of the QA/QC Group.