ML20136B204

From kanterella
Jump to navigation Jump to search
Requests Designation of One Qa/Qc Reviewer to Coordinate & Integrate Technical Concerns & Issues of Comanche Peak Technical Review Team Groups W/Qa/Qc Programmatic Issues
ML20136B204
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/15/1985
From: Noonan V
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
To: Livermore H
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
Shared Package
ML20136A539 List: ... further results
References
FOIA-85-59 NUDOCS 8601020473
Download: ML20136B204 (1)


Text

/#e,, %

$, N8blW UNITED STATES

~

^

~

Q, f,j NUCLEAR REGULATORY COM?.11S3 Cf1

=-

E WASHINGTON, D. C. 20555

\\; -...../

MAR 15 G85 MEMORANDUM FOR:

Herbert Livennore QA/QC Group Leader FROM:

Vincent S. Neonan, Director Comanche Peak Project

Subject:

DESIGNATED QA/QC COORDINATORS From your comments at the March 7,1985, meeting with TUEC on Mechanical and -

Miscellaneous issues, it is inferred that TUEC's QA/QC programmatic problems, in part, may have impacted upon the results of the various technical concerns and issues addressed in the SSERs prepared by the other TRT Groups.

Therefore, to ensure that the overall TRT review is properly integrated, it is requested that you designate _one QA/0C reviewer from your QA/QC Group to coordinate and i.9tegrate the technical concerns and issues of each of the other TRT Groups with QA/QC programmatic issues; except that two QA/QC reviewers probably should be assigned to Mechanical and Piping issues.

What I have in minc is that, to assist you with providing ongoing coordination relevant to integrtting the overall QA/QC programmatic issues re'garding Comanche Peak, the designated individuals from your QA/QC Group, with an appropriate background in the technical area to which they will be assigned, will by mid-April become thoroughly familiar with the technical concerns and issues of the other TRT Group. These designated QA/QC reviewers for each TRT Group will then continue to provide an ongoing integrating liaison function regarding follow-up action plans and related ASLB proceedings.

Accordingly, to igsure that the. designated contractor personnel will continue to be available to carry out this function, you are directed to make any necessary arrangements for their continuing services through Chet Poslusny.

O Wf, V Vincent S. Noonan, irector Comanche Peak Project cc: