Responds to NRC Re Violations Noted in Insp on 780410-14.Corrective Actions:Procedure Change Notice 7 to Work Plans Procedure 3, Field Control of Design Documents, Issued on 780628
ML20134B543
Person / Time
Site: 05000000, Palo Verde
Issue date: 07/21/1978
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17198A269 List: ... further results
References
FOIA-84-293 ANPP-11407-JAR, NUDOCS 8508150663
Download: ML20134B543 (3)


Text

!

p.o.soxaisee. pwocnix, AaizoN A eso3e July 21, 1978 ANPP-11407-JAR

&, o U. S. Nuclear Regulatory Commission ty..gjj,i,t., I.-].

(;

De Region V s'

obn

~

b.Q;$hJ.

el

'i:

Walnut Creek Plaza - Suite 202 3

1990 North California Boulevard b

g.Mi Walnut Creek, California 94596 I+'"

4 l

Attention: Mr. C. S. Spencer, Chief Reactor Construction and Engineering Support Branch Subj ect:

NRC I&E Inspection of April 10-14, 1978 File 78-044-026 Dear Sir This letter refers to the inspection conducted by Messrs. Bob Pate and Jack Carvin on April 10-14, 1978 as documented in your letter of June 14, 1978 of activities authorized by the Nuclear Regulatory Connaission (NRC) Construction Permit Nos. CPPR-141,142 and 143.

As a result of this inspection, a Notice of Violation was written identifying one infraction.

Our response to this Notice is re-corded on Attachment A.

Very trul your I_

i kW E. E. Van Brunt, Jr.

APS Vice President Construction Projects ANPP Project Director EEVBJr/ JAR ske At tachmeent cc: