ML20134A840

From kanterella
Jump to navigation Jump to search
Informs of Change of Schedule for Completion of Revised QA Manual to 741104 Based on Listed Factors,Per Request in Regulatory Operations Insp Rept 50-389/73-01
ML20134A840
Person / Time
Site: 05000000, Saint Lucie
Issue date: 07/09/1974
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17198A269 List: ... further results
References
FOIA-84-293 NUDOCS 8508150438
Download: ML20134A840 (2)


Text

- --

.K, -

u p.-.

...q..

q q

e---pa.

FLORIDA POWER & UGHT COMPANY July 9, 1974 t '

.ts

?

j i

Mr. Norman Moseley i

Director of Region II Directorate of Regulatory Operations 3'

U. S. Atomic Energy Commission 230 Peachtree Street, N. W. Suite 818 Atlanta, Georgia 30303

Dear Mr. Moseley:

Re:

St. Lucie Plant Unit No. 2 RO:II:LEF 50-389/73'-l This schedule wa's submitted in our letter dated December 14, 1973, as requested in the reference RO Inspection Report dated December 3, 1973.

The Quality Assurance Department had scheduled the com-j pletion of the revised Florida Power & Light Company Quality Assur-ance Manual for September 6, 1974.

A recent review of our manual e

I revision activity has caused us to change the rojected manual 4

completion date to November 4, 1974.

Accordin

, copies will d

be available for your review on November 11, 1 d

j We have changed the schedule based on the following factors:

An increase in the number of required procedures from the original projection.

A review and incorporation of the ". Gray',' " Orange" and " Green Book", guidelines.

A shifting of our Systems Development Group's Manpower to the complete rewrite of Chapter 17 of the SAR Documents for St.Lucie

  1. 1 and #2, as outlined in the " Green Book".

These were submitted to the AEC on July 1, 1974.

Very t uly yours.

g glf20j Robert E. Uhrig

(.

f{

Vice President f

,l?

REU:nch RET sur to

[/y /j LPDR cc:

Mr. Jack R. Newman asze

/

G(

i.... w...,..,,.

rze hojj0G50703 ggg,g LEICHTOB4-293 pop I

l

~. -- _ _

. ?..'...'i 3D g,.;.

G.j 4

,,3 s.

m.-

9

...,,.....,.1 6

3.

~.

t-

8'~

2,'..,

Letter to N. C. Moseley Prom R. E. Uhrig;4.r.

Florida g

Power & Light Company dated July 9,'197 i

2

~

';;50-389/73-1.

l

~.

4 i

t I

l I

...j

/

o,-

.I t

. I Distribution:

H'. D. Thornburg, RO Rb:BR(47 Directorate ofSensing (4)

DR Central Files ER Iocal PDR i

NSIC OIS, OR State -

t

.e 1

I e

t p

i I

.